CN103334580B - Section steel tripod in a kind of overhanging scaffold and connection system for guide rail - Google Patents

Section steel tripod in a kind of overhanging scaffold and connection system for guide rail Download PDF

Info

Publication number
CN103334580B
CN103334580B CN201310314291.7A CN201310314291A CN103334580B CN 103334580 B CN103334580 B CN 103334580B CN 201310314291 A CN201310314291 A CN 201310314291A CN 103334580 B CN103334580 B CN 103334580B
Authority
CN
China
Prior art keywords
steel
little
perpendicular support
tripod
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310314291.7A
Other languages
Chinese (zh)
Other versions
CN103334580A (en
Inventor
李雁鸣
陈辉
郭鑫
年洪喜
王红宾
李志远
杨玉苹
刘迎红
赵继刚
张维娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Original Assignee
BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd filed Critical BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Priority to CN201310314291.7A priority Critical patent/CN103334580B/en
Publication of CN103334580A publication Critical patent/CN103334580A/en
Application granted granted Critical
Publication of CN103334580B publication Critical patent/CN103334580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to the section steel tripod in a kind of overhanging scaffold, comprise crossbeam, perpendicular support and diagonal brace, crossbeam, perpendicular support and diagonal brace form triangle structure, between crossbeam and diagonal brace, be provided with little perpendicular support, little stull is provided with between perpendicular support and diagonal brace, perpendicular support leaves high-strength bolt preformed hole, anchor will erect support and structural column or wall connecting by preformed hole, realize the installation of section steel tripod, its middle cross beam, perpendicular support are 14# i iron, and little perpendicular support and little stull are 10# i iron, crossbeam arranges floor of putting more energy into, and arranges limit steel bar head under crossbeam.For Core Walls Structure position, local (as escalator position, cantilever steel girder staggered floor place) non-floor, cannot the common builder's jack girder steel of normal mounting type, section steel tripod is used to be fixed in agent structure, builder's jack is stressed to be passed on structure wall by tripod by anchor bolt, clearly stressed, power transmission is simple, and can have enough to meet the need use, achieves working security, operability, meets construction period, raises the efficiency.

Description

Section steel tripod in a kind of overhanging scaffold and connection system for guide rail
Technical field
The present invention relates to scaffold field, particularly a kind of overhanging type steel pipe scaffold system.
Background technology
Overhanging scaffold engineering is dangerous larger the work items in building operations, the design of overhanging scaffold is unreasonable or use incorrect, serious threat can be brought to the life of constructor, bring very large difficulty to engineering construction, cause ill effect to society.Especially the construction of building body corner cantilever steel girder is very crucial, and the girder steel of traditional builder's jack in body corner, building is laid radially, and this mode, due to too concentrated, is unfavorable for structural safety, there is very large potential safety hazard.
Summary of the invention
The object of the invention is: a kind of bight section steel tripod that scaffold installs is provided, solves security hidden trouble, and clearly stressed, power transmission is simple, and can have enough to meet the need use.
The technical solution used in the present invention is: provide the section steel tripod in a kind of overhanging scaffold, comprise crossbeam, perpendicular support and diagonal brace, the perpendicular support of crossbeam and diagonal brace form triangle structure, between crossbeam and diagonal brace, be provided with little perpendicular support, little stull is provided with between perpendicular support and diagonal brace, perpendicular support leaves high-strength bolt preformed hole, anchor will erect support and structural column or wall connecting by preformed hole, realize the installation of section steel tripod, its middle cross beam, perpendicular support is 14# i iron, little perpendicular support and little stull are 10# i iron, crossbeam arranges floor of putting more energy into, limit steel bar head is set under crossbeam,
In shear wall or the position of structural column non-floor and the position in structure corner, perpendicular support is perpendicular support continuously, and little perpendicular support is parallel to the direction of perpendicular support, little stull and diagonal brace perpendicular, little perpendicular support and little stull close with the link position of diagonal brace, is all positioned at the middle part of diagonal brace;
There is Cantilever Beams at structural shear wall or structural column outside or decorate eaves but the position of non-floor, perpendicular support is for being interrupted perpendicular support, be divided into diagonal brace bottom linkage section, with little stull linkage section and with crossbeam linkage section three part, wherein be positioned on crossbeam with crossbeam linkage section, three parts are erected support and are provided with high-strength bolt preformed hole, be convenient to the connection of each several part and post or body of wall, little perpendicular support is parallel to the direction of perpendicular support, little stull is perpendicular to cylinder or metope, the link position of little perpendicular support and little stull and diagonal brace is close, is all positioned at the middle part of diagonal brace;
Further, arrange local and unload wire rope, wire rope is by crossbeam limit steel bar head and post or wall connecting;
Simultaneously, the invention provides a kind of profile steel overhanging steel pipe scaffold system, it comprises the section steel tripod in above-mentioned overhanging scaffold, and comprise builder's jack support body, scaffold support body is coordinated by multiple cantilever steel girder and shaped steel tripod, synergy between each component is formed unified by Force system, support body comprises vertical rod, leger, little cross bar, wall-connecting piece and unloading wire rope, cantilever steel girder or shaped steel tripod are evenly arranged, vertical rod is set thereon, vertical rod is evenly arranged, leger is arranged on inside vertical rod, from bottom of upright rod, adjacent leger and vertical rod cruciform fastening for falsework are fixedly connected by anti-certain distance, outside removing host node, the leger of two longitudinal host nodes adds little cross bar together, arrange near vertical rod, the little cross bar of levels is arranged symmetrically with along the vertical rod left and right sides, be fixed on leger with fastener, host node place must establish a little cross bar, wall-connecting piece arranges to order anyhow, be evenly arranged, vertical with structural facades with support body, the one end be connected with support body allows declivity slightly, must not upwarp, wall-connecting piece is as far as possible near host node, and wall-connecting piece takes thick pillar form, meet post position must arrange together, cantilever steel girder or shaped steel tripod position arrange unloading wire rope,
Further, escalator Core Walls Structure position, staggered floor place adopt shaped steel tripod; Non-floor position, cantilever steel girder falls within beam, and length extends on same floor plate, and end arranges at least 2 U-shaped earth anchors in road; Staircase position, cantilever steel girder is arranged through body of wall inside structure, and when inner side is without body of wall, shaped steel end exceedes inner side coupling beam at least 200mm, U-shaped earth anchor bury with coupling beam in the middle part of;
Further, structure corner frame column position adopts shaped steel tripod, adjacent cantilever steel girder anchored end is welded into " well " font entirety with it, 14# channel-section steel is used to fall within shaped steel tripod, and weld with shaped steel tripod, support body vertical rod falls within channel-section steel, and channel-section steel crossover sites is welded into well word frame, uses Φ 17.5 wire rope to unload channel-section steel;
Wherein, the set-up mode of unloading wire rope is, per pass Cantilever Beams establishes 6 × 19(a together), Φ 17.5 steel wire rope unloading; For the position using shaped steel tripod, 6 × 19(a is together added to shaped steel tripod), Φ 17.5 unloads wire rope, between unloading wire rope and tripod, angle is 45 ° ~ 60 °, and structure rotation angle position uses 6 × 19(a) Φ 17.5 wire rope pocket vertical rod node unloads support body, and wire rope pocket is hung on support body host node, the each host node of horizontal plane arranges together, saddle clip 8 joined by every root wire rope, 6 for firm, 2 for arrange safety curved.
The invention has the beneficial effects as follows: for Core Walls Structure position, local, as escalator position, cantilever steel girder staggered floor place non-floor, cannot the common scaffold steel beam of normal mounting type, need lower-layer concrete floor to be established ground mooring wire rope fixed by shaped steel, it itself is exactly elastic body, waste material, and unfavorable to stablizing.Use section steel tripod to be fixed in agent structure, scaffold is stressed to be passed on structure wall by tripod by anchor bolt, clearly stressed, and power transmission is simple, and can have enough to meet the need use, achieves working security, operability, meets construction period, raises the efficiency.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and case study on implementation, the present invention is further described.
Fig. 1 is the present invention at shear wall or the position of structural column non-floor and the position section steel tripod schematic diagram in structure corner
Fig. 2 is that the present invention has Cantilever Beams at structural shear wall or structural column outside or decorates eaves but the position section steel tripod schematic diagram of non-floor;
Fig. 3 is that the present invention installs posterior nodal point schematic diagram;
Fig. 4 is schematic diagram after the present invention and post are installed;
Fig. 5 is that the present invention installs rear schematic diagram with there being the wall of encorbelmenting;
Fig. 6 is that steel wire safety buckle of the present invention strengthens design diagram
Description of reference numerals: 1, crossbeam; 2, perpendicular support; 3, diagonal brace; 4, little perpendicular support; 5, little stull; 6, high-strength bolt preformed hole; 7, to put more energy into floor; 8, limit steel bar head.
Detailed description of the invention
Shown in Fig. 1-2: the section steel tripod in a kind of overhanging scaffold, comprise crossbeam 1, perpendicular support 2 and diagonal brace 3, crossbeam, perpendicular support and diagonal brace form triangle structure, between crossbeam and diagonal brace, be provided with little perpendicular support 4, little stull 5 is provided with between perpendicular support and diagonal brace, perpendicular support leaves high-strength bolt preformed hole 6, anchor will erect support and structural column or wall connecting by preformed hole, realize the installation of section steel tripod, its middle cross beam, perpendicular support is 14# i iron, little perpendicular support and little stull are 10# i iron, crossbeam arranges floor 7 of putting more energy into, limit steel bar head 8 is set under crossbeam,
There is Cantilever Beams at structural shear wall or structural column outside or decorate eaves but the position of non-floor, perpendicular support is perpendicular support continuously, and little perpendicular support is parallel to the direction of perpendicular support, little stull and diagonal brace perpendicular, the link position of little perpendicular support and little stull and diagonal brace is close, is all positioned at the middle part of diagonal brace;
There is Cantilever Beams at structural shear wall or structural column outside or decorate eaves but the position of non-floor, perpendicular support is for being interrupted perpendicular support, be divided into diagonal brace bottom linkage section, with little stull linkage section and with crossbeam linkage section three part, wherein be positioned on crossbeam with crossbeam linkage section, three parts are erected support and are provided with high-strength bolt preformed hole, be convenient to the connection of each several part and post or body of wall, little perpendicular support is parallel to the direction of perpendicular support, little stull is perpendicular to cylinder or metope, the link position of little perpendicular support and little stull and diagonal brace is close, is all positioned at the middle part of diagonal brace; Further, arrange local and unload wire rope, wire rope is by limit steel bar head and post or wall connecting;
A kind of profile steel overhanging steel pipe scaffold system is also provided see Fig. 3-5 the present invention, it comprises the section steel tripod in above-mentioned overhanging scaffold, and comprise builder's jack support body, scaffold support body is coordinated by multiple cantilever steel girder and shaped steel tripod, synergy between each component is formed unified by Force system, support body comprises vertical rod, leger, little cross bar, wall-connecting piece and unloading wire rope, cantilever steel girder or shaped steel tripod are evenly arranged, vertical rod is set thereon, vertical rod is evenly arranged, leger is arranged on inside vertical rod, from bottom of upright rod, adjacent leger and vertical rod cruciform fastening for falsework are fixedly connected by anti-certain distance, outside removing host node, the leger of two longitudinal host nodes adds little cross bar together, arrange near vertical rod, the little cross bar of levels is arranged symmetrically with along the vertical rod left and right sides, be fixed on leger with fastener, host node place must establish a little cross bar, wall-connecting piece arranges to order anyhow, be evenly arranged, vertical with structural facades with support body, the one end be connected with support body allows declivity slightly, must not upwarp, wall-connecting piece is as far as possible near host node, and wall-connecting piece takes thick pillar form, meet post position must arrange together, cantilever steel girder or shaped steel tripod position arrange unloading wire rope,
Further, escalator Core Walls Structure position, staggered floor place adopt shaped steel tripod; Non-floor position, cantilever steel girder falls within beam, and length extends on same floor plate, and end arranges at least 2 U-shaped earth anchors in road; Staircase position, cantilever steel girder is arranged through body of wall inside structure, and when inner side is without body of wall, shaped steel end exceedes inner side coupling beam at least 200mm, U-shaped earth anchor bury with coupling beam in the middle part of;
Further, structure corner frame column position adopts shaped steel tripod, adjacent cantilever steel girder anchored end is welded into " well " font entirety with it, 14# channel-section steel is used to fall within shaped steel tripod, and weld with shaped steel tripod, support body vertical rod falls within channel-section steel, and channel-section steel crossover sites is welded into well word frame, uses Φ 17.5 wire rope to unload channel-section steel;
Wherein, the set-up mode of unloading wire rope is, per pass Cantilever Beams establishes 6 × 19(a together), Φ 17.5 steel wire rope unloading; For the position using shaped steel tripod, 6 × 19(a is together added to shaped steel tripod), Φ 17.5 unloads wire rope, between unloading wire rope and tripod, angle is 45 ° ~ 60 °, and structure rotation angle position uses 6 × 19(a) Φ 17.5 wire rope pocket vertical rod node unloads support body, and wire rope pocket is hung on support body host node, the each host node of horizontal plane arranges together, saddle clip 8 joined by every root wire rope, 6 for firm, 2 for arrange safety curved.
The construction technology process of section steel tripod support body is:
1 cast-in fixing bolt → 2 section steel tripod is installed → 3 channel-section steels and is installed little cross bar → 12 repetition of → 4 horizontal second step leger → 11, the first step little cross bar → 10, first step leger → 9, bar → 8 second step of sweeping the floor in longitudinal vertical rod → 7, bar → 6 of sweeping the floor 10,11 steps to bridging → 15, wall-connecting piece → 14, design height → 13 scaffold floor, flak jacket hurdle, foot guard plate → 16 safety net.
The construction technology of profile steel overhanging steel pipe scaffold system is:
1), built-in fitting construction: girder steel anchor ring to be constructed pre-plugged with roof steel bar, and use HPB235 Ф 18 reinforcement fabrication, the return certain distance of girder steel anchored end end arranges first girder steel anchor ring, and girder steel wing plate welds vertical rod antiskid bar;
2), cantilever steel girder is installed: cantilever steel girder entirety uses i iron, is evenly arranged by constant spacing, meets frame column, wall, ater-casting cannot even cloth position, the frame column that staggers, wall, arrange cantilever steel girder apart from post, wall limit 100mm; Cantilever steel girder meets shear wall structure position, before body of wall is built in relevant position high × wide preformed hole for 220mm × 120mm of indwelling in advance;
3), shaped steel tripod is installed: section steel tripod uses 14# i iron and 10# i iron to be welded, and uses anchor and high-strength chemical bolt and body of wall to connect;
4), vertical rod installs: vertical rod up and down on a vertical line, when vertical rod adopts docking spreading, vertical rod interlaced arrangement is answered to clasp, the joint of two adjacent vertical rods be not arranged on synchronous in;
5), leger is installed: connected with vertical rod cruciform fastening for falsework by adjacent leger from 200mm anti-on bottom of upright rod, the joint location of upper and lower cross bar is staggeredly arranged in different vertical rod advances;
6), little cross bar is installed: outside removing host node, the leger of two longitudinal host nodes adds little cross bar together, little cross bar to the length chosen between 40mm ~ 50mm, arrange near vertical rod, host node place must arrange a little cross bar, with being fixed in vertical rod with the little cross bar right-angle coupler socketed, the center to center distance of two right-angle couplers in host node place should not be greater than 150mm;
7), wall-connecting piece is installed: vertical interval is two steps, level interval be three across, wall-connecting piece arranges to order anyhow, be evenly arranged, vertical with structural facades with support body, the one end be connected with support body allows declivity slightly, must not upwarp, wall-connecting piece is not more than 300mm apart from the distance of host node, and the length that wall connecting rod stretches out fastener should be greater than 100mm;
8), steel wire rope unloading:
Per pass Cantilever Beams establishes 6 × 19(a together), Φ 17.5 steel wire rope unloading; For the position using shaped steel tripod, 6 × 19(a is together added to shaped steel tripod), Φ 17.5 unloads wire rope, between unloading wire rope and tripod, angle is 45 ° ~ 60 °, and structure rotation angle position uses 6 × 19(a) Φ 17.5 wire rope pocket vertical rod node unloads support body, and wire rope pocket is hung on support body host node, the each host node of horizontal plane arranges together, saddle clip 8 joined by every root wire rope, 6 for firm, 2 for arrange safety curved;
9), support body is checked and accepted
When structure reinforcing bars colligation examination, model sheetinstallat complete and complete with concreting, all burying underground of the built-in fittings such as anchor ring is carried out an acceptance inspection, wherein girder steel location examination time, answer close inspection girder steel encorbelment and whether anchorage length meets specification and designing requirement, check that whether the position of hole to be provided is accurate, check that whether the welding of girder steel suspension ring and vertical rod antiskid bar firm, and after often having set up one wall-connecting piece, tackle support body once check and accept, check and accept by after can continue to set up.
Wherein most wall-connecting piece takes thick pillar form, meets post position and arranges together, according to wall-connecting piece two step three across design adopt following measures to ensure the construction of wall-connecting piece:
(1) in beam, bury short steel pipes underground, depth of burying 200mm, expose 100mm, use Ф 48.3 × 3.6 steel pipe, cruciform fastening for falsework are rigidly connected to support body and structure, and wall-connecting piece uses two fastener;
(2) meeting shear wall position uses Ф 25 reinforcing bar to weld with short steel pipes or little cross bar, and utilize shear wall through-wall bolt hole, passed in the air by Ф 25 reinforcing bar from through-wall bolt, screw rod both sides add 100 × 100 × 8 iron plate pads, and both sides use double nut to tighten.
Points for attention for section steel tripod is installed:
Section steel tripod uses 14# i iron and 10# i iron to be welded, and uses anchor and high-strength chemical bolt and wall connecting.Tripod must be agreed to through design before installing, and is veritified structural bearing capacity by design.Due to support body construct time, initial layer structure frame column has been constructed complete, therefore, anchor needs the accurate unwrapping wire of anchorage point before installing, to stagger reinforcing bar encrypted area, so that bolt is planted in punching, and each connector center of anchoring spiral shell to the distance of nearest host node should be carried out in advance be not more than 1/3 of advance.
Points for attention for wall-connecting piece is installed:
Meeting shear wall position uses Ф 25 reinforcing bar to weld with short steel pipes or little cross bar, and utilize shear wall through-wall bolt hole, passed in the air by Ф 25 reinforcing bar from through-wall bolt, screw rod both sides add 100 × 100 × 8 iron plate pads, and both sides use double nut to tighten; Wall-connecting piece arranges to order anyhow, be evenly arranged, vertical with structural facades with support body, the one end be connected with support body can declivity slightly, must not upwarp; Wall-connecting piece is as far as possible near host node (distance apart from host node is not more than 300mm).The length that wall connecting rod stretches out fastener should be greater than 100mm.
Points for attention for steel wire rope unloading:
Use the position of section steel tripod, 6 × 19(a together added to section steel tripod), Φ 17.5 steel wire rope unloading, between unloading wire rope and tripod, angle is 45 ° ~ 60 °.Girder steel wing tip welding Φ 32 antiskid bar; On 8 layers, structure, border, 29.4m place arranges wire rope and unloads scaffold support body, and wire rope level interval is that 3m(draws a layout every one).6 × 19 Ф 12.5 wire rope selected by unloading wire rope, adopt the connected mode of embracing beam, utilize structure coupling beam to wear beam bolt hole or reserve Chuan Liang hole in unloading relevant position, wire rope place.
As shown in Figure 6: structure is delivered position and carried out reinforcement design, uses 6 × 19(a) Φ 17.5 wire rope pocket vertical rod node unloads support body, and wire rope pocket is hung on support body host node, and each host node of horizontal plane is arranged together.Saddle clip 8 joined by every root wire rope, 6 for firm, 2 for arranging " safety curved ".

Claims (4)

1. a profile steel overhanging steel pipe scaffold system, it comprises the section steel tripod in overhanging scaffold, section steel tripod in described overhanging scaffold comprises crossbeam (1), perpendicular support (2) and diagonal brace (3), crossbeam, perpendicular support and diagonal brace form triangle structure, between crossbeam and diagonal brace, be provided with little perpendicular support (4), little stull (5) is provided with between perpendicular support and diagonal brace, perpendicular support arranges high-strength bolt preformed hole (6), anchor will erect support and structural column or wall connecting by preformed hole, realize the installation of section steel tripod, its middle cross beam, perpendicular support is 14# i iron, little perpendicular support and little stull are 10# i iron, crossbeam arranges floor (7) of putting more energy into, limit steel bar head (8) is set under crossbeam, in shear wall or the position of structural column non-floor and the position in structure corner, perpendicular support is elongated shaped steel, and little perpendicular support is parallel to the direction of perpendicular support, little stull and diagonal brace perpendicular, little perpendicular support and little stull close with the link position of diagonal brace, is all positioned at the middle part of diagonal brace, there is Cantilever Beams at structural shear wall or structural column outside or decorate eaves but the position of non-floor, perpendicular support is for being interrupted perpendicular support, be divided into diagonal brace bottom linkage section, with little stull linkage section and with crossbeam linkage section three part, wherein be positioned on crossbeam with crossbeam linkage section, three parts are erected support and are provided with high-strength bolt preformed hole, be convenient to the connection of each several part and post or body of wall, little perpendicular support is parallel to the direction of perpendicular support, little stull is perpendicular to cylinder or metope, little perpendicular support and little stull close with the link position of diagonal brace, is all positioned at the middle part of diagonal brace, local is set and unloads wire rope, wire rope is by the limit steel bar head of crossbeam and post or wall connecting, it is characterized in that: comprise builder's jack support body, builder's jack support body is coordinated by multiple cantilever steel girder and shaped steel tripod, synergy between each component is formed unified by Force system, support body comprises vertical rod, leger, little cross bar, wall-connecting piece and unloading wire rope, cantilever steel girder or shaped steel tripod are evenly arranged, vertical rod is set thereon, vertical rod is evenly arranged, leger is arranged on inside vertical rod, from bottom of upright rod, adjacent leger and vertical rod cruciform fastening for falsework are fixedly connected by anti-certain distance, outside removing host node, the leger of two longitudinal host nodes adds little cross bar together, arrange near vertical rod, the little cross bar of levels is arranged symmetrically with along the vertical rod left and right sides, be fixed on leger with fastener, host node place must establish a little cross bar, wall-connecting piece arranges to order anyhow, be evenly arranged, vertical with structural facades with support body, the one end be connected with support body allows declivity slightly, must not upwarp, wall-connecting piece is as far as possible near host node, and wall-connecting piece takes thick pillar form, meet post position must arrange together, cantilever steel girder or shaped steel tripod position arrange unloading wire rope.
2. a kind of profile steel overhanging steel pipe scaffold system according to claim 1, is characterized in that: escalator Core Walls Structure position, staggered floor place, structure corner, have Cantilever Beams position to adopt shaped steel tripod; Have beam, non-floor position, cantilever steel girder falls within beam, and length extends on same floor plate, and end arranges at least 2 U-shaped earth anchors in road; Staircase position, cantilever steel girder is arranged through body of wall inside structure, and when inner side is without body of wall, shaped steel end exceedes inner side coupling beam at least 200mm, U-shaped earth anchor bury with coupling beam in the middle part of.
3. a kind of profile steel overhanging steel pipe scaffold system according to claim 1 and 2, it is characterized in that: structure corner frame column position adopts shaped steel tripod, adjacent cantilever steel girder anchored end is welded into " well " font entirety with it, 14# channel-section steel is used to fall within shaped steel tripod, and weld with shaped steel tripod, support body vertical rod falls within channel-section steel, and channel-section steel crossover sites is welded into well word frame, uses Φ 17.5 wire rope to unload channel-section steel.
4. a kind of profile steel overhanging steel pipe scaffold system according to claim 3, is characterized in that: the set-up mode of unloading wire rope is, per pass Cantilever Beams establishes 6 × 19(a together), Φ 17.5 steel wire rope unloading; For the position using shaped steel tripod, 6 × 19(a is together added to shaped steel tripod), Φ 17.5 unloads wire rope, between unloading wire rope and tripod, angle is 45 ° ~ 60 °, and structure rotation angle position uses 6 × 19(a) Φ 17.5 wire rope pocket vertical rod node unloads support body, and wire rope pocket is hung on support body host node, the each host node of horizontal plane arranges together, saddle clip 8 joined by every root wire rope, 6 for firm, 2 for arrange safety curved.
CN201310314291.7A 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail Active CN103334580B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310314291.7A CN103334580B (en) 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310314291.7A CN103334580B (en) 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail

Publications (2)

Publication Number Publication Date
CN103334580A CN103334580A (en) 2013-10-02
CN103334580B true CN103334580B (en) 2016-03-30

Family

ID=49242781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310314291.7A Active CN103334580B (en) 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail

Country Status (1)

Country Link
CN (1) CN103334580B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821767B (en) * 2016-03-23 2017-12-05 中交第二航务工程局有限公司 The method of the adjustable steel reinforcement cage colligation moulding bed of Box Beam Precast by Short Line Matching Method
CN110952765A (en) * 2019-11-20 2020-04-03 中建四局第六建设有限公司 Formwork supporting platform for shear wall high-altitude concrete cantilever structure and assembling method of formwork supporting platform
CN112962945A (en) * 2021-02-04 2021-06-15 中建一局集团建设发展有限公司 Corner bracket structure and construction method
CN114790818B (en) * 2022-06-07 2024-04-23 中冶建工集团有限公司 Diagonal bracing transition method for accelerating erection of overhanging scaffold

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4325528A (en) * 1980-03-13 1982-04-20 Martin Jack T Bracket mounting
CN2832995Y (en) * 2005-08-24 2006-11-01 上海市第七建筑有限公司 Suspension scaffold supporting device of light hanging type brandreth
CN2883556Y (en) * 2006-04-05 2007-03-28 刘国恩 Rigid shuttering outer hanging frame able to regulater hanging point
CN101736893A (en) * 2009-12-16 2010-06-16 通广建工集团有限公司 Overhanging type scaffold supporting system
CN203347213U (en) * 2013-07-25 2013-12-18 北京建工博海建设有限公司 Structural steel tripod in overhanging type scaffold and scaffold system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4325528A (en) * 1980-03-13 1982-04-20 Martin Jack T Bracket mounting
CN2832995Y (en) * 2005-08-24 2006-11-01 上海市第七建筑有限公司 Suspension scaffold supporting device of light hanging type brandreth
CN2883556Y (en) * 2006-04-05 2007-03-28 刘国恩 Rigid shuttering outer hanging frame able to regulater hanging point
CN101736893A (en) * 2009-12-16 2010-06-16 通广建工集团有限公司 Overhanging type scaffold supporting system
CN203347213U (en) * 2013-07-25 2013-12-18 北京建工博海建设有限公司 Structural steel tripod in overhanging type scaffold and scaffold system

Also Published As

Publication number Publication date
CN103334580A (en) 2013-10-02

Similar Documents

Publication Publication Date Title
CN103104092B (en) Support composite structure of beam and slab
CN203347213U (en) Structural steel tripod in overhanging type scaffold and scaffold system
CN103334580B (en) Section steel tripod in a kind of overhanging scaffold and connection system for guide rail
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN107227814B (en) A kind of large cantilever concrete structure section construction method
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN202214968U (en) Overhanging scaffold erection structure
CN105926925A (en) Joist steel cantilever beam of suspended scaffold and construction method thereof
CN206128281U (en) Balcony board installation node
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN205171369U (en) PC roof beam cable -stay bridge suo liang anchor structure
CN207177310U (en) A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure
CN205024833U (en) Reinforcing bar concrete combination prefabricated component
CN207633795U (en) A kind of foundation pit suspension lane device
CN203499259U (en) Tool type cantilevered unloading platform
CN203640257U (en) Support of overhanging type scaffold
CN205189887U (en) Tunnel preliminary bracing ground structure
CN204062152U (en) High-pressure service pump pipe fixing device
CN207633583U (en) A kind of connection structure of prefabricated post and prefabricated partition wall
CN209179027U (en) Bracing formula pile beam slab props up fender system
CN206667028U (en) A kind of suspension bridge cat road anchor
CN205875677U (en) Outer scaffold frame of reinforcement type is rock spare even

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant