CN207003685U - A kind of connecting node of Side fascia and floor - Google Patents

A kind of connecting node of Side fascia and floor Download PDF

Info

Publication number
CN207003685U
CN207003685U CN201720339558.1U CN201720339558U CN207003685U CN 207003685 U CN207003685 U CN 207003685U CN 201720339558 U CN201720339558 U CN 201720339558U CN 207003685 U CN207003685 U CN 207003685U
Authority
CN
China
Prior art keywords
side fascia
floor
fascia
upper side
splash guard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720339558.1U
Other languages
Chinese (zh)
Inventor
俞大有
朱正庚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201720339558.1U priority Critical patent/CN207003685U/en
Application granted granted Critical
Publication of CN207003685U publication Critical patent/CN207003685U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model belongs to construction engineering technical field, disclose a kind of connecting node of Side fascia and floor, including floor and Side fascia, Side fascia includes the upper Side fascia connected by vertical connector and lower Side fascia, floor is overlapped on the top of lower Side fascia, upper Side fascia is arranged on the floor top, the stitching portion of upper Side fascia and floor is provided with splash guard, the side of splash guard extends on the inside of Side fascia and Side fascia top bending upwards, opposite side extends to the outside of Side fascia and downwards Side fascia bending, lateral wall downward Side fascia of the side of the downward Side fascia bending of splash guard along the floor extends and covers the splicing seams of lower Side fascia and floor.The set-up mode of above-mentioned splash guard can effectively avoid rainwater from being penetrated into along the splicing seams and the splicing seams of lower Side fascia and floor of upper Side fascia and floor to interior, i.e. for above-mentioned two splicing seams, it is only necessary to a water-proofing treatment is done, it is easy to operate, it is fast to add speed of application, improves efficiency of construction.

Description

A kind of connecting node of Side fascia and floor
Technical field
The utility model belongs to construction engineering technical field, and in particular to a kind of connecting node of Side fascia and floor.
Background technology
Assembled architecture is built relative to conventional steel bar concrete field cast-in-place formula, a undoubtedly technical much progress, The prefabricated components factorial praluction of assembled architecture, Assembling, thus energy factory normalization production, it is quality controllable, it is efficiently fast Victory, material economy is without waste, production scene and job site non-environmental-pollution.But in the prior art, it is pre- in assembled architecture In the assembling process of product, still there is node to need using cast-in-place, such as the connection of shear wall and floor.For stable connection, building Plate would generally use laminated floor slab, i.e., pour one layer of cast-in-place concrete, therefore the laminated floor slab such as need again at the top of precast floor slab Cast-in-place concrete layer solidification after could carry out the installation of next step prefabricated component on this basis.So have a strong impact on construction speed Degree, efficiency of construction is reduced, while cast in situs will inevitably carry out the operation such as formwork, concreting, cause job site complicated Change, cause to add construction cost while potential safety hazard.
In assembled architecture industry, Side fascia carries out factorial praluction by the way of prefabricated, then Assembling, thus Standardization, and quality controllable, efficient quick can be realized.But during the assembled in situ of prefabricated outer wall panel, be to its stitching portion Water-proofing treatment is carried out, avoids splicing seams of the rainwater along Side fascia from penetrating into indoor, while if infiltration phenomenon is serious, will cause to connect Position is loose, and long-term use causes effective bearing load ability of precast facade to decline, and brings great hidden dangers in project.Tradition The waterproof of out-hung panel be typically in seam crossing to break marine glue, the workload not only constructed is big, and marine glue is over time It is permanent aging occurs, finally result in the generation of drainage, influence the water resistance and construction quality of assembled architecture.
In summary, therefore a kind of fast speed of application of exploitation, the Side fascia of cost savings, good water-proof effect and floor are needed badly Connecting node.
Utility model content
The purpose of this utility model is to provide that a kind of speed of application is fast, the Side fascia and building of cost savings, good water-proof effect The connecting node of plate.
Above-mentioned purpose is to be achieved through the following technical solutions:A kind of connecting node of Side fascia and floor, including level are set The floor and vertically arranged Side fascia put, the Side fascia include the upper Side fascia that is connected by vertical connector and it is lower outside Wallboard, the floor are overlapped on the top of lower Side fascia, and the upper Side fascia is arranged on the floor top, upper Side fascia and building The stitching portion of plate is provided with splash guard, and the side of the splash guard extends on the inside of Side fascia and Side fascia top bending upwards, Opposite side extends to the outside of Side fascia and downwards Side fascia bending, and the side of the downward Side fascia bending of the splash guard is along institute The downward Side fascia of lateral wall for stating floor extends and covers the splicing seams of the lower Side fascia and the floor.In assembling process, Before treating Side fascia dropping place, above-mentioned splash guard is arranged on the floor top relative with the upper Side fascia.It is above-mentioned anti- The set-up mode of water plate can effectively avoid splicing of the rainwater along upper Side fascia and the splicing seams and lower Side fascia and floor of floor Seam is penetrated into interior, i.e., for above-mentioned two splicing seams, it is only necessary to a water-proofing treatment is done, and it is easy to operate, effect is reliable, construction Speed is fast, and efficiency of construction is high.
Further, the splash guard is galvanized steel plain sheet.Galvanized steel plain sheet has preferable water proofing property, and has stronger corrosion resistant Corrosion, i.e. good endurance, while rigidity is moderate.
Further, the vertical connector includes the first fastener inserts being embedded in lower Side fascia and is embedded in outer The second fastener inserts in wallboard, first fastener inserts are connected by screw bolts with the second fastener inserts.Nothing in assembling process Cast-in-place concrete is needed, cost savings, speed of application is fast, short construction period, and floor and Side fascia are connected into by vertical connector Overall, the connection for adding this node tenses ability, is advantageous to the conduction of mutual power.
Further, second fastener inserts include anchoring piece and the screw rod that is arranged on the anchoring piece, and described first Fastener inserts include anchoring supporting leg and connecting plate, the connecting plate are provided with connecting hole, and the floor offers jack hole, the spiral shell Bar, which passes through the jack hole and worn, connects the connecting hole, and the connecting plate is connected and fastened by nut with the screw rod.Construction In engineering, after lower Side fascia dropping place, during floor dropping place, the position of floor is controlled so that screw rod is passed through on floor Jack hole, then carries out the dropping place of Side fascia, and screw rod insertion above in the fastener inserts of Side fascia, is then tightened solid with nut It is fixed, realize the connection of three.Upper Side fascia, lower Side fascia are formed by vertical connector and are reliably connected simultaneously, due to vertically connecting Fitting passes through the jack hole set on floor, therefore vertical connector serves certain fixation and connection function to floor, so Structure of the present utility model is more firm.
Further, the upper Side fascia sets and offers gathering hole at the first fastener inserts.It is arranged such, operating space is more Greatly, it is more beneficial for screw rod and connects operation construction when the first fastener inserts and nut tighten fixed.
Further, slurry is filled with the gathering hole.It is arranged such, on the one hand can solves caused by reservation operations mouth Unsightly problem, on the other hand, after the slurry in gathering hole solidifies, protection connector can be played, corrosion is avoided while consolidates Determine the effect of bolt.Now filling paste has no effect on construction speed, and next prefabricated component section is carried out again without waiting for slurry hardening The installation of point.Certainly, the jack hole of floor splice ends is filled while filling paste in gathering hole, such node is more firm.
Further, the upper Side fascia, the stitching portion of lower Side fascia and the floor are equipped with waterproof roll.The waterproof Coiled material is preferably SBS self-adhering type modified bituminous pitch coiled materials.It is arranged such, increases the waterproof effect of splicing seams.
Further, the splash guard extends to the side on the inside of Side fascia and is embedded in the madial wall of the upper Side fascia.
Further, the splash guard prolongs the side of downward Side fascia extension and the lateral wall of lower Side fascia passes through waterproof sealing Glue is connected.
Further, first fastener inserts are connection box, and the bottom of the connection box is provided with connecting hole, the connection box At least one side outside upper Side fascia with connecting to form gathering hole.Connection box it is pre-buried during, its one side leaving certain gaps uncovered by the economic plan, and breach With being connected outside upper Side fascia, in this way, without setting gathering hole in addition in the prefabrication process of upper Side fascia, and filled when in breach After slurry, the position of connection box is set to form hard point so that the first fastener inserts are connected firmly with screw rod.
Brief description of the drawings
Form a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new The schematic description and description of type is used to explain the utility model, does not form to improper restriction of the present utility model.
Fig. 1 is the sectional view of the connecting node of the Side fascia and floor involved by a kind of embodiment of the utility model;Fig. 2 For the sectional view of Side fascia and the connecting node of floor along A-A faces involved by Fig. 1.
In figure:
The splash guard of 3 times Side fascias of Side fascia 4 on 1 floor 2
The 5 vertical screw rod 8 of 6 anchoring piece of connector 7 anchoring supporting legs
The gathering hole of 9 connecting plate, 10 jack hole 11
Embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to the scope of protection of the utility model.In addition, those skilled in the art's retouching according to this document State, respective combination can be carried out to the feature in embodiment in this document and in different embodiments.
The utility model embodiment is as follows, referring to Figures 1 and 2, the connecting node of a kind of Side fascia and floor 1, including water The flat floor 1 set and vertically arranged Side fascia, the Side fascia include the upper Side fascia connected by vertical connector 5 2 and lower Side fascia 3, the floor 1 be overlapped on the top of lower Side fascia 3, the upper Side fascia 2 is arranged on the top of floor 1, The stitching portion of upper Side fascia 2 and floor 1 is provided with splash guard 4, the side of the splash guard 4 extend on the inside of Side fascia 2 and to The bending of the upper top of Side fascia 2, opposite side extends to the outside of Side fascia 2 and downward Side fascia 3 is bent, the splash guard 4 to Lateral wall downward Side fascia 3 of the side that lower Side fascia 3 is bent along the floor 1 extends and covers the lower Side fascia 3 and institute State the splicing seams of floor 1.In assembling process, before treating the dropping place of Side fascia 2, above-mentioned splash guard 4 can be arranged on the floor 1 The top relative with the upper Side fascia 2.The set-up mode of above-mentioned splash guard 4 can effectively avoid rainwater along upper Side fascia 2 and building Penetrated into the splicing seams of plate 1 and the splicing seams of lower Side fascia 3 and floor 1 to interior, i.e., for above-mentioned two splicing seams, it is only necessary to A water-proofing treatment is done, and it is easy to operate, effect is reliable, and speed of application is fast, and efficiency of construction is high.
On the basis of above-described embodiment, in another embodiment of the utility model, the splash guard 4 is galvanized steel plain sheet.Plating Zinc steel plate has preferable water proofing property, and has stronger corrosion resistance, i.e. good endurance, while rigidity is moderate.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, the vertical connector 5 includes The first fastener inserts being embedded in lower Side fascia 3 and the second fastener inserts being embedded in Side fascia 2, described first is pre- Embedded component is connected by screw bolts with the second fastener inserts.Without cast-in-place concrete, cost savings, speed of application in assembling process It hurry up, short construction period, floor 1 and Side fascia are connected integral by vertical connector 5, and the connection for adding this node tenses energy Power, be advantageous to the conduction of mutual power.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, the second fastener inserts bag Anchoring piece 6 and the screw rod 7 being arranged on the anchoring piece 6 are included, first fastener inserts include anchoring supporting leg 8 and connecting plate 9, The connecting plate 9 is provided with connecting hole, and the floor 1 offers jack hole 10, and the screw rod 7 passes through the jack hole 10 and worn and connects The connecting hole, the connecting plate 9 are connected and fastened by nut with the screw rod 7.In construction work, the lower dropping place of Side fascia 3 Afterwards, during the dropping place of floor 1, the position of floor 1 is controlled so that screw rod 7 passes through the jack hole 10, Ran Houjin on floor 1 The dropping place of Side fascia 2 on row, the insertion of screw rod 7 above in the fastener inserts of Side fascia 2, then tighten fixation with nut, realize three Connection.Upper Side fascia 2, lower Side fascia 3 are formed by vertical connector 5 and are reliably connected simultaneously, because vertical connector 5 passes through The jack hole 10 set on floor 1, therefore vertical connector 5 serves certain fixation and connection function to floor 1, this sample The structure of utility model is more firm.Certainly, splash guard 4 also needs to open up hole, after screw rod 7 passes through the hole on splash guard 4, to protect Waterproof effect is demonstrate,proved, slurry is preferably touched in the hole on splash guard 4 and is tamped.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, the upper Side fascia 2 sets the Gathering hole 11 is offered at one fastener inserts.It is arranged such, operating space is bigger, is more beneficial for screw rod 7 and connects first pre-buried group Operation construction when part and nut tighten fixed.
On the basis of above-described embodiment, in another embodiment of the utility model, slurry is filled with the gathering hole 11. It is arranged such, on the one hand can solves caused by reservation operations mouth 11 unsightly problem, on the other hand, the slurry in gathering hole 11 Material solidification after, fixing bolt can be played a part of, avoid service life long or external force under the influence of bolt looseness.Now filling slurry Material has no effect on construction speed, carries out the installation of next prefabricated component node again without waiting for slurry hardening.Certainly, in gathering hole 11 The jack hole 10 of the splice ends of floor 1 is filled while filling paste, such node is more firm.
On the basis of above-described embodiment, in another embodiment of the utility model, the upper Side fascia 2, lower Side fascia 3 with The stitching portion of the floor 1 is equipped with waterproof roll.The waterproof roll is preferably SBS self-adhering type modified bituminous pitch coiled materials.So Set, increase the waterproof effect of splicing seams.
On the basis of above-described embodiment, in another embodiment of the utility model, the splash guard 4 extends to Side fascia The side of 2 inner sides is embedded in the madial wall of the upper Side fascia 2.
On the basis of above-described embodiment, in another embodiment of the utility model, the splash guard 4 prolongs downward Side fascia 3 The side of extension is connected with the lateral wall of lower Side fascia 3 by waterproof gasket cement.
On the basis of above-described embodiment, in another embodiment of the utility model, first fastener inserts are connection box, The bottom of the connection box is provided with connecting hole, and the connection box at least one side outside upper Side fascia 2 with connecting to form gathering hole 11. Connect box it is pre-buried during, its one side leaving certain gaps uncovered by the economic plan, and breach and upper Side fascia 2 connect outside, in this way, in upper Side fascia 2 Without setting gathering hole 11 in addition in prefabrication process, and after filling paste in breach, set the position of connection box to be formed and strengthen Point so that the first fastener inserts are connected firmly with screw rod 7.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as the scope of protection of the utility model.

Claims (10)

1. the connecting node of a kind of Side fascia and floor, including horizontally disposed floor and vertically arranged Side fascia, described Side fascia includes the upper Side fascia connected by vertical connector and lower Side fascia, the floor are overlapped on the top of lower Side fascia Portion, the upper Side fascia are arranged on the floor top, it is characterised in that the stitching portion of the upper Side fascia and the floor is set There is splash guard, the side of the splash guard extends on the inside of the upper Side fascia and bent to the upper Side fascia top, another Side extends to the outside of the Side fascia and bent to the lower Side fascia, and the splash guard is bent to the lower Side fascia Lateral wall of the side along the floor extends to the lower Side fascia and covers the splicing seams of the lower Side fascia and the floor.
2. the connecting node of Side fascia according to claim 1 and floor, it is characterised in that the splash guard is galvanized steel Plate.
3. the connecting node of Side fascia according to claim 1 and floor, it is characterised in that the vertical connector includes The first fastener inserts being embedded in the lower Side fascia and the second fastener inserts being embedded in the upper Side fascia, it is described First fastener inserts are connected by screw bolts with the second fastener inserts.
4. the connecting node of Side fascia according to claim 3 and floor, it is characterised in that the second fastener inserts bag Anchoring piece and the screw rod being arranged on the anchoring piece are included, first fastener inserts include anchoring supporting leg and connecting plate, described Connecting plate is provided with connecting hole, and the floor offers jack hole, and the screw rod, which passes through the jack hole and worn, connects the connecting hole, The connecting plate is connected and fastened by nut with the screw rod.
5. the connecting node of Side fascia according to claim 4 and floor, it is characterised in that the upper Side fascia sets the Gathering hole is offered at one fastener inserts.
6. the connecting node of Side fascia according to claim 5 and floor, it is characterised in that be filled with the gathering hole Slurry.
7. the connecting node of the Side fascia and floor according to claim 1~6 any one, it is characterised in that on described Side fascia, the stitching portion of lower Side fascia and the floor are equipped with waterproof roll.
8. the connecting node of the Side fascia and floor according to claim 1~6 any one, it is characterised in that described anti- Water plate extends to the side on the inside of Side fascia and is embedded in the madial wall of the upper Side fascia.
9. the connecting node of Side fascia according to claim 8 and floor, it is characterised in that the splash guard prolongs outer downwards The side of wallboard extension is connected with the lateral wall of lower Side fascia by waterproof gasket cement.
10. the connecting node of Side fascia according to claim 3 and floor, it is characterised in that first fastener inserts To connect box, the bottom of the connection box is provided with connecting hole, and the connection box at least one side is with connecting formation behaviour outside upper Side fascia Make mouth.
CN201720339558.1U 2017-03-31 2017-03-31 A kind of connecting node of Side fascia and floor Active CN207003685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720339558.1U CN207003685U (en) 2017-03-31 2017-03-31 A kind of connecting node of Side fascia and floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720339558.1U CN207003685U (en) 2017-03-31 2017-03-31 A kind of connecting node of Side fascia and floor

Publications (1)

Publication Number Publication Date
CN207003685U true CN207003685U (en) 2018-02-13

Family

ID=61428731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720339558.1U Active CN207003685U (en) 2017-03-31 2017-03-31 A kind of connecting node of Side fascia and floor

Country Status (1)

Country Link
CN (1) CN207003685U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797865A (en) * 2019-01-04 2019-05-24 国住人居工程顾问有限公司 A kind of embedded exterior wall board connecting structure and its construction method
CN110453796A (en) * 2019-09-06 2019-11-15 吉林建筑大学 A construction tool and construction method for sealing joints in transfer floors of prefabricated buildings
CN113622529A (en) * 2021-08-13 2021-11-09 中国建筑第八工程局有限公司 Waterproof node
CN114108849A (en) * 2021-07-30 2022-03-01 嘉兴恒创电力设计研究院有限公司 Waterproof construction based on modular design

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797865A (en) * 2019-01-04 2019-05-24 国住人居工程顾问有限公司 A kind of embedded exterior wall board connecting structure and its construction method
CN110453796A (en) * 2019-09-06 2019-11-15 吉林建筑大学 A construction tool and construction method for sealing joints in transfer floors of prefabricated buildings
CN110453796B (en) * 2019-09-06 2024-02-23 吉林建筑科技学院 Construction tool and construction method for sealing joints of prefabricated building conversion layer
CN114108849A (en) * 2021-07-30 2022-03-01 嘉兴恒创电力设计研究院有限公司 Waterproof construction based on modular design
CN113622529A (en) * 2021-08-13 2021-11-09 中国建筑第八工程局有限公司 Waterproof node
CN113622529B (en) * 2021-08-13 2022-08-26 中国建筑第八工程局有限公司 Waterproof node

Similar Documents

Publication Publication Date Title
CN104563288B (en) Reinforced concrete frame gridding slab prefabricated energy-saving house
CN207597609U (en) A kind of precast concrete concrete frame joint
CN108049633A (en) A kind of precast concrete concrete frame joint construction method
CN108590005A (en) A kind of hollow two-way superstructure of assembled integral concealed beam and assembly method
CN207003685U (en) A kind of connecting node of Side fascia and floor
CN206174146U (en) Assembly type structure's assembly node
CN206016011U (en) A kind of steel plate concrete composite beam panel structure system
CN209179247U (en) A kind of novel precast reinforced concrete shearing force wall connection structure
CN108487476A (en) Prefabrication steel concrete compound tube site operation shear wall T-type horizontal connection structure
CN105275087B (en) The attachment structure of prefabricated assembled concrete beam column
CN205917863U (en) Connected node of wallboard and floor
CN206189454U (en) Piping lane
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN208441288U (en) A kind of connector construction for the connection of prefabricated assembled shear wall
CN208056126U (en) A kind of connecting node construction of steel pipe bundle concrete walls and Base isolation system
CN108412036B (en) Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node
CN109653378A (en) The complete low multi-story structure of load moduleization and its construction technology
CN212053812U (en) Back-off type anchor recess anchor sealing device based on communicating vessel principle
CN206034624U (en) Balcony installation node
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN205975951U (en) Side fascia installation node
CN211621660U (en) Anti-pulling base is strengthened in installation of transmission tower
CN209523311U (en) Low multi-story structure
CN213509134U (en) Steel pipe truss prestressed hollow superimposed sheet
CN209293236U (en) Side fascia waterproof connecting joint construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Connected node of side fascia and floor

Granted publication date: 20180213

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Connected node of side fascia and floor

Granted publication date: 20180213

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Connected node of side fascia and floor

Granted publication date: 20180213

License type: Common License

Record date: 20200305

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 2005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A connection node between exterior wall panel and floor

Granted publication date: 20180213

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A connection node between exterior wall panel and floor

Granted publication date: 20180213

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A connection node between exterior wall panel and floor

Granted publication date: 20180213

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of utility model: A connection node between exterior wall panel and floor

Granted publication date: 20180213

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of utility model: A connection node between exterior wall panel and floor

Granted publication date: 20180213

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of utility model: A connection node between exterior wall panel and floor

Granted publication date: 20180213

License type: Common License

Record date: 20210302

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hantai Construction Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980009995

Denomination of utility model: A connecting node between exterior wall slab and floor slab

Granted publication date: 20180213

License type: Common License

Record date: 20210929

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Shangyi Engineering Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010464

Denomination of utility model: A connecting node between exterior wall slab and floor slab

Granted publication date: 20180213

License type: Common License

Record date: 20211011

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan fengque Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010621

Denomination of utility model: A connecting node between exterior wall slab and floor slab

Granted publication date: 20180213

License type: Common License

Record date: 20211019

EE01 Entry into force of recordation of patent licensing contract