CN207633795U - A kind of foundation pit suspension lane device - Google Patents

A kind of foundation pit suspension lane device Download PDF

Info

Publication number
CN207633795U
CN207633795U CN201721827544.0U CN201721827544U CN207633795U CN 207633795 U CN207633795 U CN 207633795U CN 201721827544 U CN201721827544 U CN 201721827544U CN 207633795 U CN207633795 U CN 207633795U
Authority
CN
China
Prior art keywords
ladder cage
foundation pit
fixed
ladder
cantilever beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721827544.0U
Other languages
Chinese (zh)
Inventor
李勇海
杨嘉毅
章好龙
周新亚
孙小猛
项远方
胡晓东
徐登云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN201721827544.0U priority Critical patent/CN207633795U/en
Application granted granted Critical
Publication of CN207633795U publication Critical patent/CN207633795U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

本实用新型公开了一种基坑悬挂通道装置,这种通道装置包括设在基坑顶部的混凝土基础平台、与该平台固定的支撑架和与支撑架固定并向下深入基坑的快装式悬挂梯笼,快装式悬挂梯笼包括逐层向下拼接的梯笼标准节和Z字形楼梯,梯笼标准节具有至少三根梯笼立杆及与它们固定并围成闭合框的横撑,顶部梯笼标准节的梯笼立杆与支撑架固定,而其余相邻梯笼标准节中对应的梯笼立杆经连接件相连,Z字形楼梯包括对应每个梯笼标准节设置的休息平台和与上下相邻的休息平台固定的阶梯,休息平台上设卡槽卡设在相应梯笼标准节的横撑上固定。该装置适用于基坑开挖过程中开挖深度不断变化的情况下施工人员的上下,场地适应强,装拆方便灵活,结构安全可靠,能重复利用。

The utility model discloses a suspension channel device for a foundation pit. The channel device comprises a concrete foundation platform arranged on the top of the foundation pit, a support frame fixed with the platform, and a quick-installation type that is fixed with the support frame and penetrates downward into the foundation pit. Suspension ladder cage, quick-installation suspension ladder cage includes ladder cage standard section and Z-shaped stairs spliced downward layer by layer. The ladder cage standard section has at least three ladder cage poles and cross braces fixed with them and enclosing a closed frame. The ladder cage vertical poles of the top ladder cage standard section are fixed with the support frame, while the corresponding ladder cage vertical poles in the other adjacent ladder cage standard sections are connected through connecting pieces, and the Z-shaped stairs include a rest platform corresponding to each ladder cage standard section. As for the ladder fixed to the rest platform adjacent to the upper and lower sides, the rest platform is provided with a card slot which is fixed on the cross brace of the corresponding ladder cage standard section. The device is suitable for the up and down of construction workers when the excavation depth is constantly changing during the excavation of the foundation pit. It has strong site adaptability, convenient and flexible assembly and disassembly, safe and reliable structure, and can be reused.

Description

一种基坑悬挂通道装置A foundation pit suspension channel device

技术领域technical field

本实用新型涉及桥梁、建筑工程领域,具体是涉及一种基坑悬挂通道装置及其安装方法,这种基坑悬挂通道装置特别适用于深基坑开挖过程中随着开挖深度不断变化的情况。The utility model relates to the fields of bridges and construction engineering, in particular to a suspension channel device for foundation pits and an installation method thereof. Happening.

背景技术Background technique

在深基坑工程的施工中,现场施工人员需要通过上下通行通道进入基坑来进行施工作业。常规深基坑施工过程中,基坑上下通道多采用钢管、型钢与钢板焊接而成,且需根据基坑的深度来焊接对应高度的上下通行通道,此类上下通行通道拆装过程繁琐,费时费力,适应性较差,安全可靠性差,且钢管等材料基本都是一次性使用,重复利用率较低,浪费严重。In the construction of deep foundation pit engineering, on-site construction personnel need to enter the foundation pit through the upper and lower passages to carry out construction work. During the construction of conventional deep foundation pits, the upper and lower passages of the foundation pit are mostly welded by steel pipes, section steel and steel plates, and the upper and lower passages of corresponding heights need to be welded according to the depth of the foundation pit. The disassembly and assembly process of such upper and lower passages is cumbersome and time-consuming It is laborious, poor in adaptability, poor in safety and reliability, and materials such as steel pipes are basically disposable, with low reuse rate and serious waste.

在现有公开技术中,如公开号:CN 203755717 U《深基坑装配式上下人行通道》介绍了一种用于深基坑的上下通行通道,其技术方法是:在基坑底部混凝土基础上设置金属立柱,在此基础之上由下往上逐步安装装配式梯笼。但该技术仅适用于基坑开挖完成,基坑深度已定的情况,且必须在基坑底部浇筑混凝土基础。但并未给出基坑开挖过程中,基坑深度随着开挖不断增大如何安装人员上下通道的解决方法,因此该装置存在一定的局限性,不适用于基坑开挖过程中人员的上下。In the existing public technology, such as publication number: CN 203755717 U "Deep Foundation Pit Assembled Upper and Lower Passageway" introduces a kind of upper and lower passageways for deep foundation pits. The technical method is: on the concrete foundation at the bottom of the foundation pit Set up metal columns, and gradually install the assembled ladder cage from bottom to top on this basis. However, this technology is only applicable to the situation where the excavation of the foundation pit is completed and the depth of the foundation pit is fixed, and the concrete foundation must be poured at the bottom of the foundation pit. However, it did not give a solution to how to install the upper and lower passages for personnel when the depth of the foundation pit increases with the excavation during the excavation process of the foundation pit. Therefore, this device has certain limitations and is not suitable for personnel during the excavation process of the foundation pit. up and down.

发明内容Contents of the invention

本实用新型目的是:为深基坑施工人员提供一种基坑悬挂通道装置,其能够随时适应不同的基坑开挖深度便于施工人员上下,场地适用性强,安装、拆卸简单方便灵活,结构安全可靠,且能重复利用。The purpose of the utility model is: to provide a foundation pit suspension channel device for deep foundation pit construction personnel, which can adapt to different excavation depths of foundation pits at any time, which is convenient for construction personnel to go up and down, has strong site applicability, is simple, convenient and flexible to install and disassemble, and has a flexible structure. Safe and reliable, and can be reused.

本实用新型的技术方案是:一种基坑悬挂通道装置,适用于基坑开挖过程中开挖深度不断变化的情况,其特征在于这种通道装置包括设置在基坑顶部的混凝土基础平台、与该混凝土基础平台固定的支撑架和与支撑架固定并向下深入基坑内的快装式悬挂梯笼,所述快装式悬挂梯笼包括逐层向下拼接的梯笼标准节和设置于梯笼标准节内的Z字形楼梯,所述梯笼标准节具有至少三根梯笼立杆及与梯笼立杆固定并围合成闭合框的横撑,最上方的梯笼标准节的梯笼立杆与支撑架固定,而其余上下相邻的梯笼标准节中对应的梯笼立杆之间通过连接件相连,所述Z字形楼梯包括对应每个梯笼标准节设置的休息平台和与上下相邻的休息平台固定的阶梯,所述休息平台上设有卡槽,并藉由卡槽卡设在相应梯笼标准节的横撑上固定。The technical scheme of the utility model is: a foundation pit suspension channel device, which is suitable for the situation that the excavation depth is constantly changing during the excavation process of the foundation pit, and is characterized in that the channel device includes a concrete foundation platform arranged on the top of the foundation pit, The support frame fixed with the concrete foundation platform and the quick-installed suspension ladder cage fixed with the support frame and deep into the foundation pit downwards, the quick-installation suspension ladder cage includes ladder cage standard sections spliced downward layer by layer and arranged on The Z-shaped staircase in the ladder cage standard section, the ladder cage standard section has at least three ladder cage uprights and cross braces fixed with the ladder cage uprights and forming a closed frame, the ladder cage of the uppermost ladder cage standard section is vertical The rods are fixed to the support frame, and the corresponding ladder cage vertical rods in the other upper and lower adjacent ladder cage standard sections are connected through connecting pieces. The zigzag staircase includes a rest platform corresponding to each ladder cage standard section and an The adjacent rest platform is fixed to the ladder, and the rest platform is provided with a card slot, and is fixed on the cross brace of the corresponding ladder cage standard section by the card slot.

进一步的,本实用新型中所述支撑架包括通过混凝土基础平台上设有的预埋件固定的两根以上悬臂梁及架设并固定在这些悬臂梁上方的至少一根分配梁,所述悬臂梁和分配梁围成的闭合框形状与下方梯笼标准节的横撑围成的闭合框一致,还包括对应各悬臂梁设置的竖杆和斜撑,所述竖杆通过基坑侧壁上设有的预埋件固定,而所述斜撑两端与竖杆和悬臂梁固定,所述梯笼立杆与分配梁固定。Further, the support frame in the utility model includes more than two cantilever beams fixed by embedded parts provided on the concrete foundation platform and at least one distribution beam erected and fixed above these cantilever beams, the cantilever beams The shape of the closed frame surrounded by the distribution beam is consistent with the closed frame formed by the cross braces of the lower ladder cage standard section, and also includes vertical bars and diagonal braces set corresponding to each cantilever beam. Some embedded parts are fixed, and the two ends of the diagonal brace are fixed with the vertical bar and the cantilever beam, and the ladder cage vertical bar is fixed with the distribution beam.

更进一步的,本实用新型中所述梯笼立杆采用精轧螺纹钢,其穿过分配梁并用螺帽锁紧固定,而所述连接件为螺纹钢套筒,所述上下相邻的梯笼标准节相对应的梯笼立杆通过螺纹钢套筒连接固定;所述混凝土基础平台上的预埋件为精轧螺纹钢,其穿过悬臂梁后配合螺帽以锁紧固定悬臂梁;而所述基坑侧壁上的预埋件也为精轧螺纹钢,其穿过竖杆后配合螺帽以锁紧固定竖杆,所述斜撑两端与相应的竖杆和悬臂梁焊接,同时所述竖杆顶部也与相应的悬臂梁焊接。Furthermore, the ladder cage vertical rod in the utility model is made of fine-rolled threaded steel, which passes through the distribution beam and is fixed with nuts, and the connecting piece is a threaded steel sleeve, and the upper and lower adjacent ladders The ladder cage vertical rods corresponding to the cage standard sections are connected and fixed by threaded steel sleeves; the embedded parts on the concrete foundation platform are precision-rolled threaded steels, which pass through the cantilever beam and cooperate with nuts to lock and fix the cantilever beam; The embedded parts on the side wall of the foundation pit are also finished rolled rebars, which pass through the vertical bars and cooperate with nuts to lock and fix the vertical bars. The two ends of the diagonal braces are welded to the corresponding vertical bars and cantilever beams. , while the top of the vertical bar is also welded with the corresponding cantilever beam.

进一步优选的,本实用新型中所述梯笼立杆依次穿过悬臂梁和分配梁后用螺帽锁紧固定。Further preferably, the upright rods of the ladder cage in the present utility model pass through the cantilever beam and the distribution beam in turn and are locked and fixed with nuts.

具体的,本实用新型中所述悬臂梁和分配梁均采用双拼槽钢,其上预先开有供梯笼立杆穿过的开孔,同时所述悬臂梁上还开有供混凝土基础平台上的预埋件穿过的开孔,而所述竖杆也为双拼槽钢,其上开有供基坑侧壁上的预埋件穿过的开孔。Specifically, both the cantilever beam and the distribution beam described in the utility model are made of double channel steel, and openings are opened in advance for the upright rod of the ladder cage to pass through, and at the same time, the cantilever beam is also provided with a concrete foundation platform The opening through which the embedded part on the foundation pit passes, and the vertical bar is also a double channel steel, which has an opening for the embedded part on the side wall of the foundation pit to pass through.

进一步的,本实用新型中所述基坑侧壁上沿纵向均匀间隔一定距离x设置有扶墙杆件与梯笼立杆相连,用于增加装置的稳定性,所述x为4~6m。Further, in the utility model, on the side wall of the foundation pit described in the utility model, the buttress rods are evenly spaced at a certain distance x along the longitudinal direction to connect with the vertical rods of the ladder cage to increase the stability of the device, and the x is 4-6m.

更进一步的,本实用新型中所述扶墙杆件为螺纹钢,其一端插入基坑侧壁内,另一端则与梯笼立杆焊接固定。Furthermore, the buttress rods described in the utility model are threaded steel, one end of which is inserted into the side wall of the foundation pit, and the other end is welded and fixed with the vertical rod of the ladder cage.

进一步的,本实用新型中所述横撑通过碗扣式扣件与梯笼立杆连接。Further, the cross brace in the utility model is connected to the vertical rod of the ladder cage through a bowl button fastener.

更进一步的,本实用新型中所述梯笼标准节为矩形柱结构,具有矩形分布的四根梯笼立杆及与梯笼立杆固定并围合成矩形闭合框的四根横撑。Furthermore, the ladder cage standard section in the utility model is a rectangular column structure, with four ladder cage uprights distributed in a rectangle and four cross braces fixed with the ladder cage uprights and enclosing a rectangular closed frame.

进一步的,本实用新型中与梯笼立杆配合以锁紧分配梁的螺帽与分配梁之间还垫设有钢垫板;与混凝土基础平台上的预埋件配合以锁紧悬臂梁的螺帽与悬臂梁之间也垫设有钢垫板;与基坑侧壁上的预埋件配合以锁紧竖杆的螺帽与竖杆之间也垫设有钢垫板。Further, in the utility model, a steel backing plate is arranged between the nut of the ladder cage vertical rod to lock the distribution beam and the distribution beam; it cooperates with the embedded parts on the concrete foundation platform to lock the cantilever beam. A steel backing plate is also placed between the nut and the cantilever beam; a steel backing plate is also placed between the nut and the vertical bar that cooperate with the embedded parts on the side wall of the foundation pit to lock the vertical bar.

本实用新型的具体实施装配方法如下:The concrete implementation assembly method of the present utility model is as follows:

1、在基坑顶部沿基坑外围浇筑混凝土基础平台,并在混凝土基础平台的顶部及基坑侧壁预埋精轧螺纹钢作为预埋件。1. On the top of the foundation pit, pour a concrete foundation platform along the periphery of the foundation pit, and pre-embed the finished rolled rebar on the top of the concrete foundation platform and the side wall of the foundation pit as embedded parts.

2、待混凝土基础平台和基坑侧壁混凝土的强度达到设计强度后,通过螺帽、钢垫板将支撑架的悬臂梁与竖杆分布同混凝土基础平台和基坑侧壁上的预埋件相连。2. After the strength of the concrete foundation platform and the side wall of the foundation pit reaches the design strength, the cantilever beams and vertical bars of the support frame are distributed with the embedded parts on the concrete foundation platform and the side wall of the foundation pit through nuts and steel backing plates. connected.

3、将竖杆顶部与悬臂梁焊接固定,同时支撑架的斜撑采用单支方钢,将斜撑的两端同竖杆和悬臂梁焊接,同时将分配梁架至悬臂梁上并焊接。3. Weld and fix the top of the vertical bar to the cantilever beam. At the same time, the diagonal brace of the support frame is made of a single square steel. Weld the two ends of the diagonal brace to the vertical bar and the cantilever beam. At the same time, the distribution beam is mounted on the cantilever beam and welded.

4、安装梯笼标准节的梯笼立杆,梯笼立杆采用精轧螺纹钢,最上方的梯笼标准节的梯笼立杆上部依次穿过悬臂梁和分配梁后通过螺帽与钢垫板锁紧固定,而下部则通过螺纹钢套筒连接下方梯笼标准节的梯笼立杆,根据需要接长。4. Install the ladder cage pole of the ladder cage standard section. The ladder cage pole is made of fine-rolled rebar. The upper part of the ladder cage pole of the uppermost ladder cage standard section passes through the cantilever beam and the distribution beam in turn, and then passes through the nut and steel The backing plate is locked and fixed, and the lower part is connected to the ladder cage vertical rod of the lower ladder cage standard section through a threaded steel sleeve, and can be extended as needed.

5、安装梯笼标准节的横撑,横撑采用无缝钢管,通过碗扣式扣件连接到梯笼立杆上,并围成闭合框,闭合框的形状根据梯笼立杆预先的排布形状而定,例如三根梯笼立杆按三角形分布,则横撑围成的闭合框即成三角形,通常情况下我们采用四根梯笼立杆按矩形分布,相应的四根横撑围成的闭合框也为矩形。5. Install the cross brace of the standard section of the ladder cage. The cross brace is made of seamless steel pipe, connected to the vertical rod of the ladder cage through a bowl button fastener, and surrounded by a closed frame. Depending on the shape of the cloth, for example, three ladder cage poles are distributed in a triangle, and the closed frame surrounded by the cross braces is a triangle. Usually, we use four ladder cage poles to be distributed in a rectangle, and the corresponding four cross braces form a triangle. The enclosing box of is also a rectangle.

6、安装Z字形楼梯,构成Z字形楼梯的休息平台和阶梯都为钢板,休息平台藉由其上的卡槽卡设至相应梯笼标准节的横撑上固定,而阶梯则与上下相邻的休息平台焊接。6. Install the Z-shaped stairs. The rest platform and the steps that make up the Z-shaped stairs are all made of steel plates. The rest platform is fixed to the cross brace of the corresponding ladder cage standard section through the card slots on it, and the steps are adjacent to the upper and lower sides. The rest of the platform is welded.

7、在基坑侧壁上沿纵向均匀间隔4~6m设置有扶墙杆件与梯笼立杆相连,扶墙杆件选用螺纹钢,其一端插入基坑侧壁内,另一端则与梯笼立杆焊接固定。用于保证整个装置的稳定性。7. On the side wall of the foundation pit, there are vertically evenly spaced 4~6m with buttress rods connected with the vertical rods of the ladder cage. The cage pole is welded and fixed. Used to ensure the stability of the entire device.

8、随着基坑开挖深度的增加,重复上述步骤4-7逐节安装梯笼标准节,以满足作业人员上下需求。8. As the excavation depth of the foundation pit increases, repeat the above steps 4-7 to install the standard section of the ladder cage section by section to meet the needs of the operators.

本实用新型的优点是:The utility model has the advantages of:

1.本实用新型提供的这种基坑悬挂通道装置,其与常规根据已挖好基坑深度设计搭建的通道装置相比,最大的核心特点就是适用于基坑开挖过程中开挖深度不断变化的情况(由上而下搭建),即随时适应不同的基坑开挖深度便于施工人员上下,场地适用性强,并且安装、拆卸简单方便灵活,结构安全可靠,且能重复利用。1. The foundation pit suspension channel device provided by the utility model, compared with the conventional channel device designed and built according to the depth of the excavated foundation pit, the biggest core feature is that it is suitable for the environment where the excavation depth is constantly changing during the excavation process of the foundation pit. Situation (built from top to bottom), that is, it can adapt to different excavation depths of foundation pits at any time, which is convenient for construction personnel to go up and down, has strong site applicability, and is simple, convenient and flexible to install and disassemble, safe and reliable in structure, and can be reused.

2. 本实用新型的支撑架中所述混凝土基础平台上的设置精轧螺纹钢作为预埋件,其穿过悬臂梁后配合螺帽以锁紧固定悬臂梁;而所述基坑侧壁上的预埋件也为精轧螺纹钢,其穿过竖杆后配合螺帽以锁紧固定竖杆,这些设计不仅确保结构稳固,且都极大的便利于基坑开挖过程中的支撑架快速搭建安装和拆卸,同时材料可重复利用。2. In the support frame of the present utility model, the fine-rolled threaded steel is set on the concrete foundation platform as an embedded part, and after passing through the cantilever beam, it cooperates with a nut to lock and fix the cantilever beam; and on the side wall of the foundation pit The embedded parts are also precision-rolled rebar, which pass through the vertical bar and cooperate with the nut to lock and fix the vertical bar. These designs not only ensure the stability of the structure, but also greatly facilitate the support frame during the excavation of the foundation pit. Quick set-up, installation and dismantling, while materials can be reused.

3. 本实用新型中梯笼立杆采用精轧螺纹钢,其上端与分配梁通过螺帽锁紧固定,而两个梯笼立杆之间则采用螺纹钢套筒连接,极其便利于基坑开挖过程中接长梯笼;而横撑通过碗扣式扣件与梯笼立杆相连;阶梯及休息平台由钢板制作,休息平台通过其上设置的卡槽卡设至横撑上固定,这些设计都极大的便利于基坑开挖过程中的快速通道的搭建安装和拆卸,同时材料可重复利用。3. The vertical rod of the ladder cage in the utility model is made of fine-rolled rebar, and its upper end and the distribution beam are locked and fixed by nuts, while the two rods of the ladder cage are connected by a rebar sleeve, which is extremely convenient for the foundation pit. The ladder cage is extended during the excavation process; the cross brace is connected to the vertical pole of the ladder cage through a bowl button fastener; the ladder and the rest platform are made of steel plates, and the rest platform is fixed on the cross brace through the card slot provided on it. These designs greatly facilitate the construction, installation and disassembly of the fast channel during the excavation of the foundation pit, and the materials can be reused.

4. 本实用新型的一种具体实施方案中所述梯笼立杆依次穿过悬臂梁和分配梁后用螺帽锁紧固定,即通过梯笼立杆同时固定了悬臂梁和分配梁,简化了悬臂梁与分配梁之间原本的固定操作,利于通道的快速装拆,节约时间和材料成本,同时材料可重复利用。4. In a specific embodiment of the utility model, the ladder cage vertical rod passes through the cantilever beam and the distribution beam successively and is locked and fixed with a nut, that is, the cantilever beam and the distribution beam are fixed simultaneously through the ladder cage vertical rod, simplifying The original fixing operation between the cantilever beam and the distribution beam is eliminated, which is conducive to the rapid assembly and disassembly of the channel, saving time and material costs, and the materials can be reused.

5. 本实用新型中支撑架的悬臂梁通过竖杆和斜撑加固定位,进而支撑分配梁,而下方梯笼则通过基坑侧壁上设置的扶墙杆件加固定位,这些结构设计都确保了通道装置整体架构的稳固。5. The cantilever beam of the support frame in this utility model is fixed by the vertical bar and the diagonal brace, and then supports the distribution beam, while the lower ladder cage is fixed by the buttress rods set on the side wall of the foundation pit. These structural designs ensure It ensures the stability of the overall structure of the channel device.

6. 本实用新型中所述悬臂梁和分配梁均采用双拼槽钢,其上预先开有供梯笼立杆穿过的开孔,同时所述悬臂梁上还开有供混凝土基础平台上的预埋件穿过的开孔,而所述竖杆也为双拼槽钢,其上开有供基坑侧壁上的预埋件穿过的开孔,这些设计也极大的便利于基坑开挖过程中的快速通道的搭建安装和拆卸,同时材料可重复利用。6. The cantilever beam and the distribution beam described in the utility model are all made of double channel steel, on which there are openings for the ladder cage vertical rod to pass through, and at the same time, the cantilever beam is also opened for the concrete foundation platform to pass through. The openings through which the embedded parts pass through, and the vertical bar is also a double channel steel, and there are holes for the embedded parts on the side wall of the foundation pit to pass through. These designs are also very convenient During the excavation of the foundation pit, the construction, installation and disassembly of the fast channel can be carried out, and the materials can be reused at the same time.

7. 本实用新型中与梯笼立杆配合以锁紧分配梁的螺帽与分配梁之间还垫设有钢垫板;与混凝土基础平台上的预埋件配合以锁紧悬臂梁的螺帽与悬臂梁之间也垫设有钢垫板;与基坑侧壁上的预埋件配合以锁紧竖杆的螺帽与竖杆之间也垫设有钢垫板,钢垫板的引入保护了相应的分配梁、悬臂梁和竖杆,使得材料可重复利用。7. In the utility model, a steel backing plate is provided between the nut and the distribution beam in cooperation with the vertical rod of the ladder cage to lock the distribution beam; it cooperates with the embedded parts on the concrete foundation platform to lock the nut of the cantilever beam. A steel backing plate is also placed between the cap and the cantilever beam; a steel backing plate is also placed between the nut and the vertical bar that cooperate with the embedded parts on the side wall of the foundation pit to lock the vertical bar. The introduction protects the corresponding distribution beams, cantilever beams and vertical bars, allowing the material to be reused.

附图说明Description of drawings

下面结合附图及实施例对本实用新型作进一步描述:Below in conjunction with accompanying drawing and embodiment the utility model is further described:

图1为本实用新型一种具体实施例的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of a kind of specific embodiment of the utility model;

图2为图1实施例的正视图;Fig. 2 is the front view of Fig. 1 embodiment;

图3为图1实施例的侧视图。Fig. 3 is a side view of the embodiment of Fig. 1 .

其中:1、悬臂梁,2、竖杆,3、分配梁,4、斜撑,5、横撑,6、梯笼立杆,7、阶梯,8、休息平台,9、螺帽,10、预埋件,11、螺纹钢套筒,12、扶墙杆件;13、混凝土基础平台;14、钢垫板。Among them: 1. Cantilever beam, 2. Vertical bar, 3. Distribution beam, 4. Diagonal brace, 5. Cross brace, 6. Ladder cage pole, 7. Ladder, 8. Rest platform, 9. Nut, 10, Embedded parts, 11, threaded steel sleeve, 12, buttress wall rod; 13, concrete foundation platform; 14, steel backing plate.

具体实施方式Detailed ways

实施例:下面结合图1~图3所示对本实用新型提供的这种基坑悬挂通道装置的一种具体实施方式做具体说明如下:这种通道装置适用于基坑开挖过程中开挖深度不断变化的情况,其具有设置在基坑顶部的混凝土基础平台13、与该混凝土基础平台13固定的支撑架和与支撑架固定并向下深入基坑内的快装式悬挂梯笼,所述快装式悬挂梯笼包括逐层向下拼接的梯笼标准节和设置于梯笼标准节内的Z字形楼梯,本实施例中所述梯笼标准节为矩形框结构,由呈矩形分布的四根梯笼立杆6及与梯笼立杆6固定并围合成矩形闭合框的四根横撑5共同构成。最上方的梯笼标准节的梯笼立杆6与支撑架固定,而其余上下相邻的梯笼标准节中对应的梯笼立杆6之间通过连接件相连,所述Z字形楼梯为对应每个梯笼标准节设置的休息平台8和与上下相邻的休息平台8固定的阶梯7,所述休息平台8(两侧)上设有卡槽,并藉由卡槽卡设在相应梯笼标准节的平行的两侧两根横撑5上固定。Embodiment: Below in conjunction with Fig. 1~shown in Fig. 3, a kind of specific implementation mode of this foundation pit suspension channel device provided by the utility model is described in detail as follows: this channel device is applicable to the depth of excavation in the foundation pit excavation process Constantly changing situation, it has the concrete foundation platform 13 that is arranged on the top of the foundation pit, the support frame fixed with this concrete foundation platform 13 and the quick-installed suspension ladder cage that is fixed with the support frame and goes deep into the foundation pit downwards. The installed hanging ladder cage includes the standard section of the ladder cage which is spliced downward layer by layer and the Z-shaped stairs arranged in the standard section of the ladder cage. The standard section of the ladder cage in this embodiment is a rectangular frame structure. Root ladder cage upright bar 6 and four cross braces 5 that are fixed with ladder cage upright bar 6 and surround into a rectangular closed frame form together. The ladder cage vertical rod 6 of the uppermost ladder cage standard section is fixed to the support frame, and the corresponding ladder cage vertical rods 6 in the other upper and lower adjacent ladder cage standard sections are connected by connecting pieces, and the zigzag stairs are corresponding The rest platform 8 provided in each ladder cage standard section and the ladder 7 fixed to the rest platform 8 adjacent up and down, the rest platform 8 (both sides) is provided with a card slot, and is set on the corresponding ladder by the card slot. Fix on two horizontal braces 5 on the parallel both sides of cage standard section.

本实施例中所述支撑架具有通过混凝土基础平台13上设有的预埋件10固定的两根平行的悬臂梁1及架设并固定在这两根悬臂梁1上方的两根平行的分配梁3。所述悬臂梁1和分配梁3围成的闭合框形状与下方梯笼标准节的横撑5围成的闭合框一致,也为矩形。支撑架的结构中还具有对应各悬臂梁1设置的竖杆2和斜撑4,所述竖杆2通过基坑侧壁上设有的预埋件10固定,而所述斜撑4两端与竖杆2和悬臂梁1固定。The support frame in this embodiment has two parallel cantilever beams 1 fixed by the embedded parts 10 provided on the concrete foundation platform 13 and two parallel distribution beams erected and fixed above the two cantilever beams 1 3. The shape of the closed frame enclosed by the cantilever beam 1 and the distribution beam 3 is consistent with the closed frame enclosed by the cross braces 5 of the lower ladder cage standard section, and is also rectangular. The structure of the supporting frame also has vertical bars 2 and diagonal braces 4 corresponding to each cantilever beam 1. The vertical bars 2 are fixed by the embedded parts 10 provided on the side walls of the foundation pit, and the two ends of the diagonal braces 4 Fixed with vertical bar 2 and cantilever beam 1.

依旧具体结合图1~图3所示,本实施例中所述梯笼立杆6采用精轧螺纹钢,其依次穿过悬臂梁1和分配梁3后用螺帽9锁紧固定。而所述连接件为螺纹钢套筒11,所述上下相邻的梯笼标准节相对应的梯笼立杆6通过螺纹钢套筒11连接固定;所述混凝土基础平台13上的预埋件10为精轧螺纹钢,其穿过悬臂梁1后配合螺帽9以锁紧固定悬臂梁1;而所述基坑侧壁上的预埋件10也为精轧螺纹钢,其穿过竖杆2后配合螺帽9以锁紧固定竖杆2,所述斜撑4两端与相应的竖杆2和悬臂梁1焊接,同时所述竖杆2顶部也与相应的悬臂梁1焊接。As shown in Figures 1 to 3 in detail, the ladder cage vertical rod 6 in this embodiment is made of precision-rolled rebar, which passes through the cantilever beam 1 and distribution beam 3 in turn and is locked and fixed with nuts 9 . And described connector is threaded steel sleeve 11, and the ladder cage upright bar 6 corresponding of the ladder cage standard section adjacent up and down described is connected and fixed by threaded steel sleeve 11; 10 is a finish-rolled rebar, which is matched with a nut 9 to lock and fix the cantilever 1 after passing through the cantilever beam 1; and the embedded part 10 on the side wall of the foundation pit is also a finish-rolled rebar, which passes through the vertical After the rod 2 is fitted with a nut 9 to lock and fix the vertical rod 2, the two ends of the brace 4 are welded with the corresponding vertical rod 2 and the cantilever beam 1, and the top of the vertical rod 2 is also welded with the corresponding cantilever beam 1.

本实施例中所述悬臂梁1和分配梁3均采用双拼槽钢,其上预先开有供梯笼立杆6穿过的开孔,同时所述悬臂梁1上还开有供混凝土基础平台13上的预埋件10穿过的开孔,而所述竖杆2也为双拼槽钢,其上开有供基坑侧壁上的预埋件10穿过的开孔。In this embodiment, the cantilever beam 1 and the distribution beam 3 are all made of double channel steel, and there are holes for the ladder cage vertical rod 6 to pass through in advance, and the cantilever beam 1 is also opened for the concrete foundation. The opening through which the embedded part 10 on the platform 13 passes, and the vertical bar 2 is also a double channel steel, which has an opening for the embedded part 10 on the side wall of the foundation pit to pass through.

本实施例中,所述基坑侧壁上沿纵向均匀间隔5m距离设置有扶墙杆件12与梯笼立杆6相连,用于增加装置的稳定性。所述扶墙杆件12为螺纹钢,其一端插入基坑侧壁内,另一端则与梯笼立杆6焊接固定。In this embodiment, the side walls of the foundation pit are provided with buttress rods 12 connected to the vertical rods 6 of the ladder cage at an even distance of 5 m along the longitudinal direction, so as to increase the stability of the device. The buttress rod 12 is threaded steel, one end of which is inserted into the side wall of the foundation pit, and the other end is welded and fixed with the vertical rod 6 of the ladder cage.

本实施例中所述横撑5通过碗扣式扣件与梯笼立杆6连接。In this embodiment, the cross brace 5 is connected to the vertical rod 6 of the ladder cage through a bowl button fastener.

本实施例中与梯笼立杆6配合以锁紧分配梁3的螺帽9与分配梁3之间还垫设有钢垫板14;与混凝土基础平台13上的预埋件10配合以锁紧悬臂梁1的螺帽9与悬臂梁1之间也垫设有钢垫板14;与基坑侧壁上的预埋件10配合以锁紧竖杆2的螺帽9与竖杆2之间也垫设有钢垫板14。In this embodiment, a steel backing plate 14 is also provided between the nut 9 and the distribution beam 3 in cooperation with the ladder cage vertical rod 6 to lock the distribution beam 3; it cooperates with the embedded part 10 on the concrete foundation platform 13 to lock A steel backing plate 14 is also placed between the nut 9 of the cantilever beam 1 and the cantilever beam 1; cooperate with the embedded part 10 on the side wall of the foundation pit to lock the nut 9 of the vertical bar 2 and the vertical bar 2 Also be provided with steel backing plate 14 between pad.

结合图1~图3所示,本实施例的具体实施装配方法如下:Shown in conjunction with Fig. 1 ~ Fig. 3, the specific implementation assembly method of this embodiment is as follows:

1、在基坑顶部沿基坑外围浇筑混凝土基础平台13,并在混凝土基础平台13的顶部及基坑侧壁预埋精轧螺纹钢作为预埋件10。1. Concrete foundation platform 13 is poured along the periphery of the foundation pit on the top of the foundation pit, and pre-embedded finished rolled rebar is used as embedded part 10 on the top of concrete foundation platform 13 and the side wall of foundation pit.

2、待混凝土基础平台13和基坑侧壁混凝土的强度达到设计强度后,通过螺帽9、钢垫板14将支撑架的悬臂梁1与竖杆2分布同混凝土基础平台13和基坑侧壁上的预埋件10相连。2. After the strength of the concrete foundation platform 13 and the concrete on the side wall of the foundation pit reaches the design strength, the cantilever beam 1 and the vertical bar 2 of the support frame are distributed on the side of the concrete foundation platform 13 and the foundation pit through the nut 9 and the steel backing plate 14. The embedded parts 10 on the wall are connected.

3、将竖杆2顶部与悬臂梁1焊接固定,同时支撑架的斜撑4采用单支方钢,将斜撑4的两端同竖杆2和悬臂梁1焊接,同时将分配梁3架至悬臂梁1上并焊接。3. Weld and fix the top of the vertical bar 2 with the cantilever beam 1. At the same time, the diagonal brace 4 of the support frame adopts a single square steel. Weld the two ends of the diagonal brace 4 with the vertical bar 2 and the cantilever beam 1. to the cantilever beam 1 and welded.

4、安装梯笼标准节的梯笼立杆6,梯笼立杆6采用精轧螺纹钢,最上方的梯笼标准节的梯笼立杆6上部依次穿过悬臂梁1和分配梁3后通过螺帽9与钢垫板14锁紧固定,而下部则通过螺纹钢套筒11连接下方梯笼标准节的梯笼立杆6,根据需要接长。4. Install the ladder cage pole 6 of the ladder cage standard section. The ladder cage pole 6 is made of fine-rolled rebar. The upper part of the ladder cage pole 6 of the ladder cage standard section passes through the cantilever beam 1 and the distribution beam 3 in turn. The nut 9 and the steel backing plate 14 are locked and fixed, and the lower part is connected to the ladder cage vertical rod 6 of the lower ladder cage standard section through the threaded steel sleeve 11, and can be extended as required.

5、安装梯笼标准节的横撑5,横撑5采用无缝钢管,通过碗扣式扣件连接到梯笼立杆6上,并围成矩形闭合框。5. Install the cross brace 5 of the standard section of the ladder cage. The cross brace 5 is made of seamless steel pipe, connected to the vertical rod 6 of the ladder cage through a bowl button fastener, and surrounded by a rectangular closed frame.

6、安装Z字形楼梯,构成Z字形楼梯的休息平台8和阶梯7都为钢板,休息平台8藉由其上的卡槽卡设至相应梯笼标准节的横撑5上固定,而阶梯7则与上下相邻的休息平台8焊接。6. Install the Z-shaped stairs, the rest platform 8 and the ladder 7 that constitute the Z-shaped stairs are all steel plates, the rest platform 8 is fixed on the cross brace 5 of the corresponding ladder cage standard section by the card slot on it, and the ladder 7 Then weld with the rest platform 8 adjacent up and down.

7、在基坑侧壁上沿纵向均匀间隔5m设置有扶墙杆件12与梯笼立杆6相连,扶墙杆件12选用螺纹钢,其一端插入基坑侧壁内,另一端则与梯笼立杆6焊接固定。用于保证整个装置的稳定性。7. On the side wall of the foundation pit, there are vertically evenly spaced 5m apart buttress wall rods 12 connected to the vertical rods 6 of the ladder cage. Ladder cage vertical bar 6 is welded and fixed. Used to ensure the stability of the entire device.

8、随着基坑开挖深度的增加,重复上述步骤4-7逐节安装梯笼标准节,以满足作业人员上下需求。8. As the excavation depth of the foundation pit increases, repeat the above steps 4-7 to install the standard section of the ladder cage section by section to meet the needs of the operators.

当然上述实施例只为说明本实用新型的技术构思及特点,其目的在于让熟悉此项技术的人能够了解本实用新型的内容并据以实施,并不能以此限制本实用新型的保护范围。凡根据本实用新型主要技术方案的精神实质所做的修饰,都应涵盖在本实用新型的保护范围之内。Of course, the above-mentioned embodiments are only to illustrate the technical concept and characteristics of the present utility model, and its purpose is to allow people familiar with this technology to understand the content of the present utility model and implement it accordingly, and cannot limit the protection scope of the present utility model with this. All modifications made according to the spirit of the main technical solutions of the utility model shall fall within the protection scope of the utility model.

Claims (10)

1.一种基坑悬挂通道装置,适用于基坑开挖过程中开挖深度不断变化的情况,其特征在于这种通道装置包括设置在基坑顶部的混凝土基础平台(13)、与该混凝土基础平台(13)固定的支撑架和与支撑架固定并向下深入基坑内的快装式悬挂梯笼,所述快装式悬挂梯笼包括逐层向下拼接的梯笼标准节和设置于梯笼标准节内的Z字形楼梯,所述梯笼标准节具有至少三根梯笼立杆(6)及与梯笼立杆(6)固定并围合成闭合框的横撑(5),最上方的梯笼标准节的梯笼立杆(6)与支撑架固定,而其余上下相邻的梯笼标准节中对应的梯笼立杆(6)之间通过连接件相连,所述Z字形楼梯包括对应每个梯笼标准节设置的休息平台(8)和与上下相邻的休息平台(8)固定的阶梯(7),所述休息平台(8)上设有卡槽,并藉由卡槽卡设在相应梯笼标准节的横撑(5)上固定。1. A suspension channel device for a foundation pit, which is suitable for the situation that the excavation depth is constantly changing during the excavation of the foundation pit, and is characterized in that the channel device includes a concrete foundation platform (13) arranged on the top of the foundation pit, and the concrete foundation platform (13). The support frame fixed on the foundation platform (13) and the quick-installation suspension ladder cage fixed with the support frame and deep into the foundation pit downwards, the quick-installation suspension ladder cage includes ladder cage standard sections spliced downward layer by layer and arranged on Z-shaped stairs in the standard section of the ladder cage, the standard section of the ladder cage has at least three ladder cage uprights (6) and cross braces (5) fixed with the ladder cage uprights (6) and forming a closed frame, the topmost The ladder cage vertical rods (6) of the ladder cage standard section are fixed to the support frame, and the corresponding ladder cage vertical rods (6) in the other upper and lower adjacent ladder cage standard sections are connected by connecting pieces, and the zigzag staircase It includes a rest platform (8) corresponding to each ladder cage standard section and a ladder (7) fixed to the rest platform (8) adjacent to the upper and lower sides. The rest platform (8) is provided with a card slot, and is The slot card is fixed on the cross brace (5) of the corresponding ladder cage standard section. 2.根据权利要求1所述的一种基坑悬挂通道装置,其特征在于所述支撑架包括通过混凝土基础平台(13)上设有的预埋件(10)固定的两根以上悬臂梁(1)及架设并固定在这些悬臂梁(1)上方的至少一根分配梁(3),所述悬臂梁(1)和分配梁(3)围成的闭合框形状与下方梯笼标准节的横撑(5)围成的闭合框一致,还包括对应各悬臂梁(1)设置的竖杆(2)和斜撑(4),所述竖杆(2)通过基坑侧壁上设有的预埋件(10)固定,而所述斜撑(4)两端与竖杆(2)和悬臂梁(1)固定,所述梯笼立杆(6)与分配梁(3)固定。2. A foundation pit suspension channel device according to claim 1, characterized in that the support frame includes more than two cantilever beams ( 1) and at least one distribution beam (3) erected and fixed above these cantilever beams (1), the shape of the closed frame enclosed by the cantilever beam (1) and the distribution beam (3) is the same as that of the standard section of the ladder cage below The closed frame surrounded by the cross braces (5) is consistent, and also includes vertical bars (2) and diagonal braces (4) corresponding to each cantilever beam (1). The embedded part (10) is fixed, and the two ends of the diagonal brace (4) are fixed with the vertical bar (2) and the cantilever beam (1), and the ladder cage vertical bar (6) is fixed with the distribution beam (3). 3.根据权利要求2所述的一种基坑悬挂通道装置,其特征在于所述梯笼立杆(6)采用精轧螺纹钢,其穿过分配梁(3)并用螺帽(9)锁紧固定,而所述连接件为螺纹钢套筒(11),所述上下相邻的梯笼标准节相对应的梯笼立杆(6)通过螺纹钢套筒(11)连接固定;所述混凝土基础平台(13)上的预埋件(10)为精轧螺纹钢,其穿过悬臂梁(1)后配合螺帽(9)以锁紧固定悬臂梁(1);而所述基坑侧壁上的预埋件(10)也为精轧螺纹钢,其穿过竖杆(2)后配合螺帽(9)以锁紧固定竖杆(2),所述斜撑(4)两端与相应的竖杆(2)和悬臂梁(1)焊接,同时所述竖杆(2)顶部也与相应的悬臂梁(1)焊接。3. A foundation pit suspension channel device according to claim 2, characterized in that the ladder cage vertical rod (6) is made of precision-rolled rebar, which passes through the distribution beam (3) and is locked with a nut (9) and the connecting piece is a threaded steel sleeve (11), and the ladder cage vertical rods (6) corresponding to the upper and lower adjacent ladder cage standard sections are connected and fixed through the threaded steel sleeve (11); The embedded parts (10) on the concrete foundation platform (13) are precision-rolled rebars, which pass through the cantilever beam (1) and cooperate with nuts (9) to lock and fix the cantilever beam (1); and the foundation pit The embedded parts (10) on the side wall are also precision-rolled rebars, which pass through the vertical bar (2) and cooperate with nuts (9) to lock and fix the vertical bar (2). The end is welded with the corresponding vertical bar (2) and the cantilever beam (1), and the top of the vertical bar (2) is also welded with the corresponding cantilever beam (1). 4.根据权利要求3所述的一种基坑悬挂通道装置,其特征在于所述梯笼立杆(6)依次穿过悬臂梁(1)和分配梁(3)后用螺帽(9)锁紧固定。4. A foundation pit suspension channel device according to claim 3, characterized in that the ladder cage vertical rod (6) passes through the cantilever beam (1) and the distribution beam (3) in sequence and then uses the nut (9) Lock securely. 5.根据权利要求4所述的一种基坑悬挂通道装置,其特征在于所述悬臂梁(1)和分配梁(3)均采用双拼槽钢,其上预先开有供梯笼立杆(6)穿过的开孔,同时所述悬臂梁(1)上还开有供混凝土基础平台(13)上的预埋件(10)穿过的开孔,而所述竖杆(2)也为双拼槽钢,其上开有供基坑侧壁上的预埋件(10)穿过的开孔。5. A foundation pit suspension channel device according to claim 4, characterized in that the cantilever beam (1) and the distribution beam (3) are both made of double channel steel, on which there are pre-opened vertical rods for the ladder cage (6) Openings through which the cantilever beam (1) is also provided with openings for the embedded parts (10) on the concrete foundation platform (13) to pass through, and the vertical bar (2) It is also a double channel steel, which is provided with an opening for the embedded part (10) on the side wall of the foundation pit to pass through. 6.根据权利要求1所述的一种基坑悬挂通道装置,其特征在于基坑侧壁上沿纵向均匀间隔一定距离x设置有扶墙杆件(12)与梯笼立杆(6)相连,用于增加装置的稳定性,所述x为4~6m。6. A foundation pit suspension channel device according to claim 1, characterized in that the side wall of the foundation pit is evenly spaced at a certain distance x in the longitudinal direction, and there are buttress rods (12) connected with the vertical rods (6) of the ladder cage , used to increase the stability of the device, the x is 4~6m. 7.根据权利要求6所述的一种基坑悬挂通道装置,其特征在于所述扶墙杆件(12)为螺纹钢,其一端插入基坑侧壁内,另一端则与梯笼立杆(6)焊接固定。7. A foundation pit suspension channel device according to claim 6, characterized in that the buttress wall rod (12) is threaded steel, one end of which is inserted into the side wall of the foundation pit, and the other end is connected to the vertical rod of the ladder cage (6) Soldering and fixing. 8.根据权利要求1所述的一种基坑悬挂通道装置,其特征在于所述横撑(5)通过碗扣式扣件与梯笼立杆(6)连接。8. The foundation pit suspension channel device according to claim 1, characterized in that the cross brace (5) is connected to the ladder cage vertical rod (6) through a bowl button fastener. 9.根据权利要求1或2或8所述的一种基坑悬挂通道装置,其特征在于所述梯笼标准节为矩形柱结构,具有矩形分布的四根梯笼立杆(6)及与梯笼立杆(6)固定并围合成矩形闭合框的四根横撑(5)。9. A foundation pit suspension channel device according to claim 1, 2 or 8, characterized in that the ladder cage standard section is a rectangular column structure, with four ladder cage vertical rods (6) distributed in a rectangle and connected with The ladder cage vertical bar (6) is fixed and surrounds four cross braces (5) of a rectangular closed frame. 10.根据权利要求3所述的一种基坑悬挂通道装置,其特征在于与梯笼立杆(6)配合以锁紧分配梁(3)的螺帽(9)与分配梁(3)之间还垫设有钢垫板(14);与混凝土基础平台(13)上的预埋件(10)配合以锁紧悬臂梁(1)的螺帽(9)与悬臂梁(1)之间也垫设有钢垫板(14);与基坑侧壁上的预埋件(10)配合以锁紧竖杆(2)的螺帽(9)与竖杆(2)之间也垫设有钢垫板(14)。10. A foundation pit suspension channel device according to claim 3, characterized in that it cooperates with the ladder cage vertical rod (6) to lock the nut (9) of the distribution beam (3) and the distribution beam (3). There is also a steel backing plate (14) between them; cooperate with the embedded part (10) on the concrete foundation platform (13) to lock the nut (9) of the cantilever beam (1) and the cantilever beam (1) A steel backing plate (14) is also padded; a pad is also padded between the nut (9) of the locking vertical rod (2) and the vertical rod (2) to cooperate with the embedded part (10) on the side wall of the foundation pit. There is a steel backing plate (14).
CN201721827544.0U 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device Expired - Fee Related CN207633795U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721827544.0U CN207633795U (en) 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721827544.0U CN207633795U (en) 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device

Publications (1)

Publication Number Publication Date
CN207633795U true CN207633795U (en) 2018-07-20

Family

ID=62852376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721827544.0U Expired - Fee Related CN207633795U (en) 2017-12-25 2017-12-25 A kind of foundation pit suspension lane device

Country Status (1)

Country Link
CN (1) CN207633795U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138497A (en) * 2018-10-21 2019-01-04 济宁市昊通工程机械有限公司 A kind of safe ladder cage combination unit of engineering adjustable height
DE202021102940U1 (en) 2020-06-12 2021-06-15 China Railway Erju 5Th Engineering Co., Ltd. Fastening and reinforcing device for combined frame-like suspension channels in shafts

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138497A (en) * 2018-10-21 2019-01-04 济宁市昊通工程机械有限公司 A kind of safe ladder cage combination unit of engineering adjustable height
DE202021102940U1 (en) 2020-06-12 2021-06-15 China Railway Erju 5Th Engineering Co., Ltd. Fastening and reinforcing device for combined frame-like suspension channels in shafts

Similar Documents

Publication Publication Date Title
CN106088148B (en) Pipe gallery template and its application
CN108222540A (en) The load bearing wall that brick mix structure is changed to frame structure changes girder construction and construction method
CN104234447B (en) Deep foundation ditch tool-type hangs stair
CN207633795U (en) A kind of foundation pit suspension lane device
CN116752560A (en) Method for installing operation platform and well wall template in open caisson
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN107035131A (en) Elevator shaft integral lifting type construction operation platform and elevator shaft construction method
CN113463653B (en) A construction method for vertical section type dismantling of inner support
CN203640257U (en) Support of overhanging type scaffold
CN206917244U (en) Integral lifting type construction operation platform for elevator shaft
CN116696055B (en) Construction decoration method for cantilever structure of flat roof framework layer
CN206418861U (en) A kind of switch base for facing skirt shield and multiduty skirt of facing are protected
CN212406192U (en) Quick detach formula faces limit protection and encloses fender
CN205502013U (en) Stock static pile counterforce device
CN116591468A (en) Temporary supporting device of concrete overhanging structure and construction method thereof
CN210977265U (en) A turnable unitized lattice tower crane foundation lifting device
CN204715784U (en) A kind of suspension type foundation ditch People's Bank of China's steel ladder cage
CN219327118U (en) Reinforced steel hidden beam for large-scale pool bottom plate
CN115030487A (en) System for supporting high-altitude partition concrete construction
CN220620135U (en) Miniature steel pipe pile supporting device for pit in pit
CN218375553U (en) A water-stop type turnover type construction staircase
CN219100689U (en) Attachment structure suitable for super high floor attached lifting scaffold
CN221645601U (en) Removal structure of bridge abutment bearing arch leg
CN221919409U (en) A multifunctional guide frame
CN103614999A (en) Method and support used for grouped pile deep-hole construction under complex geological conditions

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180720