CN107663916A - A kind of network frame house cap accumulation slippage mounting structure and construction method - Google Patents

A kind of network frame house cap accumulation slippage mounting structure and construction method Download PDF

Info

Publication number
CN107663916A
CN107663916A CN201710888239.0A CN201710888239A CN107663916A CN 107663916 A CN107663916 A CN 107663916A CN 201710888239 A CN201710888239 A CN 201710888239A CN 107663916 A CN107663916 A CN 107663916A
Authority
CN
China
Prior art keywords
sliding rail
platform
rack assembly
plate
network frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710888239.0A
Other languages
Chinese (zh)
Inventor
王志强
魏子龙
洪武
张云志
张红福
李建勇
王存吉
穆清华
程秀茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority to CN201710888239.0A priority Critical patent/CN107663916A/en
Publication of CN107663916A publication Critical patent/CN107663916A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/11Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with non-parallel upper and lower edges, e.g. roof trusses
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of network frame house cap accumulation slippage mounting structure, it is characterized in that setting up platform for lining using full hall scaffold between the middle two axial lines of network frame house cap, and top bearing plate, jacking screw rod, bottom connecting bolt are set in platform steel plate and scaffolding steel pipe connecting part;Sliding rail includes bearing sliding rail and middle sliding rail, is respectively arranged on the top of frame column and Vierendeel girder, is set a roof beam in place in sliding rail lower box and skewed horizontal load bar is set between frame column;Rack assembly section is synchronous by its pushing tow to design attitude using thrustor after the completion of platform for lining over-assemble, and passing through displacement transducer during pushing tow controls hydraulic cylinder extension amount;After by jack, rack assembly section is jacked up, plug loads string ball connecting body and shock mount.The present invention can reduce the difficulty, lifting construction efficiency, improvement working security of network frame house cap sliding.The present invention also disclosed a kind of above-mentioned network frame house cap accumulation slippage mounting structure construction method.

Description

A kind of network frame house cap accumulation slippage mounting structure and construction method
Technical field
The present invention relates to the position of a kind of difficulty that can effectively reduce network frame house cap sliding, lifting rack assembly section to control essence Degree, improve site operation security and efficiency of construction, the network frame house cap accumulation slippage mounting structure of protection social environment and construction Method.Belong to building engineering field, suitable for large span grid structure installing engineering.
Background technology
With the fast development of China's economy and society, solder sphere grid structure large span industrial building, public build Application in building is more and more common.At present, grid structure installation method is various, such as the lifting of installation on ground piecemeal, full hall pin hand Frame high altitude bulk and the assembled piecemeal accumulation slippage of fixed point etc., wherein pinpointing assembled piecemeal accumulation slippage installation method has machinery The features such as change degree is high, quality in site is easily controlled, difficulty of construction is low, using more universal in engineering.
A kind of existing overlarge area hyperboloid welding net gliding construction method, comprises the following steps:(1) laying sliding Track;(2) sliding jig is built on sliding rail;(3) welding net piecemeal is hung on sliding jig;(4) will welding Net piecemeal integral slipping is to installation site;(5) height of adjustment welding net piecemeal, and it is seated in supporting construction On;(6) embedding benefit is carried out to different welding net piecemeals, to form the welding net of overlarge area.The construction method can be Site operation difficulty is reduced to a certain extent, but needs to build sliding jig, and construction cost is higher;It is difficult to large span synchronization Mobile, structure is easily disturbed in slipping;Only rack piecemeal is highly adjusted, does not consider that structural seismic performance is lifted Problem.
In consideration of it, effectively to reduce the difficulty of network frame house cap sliding, the position control accuracy for lifting rack assembly section, raising Site operation security and efficiency of construction, improve structural seismic performance, urgently invention is a kind of efficiently at present, saves, be safe and reliable Network frame house cap accumulation slippage mounting structure and construction method.
The content of the invention
It is an object of the invention to provide one kind is rational in infrastructure, construction technology is simple, economic results in society are protruded, and can had Effect reduces the network frame house cap accumulation slippage mounting structure and construction method of environmental pollution.
In order to realize above-mentioned technical purpose, present invention employs following technical scheme.
A kind of network frame house cap accumulation slippage mounting structure, it is characterised in that used between the middle two axial lines of network frame house cap Full hall scaffold sets up platform for lining (5), and sets top pressure-bearing in platform steel plate (6) and scaffolding steel pipe (7) connecting part Plate (8), jacking screw rod (9), bottom connecting bolt (10);Sliding rail (1) includes bearing sliding rail (14) and middle sliding Track (15), it is respectively arranged on the top of frame column (12) and Vierendeel girder (13), bearing sliding rail (14) and middle sliding rail (15) by track connecting bolt (24) and connection stiffening plate (26) connect, sliding rail (1) bottom Vierendeel girder (13) with Skewed horizontal load bar (16) is set between frame column (12);Thrustor (2) is provided with sliding rail (1), passes through thrustor (2) in the rack assembly section of platform for lining (5) over-assemble design attitude will be pushed into, by located at sliding rail during pushing tow (1) stroke of displacement transducer (22) the control hydraulic cylinder (29) on;It is provided with Vierendeel girder (13) and is used to jack rack spelling The jack (25) of section is filled, after rack assembly section is jacked up, plug loads string ball connecting body (44) and shock mount (23), and makes Lower edge ball connecting body (44) and shock mount (23) are connected firmly by connector bolt (45).
The sliding rail (1) uses I-steel or H profile steel;The skewed horizontal load bar (16) uses I-steel or H profile steel Or steel pipe, both ends set supporting plate (27) with Vierendeel girder (13) and frame column (12) joint.
The thrustor (2) includes crawl device (28), hydraulic cylinder (29), clamping device (21), clamps voussoir (30) and sets Space between clamping device (21) and sliding rail (1), in fixed position by caging bolt (31) to clamping device (21) auxiliary stopper is carried out;The hydraulic cylinder (29) of thrustor (2) is connected with connection otic placode (20) by link bolt (32).
The shock mount (23) includes lower seat board (33), lower joint steel plate (34), lower plane slide plate (35), middle steel Body (36), spherical slide plate (37), core (38), upper plane slide plate (39), top seam steel plate (40), upper base plate (41);Under Bearing connecting bolt (42) is set between seat board (33) and upper base plate (41);It is lower plane slide plate (35), spherical slide plate (37), upper flat Face slide plate (39) uses modified polymer material plate or rubber slab.
The top of the jack (25) sets arching pressure dispersion plate (43), the internal diameter of arching pressure dispersion plate (43) with Lower boom (17) external diameter to connect is identical.
The bottom connecting bolt (10) contacts with scaffolding steel pipe (7) top surface, the jacking screw rod (9) and top pressure-bearing Plate (8) vertical welding connects, and is connected through a screw thread with bottom connecting bolt (10).
A kind of network frame house cap accumulation slippage mounting structure construction method, it is characterised in that including following construction procedure:
1) preparation of construction:Sliding rail (1), scaffolding steel pipe (7), pushing tow dress according to needed for design document buying construction (2), lower edge ball node (3), the ball node that winds up (4), lower boom (17), web member (18) are put, engineering construction machinery is corrected;
2) BIM Building of Simulation Model:Based on Engineering Documents and field condition, BIM simulation analysis models are established, are carried out Design structure collision detection and constructing process simulation analysis;
3) platform for lining is arranged:Platform for lining is set up using full hall scaffold between the middle two axial lines of network frame house cap (5), and between the platform steel plate (6) and scaffolding steel pipe (7) of platform for lining (5) top bearing plate (8), jacking screw rod are set (9), bottom connecting bolt (10), rotational handle (11) is set in bottom on the outside of connecting bolt (10);
4) sliding rail (1) is laid:The laying sliding rail at the top of the frame column (12) and Vierendeel girder (13) of setting absolute altitude (1), and the midpoint of bearing sliding rail (14) and frame column (12) center superposition, the Vierendeel girder in sliding rail (1) bottom are made (13) skewed horizontal load bar (16) is set between frame column (12);
5) rack assembly section assembles:Lower edge ball node (3) and lower boom (17) are carried out on platform for lining (5), wind up ball The installation and welding procedure of node (4) and web member (18), it is completed to rack assembly section;
6) thrustor (2) is laid:It is each on the sliding rail (1) parallel to rack assembly section moving direction to lay one Thrustor (2), and the crawl device (28) of thrustor (2) and the connection otic placode (20) on the outside of piston shoes (19) is passed through be hinged spiral shell Bolt (32) is connected, and clamping device (21) is set between hydraulic cylinder (29) and sliding rail (1), is laid in Vierendeel girder (13) end Displacement transducer (22);
7) rack assembly segment sync pushing tow and the assembling of rack assembly section:After (28) stroke contracting cylinders of crawl device, folder Tight device (21) is connected firmly by clamping voussoir (30) and caging bolt (31) with sliding rail (1);Passed simultaneously according to displacement Sensor (22) data, the stroke of hydraulic cylinder (29) in thrustor (2) is adjusted, is realized to the same of rack assembly section displacement Step control, is moved in parallel to setting position after rack assembly segment sync, is carried out thrustor (2) and is synchronously unloaded and remove pushing tow Device (2);During rack assembly segment sync pushing tow, the assembly of next section of rack assembly section is carried out on platform for lining (5);
8) rack integral assembling:Repeat step 6)~step 7), all rack assembly sections are laid to setting position;
9) plug dress shock mount (23) and lower edge ball connecting body (44):The sliding of rack assembly section releases bearing sliding afterwards in place Track connecting bolt (24) between track (14) and middle sliding rail (15), middle sliding rail (15) is first removed, then propped up Seat sliding rail (14) both sides respectively set a jack (25), and two jack (25) are synchronous to jack lower edge ball node (3) Bearing sliding rail (14) and piston shoes (19) is taken out afterwards, then lower edge ball connecting body (44) and shock mount (23) are installed, and under making String ball connecting body (44) and shock mount (23) are connected firmly by connector bolt (45);
10) subsequent construction:Roof truss locus test → node bonding strength detection → structure antirust treatment is carried out successively → platform for lining (5) Demolition Construction.
The present invention has the characteristics of following and beneficial effect:
(1) realized in work progress by the shift position of each thrustor of displacement transducer Synchronization Control to net Synchronous dynamic control during frame assembly section pushing tow, can prevent that rack assembly section is damaged in rack assembly section moving process It is bad.
(2) sliding rail is redefined for bearing sliding rail and middle sliding rail, can avoid scene to sliding rail Cutting, lift site operation efficiency, reduce destruction of the construction to construction material.
(3) work progress and roof truss structure are simulated using BIM technology in work progress, can greatly lifts scene The efficiency of construction organization, avoid the generation of construction quality problem.
(4) plug fills shock mount after symmetrically jacking backspin ball node using two jack, can effectively reduce bearing installation Damage to structure, the anti-seismic performance of roof truss structure is lifted, improve the Stress property of structure.
(5) crawl device carries out sliding and position limitation by clamping voussoir, the caging bolt of clamping device to crawl device, can carry significantly The bonding strength of crawl device and sliding rail has been risen, has improved the application efficiency of pushing tow load.
Brief description of the drawings
Fig. 1 is a kind of network frame house cap accumulation slippage mounting structure schematic diagram of the present invention;
Fig. 2 is Fig. 1 platform for lining structure section schematic diagrames;
Fig. 3 is Fig. 1 piston shoes cross-sectional views;
Structural representation after Fig. 4 network frame house cap installations;
Fig. 5 is a kind of network frame house cap accumulation slippage mounting structure construction process schematic diagram of the present invention.
In figure:1- sliding rails;2- thrustors;3- lower edge ball nodes;4- winds up ball node;5- platform for lining;6- is put down Platform steel plate;7- scaffolding steel pipes;8- tops bearing plate;9- jacking screw rods;10- bottoms connecting bolt;11- rotational handles;12-- Frame column;13- Vierendeel girders;14- bearing sliding rails;Sliding rail among 15-;16- skewed horizontal load bars;17- lower booms;18- Web member;19- piston shoes;20- connection otic placodes;21- clamping devices;22- displacement transducers;23- shock mounts;24- tracks connect spiral shell Bolt;25- jack;26- connection stiffening plates;27- supporting plates;28- crawl devices;29- hydraulic cylinders;30- clamps voussoir;31- is spacing Bolt;32- link bolts;Seat board under 33-;34- lower joint steel plates;35- lower plane slide plates;Steel body among 36-;37- spheres Slide plate;38- cores;The upper plane slide plates of 39-;40- tops seam steel plate;41- upper base plates;42- bearing connecting bolts;43- arcs Pressure dispersion plate;44- lower edge ball connecting bodies;45- connector bolts.
Embodiment
Platform for lining erection construction technical requirements, shock mount design and installation specification, sliding in present embodiment Repeated no more in the present embodiment such as track laying construction technical requirement, Site Welding construction technical requirement, emphasis illustrates the present invention It is related to the embodiment of structure and construction method.
Fig. 1 is a kind of network frame house cap accumulation slippage mounting structure schematic diagram of the present invention, and Fig. 2 is that Fig. 1 platform for lining structures are broken Face schematic diagram, Fig. 3 are Fig. 1 piston shoes cross-sectional views, structural representation after Fig. 4 network frame house cap installations.1~Fig. 4 of reference picture institutes Show, a kind of network frame house cap accumulation slippage mounting structure, set up between the middle two axial lines of network frame house cap using full hall scaffold Platform for lining 5, and set top bearing plate 8, jacking screw rod 9, bottom to connect in platform steel plate 6 and the connecting part of scaffolding steel pipe 7 Connecting bolt 10;Sliding rail 1 includes bearing sliding rail 14 and middle sliding rail 15, is respectively arranged on frame column 12 and Vierendeel girder 13 top, bearing sliding rail 14 and middle sliding rail 15 are connected by track connecting bolt 24 and connection stiffening plate 26, Skewed horizontal load bar 16 is set between the Vierendeel girder 13 and frame column 12 of the bottom of sliding rail 1;Rack assembly section is in platform for lining 5 After the completion of over-assemble, design attitude is pushed into using thrustor 2 is synchronous, is controlled during pushing tow by displacement transducer 22 The stroke of hydraulic cylinder 29;After using jack 25, rack assembly section is jacked up, plug loads string ball connecting body 44 and shock mount 23, And lower edge ball connecting body 44 and shock mount 23 is set to be connected firmly by connector bolt 45.
The bearing sliding rail 14 and middle sliding rail 15 of sliding rail 1 are using a height of 450mm of waist, leg a width of 154 Millimeter, waist thickness are 15.5 millimeters of I-steel, and the strength grade of I-steel is Q235B.
Thrustor 2 includes crawl device 28, hydraulic cylinder 29, clamping device 21;Crawl device 28 and hydraulic cylinder 29 match, and adopt With the hydraulic pressure creep machine of TJG-50 types;The cross section of clamping device 21 is rectangular, is connected with hydraulic cylinder 29 by connection otic placode 20, interior Sectional dimension compared with 1 big 20~30mm of sliding rail;Voussoir 30 is clamped located at the sky between clamping device 21 and sliding rail 1 Gap, cross section is in a rectangular trapezoid, the wide 10mm of top surface, the wide 100mm in bottom surface, high 300mm, strength grade Q345.Caging bolt 31 A diameter of 30mm, strength grade Q345.The bottom width 200mm of connection otic placode 20, high 200mm, strength grade Q345.Be hinged spiral shell A diameter of 30mm, the strength grade Q345 of bolt 32.
A diameter of 500mm of lower edge ball node 3, wall thickness 20mm, strength grade Q345;It is supporting with lower edge ball node 3 Lower boom 17 a diameter of Φ 168mm, wall thickness 10mm, strength grade Q345.
Wind up a diameter of 350mm, wall thickness 14mm, strength grade Q345 of ball node 4;Ball node 4 is supporting with winding up Web member 18 a diameter of Φ 146mm, wall thickness 10mm, strength grade Q345.
Platform for lining 5 is set up using full hall scaffold;Its platform steel plate 6 use thick 10mm, strength grade for Q235 steel Plate, scaffolding steel pipe 7 is using diameter 48mm, wall thickness 3mm, strength grade Q235 steel pipe;The planar dimension of top bearing plate 8 is 400 × 400mm, use thick 10mm, strength grade for Q235 steel plate;A diameter of 30mm of jacking screw rod 9, strength grade Q345;Bottom connecting bolt 10 uses external diameter as 60mm, wall thickness 15mm, strength grade Q345 bolt;In bottom connecting bolt 10 outside welding rotational handle 11, a diameter of 40mm of rotational handle, length 200mm.
Frame column 12 and Vierendeel girder 13 use H profile steel, and strength grade is Q235B, and sectional dimension is respectively 500 × 500mm and 500 × 300mm.250 × the 250mm of sectional dimension of skewed horizontal load bar 16;The planar dimension of supporting plate 27 be 500 × 500mm, use thick 10mm, strength grade for Q235B steel plate.
The cross section of piston shoes 19 is in " door shape " high 400mm, and top surface size is 500 × 500mm, using thick 20mm, strength grade It is welded for Q345 steel plate.
Displacement transducer 22 uses laser distance sensor of the precision for 0.01mm.
Shock mount 23 includes lower seat board 33, lower joint steel plate 34, lower plane slide plate 35, middle steel body 36, sphere and slided Plate 37, core 38, upper plane slide plate 39, top seam steel plate 40, upper base plate 41, total height 200mm;Lower seat board 33 and the seat of honour Plate 41 uses thick 20mm, strength grade integrally to roll into design shape for Q345 steel plate;The cross section of core 38 is curved, circle Camber 130mm, top surface chord length 400mm, strength grade Q345.Lower plane slide plate 35, spherical slide plate 37, upper plane slide plate 39 are adopted With rubber slab, thickness 10mm.Bearing connecting bolt 42 and connector bolt 45 use a diameter of 36mm hexagonal stainless steel Bolt.
Track connecting bolt 24 uses a diameter of 22mm hex bolts;Stiffening plate 26 is connected using thick 6mm, strength grade For Q235B steel plate, the long 300mm of steel plate, high 150mm.
Jack 25 uses minimum top lift as 5 tons of self-locking type hydraulic jack;Arching pressure dispersion plate 43 is using thick 20mm, the steel plate that strength grade is Q345 are integrally rolled and formed, and cross section arc diameter is 168mm, length 300mm.Lower edge Ball connecting body 44 uses thick 20mm, strength grade to be welded for Q345 steel plate.
Fig. 5 is network frame house cap accumulation slippage mounting structure construction process schematic diagram of the present invention.Shown in reference picture 5, rack room Lid accumulation slippage mounting structure includes following construction procedure:
1) preparation of construction:According to design document buying construction needed for sliding rail 1, scaffolding steel pipe 7, thrustor 2, Lower edge ball node 3, the ball node 4 that winds up, lower boom 17, web member 18, are corrected to engineering construction machinery;
2) BIM Building of Simulation Model:Based on Engineering Documents and field condition, BIM simulation analysis models are established, are carried out Design structure collision detection and constructing process simulation analysis;
3) platform for lining is arranged:Platform for lining 5 is set up using full hall scaffold between the middle two axial lines of network frame house cap, And top bearing plate 8, jacking screw rod 9, bottom connection spiral shell are set between the platform steel plate 6 and scaffolding steel pipe 7 of platform for lining 5 Bolt 10, in bottom, the outside of connecting bolt 10 sets rotational handle 11;
4) sliding rail 1 is laid:In the frame column 12 and the top of Vierendeel girder 13 laying sliding rail 1 of setting absolute altitude, and make The midpoint of bearing sliding rail 14 and the center superposition of frame column 12, the bottom of sliding rail 1 Vierendeel girder 13 and frame column 12 it Between skewed horizontal load bar 16 is set;
5) rack assembly section assembles:Lower edge ball node 3 and lower boom 17 are carried out on platform for lining 5, wind up the and of ball node 4 The installation and welding procedure of web member 18, it is completed to rack assembly section;
6) thrustor 2 is laid:A pushing tow is respectively laid on the sliding rail 1 parallel to rack assembly section moving direction Device 2, and the crawl device 28 of thrustor 2 is connected with the connection otic placode 20 in the outside of piston shoes 19 by link bolt 32, in liquid Clamping device 21 is set between cylinder pressure 29 and sliding rail 1, displacement transducer 22 is laid in the end of Vierendeel girder 13;
7) rack assembly segment sync pushing tow and the assembling of rack assembly section:After 28 1 stroke contracting cylinders of crawl device, clamp Device 21 is connected firmly by clamping voussoir 30 and caging bolt 31 with sliding rail 1;Simultaneously according to the data of displacement transducer 22, The stroke of hydraulic cylinder 29 in thrustor 2 is adjusted, so as to realize the Synchronization Control to rack assembly section displacement, treats rack Assembled segment sync is moved in parallel to setting position, is carried out thrustor 2 and is synchronously unloaded and remove thrustor 2;Rack is assembled During segment sync pushing tow, the assembly of next section of rack assembly section is carried out on platform for lining 5;
8) rack integral assembling:Repeat step 6)~step 7), all rack assembly sections are laid to setting position;
9) plug dress shock mount 23 and lower edge ball connecting body 44:The sliding of rack assembly section releases bearing sliding rail afterwards in place Track connecting bolt 24 between 14 and middle sliding rail 15, middle sliding rail 15 is first removed, then in bearing sliding rail 14 Both sides respectively set a jack 25, two jack 25 to take out bearing sliding rail 14 after synchronously lower edge ball node 3 is jacked With piston shoes 19, then lower edge ball connecting body 44 and shock mount 23 are installed, and pass through lower edge ball connecting body 44 and shock mount 23 Connector bolt 45 is connected firmly;
10) subsequent construction:Roof truss locus test → node bonding strength detection → structure antirust treatment is carried out successively The Demolition Construction of → platform for lining 5.

Claims (7)

1. a kind of network frame house cap accumulation slippage mounting structure, it is characterised in that using full between the middle two axial lines of network frame house cap Hall scaffold building has platform for lining (5), and sets top pressure-bearing in platform steel plate (6) and scaffolding steel pipe (7) connecting part Plate (8), jacking screw rod (9), bottom connecting bolt (10);Sliding rail (1) includes bearing sliding rail (14) and middle sliding Track (15), it is respectively arranged on the top of frame column (12) and Vierendeel girder (13), bearing sliding rail (14) and middle sliding rail (15) by track connecting bolt (24) and connection stiffening plate (26) connect, sliding rail (1) bottom Vierendeel girder (13) with Skewed horizontal load bar (16) is set between frame column (12);Thrustor (2) is provided with sliding rail (1), passes through thrustor (2) in the rack assembly section of platform for lining (5) over-assemble design attitude will be pushed into, by located at sliding rail during pushing tow (1) stroke of displacement transducer (22) the control hydraulic cylinder (29) on;It is provided with Vierendeel girder (13) and is used to jack rack spelling The jack (25) of section is filled, after rack assembly section is jacked up, plug loads string ball connecting body (44) and shock mount (23), and makes Lower edge ball connecting body (44) and shock mount (23) are connected firmly by connector bolt (45).
A kind of 2. network frame house cap accumulation slippage mounting structure according to claim 1, it is characterised in that the sliding rail (1) I-steel or H profile steel are used;The skewed horizontal load bar (16) uses I-steel or H profile steel or steel pipe, both ends and Vierendeel girder (13) and frame column (12) joint sets supporting plate (27).
A kind of 3. network frame house cap accumulation slippage mounting structure according to claim 1, it is characterised in that the thrustor (2) include crawl device (28), hydraulic cylinder (29), clamping device (21), clamp voussoir (30) located at clamping device (21) and sliding Space between track (1), auxiliary stopper is carried out to clamping device (21) by caging bolt (31) in fixed position;Pushing tow fills The hydraulic cylinder (29) for putting (2) is connected with connection otic placode (20) by link bolt (32).
A kind of 4. network frame house cap accumulation slippage mounting structure according to claim 1, it is characterised in that the shock mount (23) include lower seat board (33), lower joint steel plate (34), lower plane slide plate (35), middle steel body (36), spherical slide plate (37), Core (38), upper plane slide plate (39), top seam steel plate (40), upper base plate (41);In lower seat board (33) and upper base plate (41) Between set bearing connecting bolt (42);Lower plane slide plate (35), spherical slide plate (37), upper plane slide plate (39) are using modified high Molecular material plate or rubber slab.
5. a kind of network frame house cap accumulation slippage mounting structure according to claim 1, its feature is in the jack (25) Top arching pressure dispersion plate (43), the internal diameter of arching pressure dispersion plate (43) and lower boom (17) the external diameter phase to connect are set Together.
A kind of 6. network frame house cap accumulation slippage mounting structure according to claim 1, it is characterised in that the bottom connection Bolt (10) contacts with scaffolding steel pipe (7) top surface, and the jacking screw rod (9) is connected with top bearing plate (8) vertical welding, with Bottom connecting bolt (10) is connected through a screw thread.
7. a kind of network frame house cap accumulation slippage mounting structure construction method, it is characterised in that including following construction procedure:
1) preparation of construction:Sliding rail (1), scaffolding steel pipe (7), thrustor according to needed for design document buying construction (2), lower edge ball node (3), the ball node that winds up (4), lower boom (17), web member (18), are corrected to engineering construction machinery;
2) BIM Building of Simulation Model:Based on Engineering Documents and field condition, BIM simulation analysis models are established, are designed Structural collision detects and constructing process simulation analysis;
3) platform for lining is arranged:Platform for lining (5) is set up using full hall scaffold between the middle two axial lines of network frame house cap, and Between the platform steel plate (6) and scaffolding steel pipe (7) of platform for lining (5) set top bearing plate (8), jacking screw rod (9), under Portion's connecting bolt (10), rotational handle (11) is set in bottom on the outside of connecting bolt (10);
4) sliding rail (1) is laid:The laying sliding rail (1) at the top of the frame column (12) and Vierendeel girder (13) of setting absolute altitude, And make midpoint and frame column (12) center superposition of bearing sliding rail (14), the Vierendeel girder (13) in sliding rail (1) bottom Skewed horizontal load bar (16) is set between frame column (12);
5) rack assembly section assembles:Lower edge ball node (3) and lower boom (17) are carried out on platform for lining (5), wind up ball node (4) and web member (18) installation and welding procedure, be completed to rack assembly section;
6) thrustor (2) is laid:One pushing tow of each laying on the sliding rail (1) parallel to rack assembly section moving direction Device (2), and the crawl device (28) of thrustor (2) and the connection otic placode (20) on the outside of piston shoes (19) is passed through link bolt (32) connect, clamping device (21) is set between hydraulic cylinder (29) and sliding rail (1), position is laid in Vierendeel girder (13) end Displacement sensor (22);
7) rack assembly segment sync pushing tow and the assembling of rack assembly section:After (28) stroke contracting cylinders of crawl device, dress is clamped Put (21) and be connected firmly by clamping voussoir (30) and caging bolt (31) with sliding rail (1);Simultaneously according to displacement transducer (22) data, the stroke of hydraulic cylinder (29) in thrustor (2) is adjusted, realizes that the synchronization to rack assembly section displacement is controlled System, is moved in parallel to setting position after rack assembly segment sync, is carried out thrustor (2) and is synchronously unloaded and remove thrustor (2);During rack assembly segment sync pushing tow, the assembly of next section of rack assembly section is carried out on platform for lining (5);
8) rack integral assembling:Repeat step 6)~step 7), all rack assembly sections are laid to setting position;
9) plug dress shock mount (23) and lower edge ball connecting body (44):The sliding of rack assembly section releases bearing sliding rail afterwards in place (14) the track connecting bolt (24) between middle sliding rail (15), middle sliding rail (15) is first removed, then is slided in bearing Move track (14) both sides and one jack (25) is respectively set, taken after the synchronous jacking by lower edge ball node (3) of two jack (25) Go out bearing sliding rail (14) and piston shoes (19), then lower edge ball connecting body (44) and shock mount (23) are installed, and make lower edge ball Connector (44) and shock mount (23) are connected firmly by connector bolt (45);
10) subsequent construction:Roof truss locus test → node bonding strength detection → structure antirust treatment → spelling is carried out successively Assembling platform (5) Demolition Construction.
CN201710888239.0A 2017-09-27 2017-09-27 A kind of network frame house cap accumulation slippage mounting structure and construction method Pending CN107663916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710888239.0A CN107663916A (en) 2017-09-27 2017-09-27 A kind of network frame house cap accumulation slippage mounting structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710888239.0A CN107663916A (en) 2017-09-27 2017-09-27 A kind of network frame house cap accumulation slippage mounting structure and construction method

Publications (1)

Publication Number Publication Date
CN107663916A true CN107663916A (en) 2018-02-06

Family

ID=61097930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710888239.0A Pending CN107663916A (en) 2017-09-27 2017-09-27 A kind of network frame house cap accumulation slippage mounting structure and construction method

Country Status (1)

Country Link
CN (1) CN107663916A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372274A (en) * 2018-12-17 2019-02-22 北京城建集团有限责任公司 A kind of high-altitude wire frame installation system and its construction method
CN109457985A (en) * 2018-12-18 2019-03-12 徐州恒翔钢结构有限公司 Elements of Space Grid Truss ball node installed height mark regulating device
CN112112284A (en) * 2020-09-25 2020-12-22 河南省安装集团有限责任公司 Integral jacking construction method for net rack
CN113279615A (en) * 2021-06-11 2021-08-20 中建四局第一建筑工程有限公司 Installation method and device for super high-rise air suspension acrylic swimming pool
CN114687558A (en) * 2022-04-11 2022-07-01 长江精工钢结构(集团)股份有限公司 Method for synchronously unloading structure by utilizing sandbox
CN114737808A (en) * 2022-03-24 2022-07-12 山东电力工程咨询院有限公司 Construction method of super-large-span dry coal shed grid structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5218801A (en) * 1991-09-25 1993-06-15 Hereford Judson A Roof truss and decking system
CN202298452U (en) * 2011-10-31 2012-07-04 张力 Vibration reducing, noise reducing and earthquake resisting spherical steel support
CN103967285A (en) * 2014-05-22 2014-08-06 中建安装工程有限公司 Method for net rack long-distance upper air synchronous sliding
CN104264999A (en) * 2014-09-09 2015-01-07 河北钢铁股份有限公司邯郸分公司 Large roof grid structure assembling and installing method
CN205296869U (en) * 2015-12-01 2016-06-08 中国建筑第八工程局有限公司 Spatial grid structure thrustor that slides
CN205894717U (en) * 2016-08-12 2017-01-18 河北建工集团有限责任公司 Space truss structure accumulation sliding system
CN207314624U (en) * 2017-09-27 2018-05-04 中铁三局集团建筑安装工程有限公司 A kind of network frame house cap accumulation slippage mounting structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5218801A (en) * 1991-09-25 1993-06-15 Hereford Judson A Roof truss and decking system
CN202298452U (en) * 2011-10-31 2012-07-04 张力 Vibration reducing, noise reducing and earthquake resisting spherical steel support
CN103967285A (en) * 2014-05-22 2014-08-06 中建安装工程有限公司 Method for net rack long-distance upper air synchronous sliding
CN104264999A (en) * 2014-09-09 2015-01-07 河北钢铁股份有限公司邯郸分公司 Large roof grid structure assembling and installing method
CN205296869U (en) * 2015-12-01 2016-06-08 中国建筑第八工程局有限公司 Spatial grid structure thrustor that slides
CN205894717U (en) * 2016-08-12 2017-01-18 河北建工集团有限责任公司 Space truss structure accumulation sliding system
CN207314624U (en) * 2017-09-27 2018-05-04 中铁三局集团建筑安装工程有限公司 A kind of network frame house cap accumulation slippage mounting structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372274A (en) * 2018-12-17 2019-02-22 北京城建集团有限责任公司 A kind of high-altitude wire frame installation system and its construction method
CN109372274B (en) * 2018-12-17 2023-12-01 北京城建集团有限责任公司 High-altitude net rack installation system and construction method thereof
CN109457985A (en) * 2018-12-18 2019-03-12 徐州恒翔钢结构有限公司 Elements of Space Grid Truss ball node installed height mark regulating device
CN109457985B (en) * 2018-12-18 2023-10-31 江苏杜邦建设工程有限公司 Steel mesh frame ball node installation elevation adjusting device
CN112112284A (en) * 2020-09-25 2020-12-22 河南省安装集团有限责任公司 Integral jacking construction method for net rack
CN113279615A (en) * 2021-06-11 2021-08-20 中建四局第一建筑工程有限公司 Installation method and device for super high-rise air suspension acrylic swimming pool
CN114737808A (en) * 2022-03-24 2022-07-12 山东电力工程咨询院有限公司 Construction method of super-large-span dry coal shed grid structure
CN114687558A (en) * 2022-04-11 2022-07-01 长江精工钢结构(集团)股份有限公司 Method for synchronously unloading structure by utilizing sandbox

Similar Documents

Publication Publication Date Title
CN207314624U (en) A kind of network frame house cap accumulation slippage mounting structure
CN107663916A (en) A kind of network frame house cap accumulation slippage mounting structure and construction method
CN108468430B (en) Hoisting and sliding construction method for large-span unequal-height support steel truss structure
CN106836498B (en) Hoisting construction method for steel truss of grand stand roof of super-large span stadium
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN107338963A (en) A kind of super-span truss string structure construction method for hanging outside the venue
CN203794498U (en) Built-in self-elevating tower crane device
CN111379334B (en) Node connecting device of square steel tube concrete column and steel beam
CN112324131B (en) One-frame dual-purpose large-span stiff beam construction structure and construction method thereof
CN112081016A (en) Lifting and folding device for bridge arch rib
CN110983987B (en) Construction method of steel-concrete combined beam
CN108643207B (en) Device for connecting side plate and bottom plate of bottom sealing-free concrete steel hanging box and construction method thereof
CN103075016B (en) Installing method of extendable latticed shell structure
CN114892873B (en) Inclined roof fish-bellied truss hoisting construction method
CN110409624B (en) Reverse calculation and construction method for large equipment installation and main body structure
CN110318468B (en) Auxiliary device and method for installing eccentric space net rack
CN209941511U (en) Supporting device for high-altitude folding of bridge steel box girder by section hoisting
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
CN111042579A (en) Quick back jacking device and method for load-bearing structure
CN112681138A (en) Segmented assembling and walking type pushing construction method for high-speed rail crossing line
CN105155418A (en) Construction method for bridge horizontal movement
CN205369229U (en) But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid
CN209907206U (en) Auxiliary device for installing dumbbell-shaped arch ribs
CN108374350B (en) Assembly jig frame of steel anchor beam and steel corbel unit and installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180206