CN108978849A - A kind of steel frame mechanization assembly type balcony - Google Patents

A kind of steel frame mechanization assembly type balcony Download PDF

Info

Publication number
CN108978849A
CN108978849A CN201810808233.2A CN201810808233A CN108978849A CN 108978849 A CN108978849 A CN 108978849A CN 201810808233 A CN201810808233 A CN 201810808233A CN 108978849 A CN108978849 A CN 108978849A
Authority
CN
China
Prior art keywords
steel frame
balcony
cantilever beams
assembly type
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810808233.2A
Other languages
Chinese (zh)
Inventor
王子毅
王威
马东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN201810808233.2A priority Critical patent/CN108978849A/en
Publication of CN108978849A publication Critical patent/CN108978849A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks

Abstract

The invention discloses a kind of steel frame mechanization assembly type balcony, prefabricated components and steel frame need to only be carried out mechanization assembling using the construction technology for improving balcony, a large amount of completion that is prefabricated in the factory that works, scene by the present invention.Steel frame mechanization assembly type balcony is constituted substantially including components such as Cantilever Beams, prestressed cable, profiled sheets;Reform to the matter of traditional cast in place balcony construction technology, prestressing technique are combined with fashioned iron Cantilever Beams, keep balcony slimmer and more graceful, guarantee the safety under geological process, Self-resetting can be achieved after shake, greatly reduce rehabilitation cost after shake, embody the advantage that steel construction easily assembles, ductility is good;Compared with traditional cast in place balcony, the plurality of advantages such as it has security performance high, and environmental pollution is small, and safety accident is few and project cost is low.The feature for having cost low, low in the pollution of the environment using such steel-frame structure.

Description

A kind of steel frame mechanization assembly type balcony
Technical field
The present invention relates to a kind of steel frame mechanization assembly type balconies, belong to technical field of civil engineering.
Background technique
The unique exterior space of the balcony as residential building, creating hand over occupant can freely directly with the Nature at any time The condition melted, is psychologically further liberated.The setting of balcony makes living space become abundant, and internal and external exchange is direct, Unobscured, room temperature and sunlight adjusting nature are flexible, the deep welcome by occupant.Balcony have become residential building can not or Scarce a part.Consider but then, balcony no matter in building and pattern handling or even difficulty of construction all than general room Complexity, in order to obtain narrow outdoor attaching space, structure design and construction causes bigger difficulty, and there is an urgent need to one kind The building technology that mechanized construction may be implemented improves the construction speed of balcony, reduces cost, and can guarantee balcony use process In safety.
In recent years, balcony has been not only the demand of residential building, is it for the tense working mood for alleviating office worker The condition that freely can directly blend with the Nature at any time is provided, more and more office buildings are also required to balcony.And it existing builds Balcony is assembled after building, and there are no practicable construction methods, in the near future, under the premise that security is guaranteed, it can be achieved that both There is the balcony construction method assembled after building that will become the primary study content of engineering construction field.
Summary of the invention
The invention proposes a kind of a kind of steel frame mechanization assembly type balconies for belonging to technical field of civil engineering.Its mesh Be improve the construction technology of balcony, a large amount of work is prefabricated in the factory completions, and scene need to be by prefabricated components and steel framework Frame carries out mechanization assembling, and safety guarantee less rural migrant worker in construction site can be transferred in safe factory and work, make agriculture Civilian worker is changed into skilled worker.In addition, factory indoor prefabricated components, it is possible to reduce concrete is stirred, pours, conserved to air Pollution reduces construction to the contribution rate of PM2.5, is the reform to a matter of balcony construction technology.
Mechanization assembly type balcony can realize standardized production, and construction enterprises can be in the enterprise of professional production balcony accessory Prefabricated standard-sized balcony component.Not only reduce construction procedure in this way for construction enterprises, but also is professional production balcony accessory Enterprise creates value.In the process, since the enterprise of production accessory is mass production, the utilization of resources can be greatly improved Rate, the generation for reducing resource consumption, reducing building waste.
Prestressing technique is combined with fashioned iron Cantilever Beams, is changed traditional bulky concrete hanging top, is made balcony more Add merrily and lightheartedly, under geological process, the assembly type balcony of light weight absorbs smaller seismic energy;It is sent out in Cantilever Beams and Steel Frame Column When raw lesser corner, tension prestressed cable can make Cantilever Beams be restored to initial position, and maintenance difficulty after reducing shake is risen To certain positive effect.
Prestressed application enables the overhanging balcony of steel-frame structure to obtain higher safety coefficient.Mechanization assembly type The major advantage of balcony: (1) prefabrication, on-site assembly reduce the construction period, reduce pollution of the construction to environment, have Help rural migrant worker and is changed into skilled worker;(2) mass production prefabricated components can greatly improve resource utilization, reduce money Source consumption, the generation for reducing building waste are conducive to promote China's Process of Housing Industrialization;(3) geological process lower prestress rope Tension is deformed, and fashioned iron Cantilever Beams can be made to be restored to initial position, plays certain product for maintenance difficulty after reducing shake Pole effect.
A kind of steel frame mechanization assembly type balcony, Connection Step: fashioned iron Cantilever Beams and beam-ends shrouding are in work first Factory is prefabricated and is welded as a whole, and completes to pour lightweight concrete floor on profiled sheet and complete to conserve in factory, using hanging Installing is standby to dispose prefabricated Cantilever Beams perpendicular to Steel Frame Column, by prestressed cable pass through fashioned iron Cantilever Beams two sides beam-ends shrouding, The reserving hole of Steel Frame Column and styletable sealing plate, it is whether vertical with Steel Frame Column using the prefabricated Cantilever Beams of total station test at this time, After ensuring vertically, prestressing force is applied to prestressed cable using permanent anchorage in the outside of beam-ends shrouding and styletable sealing plate and carries out anchor Gu;After Cantilever Beams installation, prefabricated lightweight concrete profiled sheet is attached by the way of bolt or welding with Cantilever Beams; It is ensured that the lightweight concrete floor on profiled sheet is concordant with concrete floor after connection.
A kind of steel frame mechanization assembly type balcony, after Cantilever Beams are connect with Steel Frame Column, is wanted according to owner It asks and assembles semiclosed guard rail or totally-enclosed glass curtain wall, then finished about the mechanization assembly type balcony construction of steel frame.
A kind of steel frame mechanization assembly type balcony, floor can also be used too using assembled profiled sheet floorboard The floorboards such as hollow plate.Floorboard should have enough rigidity and contact closely with Cantilever Beams, and concordant with concrete slab.
The invention has the advantages that in a kind of above-mentioned steel frame mechanization assembly type balcony, used Cantilever Beams, Lightweight concrete profiled sheet is all prefabricated components, can be assembled in factory process, construction site, such construction method It can solve the complicated problem of assembled steel frame structure balcony construction.
A kind of steel frame mechanization assembly type balcony carries out on-site assembly using prefabricated components completely, eliminates and apply The traditional approach of work poured in place concrete, is effectively guaranteed construction quality, it is entirely avoided ring caused by concreting Border pollution, realize " anhydrous, without fire, dustless " of site operation three without standard, reduce the generation of the hazardous accidents such as fire.This Invention can be recycled efficiently when component is removed, reduce building waste, really realize environmentally protective reason It reads, is a kind of green, the steel frame balcony construction technology of sustainable development.
A kind of steel frame mechanization assembly type balcony, prestressing technique are combined with fashioned iron Cantilever Beams, realize shake The Self-resetting of Cantilever Beams afterwards greatly reduces rehabilitation cost after shake;Raising balcony Cantilever Beams are anti-with steel-frame structure junction Shock stability, to improve the anti-seismic performance of steel frame structural system.
A kind of steel frame mechanization assembly type balcony proposed by the present invention is to build balcony to traditional steel-frame structure It overturns, embodies the good advantage of easily assembly, ductility of steel-frame structure.Compared with traditional steel-frame structure balcony, it has The plurality of advantages such as security performance is high, and environmental pollution is small, and safety accident is few and project cost is low.
Detailed description of the invention
Fig. 1 is fashioned iron schematic diagram used in Cantilever Beams of the invention
Fig. 2 is that Cantilever Beams of the invention split schematic diagram
Fig. 3 is the fractionation schematic diagram of Cantilever Beams and Steel Frame Column of the invention
Fig. 4 is the balcony Cantilever Beams schematic diagram after assembling of the invention
Fig. 5 is that lightweight concrete profiled sheet of the invention splits schematic diagram
Fig. 6 is that mechanization assembly type balcony of the invention splits schematic diagram
Fig. 7 is the steel frame structural system schematic diagram with assembling balcony of the invention
1. fashioned iron Cantilever Beams in figure, 2. beam-ends shroudings, 3. prestressed cables, 4. permanent anchorages, 5. styletable sealing plates, 6. steel frames Column, 7. steel-frame beams, 8. concrete floors, 9. profiled sheets, 10. lightweight concrete floors.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
As shown in Fig. 1, in a kind of steel frame mechanization assembly type balcony of the present invention, type used by Cantilever Beams Steel 1, what is provided in figure is I-steel, and the steel of other forms in addition can also be selected according to actual loading situation;
As shown in Fig. 2, in a kind of steel frame mechanization assembly type balcony of the present invention, the assembly type balcony is outstanding The composition of outrigger: Cantilever Beams are mainly made of fashioned iron Cantilever Beams 1, beam-ends shrouding 2, prestressed cable 3 and permanent anchorage 4, wherein It is different according to the prestressed cable 3 of selection when beam-ends shrouding 2 is prefabricated in the factory, reserve different size of cavity, when ease of assembly is pre- Stress rope 3 runs through;
As shown in Fig. 3, in a kind of steel frame mechanization assembly type balcony of the present invention, fashioned iron Cantilever Beams 1 first It is prefabricated in the factory and is welded as a whole with beam-ends shrouding 2, complete to pour lightweight concrete floor 10 on profiled sheet 9 in factory And complete to conserve, prefabricated Cantilever Beams are disposed perpendicular to Steel Frame Column 6 using hanging device, prestressed cable 3 is hanged across fashioned iron The reserving hole of the beam-ends shroudings 2 of 1 two sides of outrigger, Steel Frame Column 6 and styletable sealing plate 5 is tested using total station prefabricated outstanding at this time Whether outrigger is vertical with Steel Frame Column 6, it is ensured that after vertical, utilizes permanent anchorage 4 in the outside of beam-ends shrouding 2 and styletable sealing plate 5 Prestressed cable 3 is anchored;
As shown in Fig. 4, in a kind of steel frame mechanization assembly type balcony of the present invention, according to above-mentioned erection sequence The Cantilever Beams of balcony two sides are installed in place;
As shown in Fig. 5, in a kind of steel frame mechanization assembly type balcony of the present invention, according to the practical ruler of construction Very little to pour lightweight concrete floor 10 in factory, profiled sheet 9 is used as permanent bed die, forms lightweight concrete profiled sheet;
It as shown in Fig. 6,, will after Cantilever Beams installation in a kind of steel frame mechanization assembly type balcony of the present invention Prefabricated lightweight concrete profiled sheet is attached by the way of bolt or welding with Cantilever Beams, it is ensured that die mould steel after connection Plate 9 is completely embedded with fashioned iron Cantilever Beams, and lightweight concrete floor 10 thereon is concordant with concrete floor 8;
As shown in Fig. 7, in a kind of steel frame mechanization assembly type balcony of the present invention, it will need to assemble balcony After steel frame is assembled according to above-mentioned steps, the steel frame structural system for having assembly type balcony is formed.

Claims (2)

1. a kind of steel frame mechanization assembly type balcony, it is characterised in that: the mechanization assembly type balcony of the steel frame includes type Steel Cantilever Beams, beam-ends shrouding, prestressed cable, permanent anchorage, styletable sealing plate, Steel Frame Column, steel-frame beam, concrete floor, pressure Shape steel plate, lightweight concrete floor;
The Connection Step of the mechanization assembly type balcony of steel frame: fashioned iron Cantilever Beams are prefabricated in the factory and weld with beam-ends shrouding first It is connected in one, complete to pour lightweight concrete floor on profiled sheet in factory and completes to conserve, it will be pre- using hanging device Cantilever Beams processed are disposed perpendicular to Steel Frame Column, by prestressed cable pass through the beam-ends shroudings of fashioned iron Cantilever Beams two sides, Steel Frame Column and Whether vertical with Steel Frame Column the reserving hole of styletable sealing plate tests prefabricated Cantilever Beams using total station at this time, it is ensured that after vertical, Prestressing force is applied to prestressed cable using permanent anchorage in the outside of beam-ends shrouding and styletable sealing plate and is anchored;Cantilever Beams peace After dress, prefabricated lightweight concrete profiled sheet is attached by the way of bolt or welding with Cantilever Beams;It should be true after connection Lightweight concrete floor on pressure maintaining shape steel plate is concordant with concrete floor.
2. a kind of steel frame mechanization assembly type balcony according to claim 1, it is characterised in that: construct to above-mentioned steps After, semiclosed guard rail or totally-enclosed glass curtain wall are assembled, then is constructed about the mechanization assembly type balcony of steel frame It finishes.
CN201810808233.2A 2018-07-22 2018-07-22 A kind of steel frame mechanization assembly type balcony Pending CN108978849A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810808233.2A CN108978849A (en) 2018-07-22 2018-07-22 A kind of steel frame mechanization assembly type balcony

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810808233.2A CN108978849A (en) 2018-07-22 2018-07-22 A kind of steel frame mechanization assembly type balcony

Publications (1)

Publication Number Publication Date
CN108978849A true CN108978849A (en) 2018-12-11

Family

ID=64549484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810808233.2A Pending CN108978849A (en) 2018-07-22 2018-07-22 A kind of steel frame mechanization assembly type balcony

Country Status (1)

Country Link
CN (1) CN108978849A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204530999U (en) * 2015-04-10 2015-08-05 华通设计顾问工程有限公司 A kind of prestressed concrete large cantilever open-web truss structure
CN205348392U (en) * 2016-01-07 2016-06-29 朱保兵 Space prestressed reinforced concrete structure of encorbelmenting greatly
CN206128281U (en) * 2016-07-22 2017-04-26 中民筑友科技投资有限公司 Balcony board installation node
CN206941858U (en) * 2017-05-12 2018-01-30 东南大学 Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework
CN207003634U (en) * 2016-07-22 2018-02-13 中民筑友科技投资有限公司 A kind of balcony slab installs node

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204530999U (en) * 2015-04-10 2015-08-05 华通设计顾问工程有限公司 A kind of prestressed concrete large cantilever open-web truss structure
CN205348392U (en) * 2016-01-07 2016-06-29 朱保兵 Space prestressed reinforced concrete structure of encorbelmenting greatly
CN206128281U (en) * 2016-07-22 2017-04-26 中民筑友科技投资有限公司 Balcony board installation node
CN207003634U (en) * 2016-07-22 2018-02-13 中民筑友科技投资有限公司 A kind of balcony slab installs node
CN206941858U (en) * 2017-05-12 2018-01-30 东南大学 Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework

Similar Documents

Publication Publication Date Title
CN101769008B (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN103114663B (en) Assemble type multifunctional outer wall body and production and installation method thereof
CN106499051A (en) A kind of post insertion prefabricated PC concrete frame frame system and its construction method
US9797137B2 (en) Fully assembled, fully cast-in-place, composite-type house and construction method thereof
WO2019179112A1 (en) Self-adaptive assembly support tool, system and installation method for self-anchored suspension cable structure
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall
CN108589982B (en) Assembled composite wall structure based on indirect welded connection of reinforcing steel bars and construction method thereof
CN107217815B (en) Resistance to compression, safe type assembled steel construction elevartor shaft
CN111456252A (en) Steel assembled synthetic concrete building and construction method thereof
CN105089178A (en) Fabricated building of pre-assembling structure of prefabricated section steel concrete shear wall
CN107476583A (en) A kind of concrete assembled building builds construction method
CN105672664A (en) Integral heat insulation wallboard building system
CN112695794A (en) Precast concrete L shape post rim of a cup basis
CN207739437U (en) A kind of prefabricated steel reinforced concrete shear wall structure
CN203066294U (en) Assembled multifunctional outer wall body
CN109610630A (en) A kind of concrete frame mechanization assembly type balcony
CN203361332U (en) Prefabricated assembly type frame structure
CN109208750A (en) A kind of steel frame mechanization assembly type adds support balcony
CN103334492A (en) Prefabricated assembled type framework structure
CN204199434U (en) Prestressing force assembled architecture
CN208202224U (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer
CN108978849A (en) A kind of steel frame mechanization assembly type balcony
CN106013200A (en) Prefabricated assembly type strip foundation and construction technology
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN109024872A (en) A kind of concrete frame mechanization assembly type balcony

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181211

RJ01 Rejection of invention patent application after publication