CN206128281U - Balcony board installation node - Google Patents

Balcony board installation node Download PDF

Info

Publication number
CN206128281U
CN206128281U CN201620779931.0U CN201620779931U CN206128281U CN 206128281 U CN206128281 U CN 206128281U CN 201620779931 U CN201620779931 U CN 201620779931U CN 206128281 U CN206128281 U CN 206128281U
Authority
CN
China
Prior art keywords
side fascia
floor
balcony slab
balcony
lower side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620779931.0U
Other languages
Chinese (zh)
Inventor
刘斌
陈定球
俞大有
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620779931.0U priority Critical patent/CN206128281U/en
Application granted granted Critical
Publication of CN206128281U publication Critical patent/CN206128281U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of building engineering, a balcony board installation node is disclosed, including floor, lower side fascia, cantilevered member and balcony board, the floor overlap joint is under on the side fascia, the floor overlap joint under the one end on the side fascia be equipped with the built -in fitting, the floor sets up built -in fitting department and is equipped with the notch, cantilevered member includes roof and bottom plate at least, the one end of roof stretches into in the notch and with built -in fitting fixed connection, the balcony board set up on cantilevered member's bottom plate and with the floor is close to be pieced together. The utility model discloses cantilevered member mainly used supports the balcony board, and the setting of balcony board is pieced together on cantilevered member and with the floor is close, and the work progress does not have operations such as any cast -in -place or grout, and not only simple installation, and construction cycle is short. The utility model discloses distinguishing and becoming integrative structure with cantilevered member with the prefabrication of balcony board, reduced cantilevered member's thickness, not only the installation has been simplified simultaneously to simple manufacture, saving cost.

Description

A kind of balcony slab installs node
Technical field
This utility model belongs to construction engineering technical field, and in particular to a kind of balcony slab installs node.
Background technology
The balcony slab of traditional architecture mostly using the form of construction work of cast-in-site, exist site operation amount big, complex process, Progress is slow, efficiency is low, cycle length and the not high problem of workmen's degree of safety, is unfavorable for playing Modern Residence industrialization advantage.
In prior art, the form of construction work directly installed using prefabricated balcony plate is gradually increased, patent CN103255834A discloses a kind of prefabricated thermal insulation balcony, including balcony floor, balcony fence and overhanging anchor bar, the sun Platform base plate includes lower precast surface layer, balcony floor heat-insulation layer, upper precast surface layer and balcony floor Steel bar rack, the balcony fence Including outer precast surface layer, balcony fence heat-insulation layer, interior precast surface layer and balcony fence Steel bar rack, prefabricated reinforced concrete insulation The overhanging anchor bar that balcony passes through to arrange on balcony floor and balcony fence carries out effectively connection with agent structure.Patent CN103334495A discloses a kind of prefabricated balcony attachment structure containing steel bar girder, including prefabricated balcony plate, prestressing force are folded Plywood, precast beam, the prefabricated balcony plate include prefabricated balcony plate principal rod, and prefabricated balcony plate principal rod is stretched out located at prestressing force In superimposed sheet;Also include steel bar girder, steel bar girder is laterally homogeneous be arranged at prestressing force superimposed sheet in and perpendicular to the pre- of both sides Beam processed, and steel bar girder intersects anchoring with prefabricated balcony plate principal rod.The first balcony construction when, due to overhanging anchor bar It is integrative-structure with balcony floor and balcony fence, it is therefore necessary to will be poured with building body simultaneously, site operation amount is big;Second Kind as prefabricated balcony plate principal rod stretches out and be located in prestressing force superimposed sheet, have to take into account building body in construction and answer in advance The construction time of power superimposed sheet, progress is slow, efficiency is low, long construction period.
In sum, thus need a kind of simple installation of exploitation badly, speed of application is fast, the balcony slab that is connected firmly installs node.
Utility model content
The purpose of this utility model is to provide the balcony slab that a kind of simple installation, speed of application are fast, be connected firmly and installs section Point.
Above-mentioned purpose is to be achieved through the following technical solutions:A kind of balcony slab installs node, including floor, lower Side fascia, Overhanging component and balcony slab, the floor are overlapped on lower Side fascia, and one end that floor is overlapped on lower Side fascia is provided with pre-buried Part, the floor arrange and notch are provided with built-in fitting, and the overhanging component at least includes top board and base plate, one end of the top board Be fixedly connected in stretching into the notch and with built-in fitting, the balcony slab be arranged on the base plate of overhanging component and with the floor Close spelling.In work progress, after wainscot sheathing with floor dropping place, overhanging component is lifted, one end of overhanging component top board is overlapped on building On plate and stretch in the notch, then top board is fixedly connected with the built-in fitting being embedded in floor, it is then hoisting prefabricated Balcony slab, on the base plate of balcony slab dropping place to overhanging component and with the close spelling of floor.This utility model overhanging component is mainly used in propping up Support balcony slab, the overhanging component can be cantilevered plate or Cantilever Beams;Balcony slab of the present utility model is arranged on overhanging component And with the close spelling of floor, work progress is without the operations such as any cast-in-place or grouting, not only simple installation, and short construction period.In addition, This utility model is distinguished with by overhanging component and the prefabricated all-in-one-piece structure of balcony slab, greatly reducing the thickness of overhanging component Degree, not only make it is simple, saved production cost, while enormously simplify installation process, and solve to a certain extent and building Build beyond the region of objective existence to encorbelment unsightly problem that have an overhanging component and caused.
Further, the top board of the overhanging component is welded or is bolted with the built-in fitting.Thus, realizing encorbelmenting Component is reliably connected with floor.
Further, the overhanging component is Cantilever Beams, and at least two Cantilever Beams are provided with the outside of the lower Side fascia top, The balcony slab is overlapped on the base plate of two Cantilever Beams being disposed adjacent.It is arranged such, the material of overhanging component can be reduced, saves About cost.The Cantilever Beams are preferably I-beam, also including connection top board and the web of base plate.
Further, top surface of the top surface of the balcony slab less than the floor.It is arranged such, floor forms one with balcony slab The fixed discrepancy in elevation, can prevent rainwater from penetrating into indoor.
Further, the balcony slab is connected by transverse connection with floor.Thus, balcony slab forms reliable company with floor Connect, the two firm connection, it is to avoid under the effect of the external force such as earthquake, balcony slab produces larger movement.Described transverse connection can To be in being embedded in balcony slab and floor respectively and form the fastener inserts being reliably connected.
Further, the Cantilever Beams are provided with for fixing the baffle plate of the balcony slab.Thus, balcony slab can be avoided in external force Effect is lower and Cantilever Beams occur relative movement.
Further, also including upper Side fascia, the upper Side fascia is connected by vertical connector with lower Side fascia.
Further, there is brace between the upper Side fascia and balcony slab.Described brace one end is connected with upper Side fascia, The other end is connected with balcony slab, thus, connect using brace and ensureing the stability of balcony slab and can accordingly increase balcony slab Load-bearing, while brace can play decoration function as the guardrail of balcony, do not interfere with attractive in appearance.
Further, the floor is provided with jack hole, and the vertical connector passes through the jack hole by upper Side fascia with Side fascia connection is integral.Due to the jack hole that vertical connector is arranged through on floor, therefore vertical connector is played to floor Certain fixation and interconnection function, structure so of the present utility model are more firm.
Further, the vertical connector includes the screw rod being embedded in lower Side fascia and is embedded in Side fascia Fastener inserts, the screw rod are connected through jack hole with the fastener inserts in upper Side fascia, and are fixed by nut screwing clamping.Such as This, upper Side fascia sockets fixation by screw rod with lower Side fascia, and structural strength is high;In the connection of vertical connector, Side fascia is with In the operating process of Side fascia, for the ease of construction, screw rod is connected with fastener inserts, can be arranged in upper Side fascia by tightening nuts Gathering hole at fastener inserts, when the filling paste in gathering hole, slurry can fill the jack hole simultaneously, and hardening aftershaping is mixed Solidifying soil shear connector, it is firm solid, effectively absorb and consume horizontal, the oblique shear power between four.
Further, the fastener inserts include the connecting plate for being provided with through hole and the anchoring supporting leg being arranged on connecting plate. The setting of anchoring supporting leg, can be effectively increased anchor force of the fastener inserts in floor, improve the knot that connecting plate is connected with floor Structure intensity.
Further, the fastener inserts are connection box, and the bottom of the connection box is provided with through hole.
Further, the connection box at least one side connects to form gathering hole with outside upper Side fascia.In the pre-buried mistake of connection box Cheng Zhong, its one side leaving certain gaps uncovered by the economic plan, and breach are connected with outside upper Side fascia, thus, without the need for another in the prefabrication process of upper Side fascia Outer setting gathering hole, and after filling paste in breach, the position for arranging connection box forms hard point, the fastener inserts for making and spiral shell Bar is connected firmly.
Further, slurry is filled with the gathering hole.It is arranged such, on the one hand can solves because caused by reservation operations mouth Unsightly problem, on the other hand, after the slurry in gathering hole solidifies, can play a part of fixing bolt, it is to avoid use year Limit bolt looseness under the influence of long or external force.Now filling paste has no effect on construction speed, is carried out without waiting for slurry hardening again The installation of next prefabricated component node.Certainly, jack hole is filled while filling paste in gathering hole, such node is more firm.
Further, the screw rod is provided with anchoring piece.It is arranged such, anchoring of the screw rod in lower Side fascia can be effectively increased Power, improves the structural strength that screw rod is connected with lower Side fascia, substantially increases the resistance to drawing ability of screw rod, effectively can prevent Screw rod axially and radially moving in lower Side fascia, is especially rotated nut and fastener inserts is twisted with screw rod under external force When fastening, so, screw rod is more firm with what fastener inserts were also connected.
Further, upper Side fascia is embedded with elastic water-proof with the contact surface of floor with the contact surface and/or lower Side fascia of floor Body.In the prefabrication process of Side fascia and/or floor, elastic water-proof body is embedded in into its Mosaic face, when this utility model completes to spell After dress docking, water-proof elastomer is tightly squeezed in the Mosaic face of the two for Side fascia and floor, thus, water can be prevented along Side fascia With the Mosaic face seepage of floor.Certainly, multiple elastic water-proof bodies can be embedded with its Mosaic face.It is preferred that, can with elastic water-proof body Contact surface the Mosaic face of groove, the embedded floor in elastic water-proof body side or Side fascia is set, opposite side is squeezed into corresponding outer In the groove of wallboard or floor Mosaic face, waterproof effect so can be both played, the smooth of the two contact surface had been nor affected on.
Further, upper Side fascia is provided with waterproof steel plate with the stitching portion of floor and/or the stitching portion of lower Side fascia and floor, Adjacent waterproof steel plate welding is integral.It is arranged such, waterproof steel plate now plays a part of to close or blocks Mosaic face, can Water is prevented effectively along Mosaic face seepage.Certainly, welding position can be polished flat by polisher after waterproof steel plate welding so as to It is more attractive in appearance.
Description of the drawings
The accompanying drawing for constituting a part of the present utility model is used for providing further understanding to of the present utility model, and this practicality is new The schematic description and description of type is used to explain this utility model, does not constitute to improper restriction of the present utility model.
Fig. 1 is that a kind of vertical cross section structure of the balcony slab installation node involved by a kind of embodiment of this utility model is shown It is intended to;
Fig. 2 installs the vertical cross section schematic diagram in another section of node for a kind of balcony slab involved in Fig. 1;
Fig. 3 installs the vertical cross section schematic diagram of node for the balcony slab in Fig. 1 involved by another embodiment.
In figure:
2 times Side fascias of Side fascia, 3 floor, 4 balcony slab on 1
5 built-in fitting, 6 screw rod, 7 nut, 8 connecting plate
9 11 anchoring pieces of anchoring 10 gathering hole of supporting leg 12 connect box
13 overhanging component, 14 end plate, 15 top board, 16 base plate
17 notches
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in detail, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiments.
This utility model embodiment is as follows, and with reference to Fig. 1, a kind of balcony slab installs node, including floor 3, lower Side fascia 2, Overhanging component 13 and balcony slab 4, the floor 3 are overlapped on lower Side fascia 2, and one end that floor 3 is overlapped on lower Side fascia 2 sets There is built-in fitting 5, the floor 3 arranges and notch 17 is provided with built-in fitting 5, and the overhanging component 13 at least includes top board 15 and base plate 16, it is fixedly connected during the notch 17 is stretched in one end of the top board 15 and with built-in fitting 5, the balcony slab 4 is arranged on encorbelments On the base plate 16 of component 13 and with 3 close spelling of the floor.In work progress, after wainscot sheathing with 3 dropping place of floor, structure of encorbelmenting is lifted Part 13, one end of 13 top board 15 of overhanging component are overlapped on floor 3 and stretch in the notch 17, then by top board 15 with it is pre-buried Built-in fitting 5 in floor 3 is fixedly connected, then hoisting prefabricated balcony slab 4, the bottom of 4 dropping place of balcony slab to overhanging component 13 On plate 16 and with 3 close spelling of floor.The top surface for arranging the purpose controlroof 15 of notch 17 herein is not higher than located on the inside of Side fascia 3 top surface of floor.This utility model overhanging component 13 is mainly used in supporting balcony slab 4, and the overhanging component 13 can be encorbelmented Plate or Cantilever Beams;Balcony slab of the present utility model 4 be arranged on overhanging component 13 and with 3 close spelling of floor, work progress is without any It is cast-in-place or grouting etc. operation, not only simple installation, and short construction period.In addition, this utility model difference with by overhanging component 13 with 4 prefabricated all-in-one-piece structure of balcony slab, greatly reducing the thickness of overhanging component 13, not only make it is simple, save Production cost, while enormously simplify installation process, and solves to a certain extent outside the building to encorbelment and has overhanging component 13 And caused unsightly problem.Close match-place described in the utility model connects and refers to that prefabricated component stitching portion leaves no gaps, and should manage Solution, does not imply that the completely no gap in stitching portion of prefabricated component, and in actual work progress, due to rigging error or splicing , often can there is tiny gap during splicing in face out-of-flatness.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, the top of the overhanging component 13 Plate 15 is welded or is bolted with the built-in fitting 5.Thus, realizing being reliably connected for overhanging component 13 and floor 3.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1, the overhanging component 13 is outstanding Outrigger, is provided with least two Cantilever Beams on the outside of 2 top of lower Side fascia, the balcony slab 4 is overlapped on two for being disposed adjacent On the base plate 16 of root Cantilever Beams.It is arranged such, the material of overhanging component 13 can be reduced, it is cost-effective.The Cantilever Beams are preferably I-beam, also including connection top board 15 and the web of base plate 16.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 1~3, the top of the balcony slab 4 Top surface of the face less than the floor 3.It is arranged such, floor 3 forms certain discrepancy in elevation with balcony slab 4, can prevents rainwater from penetrating into room It is interior.
On the basis of above-described embodiment, in another embodiment of this utility model, the balcony slab 4 is with floor 3 by horizontal stroke Connect to connector.Thus, balcony slab 4 is formed with floor 3 being reliably connected, the two firm connection, it is to avoid in the outer masterpiece such as earthquake Larger movement is produced with lower balcony slab 4.Described transverse connection can be embedded in balcony slab 4 and floor 3 respectively And form the fastener inserts being reliably connected.
On the basis of above-described embodiment, in another embodiment of this utility model, the Cantilever Beams are provided with for fixing State the baffle plate of balcony slab 4.Thus, can avoid balcony slab 4 that relative movement occurs with Cantilever Beams under external force.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2 and Fig. 3, also including upper Side fascia 1, the upper Side fascia 1 is connected by vertical connector with lower Side fascia 2.
On the basis of above-described embodiment, in another embodiment of this utility model, the upper Side fascia 1 and balcony slab 4 it Between have brace.Described brace one end is connected with upper Side fascia 1, and the other end is connected with balcony slab 4, thus, using oblique pull Bar connection ensures the stability of balcony slab 4 and can accordingly increase the load-bearing of balcony slab 4, while brace can be used as the shield of balcony Hurdle, plays decoration function, does not interfere with attractive in appearance.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2 and Fig. 3, the floor 3 are provided with Upper Side fascia 1 and lower Side fascia 2 are connected integral through the jack hole by jack hole, the vertical connector.Due to vertical The jack hole that connector is arranged through on floor 3, therefore vertical connector serves certain fixation and interconnection function to floor 3, Structure so of the present utility model is more firm.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2 and Fig. 3, the vertical connector Including the screw rod 6 and the fastener inserts being embedded in upper Side fascia 1 that are embedded in lower Side fascia 2, the screw rod 6 is worn and is connect Hole is connected with the fastener inserts in upper Side fascia 1, and tightens fixation by nut 7.Thus, upper Side fascia 1 is logical with lower Side fascia 2 Cross screw rod 6 and socket fixation, structural strength is high;On vertical connector connects in the operating process of Side fascia 1 and lower Side fascia 2, For the ease of construction, screw rod 6 is connected by tightening nuts with fastener inserts, can arrange gathering hole at fastener inserts in upper Side fascia 1 10, when the filling paste in gathering hole 10, slurry can fill the jack hole simultaneously, harden aftershaping concrete shear key, It is firm solid, effectively absorb and consume horizontal, the oblique shear power between four.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2, the fastener inserts include setting The connecting plate 8 for having through hole and the anchoring supporting leg 9 being arranged on connecting plate 8.The setting of anchoring supporting leg 9, can be effectively increased pre-buried Anchor force of the component in floor 3, improves the structural strength that connecting plate 8 is connected with floor 3.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 3, the fastener inserts are connection Box 12, the bottom of the connection box 12 are provided with through hole.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 3, the connection box 12 at least Face is outer with upper Side fascia 1 to be connected to form gathering hole 10.Connection box 12 it is pre-buried during, its one side leaving certain gaps uncovered by the economic plan, and breach It is outer with upper Side fascia 1 to connect, thus, without the need for arranging gathering hole 10 in addition in the prefabrication process of upper Side fascia 1, and work as in breach After filling paste, the position for arranging connection box 12 forms hard point, and the fastener inserts for making are connected firmly with screw rod 6.
On the basis of above-described embodiment, in another embodiment of this utility model, slurry in the gathering hole 10, is filled with. It is arranged such, on the one hand can solves because of 10 caused unsightly problem of reservation operations mouth, on the other hand, the slurry in gathering hole 10 After material solidification, fixing bolt can be played a part of, it is to avoid service life bolt looseness long or under the influence of external force.Now filling is starched Material has no effect on construction speed, carries out the installation of next prefabricated component node again without waiting for slurry hardening.Certainly, in gathering hole 10 Jack hole is filled while filling paste, such node is more firm.
On the basis of above-described embodiment, in another embodiment of this utility model, such as Fig. 2 and Fig. 3 is set on the screw rod 6 There is anchoring piece 11.Be arranged such, anchor force of the screw rod 6 in lower Side fascia 2 can be effectively increased, screw rod 6 is improve with lower exterior wall The structural strength of the connection of plate 2, substantially increases the resistance to drawing ability of screw rod 6, can effectively prevent screw rod 6 under external force from existing Axially and radially moving in lower Side fascia 2, when especially fastener inserts and screw rod 6 are tightened fixed by rotation nut 7, so, Screw rod 6 is more firm with what fastener inserts were also connected.
On the basis of above-described embodiment, in another embodiment of this utility model, the contact surface of upper Side fascia 1 and floor 3 And/or lower Side fascia 2 is embedded with elastic water-proof body with the contact surface of floor 3.In the prefabrication process of Side fascia and/or floor 3, will Elastic water-proof body is embedded in its Mosaic face, and after this utility model completes assembled docking, Side fascia and floor 3 are tight by water-proof elastomer The Mosaic face of the two is squeezed in tightly, thus, water can be prevented along Side fascia and the Mosaic face seepage of floor 3.Certainly, can be in its splicing Face is embedded with multiple elastic water-proof bodies.It is preferred that, groove can be set in the contact surface with elastic water-proof body, elastic water-proof body side is embedded in The Mosaic face of floor 3 or Side fascia, opposite side are squeezed in the groove of 3 Mosaic face of corresponding Side fascia or floor, so both may be used Waterproof effect is played, the smooth of the two contact surface is nor affected on.
On the basis of above-described embodiment, in another embodiment of this utility model, the stitching portion of upper Side fascia 1 and floor 3 And/or lower Side fascia 2 is provided with waterproof steel plate with the stitching portion of floor 3, adjacent waterproof steel plate welding is integral.It is arranged such, Waterproof steel plate now plays a part of to close or blocks Mosaic face, can effectively prevent water along Mosaic face seepage.Certainly, waterproof steel Welding position can be polished flat by polisher after plate weld so as to more attractive in appearance.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (10)

1. a kind of balcony slab installs node, it is characterised in that including floor, lower Side fascia, overhanging component and balcony slab, the building Plate is overlapped on lower Side fascia, and one end that floor is overlapped on lower Side fascia is provided with built-in fitting, and the floor is arranged at built-in fitting Be provided with notch, the overhanging component at least includes top board and base plate, during the notch is stretched in one end of the top board and with it is pre-buried Part is fixedly connected, the balcony slab be arranged on the base plate of overhanging component and with the close spelling of the floor.
2. balcony slab according to claim 1 installs node, it is characterised in that the top board of the overhanging component is pre- with described Slugging is bolted.
3. balcony slab according to claim 2 installs node, it is characterised in that the overhanging component is Cantilever Beams, described At least two Cantilever Beams are provided with the outside of lower Side fascia top, the balcony slab is overlapped on the bottom of two Cantilever Beams being disposed adjacent On plate.
4. balcony slab according to claim 3 installs node, it is characterised in that the top surface of the balcony slab is less than the building The top surface of plate.
5. balcony slab according to claim 4 installs node, it is characterised in that the balcony slab is with floor by laterally connecting Fitting connects.
6. balcony slab according to claim 4 installs node, it is characterised in that the Cantilever Beams are provided with for fixed described The baffle plate of balcony slab.
7. the balcony slab according to claim 1~6 any one installs node, it is characterised in that also including upper Side fascia, The upper Side fascia is connected by vertical connector with lower Side fascia.
8. balcony slab according to claim 7 installs node, it is characterised in that have between the upper Side fascia and balcony slab Brace.
9. balcony slab according to claim 7 installs node, it is characterised in that the floor is provided with jack hole, described perpendicular Will be upper Side fascia and the connection of lower Side fascia integral through the jack hole to connector.
10. balcony slab according to claim 9 installs node, it is characterised in that the vertical connector includes being embedded in Screw rod and the fastener inserts being embedded in Side fascia in lower Side fascia, the screw rod is through in jack hole and upper Side fascia Fastener inserts be connected, and fixed by nut screwing clamping;Or the fastener inserts include being provided with connecting plate and the setting of through hole Anchoring supporting leg on connecting plate;Or the fastener inserts are connection box, the bottom of the connection box is provided with through hole;Or the company Connect box at least one side to connect to form gathering hole with outside upper Side fascia;Or in the gathering hole, it is filled with slurry;Or on the screw rod It is provided with anchoring piece;Or upper Side fascia is embedded with elastic water-proof body with the contact surface of floor with the contact surface and/or lower Side fascia of floor; Or upper Side fascia is provided with waterproof steel plate, adjacent waterproof steel with the stitching portion of floor and/or the stitching portion of lower Side fascia and floor Plate weld is integral.
CN201620779931.0U 2016-07-22 2016-07-22 Balcony board installation node Active CN206128281U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620779931.0U CN206128281U (en) 2016-07-22 2016-07-22 Balcony board installation node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620779931.0U CN206128281U (en) 2016-07-22 2016-07-22 Balcony board installation node

Publications (1)

Publication Number Publication Date
CN206128281U true CN206128281U (en) 2017-04-26

Family

ID=58563208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620779931.0U Active CN206128281U (en) 2016-07-22 2016-07-22 Balcony board installation node

Country Status (1)

Country Link
CN (1) CN206128281U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355006A (en) * 2017-09-13 2017-11-17 长沙远大住宅工业集团股份有限公司 The connecting node and its construction method of composite beam and superposed member
CN108978849A (en) * 2018-07-22 2018-12-11 北京工业大学 A kind of steel frame mechanization assembly type balcony
CN109024872A (en) * 2018-07-22 2018-12-18 北京工业大学 A kind of concrete frame mechanization assembly type balcony

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355006A (en) * 2017-09-13 2017-11-17 长沙远大住宅工业集团股份有限公司 The connecting node and its construction method of composite beam and superposed member
CN108978849A (en) * 2018-07-22 2018-12-11 北京工业大学 A kind of steel frame mechanization assembly type balcony
CN109024872A (en) * 2018-07-22 2018-12-18 北京工业大学 A kind of concrete frame mechanization assembly type balcony

Similar Documents

Publication Publication Date Title
CN205917838U (en) Balcony board installation node
CN207003634U (en) A kind of balcony slab installs node
CN106121107B (en) Assemble type concrete slab and its plate dry type connection method
CN108049633A (en) A kind of precast concrete concrete frame joint construction method
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN207597609U (en) A kind of precast concrete concrete frame joint
CN110528950B (en) Assembled hidden bracket type beam-column joint connecting device
CN106149937B (en) Assembly concrete beam and its dry type connection method
CN206337641U (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN107761947A (en) Assembled beam-column connecting node and its construction method
CN206034631U (en) Connected node of wallboard and floor
CN110565797B (en) Hidden corbel type beam-column joint connection method for shock absorption
CN206128281U (en) Balcony board installation node
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN215166634U (en) Assembly type building wallboard connecting structure
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN207003673U (en) A kind of connecting node of beam and wallboard
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN205917839U (en) Connected node of wallboard and floor
CN205917863U (en) Connected node of wallboard and floor
CN207003685U (en) A kind of connecting node of Side fascia and floor
CN206034624U (en) Balcony installation node
CN108589914A (en) A kind of Self-resetting frame structure and construction method
CN207934185U (en) A kind of detachably prefabricated assembled concrete-filled steel square tubular column and girder steel combined joint
CN110424534A (en) A kind of prefabricated assembled non-reinforced concrete frame and its construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20200305

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 3005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of utility model: A balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of utility model: A balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of utility model: A kind of balcony board installation node

Granted publication date: 20170426

License type: Common License

Record date: 20210302

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan fengque Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010621

Denomination of utility model: A balcony plate installation node

Granted publication date: 20170426

License type: Common License

Record date: 20211019