CN213804912U - Collapsible crossbeam construction hanging flower basket - Google Patents

Collapsible crossbeam construction hanging flower basket Download PDF

Info

Publication number
CN213804912U
CN213804912U CN202022224957.8U CN202022224957U CN213804912U CN 213804912 U CN213804912 U CN 213804912U CN 202022224957 U CN202022224957 U CN 202022224957U CN 213804912 U CN213804912 U CN 213804912U
Authority
CN
China
Prior art keywords
hanging
muscle
cross beam
ribs
basket according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022224957.8U
Other languages
Chinese (zh)
Inventor
陈磊
常晓亮
吴俊涛
张亮
杨义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202022224957.8U priority Critical patent/CN213804912U/en
Application granted granted Critical
Publication of CN213804912U publication Critical patent/CN213804912U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application relates to a collapsible crossbeam construction hanging flower basket relates to the field of construction hanging flower basket. The hanging flower basket includes two skeleton units that are parallel to each other, connect the multichannel steel strand wires between two skeleton units and set up the platform of standing in two skeleton unit one ends, the skeleton unit includes two hanging muscle that are parallel to each other and sets firmly the reinforcement muscle between hanging the muscle, the reinforcement muscle sets up the multichannel along the length direction interval that hangs the muscle, the both ends of steel strand wires are connected respectively on the hanging muscle of different skeleton units, and the plane that steel strand wires perpendicular to skeleton unit formed, the platform of standing is connected with four hanging muscle, four hanging muscle keep away from the one end of platform of standing and are equipped with the couple, wear to be equipped with the crossbeam that is on a parallel with the steel strand wires between two couples. The application has the advantages of being foldable, convenient to move, safe, reliable and capable of improving the construction efficiency.

Description

Collapsible crossbeam construction hanging flower basket
Technical Field
The application relates to the field of construction hanging baskets, in particular to a foldable beam construction hanging basket.
Background
At present, the construction steel bar density of the beam of the bridge deck system of the expressway is high, the operation difficulty is high, and the great hidden trouble of installation exists. During the construction process, there is a large amount of overhead installation and detection work. The conventional method is to fix an operation hanging basket on a component to provide a working platform for the high-altitude operation of constructors, so that the operation is time-saving and labor-saving, a large amount of cost is saved for engineering, and the safety of the constructors is effectively guaranteed.
However, the conventional hanging basket is large in size, inconvenient to transport and easy to damage, so that before the steel structure is installed, the finished hanging basket is not usually operated, construction personnel are required to manufacture and install the hanging basket on site, the whole process is time-consuming, the quality of the operating hanging basket is difficult to control during manufacturing, potential safety hazards exist, and time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems that the existing hanging basket is large in size and inconvenient to transport and needs to be assembled on site, the application provides a foldable beam construction hanging basket.
The application provides a pair of collapsible crossbeam construction hanging flower basket adopts following technical scheme:
a foldable beam construction hanging basket comprises two framework units which are parallel to each other, a plurality of steel strands connected between the two framework units and a standing platform arranged at one end of each of the two framework units; the framework units comprise two parallel hanging bars and reinforcing bars fixedly arranged between the hanging bars, the reinforcing bars are arranged at intervals along the length direction of the hanging bars, two ends of each steel strand are respectively connected to the hanging bars of different framework units, and the steel strands are perpendicular to planes formed by the framework units; the standing platform is connected with four hanging ribs, hooks are arranged at one ends of the four hanging ribs far away from the standing platform, and a cross beam parallel to the steel strand is arranged between the two hooks in a penetrating mode.
By adopting the technical scheme, when the hanging basket is used, the cross beam is arranged on the hook in a penetrating mode, the cross beam is erected on the bridge floor, the hanging basket is fixed, and a worker can place the framework unit as a ladder stand on the standing platform to carry out operation under the bridge; after using the completion, because steel strand wires belong to flexonics, behind the detachable crossbeam, fold two skeleton units together, be convenient for transport and deposit, this application has easy operation, removes advantage convenient, that the security is high to both can do the hanging flower basket and use, also can do the cat ladder, avoid using hoisting equipment to hang the staff and put to the bridge floor below on the platform of standing, practice thrift the cost.
Preferably, the standing platform comprises two parallel horizontal ribs and longitudinal ribs fixedly arranged on the two horizontal ribs, the longitudinal ribs are arranged in multiple ways at intervals along the length direction of the horizontal ribs, one end, close to the standing platform, of each hanging rib is provided with a hanging ring, and the hanging rings are connected to the horizontal ribs.
By adopting the technical scheme, the manufacturing is simple and the stability is good.
Preferably, both ends of the horizontal rib are respectively provided with a blocking rod, a through hole is formed in the blocking rod, the hanging ring is sleeved on the horizontal rib and is positioned between the blocking rod and the longitudinal rib, and the end parts of the two horizontal ribs penetrate through the through hole and are in threaded connection with the positioning cylinder.
Through adopting above-mentioned technical scheme, through setting up a location section of thick bamboo and shelves pole, when not using, be convenient for demolish the platform of standing from the skeleton unit, reduce the occupation space of hanging flower basket, be convenient for transport and store.
Preferably, the beam is sleeved with two clamping pieces, the clamping pieces are in threaded connection with the beam, and the hook is hooked on the beam and located between the two clamping pieces.
Through adopting above-mentioned technical scheme, two clamping piece centre gripping couples can avoid the couple to remove along the crossbeam to lead to warping between two skeleton units, influence the use of hanging flower basket and cause the safety problem.
Preferably, the distance between the upper and lower adjacent steel strands is 50 cm.
By adopting the technical scheme, the stability of the hanging basket is ensured.
Preferably, the spacing between adjacent reinforcing ribs is 50 cm.
Through adopting above-mentioned technical scheme, increase the intensity and the stability of skeleton unit.
Preferably, the distance between adjacent longitudinal bars is 5 cm.
Preferably, the specification of the hanging ribs is phi 16mm, and the specification of the reinforcing ribs is phi 12 mm.
By adopting the technical scheme, the steel bar with large diameter is selected as the hanging basket, the hoisting capacity of the hanging basket is increased, and the construction safety is ensured.
Preferably, the specification of the horizontal ribs and the longitudinal ribs is phi 16 mm.
By adopting the technical scheme, the standing platform which is stable and high in bearing capacity is provided, and the safety of constructors is ensured.
Preferably, the beam has a diameter of 25 mm.
By adopting the technical scheme, the standing platform which is stable and high in bearing capacity is provided, and the safety of constructors is ensured.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the hanging basket is used, the cross beam penetrates through the hook, is erected on the bridge floor, and is fixed, so that a worker can place the framework unit as a ladder stand on the standing platform to operate under the bridge; after the steel strand is used, the steel strand belongs to flexible connection, and after the beam can be disassembled, the two framework units are folded together, so that the transportation and the storage are convenient;
2. by arranging the positioning cylinder and the stop lever, when the hanging basket is not used, the standing platform is convenient to detach from the framework unit, the occupied space of the hanging basket is reduced, and the hanging basket is convenient to transport and store;
3. through setting up two clamping pieces on the crossbeam, two clamping piece centre gripping couples can avoid the couple to remove along the crossbeam to lead to warping between two skeleton units, influence the use of hanging flower basket and cause the safety problem.
Drawings
FIG. 1 is a schematic structural diagram of a basket in the first embodiment.
FIG. 2 is a schematic view of a connection structure at a cross beam in the first embodiment.
FIG. 3 is a schematic structural diagram of a standing platform according to a second embodiment.
Description of reference numerals: 1. a skeleton unit; 11. hanging the ribs; 12. reinforcing ribs; 13. hooking; 14. hanging a ring; 2. steel strand wires; 3. a cross beam; 4. a standing platform; 41. horizontal ribs; 42. longitudinal ribs; 43. a gear lever; 44. a positioning cylinder; 5. a clip.
Detailed Description
The first embodiment is as follows:
combine fig. 1 and fig. 2, this application embodiment discloses a collapsible crossbeam construction hanging flower basket, including two skeleton unit 1 that are parallel to each other, connect multichannel steel strand wires 2 between two skeleton unit 1 and set up the platform 4 of standing in two skeleton unit 1 one ends, steel strand wires 2 are connected with skeleton unit 1 and are formed cuboid frame construction.
The framework unit 1 comprises two hanging ribs 11 which are parallel to each other, reinforcing ribs 12 are welded between the two hanging ribs 11, the reinforcing ribs 12 are perpendicular to the two hanging ribs 11 respectively, multiple channels are uniformly arranged along the length direction of the hanging ribs 11 at intervals, and the interval between every two adjacent reinforcing ribs 12 is 50 cm. The steel strand wires 2 set up respectively in 1 width direction's of skeleton unit both sides, and the both ends of steel strand wires 2 are connected respectively on different skeleton unit 1 hang muscle 11, and the plane that 2 perpendicular to skeleton unit of steel strand wires formed simultaneously, steel strand wires 2 along hanging the even multichannel that sets up in length direction interval of muscle 11, and the interval between the adjacent steel strand wires 2 is 50 cm. The standing platform 4 is respectively connected with four hanging ribs 11; one end of each of the four hanging ribs 11, which is far away from the standing platform 4, is bent to form a hook 13, and a cross beam 3 parallel to the steel strand 2 penetrates between two groups of the hooks 13.
When the hanging basket is used, the cross beam 3 penetrates through the hook 13, the cross beam 3 is erected on the bridge floor, the hanging basket is fixed, and a worker can place the framework unit 1 as a ladder stand on the standing platform 4 to work under the bridge; after using the completion, because steel strand wires 2 belong to flexonics, behind the detachable crossbeam 3, fold two skeleton unit 1 together, be convenient for transport and deposit, this application has easy operation, removes the advantage convenient, that the security is high to both can do the hanging flower basket and use, also can do the cat ladder, avoid using hoisting equipment to hang the staff and put to the bridge floor below standing platform 4 on, practice thrift the cost.
The standing platform 4 comprises two parallel horizontal ribs 41 and longitudinal ribs 42 welded on the two horizontal ribs 41, the longitudinal ribs 42 are perpendicular to the horizontal ribs 41, multiple channels are uniformly arranged along the length direction of the horizontal ribs 41 at intervals, and the interval between the adjacent longitudinal ribs 42 is 5 cm. One end of the hanging rib 11 close to the standing platform 4 is bent to form a closed hanging ring 14, and the hanging ring 14 is sleeved at one end of the horizontal rib 41 and is positioned between two longitudinal ribs 42.
Further, the cover is equipped with two clamping pieces 5 on the crossbeam 3, and clamping piece 5 and 3 bolted connection of crossbeam, couple 13 hook establish on crossbeam 3 and lie in between two clamping pieces 5, and two clamping pieces 5 centre gripping couple 13 can avoid couple 13 to remove along crossbeam 3 to lead to warping between two skeleton unit 1, influence the use of hanging flower basket and lead to the fact the safety problem.
The specification of the hanging ribs 11 is phi 16mm, the specification of the reinforcing ribs 12 is phi 12mm, and steel bars with large diameters are selected as hanging baskets, so that the hanging capacity of the hanging baskets is improved, and the construction safety is guaranteed.
The horizontal ribs 41 and the longitudinal ribs 42 are phi 16mm in specification, a stable standing platform 4 with high bearing capacity is provided, and safety of constructors is guaranteed.
The beam 3 is phi 25cm in specification, and as the beam 3 is erected on the bridge floor and bears the whole weight of a hanging basket and workers, large-specification reinforcing steel bars are selected to ensure the bearing capacity of the hanging basket.
The using process is as follows:
when using, wear to establish crossbeam 3 on couple 13, expand two skeleton unit 1, then twist two clamping pieces 5 on crossbeam 3, two clamping pieces 5 lock the distance between two skeleton unit 1, and crossbeam 3 erects on the bridge floor, fixes the hanging flower basket, and the staff can carry out the operation to under the bridge on standing platform 4 as the cat ladder with skeleton unit 1 down.
When not in use, the clamping pieces 5 and the cross beams 3 are removed, and the two framework units 1 are folded together, so that the transportation and the storage are convenient.
Example two:
referring to fig. 3, the difference from the first embodiment is that two ends of the horizontal rib 41 are respectively provided with a blocking rod 43, the blocking rod 43 is provided with a through hole, the end portions of the two horizontal ribs 41 penetrate through the through hole and are connected with a positioning cylinder 44 by a thread, the hanging ring 14 is sleeved on the horizontal rib 41 and is located between the blocking rod 43 and the longitudinal rib 42, and the positioning cylinder 44 fixes the blocking rod 43 on the horizontal rib 41. When the hanging ring is used, the horizontal rods on the base are respectively inserted into the corresponding hanging rings 14, then the blocking rods 43 are sleeved to clamp the hanging rings 14 between the longitudinal rods and the blocking rods 43, and the positioning cylinders 44 are screwed at the end parts of the horizontal ribs 41. Through setting up location section of thick bamboo 44 and shelves pole 43, when not using, be convenient for demolish standing platform 4 from skeleton unit 1, reduce the occupation space of hanging flower basket, be convenient for transportation and storage.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a collapsible crossbeam construction hanging flower basket which characterized in that: the device comprises two framework units (1) which are parallel to each other, a plurality of steel strands (2) connected between the two framework units (1) and a standing platform (4) arranged at one end of each of the two framework units (1); the framework units (1) comprise two parallel hanging bars (11) and reinforcing bars (12) fixedly arranged between the hanging bars (11), the reinforcing bars (12) are arranged at intervals along the length direction of the hanging bars (11), two ends of each steel strand (2) are respectively connected to the hanging bars (11) of different framework units (1), and the steel strands (2) are perpendicular to a plane formed by the framework units (1); the standing platform (4) is connected with four hanging ribs (11), four hanging ribs (11) are provided with hooks (13) at one ends far away from the standing platform (4), and a cross beam (3) parallel to the steel strand (2) penetrates between the two hooks (13).
2. A collapsible cross beam construction basket according to claim 1, wherein: stand platform (4) include twice level muscle (41) that are parallel to each other and set firmly indulge muscle (42) on twice level muscle (41), it sets up the multichannel along the length direction interval of level muscle (41) to indulge muscle (42), it is equipped with link (14) to hang muscle (11) one end near stand platform (4), link (14) are connected on level muscle (41).
3. A collapsible cross beam construction basket according to claim 2, wherein: the both ends of horizontal muscle (41) are equipped with shelves pole (43) respectively, the perforation has been seted up on shelves pole (43), link (14) cover is established on horizontal muscle (41) and is located shelves pole (43) and indulge between muscle (42), two the tip of horizontal muscle (41) passes perforation threaded connection and has a location section of thick bamboo (44).
4. A collapsible cross beam construction basket according to claim 1, wherein: the clamp is characterized in that the beam (3) is sleeved with two clamping pieces (5), the clamping pieces (5) are in threaded connection with the beam (3), and the hook (13) is hooked on the beam (3) and located between the two clamping pieces (5).
5. A collapsible cross beam construction basket according to any one of claims 1 to 4, wherein: the distance between the upper and lower adjacent steel strands (2) is 50 cm.
6. A collapsible cross beam construction basket according to any one of claims 1 to 4, wherein: the distance between the adjacent reinforcing ribs (12) is 50 cm.
7. A collapsible cross beam construction basket according to any one of claims 2 or 3, wherein: the distance between the adjacent longitudinal ribs (42) is 5 cm.
8. A collapsible cross beam construction basket according to any one of claims 1 to 4, wherein: the specification of the hanging ribs (11) is phi 16mm, and the specification of the reinforcing ribs (12) is phi 12 mm.
9. A collapsible cross beam construction basket according to any one of claims 2 or 3, wherein: the specifications of the horizontal ribs (41) and the longitudinal ribs (42) are phi 16 mm.
10. A collapsible cross beam construction basket according to any one of claims 1 to 4, wherein: the specification of the cross beam (3) is phi 25 mm.
CN202022224957.8U 2020-10-09 2020-10-09 Collapsible crossbeam construction hanging flower basket Active CN213804912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022224957.8U CN213804912U (en) 2020-10-09 2020-10-09 Collapsible crossbeam construction hanging flower basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022224957.8U CN213804912U (en) 2020-10-09 2020-10-09 Collapsible crossbeam construction hanging flower basket

Publications (1)

Publication Number Publication Date
CN213804912U true CN213804912U (en) 2021-07-27

Family

ID=76956824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022224957.8U Active CN213804912U (en) 2020-10-09 2020-10-09 Collapsible crossbeam construction hanging flower basket

Country Status (1)

Country Link
CN (1) CN213804912U (en)

Similar Documents

Publication Publication Date Title
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN107190997A (en) A kind of steel construction high-rise working safety belt safety rope branch hang device
CN104631810A (en) High-altitude movable hanging basket system and construction method thereof
CN207392716U (en) A kind of tool-type suspension scaffold
CN213804912U (en) Collapsible crossbeam construction hanging flower basket
CN214831957U (en) Assembled multi-high-rise steel column butt joint operation platform
CN112523112A (en) Method for dismantling overhead suspension casting hanging basket
CN209975993U (en) Suspension cage
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN107217912B (en) A kind of superelevation physical isolation construction method for neighbouring high-speed rail Business Line construction
CN216739582U (en) Multifunctional auxiliary device for binding reinforcing steel bars of slide-resistant piles
CN212895962U (en) Detachable operation platform for tensioning operation of cantilever irrigation beam
CN113529571B (en) Positioning device for rhombic wire-separating pipe cable saddle of short-tower cable-stayed bridge
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN216129204U (en) Removable hoisting point tool for pipe gallery
CN2216104Y (en) Hanging lift scaffold
CN207314891U (en) A kind of steel construction high-rise working safety belt safety rope branch hang device
RU2438963C1 (en) Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end
CN217680774U (en) Encircling ladder cage for pier construction
CN111979916B (en) Cable-stayed bridge tower part suspension construction method and suspension operation platform device
CN212336694U (en) Connecting device for embedded steel pipe and scaffold cross rod
CN214194157U (en) Steel pipe arch bridge operation platform
CN217268734U (en) Cast-in-place box girder bottom decorates auxiliary device
CN218522613U (en) Vertical climbing hanging ladder
CN216913799U (en) Simple and easy wire rope stores pylon of assemblization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant