CN206751210U CN201621341444.2U CN201621341444U CN206751210U CN 206751210 U CN206751210 U CN 206751210U CN 201621341444 U CN201621341444 U CN 201621341444U CN 206751210 U CN206751210 U CN 206751210U
Authority
CN
China
Prior art keywords
track
shiftable track
shiftable
electric hoist
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621341444.2U
Other languages
Chinese (zh)
Inventor
闫保贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sedin Engineering Co Ltd
Original Assignee
Sedin Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sedin Engineering Co Ltd filed Critical Sedin Engineering Co Ltd
Priority to CN201621341444.2U priority Critical patent/CN206751210U/en
Application granted granted Critical
Publication of CN206751210U publication Critical patent/CN206751210U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of multi-thread boom hoisting of shiftable track it include shiftable track (1), shiftable track (2), shiftable track (3), fixed hoisting track (4), it is parallel between shiftable track (1) and shiftable track (2), and in same level, shiftable track (1) is vertical with fixed hoisting track (4), shiftable track (1) installation shiftable track suspension electric hoist (5), shiftable track (2) installation shiftable track suspension electric hoist (6), shiftable track (3) is installed on shiftable track suspension electric hoist (5) and shiftable track suspension electric hoist (6), shiftable track (3) is located in same level with fixed hoisting track (4), shiftable track (3) is provided with equipment lifting electric hoist (7).The advantages of the utility model has simple in construction, small investment, and utilization rate is high.

Description

The multi-thread boom hoisting of shiftable track
Technical field
The utility model belongs to a kind of multi-thread boom hoisting of shiftable track.
Background technology
Industrial premises general device is relatively more, and is multi storied factory building, and overhaul of the equipments, which needs to be lifted by crane, to be moved to ground and enter Row maintenance.It is middle to have structural column separation again because factory building span is big, it is impossible to solve the problems, such as lifting with a boom hoisting, It can only be overhauled at every and a boom hoisting is respectively set on circuit, generally require to set more boom hoistings.What is so set lacks Point is that boom hoisting investment is big, and utilization rate is low (boom hoisting can only be responsible for the equipment lifting on a circuit), itself Maintenance cost it is also high.
The content of the invention
The utility model purpose is to provide a kind of simple in construction, small investment, the multi-thread lifting of the high shiftable track of utilization rate Device.
The utility model is the mobility using track, realizes that a plurality of lifting circuit only needs a set of boom hoisting Carry out the lifting of the equipment of each bar circuit.So, boom hoisting can be reduced, improve its utilization rate, the maintenance of itself into This is also reduced.
The multi-thread boom hoisting of a kind of shiftable track of the present utility model, it includes the first shiftable track, and second is removable Dynamic rail road, shiftable track, fixed hoisting track, the first shiftable track suspension electric hoist, the second shiftable track suspension electricity Cucurbit, equipment lifting electric hoist, it is characterised in that it is parallel between the first shiftable track and the second shiftable track, and positioned at same On one horizontal plane, the first shiftable track and the second shiftable track are vertical with fixed hoisting track, the first shiftable track peace Electric hoist is hung equipped with the first shiftable track, the second shiftable track is provided with the second shiftable track suspension electric hoist, First shiftable track hangs and is provided with shiftable track, removable dynamic rail on electric hoist and the second shiftable track suspension electric hoist Road and fixed hoisting track be located in same level, and make the gap of shiftable track and fixed hoisting orbital docking be 2~ 4mm, shiftable track are provided with equipment lifting electric hoist.
First shiftable track suspension electric hoist and the second shiftable track suspension electric hoist as described above is that interlocking exists Together, it is synchronization-moving.
Fixed hoisting track as described above is fixedly installed at the top of the factory building of workspace, and fixed hoisting track can be 4a, 4b, 4c, 4d ..., more tracks of 4n are parallel between more fixed hoisting tracks.First shiftable track and second may move Track is fixedly installed at the top of the factory building in maintenance area.
The multi-thread boom hoisting of the utility model shiftable track is installed in industrial premises and uses (such as accompanying drawing).Have in factory building More industrial equipments, industrial equipment can be arranged on multistory frame, and the industrial equipment that need to be overhauled can be divided into a and play messenger wire Road, b lifting circuit, c lifting circuit ..., n lifting circuit, it is therefore an objective to by equipment to be lifted from installation site lifting after be moved to Overhauled on the ground of service area.
Shiftable track is risen by the mobile any one track alignment with fixed hoisting track (a, b, c ..., n), equipment Electric hoist is hung to move on the line track with composition.
The course of work of the multi-thread boom hoisting of the utility model shiftable track is as follows:
When certain equipment of certain circuit or its part need lifting, such as the equipment on b lines, first pass through driving first (the two electric hoists are to lock together, synchronous for shiftable track suspension electric hoist and the second shiftable track suspension electric hoist It is mobile), lifting by crane electric hoist with the shiftable track and equipment being fixed thereon together can along the first shiftable track and second Moving track moves, and shiftable track is moved to when being alignd with fixed hoisting track b, that is, stops movement.Driving equipment rises again Hang electric hoist to move to workspace along shiftable track and the fixed hoisting track b line tracks formed, treat that equipment lifts by crane electric calabash Lu Yidong causes to need the equipment surface lifted by crane, and stops movement, it would be desirable to which the hanging equipment of lifting is hung equipment lifting electric hoist On hook and lift by crane, then driving equipment lifting electric hoist is moved to maintenance area, and equipment is put to ground and overhauled.Overhaul of the equipments After the completion of, equipment is lifted by crane again, the installation site of equipment is returned to by reverse circuit, equipment lifting electric hoist returns to maintenance area Treat slinging work next time.
The hoisting weight of the multi-thread boom hoisting of the utility model shiftable track is optional, and maximum is chosen as 20 tons;Play rise Degree is optional according to factory building height, and optional scope is 10~60 meters.
The utility model has the following advantages:
(1) lifting track is divided into shiftable track and fixed hoisting track, realizes the mobility of track on demand.
(2) factory building for making to have a plurality of lifting circuit realizes the lifting for only needing a set of boom hoisting can to meet equipment The function of maintenance, the utilization rate of boom hoisting is improved, reduce the maintenance quantity of boom hoisting.
Brief description of the drawings
Fig. 1 is the multi-thread boom hoisting top view of the utility model shiftable track;
Fig. 2 is the multi-thread boom hoisting A-A views of the utility model shiftable track;
Fig. 3 is figure a partial enlarged drawings;
Fig. 4 is figure b partial enlarged drawings.
As illustrated, the 1-the first shiftable track, the 2-the second shiftable track, 3-shiftable track, 4-fix Hanger rail road, the 5-the first shiftable track suspension electric hoist, the 6-the second shiftable track suspension electric hoist, 7-equipment lifting electricity Cucurbit, 8-workspace, 9-maintenance area, 10-mill construction post, 11-equipment to be lifted.
Embodiment
Embodiment 1:
The multi-thread boom hoisting of shiftable track, it includes the first shiftable track 1, the first shiftable track 2, removable dynamic rail Road 3, fixed hoisting track 4, the first shiftable track suspension electric hoist 5, the second shiftable track suspension electric hoist 6, equipment rise Hang electric hoist 7, it is characterised in that it is parallel between the first shiftable track 1 and the second shiftable track 2, and it is located at same level On, the first shiftable track 1 and the second shiftable track 2 are vertical with fixed hoisting track 4, and the first shiftable track 1 is provided with First shiftable track hangs electric hoist 5, and the second shiftable track 2 is provided with the second shiftable track suspension electric hoist 6, the Shiftable track 3 is installed on one shiftable track suspension electric hoist 5 and second shiftable track suspension electric hoist 6, may move Track 3 is located in same level with fixed hoisting track 4, and the gap for making shiftable track 3 be docked with fixed hoisting track 4 For 4mm, shiftable track 3 is provided with equipment lifting electric hoist 7.
Described the first shiftable track suspension electric hoist 5 and second shiftable track suspension electric hoist 6 is interlocking one Rise, it is synchronization-moving.
Described fixed hoisting track 4 is fixedly installed at the top of the factory building of workspace, and fixed hoisting track 4 is 8 tracks, Totally 8 lifting circuits, it is parallel between 8 fixed hoisting tracks 4.First shiftable track 1 and the second shiftable track 2 fix peace At the top of factory building loaded on maintenance area.
4 tons of the equipment maximum part weight that need to be lifted by crane, equipment are supported on 2 layers, and support layer height is 6 meters, factory building heights of roofs 14 meters, every lifting circuit on need repair apparatus 6.
Equipment lifting electric hoist 7 is from the electric block that specified hoisting weight is 5 tons, shiftable track suspension electric hoist 5 Specified supporting power with 6 is 5 tons.The device lifting altitude is 10 meters.
The course of work of the multi-thread boom hoisting of the utility model shiftable track is as follows:
When certain equipment of certain circuit or its part need lifting, such as the equipment on b lines, first pass through driving first (the two electric hoists are to lock together to shiftable track suspension electric hoist 5 and second shiftable track suspension electric hoist 6, together Moved further), electric hoist 7 is lifted by crane together along the first shiftable track 1 and the with the shiftable track 3 and equipment that are fixed thereon Two shiftable tracks 2 move, and shiftable track 3 are moved to when being alignd with fixed hoisting track 4b, that is, stop movement.Drive again Equipment lifting electric hoist 7 moves along the shiftable track 3 and fixed hoisting track 4b line tracks formed to workspace, treats equipment The lifting movement of electric hoist 7 causes to need the equipment surface lifted by crane, and stops movement, it would be desirable to which the hanging equipment of lifting lifts by crane electricity in equipment On the suspension hook of cucurbit 7 and lift by crane, then driving equipment lifting electric hoist 7 is moved to maintenance area, and equipment is put to ground and examined Repair.After the completion of overhaul of the equipments, equipment is lifted by crane again, the installation site of equipment, equipment lifting electric hoist 7 are returned to by reverse circuit Return to maintenance area and treat slinging work next time.
Embodiment 2:
Described fixed hoisting track 4 is fixedly installed at the top of the factory building of workspace, and fixed hoisting track 4 is 4 tracks, Totally 4 lifting circuits, it is parallel between 4 fixed hoisting tracks 4.
8 tons of the equipment maximum part weight that need to be lifted by crane, equipment are supported on 9 layers, and support layer height is 52 meters, factory building heights of roofs 63 meters, every lifting circuit on need repair apparatus 4.
Equipment lifting electric hoist 7 is from the electric block that specified hoisting weight is 10 tons, shiftable track suspension electric hoist 5 Specified supporting power with 6 is 10 tons.Shiftable track 3 is 3mm with the gap docked of fixed hoisting track 4.The device raising Highly it is 60 meters.Remaining is the same as embodiment 1.
Embodiment 3:
Described fixed hoisting track 4 is fixedly installed at the top of the factory building of workspace, and fixed hoisting track 4 is 5 tracks, Totally 5 lifting circuits, it is parallel between 5 fixed hoisting tracks 4.
16 tons of the equipment maximum part weight that need to be lifted by crane, equipment are supported on 5 layers, and support layer height is 30 meters, and factory building is risen 42 meters are spent, needs repair apparatus 3 on every lifting circuit.
Equipment lifting electric hoist 7 is from the electric block that specified hoisting weight is 20 tons, shiftable track suspension electric hoist 5 Specified supporting power with 6 is 20 tons.Shiftable track 3 is 2mm with the gap docked of fixed hoisting track 4.The device raising Highly it is 38 meters.Remaining is the same as embodiment 1.

Claims (6)

1. a kind of multi-thread boom hoisting of shiftable track, it includes the first shiftable track (1), and the second shiftable track (2) can Moving track (3), fixed hoisting track (4), the first shiftable track suspension electric hoist (5), the second shiftable track suspension electricity Cucurbit (6), equipment lifting electric hoist (7), it is characterised in that between the first shiftable track (1) and the second shiftable track (2) It is parallel, and in same level, the first shiftable track (1) and the second shiftable track (2) and fixed hoisting track (4) Vertically, the first shiftable track (1) is provided with the first shiftable track suspension electric hoist (5), the second shiftable track (2) installation There is the second shiftable track to hang electric hoist (6), hanged in the first shiftable track suspension electric hoist (5) and the second shiftable track Hang and shiftable track (3) is installed on electric hoist (6), shiftable track (3) is located at same level with fixed hoisting track (4) On, and the gap for making shiftable track (3) be docked with fixed hoisting track (4) is 2~4mm, shiftable track (3), which is provided with, to be set Standby lifting electric hoist (7).
2. a kind of multi-thread boom hoisting of shiftable track as claimed in claim 1, it is characterised in that described first is removable Track suspension electric hoist (5) and the second shiftable track suspension electric hoist (6) are to lock together, synchronization-moving.
A kind of 3. multi-thread boom hoisting of shiftable track as claimed in claim 1, it is characterised in that described fixed hoisting rail Road (4) is fixedly installed at the top of the factory building of workspace, and fixed hoisting track (4) is 4a, 4b, 4c, 4d ..., and more tracks of 4n are more It is parallel between root fixed hoisting track (4).
A kind of 4. multi-thread boom hoisting of shiftable track as claimed in claim 1, it is characterised in that the first removable dynamic rail Road (2) and the second shiftable track (3) are fixedly installed at the top of the factory building in maintenance area.
5. a kind of multi-thread boom hoisting of shiftable track as claimed in claim 1, it is characterised in that hoisting weight is up to 20 Ton.
6. a kind of multi-thread boom hoisting of shiftable track as claimed in claim 1, it is characterised in that lift by crane the model of lifting altitude Enclose for 10~60 meters.
CN201621341444.2U 2016-12-07 2016-12-07 The multi-thread boom hoisting of shiftable track Expired - Fee Related CN206751210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621341444.2U CN206751210U (en) 2016-12-07 2016-12-07 The multi-thread boom hoisting of shiftable track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621341444.2U CN206751210U (en) 2016-12-07 2016-12-07 The multi-thread boom hoisting of shiftable track

Publications (1)

Publication Number Publication Date
CN206751210U true CN206751210U (en) 2017-12-15

Family

ID=60606846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621341444.2U Expired - Fee Related CN206751210U (en) 2016-12-07 2016-12-07 The multi-thread boom hoisting of shiftable track

Country Status (1)

Country Link
CN (1) CN206751210U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113086841A (en) * 2021-04-13 2021-07-09 索通发展股份有限公司 Hanging basket device for repairing roasting furnace wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113086841A (en) * 2021-04-13 2021-07-09 索通发展股份有限公司 Hanging basket device for repairing roasting furnace wall
CN113086841B (en) * 2021-04-13 2022-10-21 索通发展股份有限公司 Be used for prosthetic hanging flower basket device of roasting furnace wall

Similar Documents

Publication Publication Date Title
CN201268937Y (en) Double-layer hanging cradle for working aloft
CN102786004B (en) Integrally moving on-load hydraulic lifting system without mooring rope and lifting method
CN203143872U (en) Mobile platform for elevator installation construction
CN206751210U (en) The multi-thread boom hoisting of shiftable track
CN103967263A (en) Novel hydraulic automatic climbing discharging platform
CN202542703U (en) Electric signal beam crane
CN201460186U (en) Adhesive lifting scaffold
CN204873491U (en) Self -supporting does not have crossbeam hoist system
CN203878957U (en) Protective screen module unit
CN205653077U (en) Tower crane for building site of band shift dynamic formula scaffold frame
CN105253793B (en) Construction method for traction transporting and hoisting of zinc pot in zinc plating workshop
CN204000632U (en) A kind of sandbox prepressing device based on reaction frame
CN203594215U (en) High-altitude large-area work platform semi-automatic lifting apparatus
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN209397505U (en) One kind being used for loading test of half-through CFST arch bridge hoisting of deck beam mounting device
CN208666843U (en) The anti-rope device of cant beam on machine room
CN201660377U (en) Special gantry crane for overlength and large-tonnage parts
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN103058083B (en) Bolt sphere truss gig
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN103626008A (en) Elevator cable anti-deflection device
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN204549903U (en) A kind of fixed point traction and slide rail displacement hoisting device
CN203602184U (en) Arrangement structure of sightseeing elevator with no machine room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20181207