CN205653077U - Tower crane for building site of band shift dynamic formula scaffold frame - Google Patents

Tower crane for building site of band shift dynamic formula scaffold frame Download PDF

Info

Publication number
CN205653077U
CN205653077U CN201620453323.0U CN201620453323U CN205653077U CN 205653077 U CN205653077 U CN 205653077U CN 201620453323 U CN201620453323 U CN 201620453323U CN 205653077 U CN205653077 U CN 205653077U
Authority
CN
China
Prior art keywords
platform
scaffold
overarm arm
lifting
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620453323.0U
Other languages
Chinese (zh)
Inventor
过伟南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Petrochemical Crane Co Ltd
Original Assignee
Wuxi Petrochemical Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Petrochemical Crane Co Ltd filed Critical Wuxi Petrochemical Crane Co Ltd
Priority to CN201620453323.0U priority Critical patent/CN205653077U/en
Application granted granted Critical
Publication of CN205653077U publication Critical patent/CN205653077U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses a tower crane for building site of band shift dynamic formula scaffold frame, including the hoist body, hoist body one end is equipped with the support frame, the support frame is vertical to be fixed subaerial, the support frame top is equipped with the rotatory room of controlling, the rotatory room one end of controlling derives the davit of hanging oneself from a beam, the rotation is controlled the room lower extreme and is connected with hydraulic elevating platform, support frame one end still derives one and goes up and down to prop up a supporting bench, go up and down a supporting bench with the davit relative up -down that hangs oneself from a beam sets up, a supporting bench one end of going up and down is connected with the riser, a supporting bench other end that goes up and down is a horizontal table, go up and down a supporting bench with hang oneself from a beam and built the scaffold frame between the davit. In this way, the utility model discloses not only can can also regard as the portable scaffold frame of building site to use as hoist hoist and mount article, construction worker stands and can follow the hang oneself from a beam davit and a supporting bench lift removal job of going up and down on the scaffold frame.

Description

The construction site derrick crane of Tape movement formula scaffold
Technical field
This utility model relates to crane field, particularly relates to the construction site derrick crane of a kind of Tape movement formula scaffold.
Background technology
Derrick crane is called for short tower crane, and tower crane is divided into upper rotary tower crane and the big class of lower turret machine two.Wherein the former bearing capacity is higher than the latter, and what in many job sites, we were seen is exactly on top slewing, and lifting guide support adding connects high tower crane.Swing arm is contained in the revolving crane on towering tower body top.Working space is big, is mainly used in vertically and horizontally conveying and the installation of building element of material in housing construction.It is made up of metal structure, operating mechanism and electrical system three part.Metal structure includes tower body, swing arm and base etc..Operating mechanism hoists, luffing, four parts of turning round and walk.Electrical system includes motor, controller, power distribution cabinet, connection line, signal and illuminator etc..But traditional derrick crane is merely possible to crane hanging component article to be used, and function is the most single, lacks other functions, the instrument that derrick crane is commonly used as building site, it is impossible to bring more service to building field further.
Utility model content
This utility model is mainly solving the technical problems that provide the construction site derrick crane of a kind of Tape movement formula scaffold, it is possible to as crane hanging component article, moreover it is possible to use as construction site traveling centering.
For solving above-mentioned technical problem, the technical scheme that this utility model uses is: provide the construction site derrick crane of a kind of Tape movement formula scaffold, including gantry body, described gantry body one end is provided with bracing frame, support frame as described above vertically fixes on the ground, support frame as described above top is provided with rotation OPS, overarm arm is derived in one end by described rotation OPS, described rotation OPS lower end connects hydraulic elevator platform, support frame as described above one end is also derived a lifting and is supported platform, described lifting supports platform and is oppositely arranged up and down with described overarm arm, described lifting supports the connection of platform one end lifter, it is a level table that described lifting supports the platform other end, described lifting supports and has built scaffold between platform and described overarm arm.
In one preferred embodiment of this utility model, described lifting supports and is controlled collaborative lifting moving by controller between platform and described hydraulic elevator platform, described overarm arm is driven lifting moving by described hydraulic elevator platform, and described lifting supports and remains same distance between platform and described overarm arm.
In one preferred embodiment of this utility model, it is provided with trolley travelling track in described overarm arm, described trolley travelling track is provided with wheeling mechanism, described wheeling mechanism is slidably connected on described trolley travelling track, wire sling is derived in described wheeling mechanism lower end, and described wire sling lower end connects hook gear.
In one preferred embodiment of this utility model, described scaffold includes pole and scaffold platen, described pole is vertically installed at described overarm arm and described lifting supports between platform, described pole one end is fixed on described overarm arm bottom end face, the described pole other end is fixed on described lifting and supports on the level table of platform upper end, and described scaffold platen is horizontally mounted to be built between described pole.
In one preferred embodiment of this utility model, described scaffold is provided with scaffold platen described in multilamellar, is capped with protection network outside described scaffold.
The beneficial effects of the utility model are: this utility model can not only be as crane hanging component article; can also use as construction site traveling centering; builder stands in and can follow overarm arm and lifting support platform lifting moving work on scaffold; safety stablized by scaffold; outside also has protection network protection, it is ensured that the safety of builder.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme in this utility model embodiment, in describing embodiment below, the required accompanying drawing used is briefly described, apparently, accompanying drawing in describing below is only embodiments more of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of construction site derrick crane one preferred embodiment of this utility model Tape movement formula scaffold;
In accompanying drawing, the labelling of each parts is as follows: 1, gantry body;2, bracing frame;3, OPS is rotated;4, overarm arm;5, hydraulic elevator platform;6, lifting supports platform;7, lifter;8, scaffold;9, trolley travelling track;10, wheeling mechanism;11, wire sling;12, hook gear;13, pole;14, scaffold platen.
Detailed description of the invention
Technical scheme in this utility model embodiment will be clearly and completely described below, it is clear that described embodiment is only a part of embodiment of the present utility model rather than whole embodiments.Based on the embodiment in this utility model, all other embodiments that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
Referring to Fig. 1, this utility model embodiment includes:
A kind of construction site derrick crane of Tape movement formula scaffold, including gantry body 1, described gantry body 1 one end is provided with bracing frame 2, support frame as described above 2 vertically fixes on the ground, support frame as described above 2 top is provided with rotation OPS 3, overarm arm 4 is derived in one end by described rotation OPS 3, described rotation OPS 3 lower end connects hydraulic elevator platform 5, support frame as described above 2 one end is also derived a lifting and is supported platform 6, described lifting supports platform 6 and is oppositely arranged with described overarm arm about 4, described lifting supports the connection of platform 6 one end lifter 7, it is a level table that described lifting supports platform 6 other end, described lifting supports and has built scaffold 8 between platform 6 and described overarm arm 4.
It addition, described lifting supports is controlled collaborative lifting moving by controller between platform 6 and described hydraulic elevator platform 5, described overarm arm 4 is driven lifting moving by described hydraulic elevator platform 5, and described lifting supports and remains same distance between platform 6 and described overarm arm 4.
Additionally, it is provided with trolley travelling track 9 in described overarm arm 4, described trolley travelling track 9 is provided with wheeling mechanism 10, described wheeling mechanism 10 is slidably connected on described trolley travelling track 9, wire sling 11 is derived in described wheeling mechanism 10 lower end, and described wire sling 11 lower end connects hook gear 12.
Additionally, described scaffold 8 includes pole 13 and scaffold platen 14, described pole 13 is vertically installed at described overarm arm 4 and described lifting supports between platform 6, described pole 13 one end is fixed on described overarm arm 4 bottom end face, described pole 13 other end is fixed on described lifting and supports on the level table of platform 6 upper end, and described scaffold platen 14 is horizontally mounted to be built between described pole 13.
It addition, described scaffold 8 is provided with scaffold platen 14 described in multilamellar, outside described scaffold 8, it is capped with protection network.
nullOperation principle of the present utility model is for be provided with bracing frame 2 in gantry body 1 one end,Bracing frame 2 vertically fixes on the ground,Bracing frame 2 top is provided with rotation OPS 3,Rotate OPS 3 one end and derive overarm arm 4,It is provided with trolley travelling track 9 in overarm arm 4,Trolley travelling track 9 is provided with wheeling mechanism 10,Wheeling mechanism 10 is slidably connected on trolley travelling track 9,Wire sling 11 is derived in wheeling mechanism 10 lower end,Wire sling 11 lower end connects hook gear 12,Rotate OPS 3 lower end connection and have hydraulic elevator platform 5,Bracing frame 2 one end is also derived a lifting and is supported platform 6,Lifting supports platform 6 and is oppositely arranged with overarm arm about 4,Lifting supports and is controlled collaborative lifting moving by controller between platform 6 and hydraulic elevator platform 5,Overarm arm 4 is driven lifting moving by hydraulic elevator platform 5,Lifting supports and remains same distance between platform 6 and overarm arm 4,Lifting supports the connection of platform 6 one end lifter 7,It is a level table that lifting supports platform 6 other end,Lifting supports and has built scaffold 8 between platform 6 and overarm arm 4,Scaffold 8 includes pole 13 and scaffold platen 14,Pole 13 is vertically installed at overarm arm 4 and lifting supports between platform 6,Pole 13 one end is fixed on overarm arm 4 bottom end face,Pole 13 other end is fixed on lifting and supports on the level table of platform 6 upper end,Scaffold platen 14 is horizontally mounted to be built between pole 13,Scaffold 8 is provided with multi-layer scaffold platen 14,It is capped with protection network outside scaffold 8,Crane equipment both can be as crane hanging component article,Can also use as construction site traveling centering,Builder stands in and can follow overarm arm 4 and lifting support platform 6 lifting moving work on scaffold 8,Safety stablized by scaffold 8,Outside also has protection network protection,Ensure that the safety of builder.
The foregoing is only embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every equivalent structure utilizing this utility model description to be made or equivalence flow process conversion; or directly or indirectly it is used in other relevant technical field, the most in like manner it is included in scope of patent protection of the present utility model.

Claims (5)

1. the construction site derrick crane of a Tape movement formula scaffold, including gantry body, it is characterized in that, described gantry body one end is provided with bracing frame, support frame as described above vertically fixes on the ground, support frame as described above top is provided with rotation OPS, overarm arm is derived in one end by described rotation OPS, described rotation OPS lower end connects hydraulic elevator platform, support frame as described above one end is also derived a lifting and is supported platform, described lifting supports platform and is oppositely arranged up and down with described overarm arm, described lifting supports the connection of platform one end lifter, it is a level table that described lifting supports the platform other end, described lifting supports and has built scaffold between platform and described overarm arm.
The construction site derrick crane of Tape movement formula scaffold the most according to claim 1, it is characterized in that, described lifting supports and is controlled collaborative lifting moving by controller between platform and described hydraulic elevator platform, described overarm arm is driven lifting moving by described hydraulic elevator platform, and described lifting supports and remains same distance between platform and described overarm arm.
The construction site derrick crane of Tape movement formula scaffold the most according to claim 1, it is characterized in that, it is provided with trolley travelling track in described overarm arm, described trolley travelling track is provided with wheeling mechanism, described wheeling mechanism is slidably connected on described trolley travelling track, wire sling is derived in described wheeling mechanism lower end, and described wire sling lower end connects hook gear.
The construction site derrick crane of Tape movement formula scaffold the most according to claim 1, it is characterized in that, described scaffold includes pole and scaffold platen, described pole is vertically installed at described overarm arm and described lifting supports between platform, described pole one end is fixed on described overarm arm bottom end face, the described pole other end is fixed on described lifting and supports on the level table of platform upper end, and described scaffold platen is horizontally mounted to be built between described pole.
The construction site derrick crane of Tape movement formula scaffold the most according to claim 1, it is characterised in that described scaffold is provided with scaffold platen described in multilamellar, is capped with protection network outside described scaffold.
CN201620453323.0U 2016-05-18 2016-05-18 Tower crane for building site of band shift dynamic formula scaffold frame Expired - Fee Related CN205653077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620453323.0U CN205653077U (en) 2016-05-18 2016-05-18 Tower crane for building site of band shift dynamic formula scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620453323.0U CN205653077U (en) 2016-05-18 2016-05-18 Tower crane for building site of band shift dynamic formula scaffold frame

Publications (1)

Publication Number Publication Date
CN205653077U true CN205653077U (en) 2016-10-19

Family

ID=57403182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620453323.0U Expired - Fee Related CN205653077U (en) 2016-05-18 2016-05-18 Tower crane for building site of band shift dynamic formula scaffold frame

Country Status (1)

Country Link
CN (1) CN205653077U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105800479A (en) * 2016-05-18 2016-07-27 无锡石油化工起重机有限公司 Tower crane for construction site with movable scaffold
CN107089595A (en) * 2017-05-22 2017-08-25 无锡石油化工起重机有限公司 The derrick crane of multi-faceted direction board is installed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105800479A (en) * 2016-05-18 2016-07-27 无锡石油化工起重机有限公司 Tower crane for construction site with movable scaffold
CN107089595A (en) * 2017-05-22 2017-08-25 无锡石油化工起重机有限公司 The derrick crane of multi-faceted direction board is installed

Similar Documents

Publication Publication Date Title
CN214359854U (en) Anti-swing device of single-beam crane
CN203855328U (en) Novel hoisting machine
CN105800482A (en) Tower crane with climbing ladder and elevator
CN205653092U (en) Tower crane of band plate material bracket
CN105776037A (en) Tower crane with water spray and dust prevention functions
CN204474187U (en) A kind of wall type turning crane
CN205653086U (en) Tower crane who possesses climbing ladder and lift
CN105003082A (en) Glass curtain wall mounting equipment and glass curtain mounting method
CN205114894U (en) Manual formula wall type swing crane; derrick
CN205653091U (en) Many davits tower crane
CN205653087U (en) Tower crane who possesses solar energy, wind power generation function
CN204474193U (en) A kind of Pillar-fixing Type Slewing Crane
CN206970045U (en) A kind of construction hanging device
CN205653077U (en) Tower crane for building site of band shift dynamic formula scaffold frame
CN105800479A (en) Tower crane for construction site with movable scaffold
CN204297972U (en) The machining center of convenient for maintaining
CN202449763U (en) Simple pneumatic crane
CN2926741Y (en) Pipeline repairing apparatus capable of vertically and turning operation
CN206273951U (en) The hoisting apparatus of attachment type raise scaffold
CN202440231U (en) Gantry crane lifting hook device
CN202542703U (en) Electric signal beam crane
CN204802839U (en) Jacking equipment for building
CN105520681B (en) Flexion-extension formula folding arm window cleaning equipment
CN112279100A (en) Automatic hoisting device of crane
CN202465121U (en) Suspension arm of crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161019

Termination date: 20170518