CN110242034A - A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment - Google Patents
A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment Download PDFInfo
- Publication number
- CN110242034A CN110242034A CN201910541850.5A CN201910541850A CN110242034A CN 110242034 A CN110242034 A CN 110242034A CN 201910541850 A CN201910541850 A CN 201910541850A CN 110242034 A CN110242034 A CN 110242034A
- Authority
- CN
- China
- Prior art keywords
- frame body
- layer frame
- installation
- operating platform
- workbench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000010276 construction Methods 0.000 claims abstract description 29
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 238000003032 molecular docking Methods 0.000 claims description 3
- 241000219122 Cucurbita Species 0.000 claims 1
- 235000009852 Cucurbita pepo Nutrition 0.000 claims 1
- 239000000463 material Substances 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/17—Comprising essentially pre-assembled three-dimensional elements, e.g. cubic elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
- Movable Scaffolding (AREA)
Abstract
The present invention relates to a kind of Mobile operating platforms and its installation method for the installation of high-altitude pipe-line equipment, including idler wheel, assembled frame member, workbench and steel ladder, the assembly frame member is made of upright bar and cross bar interconnection, the bottom end of the upright bar is equipped with the idler wheel mobile convenient for operating platform, the fixed top surface for being located at upright bar of the workbench, safety guide rail is surrounded by the workbench, the workbench is equipped with foot pedal, described foot pedal one end is equipped with opening, it is equipped in opening convenient for the steel ladder of workbench above and below construction personnel, installation method of the invention includes electric block installation, frame body assembling and the Mobile operating platform that frame body assembly is integral.It is convenient with demolishing process that the present invention is set up, and can be used after the completion of construction with the next project of convenient disassembly, the material consumption that the present invention installs and uses is less, and short construction period greatly reduces construction cost.
Description
Technical field
The present invention relates to field of aerial work, more particularly a kind of moving operation for the installation of high-altitude pipe-line equipment is flat
Platform and its installation method.
Background technique
Currently, many workshop girders are steelframe structure herringbone beam, elevation of top reaches 10-20m etc., fire-fighting spraying in warehouse
Caliber mounting height is high, length is longer, and material load is big, and construction is extremely inconvenient, sets up scaffold below pipeline in this way
Construct pipeline, great in constructing amount, the material of consumption is more, and construction cost is big, and scaffold is through long, will affect warehouse its
He constructs development, influences construction progress.
Summary of the invention
The invention patent proposes a kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment, uses
In solving the problems, such as that high-altitude pipe-line equipment is difficult to install.
To achieve the goals above, the present invention provides it is a kind of for high-altitude pipe-line equipment installation Mobile operating platform,
Including idler wheel, assembled frame member, workbench and steel ladder, it is characterised in that: the assembly frame member is mutual with cross bar by upright bar
Connection composition, the bottom end of the upright bar are equipped with the idler wheel mobile convenient for operating platform, and the workbench fixation is located at upright bar
Top surface, in the safety guide rail that is surrounded by of the workbench, the workbench is equipped with foot pedal, the foot pedal one
End is equipped with opening, is equipped in opening convenient for the steel ladder of workbench above and below construction personnel.
As a preferred technical solution of the present invention, the assembly frame member is assemblied to form by three layer frame bodies, the frame body
Between by sleeve connection, and be bolted, the idler wheel is located at the bottom of first layer frame body, and the workbench is located at
Third layer frame body top surface.
As a preferred technical solution of the present invention, increasing is equipped between the upright bar and cross bar on each layer frame body
Add the brace of frame body rigidity.
As a preferred technical solution of the present invention, the assembly frame member is equipped in installation steel ladder position side and is used for
The outlet of construction personnel's steel inlet-outlet ladder.
As a preferred technical solution of the present invention, the safety guide rail is connected with each other group by several upright bars and cross bar
At.
As a preferred technical solution of the present invention, the bottom end of the safety guide rail is equipped with to be fallen for construction tool
Coaming plate.
As a preferred technical solution of the present invention, the idler wheel is universal wheel, and the idler wheel is mounted on bottom of upright rod
On the jacking of side.
A kind of installation method of the Mobile operating platform for the installation of high-altitude pipe-line equipment, comprising the following steps:
Electric block installation: S1 electric block installation is located on warehouse herringbone crossbeam, for lifting assembled frame member;
S2, frame member are assembled;It is respectively that three layer frame parts are assembled using upright bar, cross bar and brace, by workbench, safety guide rail with
Third layer frame body is assembled, and assembled good frame body is shelved on position different under warehouse herringbone crossbeam position;
S3, third layer frame body: being lifted on second layer frame body by hoisting platform using electric block, using sleeve and bolt by
Three layer frame bodies are docked with second layer frame body, are lifted on first using electric block to the third layer frame body and second layer frame body that connect
On layer frame body, the entirety that third layer frame body and second layer frame body connect is docked again with first layer frame body, ultimately forms entirety
Mobile operating platform.
As a preferred technical solution of the present invention, in S3, the third layer frame body docks with second layer frame body, third
When layer frame body and the entirety of second layer frame body connection are docked with first layer frame body, construction personnel uses sleeve in ease of Use platform
Add bolt that will be connected and fixed between frame body.
The prior art is compared, the present invention have it is following the utility model has the advantages that
Mobile operating platform is assemblied to form by all parts using bolt, and it is convenient with demolishing process to set up, and the process segment is not take up
Site space and time.Mobile operating platform the space occupied is fewer, will not influence other appliance arrangements construction in warehouse, moves
The low side of dynamic operating platform is equipped with idler wheel, convenient for the movement of operating platform.Mobile operating platform can the side of dismounting after the completion of construction
Just next project uses.
Present device material consumption is few, reduces the investment of construction personnel, and construction period is shorter, greatly reduces and is constructed into
This, the present invention is suitable for the installation of high-altitude various pipes equipment.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is schematic elevation view of the present invention;
Fig. 3 is first layer frame body schematic diagram of the present invention;
Fig. 4 connection schematic diagram between upright bar of the present invention;
In figure: 1. idler wheels, 2. assembled frame member, 3. upright bars, 4. cross bars, 5. braces, 6. workbenches, 7. foot pedals, 8. safety are anti-
Guardrail, 9. coaming plates, 10. steel ladders, 11. sleeves.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The technology of the present invention is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain this hair
It is bright, it is not intended to limit the present invention.
Structural schematic diagram disclosed by the invention as shown in figures 1-4, it is a kind of for high-altitude pipe-line equipment installation moving operation
Platform is put down including idler wheel 1, jacking, the assembled frame member 2 being made of upright bar 3 with cross bar 4, the work for being mounted on assembled 2 top surface of frame member
Platform 6 and steel stair for workbench 6 above and below construction personnel.
The assembled frame member 2 described in the present embodiment is assemblied to form by three layer frame bodies, respectively first layer frame body, the second layer frame
Body and third layer frame body are equipped with sleeve 11 between the frame body and connect, and be bolted.Every layer frame part is high
The height of 3.5m, the frame body are set according to the height in warehouse.
The frame body is made of upright bar 3 and the interconnection of cross bar 4, and the cross bar 4 will be connected with each other between upright bar 3, and
The cross bar 4 is vertical with upright bar 3, is worn between the upright bar 3 and cross bar 4 by connector and is bolted fixation.The connector
It is equipped with the threaded hole adaptable with upright bar 3 and cross bar 4, bolt is worn in screw thread hole site and connect upright bar 3 admittedly with cross bar 4
It is fixed.The brace 5 for increasing frame body rigidity is additionally provided between the upright bar 3 and cross bar 4, the brace 5 is diagonal in upright bar 3 and cross bar 4
Setting, forms triangle, the end of the brace 5 is fixed on connector between the upright bar 3, cross bar 4 and brace 5.
The both ends of about 11 sleeve and the inner cavity of frame body upright bar 3 are adapted, and the lower end cap of the sleeve 11 is in lower layer
The top surface of frame body upright bar 3, the upper end cap of the sleeve 11 is in the bottom surface of upper layer frame body upright bar 3, using sleeve 11 by upper layer and lower layer
Frame body docking, the sleeve 11 are equipped with the threaded hole being adapted with upright bar 3, wear bolt in screw thread hole site and consolidate two layers of frame body
It is fixed.
The bottom surface of the first layer frame body upright bar 3 is equipped with screw bolt support, and the screw bolt support is for ensuring to operate
Stability when platform construction guarantees construction safety, is equipped with jacking, the bottom end of the jacking in the side of 3 bottom of upright bar
Equipped with the idler wheel 1 mobile convenient for operating platform, the jacking is weldingly fixed on vertical after Mobile operating platform is all installed
The side of 3 bottom end of bar.
The top surface of the third layer frame body is fixed with workbench 6, and the workbench 6 is by several 4 zigzag welds of cross bar
Connect composition, be equipped with foot pedal 7 on the cross bar 4, the foot pedal 7 is plank or steel plate, the foot pedal 7 it is any one
Angle is equipped with opening, is equipped with steel ladder 10 in the aperture position and is connected to ground, for workbench 6 above and below construction personnel, institute
The opening for stating foot pedal 7 is equipped with cover board, and construction personnel steps on sky when for preventing construction working, while preventing falling for power tool
It falls, guarantees construction safety.
Being surrounded by for the workbench 6 connect the safety guide rail 8 formed with cross bar 4 by upright bar 3, and the safety is anti-
Guardrail 8 is 1.2m~1.5m high, and the bottom installation of the safety guide rail 8 is equipped with coaming plate 9 and is used to prevent the tool on workbench 6
It falls.
The assembly frame member 2 is equipped with the outlet for construction personnel's steel inlet-outlet ladder 10 at installation 10 position of steel ladder.
A kind of installation method of the Mobile operating platform for the installation of high-altitude pipe-line equipment, comprising the following steps:
S1, electric block installation: electric block installation is located on warehouse herringbone crossbeam, then by the control electricity of electric block
Road is all turned on, and is debugged electric block and is checked and accepted, for lifting assembled frame member 2.
Electric block described in the present embodiment is mounted on warehouse herringbone crossbeam, is easily installed the pipe in warehouse middle
Road lifting, while being easy to lift platform.
S2, frame member are assembled;Three layer frame part assembly are completed respectively on ground using upright bar 3, cross bar 4 and brace 5, it will be described
Workbench 6, safety guide rail 8 and third layer frame body are assembled, and assembled three good layer frame bodies are shelved on warehouse herringbone crossbeam position
Set lower different position;
Hoisting platform: S3 passes through electric block merogenesis from top to bottom and installs when the stage+module.Control electric block is run to
Third layer frame body is lifted into above second layer frame body, in second layer frame by the top of third layer frame body using electric block
Ease of Use platform is set up on the periphery of body, for construction personnel in ease of Use platform by the third layer frame body and the second layer frame
Body docks, and is connected between the frame body by sleeve 11, and be bolted.
After third layer frame body has been docked with second layer frame body, using electric block by third layer frame body and second layer frame body pair
The integral hoisting connect is above first layer frame body, and the ease of Use platform on second layer frame body periphery is in the assembled good second layer
Frame body moves the periphery of first layer frame body after slinging, for third layer frame body and second layer frame body to the entirety and first connected
The docking of layer frame body, ultimately forms overall movement operating platform.
Preferably, the assembled frame member 2 can select two layers of frame body or three layer frame bodies assembled according to the height of warehouse pipeline,
The height of each layer frame body equally can be according to the height of warehouse pipeline in the height for setting upright bar 3.
Preferably, form the upright bar 3 of operating platform, cross bar 4, brace 5, connector, workbench 6, steel ladder 10 and
Sleeve 11 is to process in plant design, and drilling, welding are completed, and is then transported to construction site assembling.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel should this understanding, the present invention is not limited to the above embodiments, the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (10)
1. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment, including idler wheel (1), assembled frame member (2), workbench
(6) and steel ladder (10), it is characterised in that: the assembly frame member (2) is made of upright bar (3) and cross bar (4) interconnection, institute
The bottom end for stating upright bar (3) is equipped with the idler wheel (1) mobile convenient for operating platform, and workbench (6) fixation is located at upright bar (3)
Top surface, in being surrounded by safety guide rail (8) for the workbench (6), the workbench (6) is equipped with foot pedal (7),
(7) one jiaos of the foot pedal are equipped with opening, are equipped in opening convenient for the steel ladder (10) of workbench above and below construction personnel.
2. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 1, it is characterised in that: institute
It states assembled frame member (2) to be assemblied to form by three layer frame bodies, be connected between the frame body by sleeve (11), and be bolted,
The idler wheel (1) is located at first layer frame body, and the workbench (6) is located at third layer frame body.
3. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 2, it is characterised in that: institute
State the brace (5) for being equipped between the upright bar (3) on each layer frame body and cross bar (4) and increasing frame body rigidity.
4. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 3, it is characterised in that: institute
It states and screw rod is worn by connector between upright bar (3), cross bar (4) and brace (5) is connected and fixed.
5. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 1, it is characterised in that: institute
It states assembled frame member (2) and is equipped with the outlet for being used for construction personnel's steel inlet-outlet ladder (10) at installation steel ladder (10) position.
6. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 1, it is characterised in that: institute
Safety guide rail (8) is stated to be made of several upright bars (3) and cross bar (4) interconnection.
7. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 6, it is characterised in that: institute
The bottom end for stating safety guide rail (8) is equipped with the coaming plate (9) fallen for construction tool.
8. a kind of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 1, it is characterised in that: institute
Stating idler wheel (1) is universal wheel, and the idler wheel (1) is mounted on the jacking of upright bar (3) bottom side.
9. a kind of installation method of the Mobile operating platform for the installation of high-altitude pipe-line equipment, comprising the following steps:
Electric block installation: S1 electric block installation is located on warehouse herringbone crossbeam, for lifting assembled frame member (2);
S2, frame member are assembled;It is respectively that three layer frame parts are assembled using upright bar (3), cross bar (4) and brace (5), by workbench (6),
Safety guide rail (8) and third layer frame body are assembled, and assembled good frame body is shelved on portion different under warehouse herringbone crossbeam position
Position;
S3, third layer frame body: being lifted on second layer frame body by hoisting platform using electric block, then using sleeve (11) and
Bolt docks third layer frame body with second layer frame body, uses electric gourd hang to the third layer frame body and second layer frame body that connect
On first layer frame body, the entirety that third layer frame body and second layer frame body connect is docked again with first layer frame body, finally
It is formed and moves integrally operating platform.
10. a kind of installation method of Mobile operating platform for the installation of high-altitude pipe-line equipment according to claim 9,
Be characterized in that: in the S3, the third layer frame body is connect with the docking of second layer frame body, third layer frame body and second layer frame body
When entirety is docked with first layer frame body, construction personnel will be connected in ease of Use platform using sleeve (11) plus bolt between frame body
It is fixed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910541850.5A CN110242034A (en) | 2019-06-21 | 2019-06-21 | A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910541850.5A CN110242034A (en) | 2019-06-21 | 2019-06-21 | A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN110242034A true CN110242034A (en) | 2019-09-17 |
Family
ID=67888536
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910541850.5A Pending CN110242034A (en) | 2019-06-21 | 2019-06-21 | A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN110242034A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111472534A (en) * | 2020-04-30 | 2020-07-31 | 中建四局第六建设有限公司 | Steel operation platform for assisting hoisting of super high-rise steel bar |
| CN111809849A (en) * | 2020-08-18 | 2020-10-23 | 浙江中南建设集团钢结构有限公司 | Auxiliary operation platform for installation of outer guard plate of ventilation building and its use method |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203755627U (en) * | 2014-02-28 | 2014-08-06 | 中国建筑第五工程局有限公司广州分公司 | Movable type scaffold |
| CN204282789U (en) * | 2014-11-27 | 2015-04-22 | 中国建筑一局(集团)有限公司 | Movable concave shaped steel scaffold |
| WO2017024363A1 (en) * | 2015-08-07 | 2017-02-16 | Justin Maher | Deck for scaffold |
| CN207003972U (en) * | 2017-07-10 | 2018-02-13 | 中国建筑一局(集团)有限公司 | Movable construction operation platform |
| CN210316439U (en) * | 2019-06-21 | 2020-04-14 | 汕头市建筑工程总公司 | Movable operating platform for installing high-altitude pipeline equipment |
-
2019
- 2019-06-21 CN CN201910541850.5A patent/CN110242034A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN203755627U (en) * | 2014-02-28 | 2014-08-06 | 中国建筑第五工程局有限公司广州分公司 | Movable type scaffold |
| CN204282789U (en) * | 2014-11-27 | 2015-04-22 | 中国建筑一局(集团)有限公司 | Movable concave shaped steel scaffold |
| WO2017024363A1 (en) * | 2015-08-07 | 2017-02-16 | Justin Maher | Deck for scaffold |
| CN207003972U (en) * | 2017-07-10 | 2018-02-13 | 中国建筑一局(集团)有限公司 | Movable construction operation platform |
| CN210316439U (en) * | 2019-06-21 | 2020-04-14 | 汕头市建筑工程总公司 | Movable operating platform for installing high-altitude pipeline equipment |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111472534A (en) * | 2020-04-30 | 2020-07-31 | 中建四局第六建设有限公司 | Steel operation platform for assisting hoisting of super high-rise steel bar |
| CN111472534B (en) * | 2020-04-30 | 2025-04-01 | 中国建筑第四工程局有限公司 | A steel operating platform for assisting the lifting of super-high-rise steel bars |
| CN111809849A (en) * | 2020-08-18 | 2020-10-23 | 浙江中南建设集团钢结构有限公司 | Auxiliary operation platform for installation of outer guard plate of ventilation building and its use method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204781881U (en) | Elevartor shaft structure construction handling frame | |
| CN205223851U (en) | A platform of crawling for work of suspension bridge main push -towing rope testing and maintenance | |
| CN106499188B (en) | The hydraulic material distributing machine of floor inner climbing type is climbed support system | |
| CN110242034A (en) | A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment | |
| CN105133509B (en) | A kind of simple workbench of truss-like based on bridge maintenance | |
| CN212251443U (en) | Special pipeline of old factory building dust removal pipeline transformation installation removes hoist device | |
| CN103835195A (en) | Rail layer low-position jacking and rapid transversely-moving span changing device and method | |
| CN105019360B (en) | A kind of construction method based on high-altitude crawler crane trestle | |
| CA2920075A1 (en) | Scaffold | |
| CN210316439U (en) | Movable operating platform for installing high-altitude pipeline equipment | |
| CN212176516U (en) | Attached type lifting scaffold wall-attached support for floor slab | |
| CN204185146U (en) | Construction of Steel Structure overhang crane between skyscraper two tall buildings | |
| CN203654705U (en) | Slideable hanging basket apparatus for steel skeleton assembling | |
| CN209243585U (en) | A kind of large-tonnage load piston shoes | |
| CN115465777B (en) | Auxiliary lifting roll-over stand and lifting method for large-scale tower-shaped parts for ship construction | |
| CN207484921U (en) | Assembled moving operating platform | |
| CN205577451U (en) | Instrument formula protection frame suitable for assemble integral concrete horizontal element | |
| CN211597642U (en) | Scaffold for building convenient to installation | |
| CN215052142U (en) | Continuous tensioning lifting beam device | |
| CN2818654Y (en) | Self-walking straight-arm overhead operating platform | |
| CN210528275U (en) | Hanging platform convenient to assemble and move in crown block beam and slide wire maintenance | |
| CN201738563U (en) | Hydraulic climbing scaffold for building construction | |
| CN220847086U (en) | Movable aerial work trolley for steel box girder construction | |
| CN223256486U (en) | String beam sliding pushing construction device | |
| CN218862036U (en) | A steel grating with a sandwich structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190917 |