CN218522613U - Vertical climbing hanging ladder - Google Patents

Vertical climbing hanging ladder Download PDF

Info

Publication number
CN218522613U
CN218522613U CN202222798266.8U CN202222798266U CN218522613U CN 218522613 U CN218522613 U CN 218522613U CN 202222798266 U CN202222798266 U CN 202222798266U CN 218522613 U CN218522613 U CN 218522613U
Authority
CN
China
Prior art keywords
steel column
ladder
fixedly connected
vertical climbing
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222798266.8U
Other languages
Chinese (zh)
Inventor
张齐东
齐新权
张平
赵忠峰
刘军宏
王少清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Fifth Engineering Co Ltd
Original Assignee
CCCC SHB Fifth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Fifth Engineering Co Ltd filed Critical CCCC SHB Fifth Engineering Co Ltd
Priority to CN202222798266.8U priority Critical patent/CN218522613U/en
Application granted granted Critical
Publication of CN218522613U publication Critical patent/CN218522613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a building steel column installation technical field just discloses a perpendicular ladder of ascending a height, including the steel column, the lateral wall of steel column passes through the fixed pendant of bolt fixedly connected with, fixed pendant is external to be equipped with two couples, two the same perpendicular ladder body of ascending a height of lateral wall fixedly connected with of the relative one side of couple. The utility model can effectively avoid the problem that the traditional steel column construction safe channel damages the anticorrosive coating layer on the surface of the steel column and the problems of poor stability and slow erection and dismantling speed caused by adopting the short steel bar or scaffold erection form; the steel column quick dismantling device can be installed and dismantled quickly, the next procedure time of steel column construction is not delayed, secondary turnover utilization can be achieved, machining is simple, and cost is low.

Description

Vertical climbing hanging ladder
Technical Field
The utility model relates to a building steel column installation technical field especially relates to a ladder is hung in ascending a height perpendicularly.
Background
During operations such as building structure steel column hoist and mount, correction, the operation personnel need often make a round trip to climb the steel column of ascending a height, and the tradition adopts forms such as welding stub bar or set up scaffold frame on the steel column to form simple and easy cat ladder and supplies the operation personnel to pass from top to bottom. However, because the steel column is generally high in height and high in surface coating protection requirement, the traditional safety channel can damage an anticorrosive coating layer on the surface of the steel column on one hand, and is poor in stability and slow in setting and dismantling speed on the other hand; meanwhile, the steel column is fixedly welded on the surface of the steel column, so that rapid secondary circulation utilization cannot be carried out.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art during operations such as building structure steel column hoist and mount, correction, the operation personnel need often make a round trip to scramble the steel column of ascending a height, and the tradition adopts the welding stub bar on the steel column or sets up forms such as scaffold frame and forms simple and easy cat ladder and supply the operation personnel to pass from top to bottom. However, because the steel column is generally high in height and high in surface coating protection requirement, the traditional safety channel can damage an anticorrosive coating layer on the surface of the steel column on one hand, and is poor in stability and slow in setting and dismantling speed on the other hand; simultaneously because fixed welding is on the steel column surface, lead to the problem that can't carry out quick secondary turnover utilization, and the ladder of hanging of ascending a height perpendicularly that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a hang ladder of ascending a height perpendicularly, includes the steel column, the lateral wall of steel column passes through the fixed pendant of bolt fixedly connected with, fixed pendant is external to be equipped with two couples, two the same perpendicular hang ladder body of ascending a height of lateral wall fixedly connected with of the relative one side of couple.
Preferably, the vertical climbing hanging ladder body comprises two ladder beams, and two side walls of one opposite side of each ladder beam are fixedly connected with a plurality of stepping rollers.
Adopt above-mentioned technical scheme: the vertical climbing hanging ladder body is simple to process and low in cost.
Preferably, the side walls of the two ladder beams are fixedly connected with two supporting pieces.
Adopt above-mentioned technical scheme: a gap between the hanging ladder and the steel column is provided through the supporting piece to provide a pedal space for an operator to go up and down; meanwhile, the support piece can ensure that the hanging ladder and the steel column are tightly attached, and the stability of the hanging ladder is improved.
Preferably, two limiting holes are formed in the rod wall, parallel to each other, of the hook, limiting pins are inserted into the two limiting holes, the left ends of the two limiting pins are fixedly connected with the same pull plate, and the pull plate and the side wall, opposite to the hook, of the side wall are fixedly connected with the same spring.
Adopt above-mentioned technical scheme: can be spacing to the ladder body of hanging of ascending a height perpendicularly.
Preferably, the side wall of the pulling plate is fixedly connected with a pulling ring.
Adopt above-mentioned technical scheme: the pulling plate is convenient to pull.
Compared with the prior art, the utility model provides a vertical climbing hook ladder possesses following beneficial effect:
according to the vertical climbing hanging ladder, the problems that a traditional steel column construction safety channel destroys an anticorrosive coating layer on the surface of a steel column and the problems of poor stability and low erecting and dismantling speed caused by the erecting form of short steel bars or scaffolds can be effectively solved through the arranged steel column, the fixed hanging piece, the hook and the vertical climbing hanging ladder body; the steel column quick dismantling device can be installed and dismantled quickly, the next procedure time of steel column construction is not delayed, secondary turnover utilization can be achieved, machining is simple, and cost is low.
Drawings
Fig. 1 is a schematic structural view of a vertical climbing hanging ladder provided by the utility model;
FIG. 2 is an enlarged view of portion A of FIG. 1;
fig. 3 is the utility model provides a position relation sketch map of steel column and perpendicular ascending a height string ladder body in perpendicular ascending a height string ladder.
In the figure: 1. a steel column; 2. fixing the hanging piece; 3. hooking; 4. the vertical ascending hanging ladder body; 5. a ladder beam; 6. stepping on a roller; 7. a support member; 8. a spacing pin; 9. pulling a plate; 10. and (4) a pull ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a vertical climbing hanging ladder comprises a steel column 1, wherein the side wall of the steel column 1 is fixedly connected with a fixed hanging piece 2 through a bolt, two hooks 3 are externally hung on the fixed hanging piece 2, and the side wall of one side, opposite to the two hooks 3, is fixedly connected with a vertical climbing hanging ladder body 4. The vertical climbing hanging ladder body 4 comprises two ladder beams 5, a plurality of pedal rollers 6 are fixedly connected to the side wall of one side, opposite to the two ladder beams 5, of the vertical climbing hanging ladder body 4, and the vertical climbing hanging ladder body is simple to process and low in cost.
Two support pieces 7 are fixedly connected to the side walls of the two ladder beams 5, and a gap between the hanging ladder and the steel column is provided through the support pieces so that operating personnel can get on and off the space; simultaneously support piece can guarantee to hang closely laminating between ladder and the steel column, increases the stability of hanging the ladder.
Two spacing holes have all been seted up to the pole wall that couple 3 is parallel to each other, and two spacing downthehole spacer pins 8 that have all been pegged graft, the same arm-tie 9 of the left end fixedly connected with of two spacer pins 8, the lateral wall fixedly connected with pull ring 10 of arm-tie 9, conveniently stimulate arm-tie 9, the same root spring of lateral wall fixedly connected with of the relative one side of arm-tie 9 and couple 3 can be spacing to perpendicular ascending a height string ladder body 4.
In the utility model, when in use, before the steel column is hoisted, the fixed hanging part 2 of the hanging ladder is firstly installed on the top of the steel column 1 through the bolt, after the steel column 1 is hoisted in place, the hanging ladder body 4 which ascends vertically is hung on the fixed hanging part 2 which is welded on the top of the steel column 1 in advance through the hook 3 at the top, and a gap between the hanging ladder and the steel column 1 is provided through the supporting part 7 so as to provide a pedal space for operating personnel to go up and down; meanwhile, the support piece 7 can ensure that the hanging ladder and the steel column 1 are tightly attached, and the stability of the hanging ladder is improved. After the operations such as the hoisting of the steel column 1, correction and the like are completed, the hanging ladder is taken down from the fixed hanging pieces 2, meanwhile, the fixed hanging pieces 2 are removed, and the steel column 1 can be quickly circulated to the next steel column 1 for continuous use. The problem that the anticorrosive coating layer on the surface of the steel column is damaged by a traditional steel column construction safety channel is solved; meanwhile, the problems that the stability is poor, the erection and dismantling speed is low and the rapid secondary turnover utilization cannot be carried out due to the fact that a short steel bar or scaffold is traditionally adopted in an erection mode are solved.
In general, the technical problem is addressed: during operations such as building structure steel column hoist and mount, correction, the operation personnel need often make a round trip to climb the steel column of ascending a height, and the tradition adopts forms such as welding stub bar or set up scaffold frame on the steel column to form simple and easy cat ladder and supplies the operation personnel to pass from top to bottom. However, because the steel column is generally high in height and high in surface coating protection requirement, the traditional safety channel can damage an anticorrosive coating layer on the surface of the steel column on one hand, and is poor in stability and slow in setting and dismantling speed on the other hand; meanwhile, the steel column is fixedly welded on the surface of the steel column, so that rapid secondary circulation utilization cannot be carried out; the technical scheme is as follows: a vertical climbing hanging ladder comprises a steel column, wherein the side wall of the steel column is fixedly connected with a fixed hanging piece through a bolt, two hooks are hung outside the fixed hanging piece, and the side wall of one side, opposite to the two hooks, of the two hooks is fixedly connected with the same vertical climbing hanging ladder body; the technical scheme is implemented by the following steps: before a steel column is hoisted, firstly, a fixed hanging piece 2 of a hanging ladder is installed on the top of the steel column 1 through a bolt, after the steel column 1 is hoisted in place, a hanging ladder body 4 which ascends vertically is hung on the fixed hanging piece 2 which is welded on the top of the steel column 1 in advance through a hook 3 on the top, and a gap between the hanging ladder and the steel column 1 is provided through a support piece 7 so that an operator can get on or off the steel column in a treading space; meanwhile, the support piece 7 can ensure that the hanging ladder and the steel column 1 are tightly attached, and the stability of the hanging ladder is improved. After the operations such as the hoisting of the steel column 1, correction and the like are completed, the hanging ladder is taken down from the fixed hanging pieces 2, meanwhile, the fixed hanging pieces 2 are removed, and the steel column 1 can be quickly circulated to the next steel column 1 for continuous use. The problem that the anticorrosive coating layer on the surface of the steel column is damaged by a traditional steel column construction safety channel is solved; meanwhile, the problems of poor stability, low erecting and dismantling speed and incapability of quick secondary turnover utilization caused by the traditional erecting form of adopting short steel bars or scaffolds are solved; therefore, the technical problem can be solved certainly, and the technical effects are as follows: the problems that the anticorrosion coating layer on the surface of the steel column is damaged by a traditional erected steel column construction safety channel and the problems of poor stability and low erection and dismantling speed caused by the adoption of a short steel bar or scaffold erecting mode can be effectively solved; the steel column quick dismantling device can be installed and dismantled quickly, the next procedure time of steel column construction is not delayed, secondary turnover utilization can be achieved, machining is simple, and cost is low.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a vertical climbing hanging ladder, includes steel column (1), its characterized in that, the lateral wall of steel column (1) passes through the fixed pendant of bolt fixedly connected with (2), fixed pendant (2) are external to be equipped with two couples (3), two the same vertical climbing hanging ladder body (4) of lateral wall fixedly connected with of the relative one side of couple (3).
2. The vertical climbing ladder according to claim 1, wherein the vertical climbing ladder body (4) comprises two ladder beams (5), and a plurality of treading rollers (6) are fixedly connected to the side walls of the two ladder beams (5) at the opposite sides.
3. A vertical climbing ladder according to claim 2, characterized in that two supports (7) are fixedly connected to the side walls of both ladder beams (5).
4. The vertical climbing hanging ladder according to claim 1, wherein two limiting holes are formed in the parallel rod walls of the hook (3), limiting pins (8) are inserted into the two limiting holes, the left ends of the two limiting pins (8) are fixedly connected with the same pulling plate (9), and the side wall of the pulling plate (9) opposite to the hook (3) is fixedly connected with the same spring.
5. A vertical ladder as claimed in claim 4, characterized in that the side walls of the pull plate (9) are fixedly connected with a pull ring (10).
CN202222798266.8U 2022-10-24 2022-10-24 Vertical climbing hanging ladder Active CN218522613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222798266.8U CN218522613U (en) 2022-10-24 2022-10-24 Vertical climbing hanging ladder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222798266.8U CN218522613U (en) 2022-10-24 2022-10-24 Vertical climbing hanging ladder

Publications (1)

Publication Number Publication Date
CN218522613U true CN218522613U (en) 2023-02-24

Family

ID=85251020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222798266.8U Active CN218522613U (en) 2022-10-24 2022-10-24 Vertical climbing hanging ladder

Country Status (1)

Country Link
CN (1) CN218522613U (en)

Similar Documents

Publication Publication Date Title
CN210460016U (en) Integrated form single power lift material platform
CN218522613U (en) Vertical climbing hanging ladder
CN220580578U (en) Various steel sheet wallboard installation cage of steel construction factory building
CN210857952U (en) Novel attached lifting scaffold
CN220014395U (en) Can have enough to meet need mounting bracket by intelligent integrated platform system bailey frame of equipping
CN210117149U (en) A jacket sling platform
CN218264865U (en) Triangular hanging basket supporting structure
CN214462394U (en) High-altitude overhanging scaffold
CN217151153U (en) Steel column construction regularization temporary operation platform
CN113404278B (en) Self-climbing type protection frame and climbing method thereof
CN215443025U (en) Safety construction platform for machine-room-less elevator shaft
CN212053667U (en) Building outer wall construction scaffold convenient to installation
CN215160368U (en) Be used for climbing frame and demolish artifical hoisting device
CN211257761U (en) Lifting type elevator shaft operating platform
CN110388042A (en) A kind of construction of lift well operating platform
CN210342619U (en) Connecting piece of integral lifting scaffold
CN211545655U (en) Lower cell shell integral hoisting device for prebaked anode aluminum cell maintenance
CN214364797U (en) Scaffold for external construction of tower
JPH0317350A (en) Scaffold for building structure
CN215717103U (en) Parallel type weight-distribution-free low-leg stand column hanging basket mounting structure
CN218815440U (en) Ladder stand
CN216840812U (en) Assembled ladder cage device
CN212671160U (en) Combined building scaffold
CN220036560U (en) Suspension type cage ladder
CN222525815U (en) A hanging basket device for equipment room on roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant