CN207633795U - A kind of foundation pit suspension lane device - Google Patents

A kind of foundation pit suspension lane device Download PDF

Info

Publication number
CN207633795U
CN207633795U CN201721827544.0U CN201721827544U CN207633795U CN 207633795 U CN207633795 U CN 207633795U CN 201721827544 U CN201721827544 U CN 201721827544U CN 207633795 U CN207633795 U CN 207633795U
Authority
CN
China
Prior art keywords
ladder cage
foundation pit
upright bar
standard knot
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721827544.0U
Other languages
Chinese (zh)
Inventor
李勇海
杨嘉毅
章好龙
周新亚
孙小猛
项远方
胡晓东
徐登云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN201721827544.0U priority Critical patent/CN207633795U/en
Application granted granted Critical
Publication of CN207633795U publication Critical patent/CN207633795U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of foundation pits to hang lane device, this lane device includes the concrete foundation platform being located at the top of foundation pit, with the fixed supporting rack of the platform and fixed with supporting rack and reach deep down into foundation pit ready-package hang ladder cage, it includes the ladder cage standard knot successively spliced downwards and zigzag stair that ready-package, which hangs ladder cage, ladder cage standard knot has at least three ladder cage upright bars and is fixed with them and surround the stull for being closed frame, the ladder cage upright bar of top ladder cage standard knot is fixed with supporting rack, and corresponding ladder cage upright bar is connected through connector in remaining adjacent ladder cage standard knot, zigzag stair include corresponding each ladder cage standard knot setting half space and with the neighbouring fixed ladder of half space, card slot is set on half space is fastened on fixation in the stull of corresponding ladder cage standard knot.The device suitable for cutting depth Excavation Process in the case of continually changing construction personnel up and down, place adapts to strong, is convenient to mount and dismount flexibly, structure is safe and reliable, can reuse.

Description

A kind of foundation pit suspension lane device
Technical field
The utility model is related to bridge, building engineering field, it is specifically related to a kind of foundation pit suspension lane device and its peace Dress method, this foundation pit suspension lane device especially suitable in Deep Excavation with the continually changing feelings of cutting depth Condition.
Background technology
In the construction of deep-foundation pit engineering, site operation personnel need to enter foundation pit by upper and lower transit passage to apply Work industry.In conventional Deep foundation Pit excavation, foundation pit lower channel mostly uses steel pipe, shaped steel and steel plate and is welded, and needs root The transit passage up and down of respective heights is welded according to the depth of foundation pit, such transit passage disassembly process up and down is cumbersome, time-consuming to take Power, adaptability is poor, and security reliability is poor, and the materials such as steel pipe are substantially disposable, and recycling rate of waterused is relatively low, waste Seriously.
In existing public technology, such as publication number:CN 203755717 U《Walkway above and below deep basal pit assembled》It is situated between Continued a kind of transit passage up and down for deep basal pit, and technical method is:Metal is set in bottom of foundation ditch concrete foundation Column gradually installs assembled ladder cage from lower to upper herein on basis.But the technology is only applicable to excavation of foundation pit completion, foundation pit The fixed situation of depth, and must be on bottom of foundation ditch casting concrete basis.But it does not provide in Excavation Process, foundation pit is deep Degree with excavate constantly increase how the solution of installation personnel lower channel, therefore the device has some limitations, Be not suitable for personnel in Excavation Process up and down.
Invention content
The utility model aim is:A kind of foundation pit suspension lane device is provided for deep foundation pit construction personnel, it can be at any time Different excavation of foundation pit depth is adapted to convenient for above and below construction personnel, place strong applicability, installation, easy removal are flexible, is tied Structure is safe and reliable, and can reuse.
The technical solution of the utility model is:A kind of foundation pit suspension lane device, is excavated suitable for Excavation Process The continually changing situation of depth, it is characterised in that this lane device include the concrete foundation platform being arranged at the top of foundation pit, With the fixed supporting rack of concrete foundation platform and fixed with supporting rack and reach deep down into the ready-package in foundation pit hang ladder cage, The ready-package suspension ladder cage includes the ladder cage standard knot successively spliced downwards and the zigzag building being set in ladder cage standard knot Ladder, the ladder cage standard knot have at least three ladder cage upright bars and are fixed with ladder cage upright bar and enclose the stull for being closed frame, most The ladder cage upright bar of the ladder cage standard knot of top is fixed with supporting rack, and corresponding ladder cage in remaining neighbouring ladder cage standard knot Be connected by connector between upright bar, the zigzag stair include corresponding each ladder cage standard knot setting half space and with The fixed ladder of neighbouring half space, the half space is equipped with card slot, and is fastened on corresponding ladder cage by card slot It is fixed in the stull of standard knot.
Further, supporting rack described in the utility model includes being consolidated by the built-in fitting that concrete foundation platform is equipped with Two or more fixed cantilever beams and erection are simultaneously fixed on at least distribution beam above these cantilever beams, the cantilever beam and point The closure frame shape surrounded with beam is consistent with the closure frame that the stull of lower section ladder cage standard knot surrounds, and further includes corresponding each cantilever beam The montant and diagonal brace of setting, the montant is fixed by the built-in fitting that foundation pit side-wall is equipped with, and the diagonal brace both ends and montant It is fixed with cantilever beam, the ladder cage upright bar is fixed with distribution beam.
Further, ladder cage upright bar described in the utility model uses fining twisted steel, passes through distribution beam and uses spiral shell Cap is locked, and the connector is rebar sleeve, the corresponding ladder cage upright bar of neighbouring ladder cage standard knot It is connected and fixed by rebar sleeve;Built-in fitting on the concrete foundation platform is fining twisted steel, passes through cantilever beam Cooperation nut is with the cantilever beam that is locked afterwards;And the built-in fitting on the foundation pit side-wall is also fining twisted steel, passes through montant Cooperation nut is with the montant that is locked afterwards, and the diagonal brace both ends are welded with corresponding montant and cantilever beam, while the montant top Also it is welded with corresponding cantilever beam in portion.
It is further preferred that ladder cage upright bar described in the utility model uses nut lock after sequentially passing through cantilever beam and distribution beam It fastens.
Specifically, cantilever beam described in the utility model and distribution beam are all made of Two bors d's oeuveres channel steel, it is provided in advance for ladder thereon The trepanning that cage upright bar passes through, while the trepanning passed through for the built-in fitting on concrete foundation platform is also provided on the cantilever beam, And the montant is also Two bors d's oeuveres channel steel, is provided with the trepanning passed through for the built-in fitting on foundation pit side-wall thereon.
Further, uniform intervals certain distance x is provided with sustaining wall along longitudinal direction on foundation pit side-wall described in the utility model Rod piece is connected with ladder cage upright bar, the stability for increasing device, and the x is 4 ~ 6m.
Further, sustaining wall rod piece described in the utility model is screw-thread steel, and one end is inserted into foundation pit side-wall, another End is then welded and fixed with ladder cage upright bar.
Further, stull described in the utility model is connect by bowl fastening type fastener with ladder cage upright bar.
Further, ladder cage standard knot described in the utility model is rectangle rod structure, has four of distributed rectangular Ladder cage upright bar and four stulls that rectangular closure frame is fixed and enclosed with ladder cage upright bar.
Further, coordinate with ladder cage upright bar in the utility model and also padded between the nut of distribution beam and distribution beam with locking Equipped with billet;Coordinate with the built-in fitting on concrete foundation platform and is set with locking also to pad between the nut of cantilever beam and cantilever beam There is billet;Coordinate with the built-in fitting on foundation pit side-wall and is equipped with billet to lock also to pad between the nut of montant and montant.
The specific implementation assembly method of the utility model is as follows:
1, along foundation pit periphery casting concrete basic platform at the top of foundation pit, and in the top of concrete foundation platform and base The pre-buried fining twisted steel of side wall is cheated as built-in fitting.
2, after the intensity of concrete foundation platform and foundation pit side-wall concrete reaches design strength, pass through nut, steel pad The cantilever beam of supporting rack is distributed by plate with montant to be connected with the built-in fitting on concrete foundation platform and foundation pit side-wall.
3, it will be welded and fixed with cantilever beam at the top of montant, the diagonal brace for simultaneously supporting frame uses list Zhi Fanggang, by the two of diagonal brace End is welded with montant and cantilever beam, while will be distributed on roof beam structure to cantilever beam and being welded.
4, the ladder cage upright bar of ladder cage standard knot is installed, ladder cage upright bar uses fining twisted steel, the ladder cage standard knot of the top Ladder cage upright bar top sequentially pass through cantilever beam and distribution beam after be locked by nut and billet, and lower part then passes through spiral shell The ladder cage upright bar of line steel bushing connection lower section ladder cage standard knot, spreading as needed.
5, the stull of ladder cage standard knot is installed, stull uses seamless steel pipe, ladder cage upright bar is connected to by bowl fastening type fastener On, and closure frame is surrounded, the shape of frame is closed depending on the advance arrangement shape of ladder cage upright bar, such as three ladder cage upright bars are pressed Triangle-Profile, then the closure frame that stull surrounds triangle, under normal conditions we press rectangle using four ladder cage upright bars Distribution, the closure frame that corresponding four stulls surround also are rectangle.
6, zigzag stair are installed, the half space and ladder for constituting zigzag stair are all steel plate, and half space is by it On card slot card set to fixed in the stull of corresponding ladder cage standard knot, and ladder is then welded with neighbouring half space.
7,4 ~ 6m of uniform intervals is provided with sustaining wall rod piece and is connected with ladder cage upright bar along longitudinal direction on foundation pit side-wall, sustaining wall rod piece Screw-thread steel, one end is selected to be inserted into foundation pit side-wall, the other end is then welded and fixed with ladder cage upright bar.For ensureing whole device Stability.
8, with the increase of excavation of foundation pit depth, the 4-7 that repeats the above steps installs ladder cage standard knot section by section, to meet operation Demand above and below personnel.
The utility model has the advantages that:
1. this foundation pit provided by the utility model hangs lane device, foundation depth design has been dug with conventional basis The lane device built is compared, and maximum central characteristics are exactly the continually changing feelings of cutting depth suitable for Excavation Process Condition(From top to bottom build), i.e., different excavation of foundation pit depth is adapted at any time convenient for above and below construction personnel, place strong applicability, and And installation, easy removal it is flexible, structure is safe and reliable, and can reuse.
2. the setting fining twisted steel on concrete foundation platform described in the supporting rack of the utility model is as pre-buried Part, cooperation nut is with the cantilever beam that is locked after passing through cantilever beam;And the built-in fitting on the foundation pit side-wall is also finish rolling spiral shell Line steel, for cooperation nut with the montant that is locked, these designs not only ensure stabilized structure after passing through montant, and all greatly just Conducive to the supporting rack fast construction installation and removal in Excavation Process, while material is repeated and is utilized.
3. ladder cage upright bar uses fining twisted steel, the upper end to be locked by nut with distribution beam in the utility model, And rebar sleeve is then used to connect between two ladder cage upright bars, spreading ladder cage in extremely convenient Excavation Process;And it is horizontal Support is connected by bowl fastening type fastener with ladder cage upright bar;Ladder and half space are made by steel plate, and half space by being arranged thereon Card slot card set to fixed in stull, these design all express passways of the great convenience in Excavation Process build peace Assembly and disassembly, while the repeatable utilization of material.
After 4. ladder cage upright bar described in a kind of specific embodiment of the utility model sequentially passes through cantilever beam and distribution beam Be locked with nut, i.e., cantilever beam and distribution beam secured by ladder cage upright bar simultaneously, simplify cantilever beam and distribution beam it Between script fixed operation, be conducive to the rapid-assembling/disassembling in channel, save time and materials cost, while material is repeatable utilizes.
5. the cantilever beam of supporting rack reinforces positioning by montant and diagonal brace in the utility model, and then supports distribution beam, and Lower section ladder cage is then positioned by the sustaining wall reinforcement of rod pieces being arranged on foundation pit side-wall, these structure designs have all ensured that lane device is whole Body framework consolidates.
6. cantilever beam described in the utility model and distribution beam are all made of Two bors d's oeuveres channel steel, it is provided in advance thereon vertical for ladder cage The trepanning that bar passes through, while the trepanning passed through for the built-in fitting on concrete foundation platform is also provided on the cantilever beam, and institute State montant also be Two bors d's oeuveres channel steel, be provided with the trepanning passed through for the built-in fitting on foundation pit side-wall thereon, these design also greatly just Conducive to the installation and removal of building of the express passway in Excavation Process, while material is repeated and is utilized.
7. coordinating with ladder cage upright bar in the utility model and being equipped with steel to lock also to pad between the nut of distribution beam and distribution beam Backing plate;Coordinate with the built-in fitting on concrete foundation platform and is equipped with steel pad to lock also to pad between the nut of cantilever beam and cantilever beam Plate;Coordinate with the built-in fitting on foundation pit side-wall and is equipped with billet to lock also to pad between the nut of montant and montant, billet Introducing protects corresponding distribution beam, cantilever beam and montant so that material is repeatable to be utilized.
Description of the drawings
The utility model is further described with reference to the accompanying drawings and embodiments:
Fig. 1 is a kind of dimensional structure diagram of specific embodiment of the utility model;
Fig. 2 is the front view of Fig. 1 embodiments;
Fig. 3 is the side view of Fig. 1 embodiments.
Wherein:1, cantilever beam, 2, montant, 3, distribution beam, 4, diagonal brace, 5, stull, 6, ladder cage upright bar, 7, ladder, 8, rest Platform, 9, nut, 10, built-in fitting, 11, rebar sleeve, 12, sustaining wall rod piece;13, concrete foundation platform;14, billet.
Specific implementation mode
Embodiment:The one of lane device is hung to this foundation pit provided by the utility model with reference to shown in Fig. 1 ~ Fig. 3 Kind specific implementation mode is described as follows:This lane device cutting depth suitable for Excavation Process constantly changes The case where, there is the concrete foundation platform 13 being arranged at the top of foundation pit and the 13 fixed support of concrete foundation platform Frame and the suspension ladder cage of the ready-package in foundation pit is fixed and reached deep down into supporting rack, ready-package suspension ladder cage include successively to The ladder cage standard knot of lower splicing and the zigzag stair being set in ladder cage standard knot, ladder cage standard knot described in the present embodiment are Rectangular frame structure, by rectangular distribution four ladder cage upright bars 6 and with ladder cage upright bar 6 fix and enclose it is rectangular be closed frame four Root stull 5 collectively forms.The ladder cage upright bar 6 of the ladder cage standard knot of the top is fixed with supporting rack, and remaining neighbouring ladder It is connected by connector between corresponding ladder cage upright bar 6 in cage standard knot, the zigzag stair are corresponding each ladder cage standard knot The half space 8 of setting and with neighbouring 8 fixed ladder 7 of half space, the half space 8(Both sides)It is equipped with card Slot, and be fastened in the stull 5 of parallel both sides two of corresponding ladder cage standard knot and fix by card slot.
Supporting rack described in the present embodiment has the built-in fitting 10 fixed two being equipped with by concrete foundation platform 13 The parallel cantilever beam 1 of root and the two parallel distribution beams 3 for setting up and being fixed on this two cantilever beams, 1 top.The cantilever beam 1 It is consistent with the closure frame that the stull 5 of lower section ladder cage standard knot surrounds with the closure frame shape that distribution beam 3 surrounds, also it is rectangle.Branch The montant 2 and diagonal brace 4, the montant 2 also in the structure of support with corresponding each setting of cantilever beam 1 are equipped with by foundation pit side-wall Built-in fitting 10 fix, and 4 both ends of the diagonal brace and montant 2 and cantilever beam 1 are fixed.
It still specifically combines shown in Fig. 1 ~ Fig. 3, ladder cage upright bar described in the present embodiment 6 uses fining twisted steel, successively It is locked with nut 9 after cantilever beam 1 and distribution beam 3.And the connector is rebar sleeve 11, it is described neighbouring The corresponding ladder cage upright bar 6 of ladder cage standard knot be connected and fixed by rebar sleeve 11;On the concrete foundation platform 13 Built-in fitting 10 be fining twisted steel, pass through cantilever beam 1 after cooperation nut 9 with the cantilever beam 1 that is locked;And the foundation pit side Built-in fitting 10 on wall is also fining twisted steel, and cooperation nut 9 is with the montant 2 that is locked, the diagonal brace 4 after passing through montant 2 Both ends are welded with corresponding montant 2 and cantilever beam 1, while 2 top of the montant is also welded with corresponding cantilever beam 1.
Cantilever beam 1 described in the present embodiment and distribution beam 3 are all made of Two bors d's oeuveres channel steel, are provided in advance thereon for ladder cage upright bar 6 The trepanning passed through, while the trepanning passed through for the built-in fitting 10 on concrete foundation platform 13 is also provided on the cantilever beam 1, and The montant 2 is also Two bors d's oeuveres channel steel, is provided with the trepanning passed through for the built-in fitting 10 on foundation pit side-wall thereon.
In the present embodiment, uniform intervals 5m distances are provided with sustaining wall rod piece 12 along longitudinal direction on the foundation pit side-wall and ladder cage is vertical Bar 6 is connected, the stability for increasing device.The sustaining wall rod piece 12 is screw-thread steel, and one end is inserted into foundation pit side-wall, another End is then welded and fixed with ladder cage upright bar 6.
Stull 5 described in the present embodiment is connect by bowl fastening type fastener with ladder cage upright bar 6.
Coordinate with ladder cage upright bar 6 in the present embodiment and is equipped with steel to lock also to pad between the nut 9 of distribution beam 3 and distribution beam 3 Backing plate 14;Coordinate to lock between the nut 9 of cantilever beam 1 and cantilever beam 1 with the built-in fitting 10 on concrete foundation platform 13 Pad is equipped with billet 14;Coordinate with the built-in fitting 10 on foundation pit side-wall and is set with locking also to pad between the nut 9 of montant 2 and montant 2 There is billet 14.
In conjunction with shown in Fig. 1 ~ Fig. 3, the specific implementation assembly method of the present embodiment is as follows:
1, along foundation pit periphery casting concrete basic platform 13 at the top of foundation pit, and at the top of concrete foundation platform 13 And the pre-buried fining twisted steel of foundation pit side-wall is as built-in fitting 10.
2, after the intensity of concrete foundation platform 13 and foundation pit side-wall concrete reaches design strength, pass through nut 9, steel The cantilever beam 1 of supporting rack and montant 2 are distributed with 10 phase of built-in fitting on concrete foundation platform 13 and foundation pit side-wall by backing plate 14 Even.
3,2 top of montant is welded and fixed with cantilever beam 1, the diagonal brace 4 for simultaneously supporting frame uses list Zhi Fanggang, by diagonal brace 4 Both ends welded with montant 2 and cantilever beam 1, while on distribution beam 3 frame to cantilever beam 1 and will weld.
4, the ladder cage upright bar 6 of ladder cage standard knot is installed, ladder cage upright bar 6 uses fining twisted steel, the ladder cage standard of the top 6 top of ladder cage upright bar of section is locked after sequentially passing through cantilever beam 1 and distribution beam 3 by nut 9 and billet 14, and lower part The ladder cage upright bar 6 of lower section ladder cage standard knot, spreading as needed are then connected by rebar sleeve 11.
5, the stull 5 of ladder cage standard knot is installed, stull 5 uses seamless steel pipe, and it is vertical to be connected to ladder cage by bowl fastening type fastener On bar 6, and surrounds rectangle and be closed frame.
6, install zigzag stair, constitute zigzag stair half space 8 and ladder 7 all be steel plate, half space 8 by Card slot card thereon is set to fixation in the stull 5 of corresponding ladder cage standard knot, and ladder 7 is then welded with neighbouring half space 8 It connects.
7, uniform intervals 5m is provided with sustaining wall rod piece 12 and is connected with ladder cage upright bar 6 along longitudinal direction on foundation pit side-wall, sustaining wall bar Part 12 selects screw-thread steel, one end to be inserted into foundation pit side-wall, and the other end is then welded and fixed with ladder cage upright bar 6.It is entire for ensureing The stability of device.
8, with the increase of excavation of foundation pit depth, the 4-7 that repeats the above steps installs ladder cage standard knot section by section, to meet operation Demand above and below personnel.
Certain above-described embodiment is only the technical concepts and features for illustrating the utility model, and its object is to allow be familiar with this The people of technology can understand the content of the utility model and implement according to this, and the protection model of the utility model can not be limited with this It encloses.Any modifications made in accordance with the spirit of the main technical solutions of the utility model should all cover the guarantor in the utility model Within the scope of shield.

Claims (10)

1. a kind of foundation pit hangs lane device, the continually changing situation of cutting depth, feature suitable for Excavation Process It is that this lane device includes the concrete foundation platform being arranged at the top of foundation pit(13)And the concrete foundation platform(13) It fixed supporting rack and is fixed with supporting rack and reaches deep down into the suspension ladder cage of the ready-package in foundation pit, the ready-package hangs ladder cage Including the ladder cage standard knot successively spliced downwards and the zigzag stair being set in ladder cage standard knot, the ladder cage standard knot tool There are at least three ladder cage upright bars(6)And with ladder cage upright bar(6)It fixes and encloses the stull for being closed frame(5), the ladder cage of the top The ladder cage upright bar of standard knot(6)It is fixed with supporting rack, and corresponding ladder cage upright bar in remaining neighbouring ladder cage standard knot(6) Between be connected by connector, the zigzag stair include the half space of corresponding each ladder cage standard knot setting(8)With with it is upper Under adjacent half space(8)Fixed ladder(7), the half space(8)It is equipped with card slot, and phase is fastened on by card slot Answer the stull of ladder cage standard knot(5)Upper fixation.
2. a kind of foundation pit according to claim 1 hangs lane device, it is characterised in that support frame as described above includes by mixed Solidifying earth foundation platform(13)The built-in fitting being equipped with(10)Fixed two or more cantilever beams(1)And it sets up and is fixed on these and hang Arm beam(1)An at least distribution beam for top(3), the cantilever beam(1)And distribution beam(3)The closure frame shape surrounded and lower section The stull of ladder cage standard knot(5)The closure frame surrounded is consistent, further includes corresponding each cantilever beam(1)The montant of setting(2)And diagonal brace (4), the montant(2)The built-in fitting being equipped with by foundation pit side-wall(10)It is fixed, and the diagonal brace(4)Both ends and montant(2) And cantilever beam(1)It is fixed, the ladder cage upright bar(6)With distribution beam(3)It is fixed.
3. a kind of foundation pit according to claim 2 hangs lane device, it is characterised in that the ladder cage upright bar(6)Using essence Screw-thread steel is rolled, distribution beam is passed through(3)Nut is used in combination(9)It is locked, and the connector is rebar sleeve(11), described The corresponding ladder cage upright bar of neighbouring ladder cage standard knot(6)Pass through rebar sleeve(11)It is connected and fixed;The concrete Basic platform(13)On built-in fitting(10)For fining twisted steel, cantilever beam is passed through(1)After coordinate nut(9)To be locked Cantilever beam(1);And the built-in fitting on the foundation pit side-wall(10)Also it is fining twisted steel, passes through montant(2)After coordinate nut (9)With the montant that is locked(2), the diagonal brace(4)Both ends and corresponding montant(2)And cantilever beam(1)Welding, at the same it is described perpendicular Bar(2)Top also with corresponding cantilever beam(1)Welding.
4. a kind of foundation pit according to claim 3 hangs lane device, it is characterised in that the ladder cage upright bar(6)It wears successively Cross cantilever beam(1)And distribution beam(3)After use nut(9)It is locked.
5. a kind of foundation pit according to claim 4 hangs lane device, it is characterised in that the cantilever beam(1)And distribution beam (3)It is all made of Two bors d's oeuveres channel steel, is provided in advance thereon for ladder cage upright bar(6)The trepanning passed through, while the cantilever beam(1)On also open Have for concrete foundation platform(13)On built-in fitting(10)The trepanning passed through, and the montant(2)Also it is Two bors d's oeuveres channel steel, thereon It is provided with for the built-in fitting on foundation pit side-wall(10)The trepanning passed through.
6. a kind of foundation pit according to claim 1 hangs lane device, it is characterised in that on foundation pit side-wall along longitudinal direction uniformly X spaced apart is provided with sustaining wall rod piece(12)With ladder cage upright bar(6)It is connected, the stability for increasing device, the x is 4~6m。
7. a kind of foundation pit according to claim 6 hangs lane device, it is characterised in that the sustaining wall rod piece(12)For spiral shell Line steel, one end be inserted into foundation pit side-wall in, the other end then with ladder cage upright bar(6)It is welded and fixed.
8. a kind of foundation pit according to claim 1 hangs lane device, it is characterised in that the stull(5)Pass through bowl fastening type Fastener and ladder cage upright bar(6)Connection.
9. a kind of foundation pit according to claims 1 or 2 or 8 hangs lane device, it is characterised in that the ladder cage standard knot For rectangle rod structure, four ladder cage upright bars with distributed rectangular(6)And with ladder cage upright bar(6)It fixes and encloses rectangular closure Four stulls of frame(5).
10. a kind of foundation pit according to claim 3 hangs lane device, it is characterised in that with ladder cage upright bar(6)Cooperation with Lock distribution beam(3)Nut(9)With distribution beam(3)Between also pad be equipped with billet(14);With concrete foundation platform(13) On built-in fitting(10)Cooperation is to lock cantilever beam(1)Nut(9)With cantilever beam(1)Between also pad be equipped with billet(14); With the built-in fitting on foundation pit side-wall(10)Cooperation is to lock montant(2)Nut(9)With montant(2)Between also pad be equipped with billet (14).
CN201721827544.0U 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device Active CN207633795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721827544.0U CN207633795U (en) 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721827544.0U CN207633795U (en) 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device

Publications (1)

Publication Number Publication Date
CN207633795U true CN207633795U (en) 2018-07-20

Family

ID=62852376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721827544.0U Active CN207633795U (en) 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device

Country Status (1)

Country Link
CN (1) CN207633795U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138497A (en) * 2018-10-21 2019-01-04 济宁市昊通工程机械有限公司 A kind of safe ladder cage combination unit of engineering adjustable height
DE202021102940U1 (en) 2020-06-12 2021-06-15 China Railway Erju 5Th Engineering Co., Ltd. Fastening and reinforcing device for combined frame-like suspension channels in shafts

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138497A (en) * 2018-10-21 2019-01-04 济宁市昊通工程机械有限公司 A kind of safe ladder cage combination unit of engineering adjustable height
DE202021102940U1 (en) 2020-06-12 2021-06-15 China Railway Erju 5Th Engineering Co., Ltd. Fastening and reinforcing device for combined frame-like suspension channels in shafts

Similar Documents

Publication Publication Date Title
CN107939068A (en) A kind of foundation pit hangs lane device
CN103882813B (en) For calf support platform and the building method thereof of bridge pier and straining beam synchronous construction
CN106150088A (en) Large cantilever beam slab combined type formwork system and construction method
CN103866697B (en) A kind of bridge pier and straining beam calf support method for synchronously constructing
CN103422668A (en) Construction method of super-thick large-slope shear wall and hydraulic self-jacking inclined creeping framework thereof
CN207633795U (en) A kind of foundation pit suspension lane device
CN105804400A (en) Hoisting construction method of curved truss
CN203347213U (en) Structural steel tripod in overhanging type scaffold and scaffold system
CN113074003B (en) Small clear distance tunnel deformation inhibition method for argillaceous sandstone stratum
CN103334580B (en) Section steel tripod in a kind of overhanging scaffold and connection system for guide rail
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN101591915A (en) The outer support system and the job practices thereof that are used for supporting caisson structure
KR100642326B1 (en) A temporary apparatus for constructing girder by top-down style construction method
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN110409462B (en) Foundation pit support reinforcing method and foundation pit support system
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN207177310U (en) A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure
CN201433398Y (en) External support system for supporting open caisson structure
CN106836242B (en) Deep foundation pit anchor cable tensioning assembly type operation platform
CN115977696A (en) Soft rock tunnel intersection supporting construction method
CN108240113A (en) Detachably across the support device at hole and method
CN208934293U (en) Vertical shaft stair
CN209277169U (en) Two bors d's oeuveres bracing members node apparatus
CN217590191U (en) Large-span subway foundation pit cable trench suspends normal position protection architecture in midair

Legal Events

Date Code Title Description
GR01 Patent grant