CN104831829B - 一种混凝土剪力墙与填充墙一体化预制的连接方法 - Google Patents

一种混凝土剪力墙与填充墙一体化预制的连接方法 Download PDF

Info

Publication number
CN104831829B
CN104831829B CN201510236504.8A CN201510236504A CN104831829B CN 104831829 B CN104831829 B CN 104831829B CN 201510236504 A CN201510236504 A CN 201510236504A CN 104831829 B CN104831829 B CN 104831829B
Authority
CN
China
Prior art keywords
wall
prefabricated
concrete shear
filling
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510236504.8A
Other languages
English (en)
Other versions
CN104831829A (zh
Inventor
孟凡林
孟祥瑞
付萍
孟锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fanlin Assembly Building Technology Co.,Ltd.
Original Assignee
孟凡林
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 孟凡林 filed Critical 孟凡林
Priority to CN201510236504.8A priority Critical patent/CN104831829B/zh
Publication of CN104831829A publication Critical patent/CN104831829A/zh
Application granted granted Critical
Publication of CN104831829B publication Critical patent/CN104831829B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种混凝土剪力墙与填充墙一体化预制的连接方法,属于建筑类技术领域,包括预制混凝土剪力墙、预制填充墙、软质材料、预制填充墙钢丝,并通过以下步骤实现:依据设计要求支模;绑扎墙体钢筋和钢丝;若预制混凝土剪力墙和预制填充墙为空心的,应置入相应的模具;放置预制混凝土剪力墙与预制填充墙之间的软质材料;浇筑墙体混凝土经养护后脱模完成。本发明可以忽略填充墙对整体结构抗侧移刚度的影响,结构受力明确,传力路线清晰,保证了结构的可靠性;同时一体化预制方法简单,便于预制构件的生产和施工安装,提高了质量和效率,降低了建设成本,对于预制装配式混凝土建筑的发展具有积极的意义。

Description

一种混凝土剪力墙与填充墙一体化预制的连接方法
技术领域
本发明属于建筑类技术领域,特别是涉及到一种装配式混凝土结构。
背景技术
装配式混凝土剪力墙结构,其填充墙的做法主要有三类:
第一类是后砌筑的方法,见《砌体结构设计规范》(GB50003-2011)。属于传统的施工方法,材料人力消耗高,成本高,质量差,工效低。
第二类是现场安装预制墙板填充墙。见河北、天津、山西、内蒙古、河南联合编制,中国建筑工业出版社出版的《钢丝网架水泥聚苯乙烯夹芯墙》(图集号:05J3-5);江苏省建筑标准设计图集《轻质墙板构造图集》(图集号:苏JT15-2005);广东省建筑标准设计图集《蒸压陶粒轻质混凝土墙板墙体构造》(图集号:粤11J/T136)等。上述图集中体现的连接方式普遍存在的问题是:连接仅为简单的贴连或高延性低强度的纤维材料粘贴连接,没有采用抗拉钢丝或钢筋,将两者连接为一体,无法抵抗房屋的预制非承重墙体与结构构件之间因干缩和冷缩而产生的开裂现象,致使连接失效,影响墙体的观瞻效果,房屋质量受到损害,给用户带来不必要的麻烦。
第三类是剪力墙构件同填充墙一体化预制的方法,见发明专利“带填充式墙板的预制混凝土短肢剪力墙(ZL 2008 2 0090192X)”和“预制非承重墙体与结构构件一体化连接的建造方法(ZL 2012 1 0476451.3)”等上述方法不同程度上会增加整体结构的抗侧移刚度。按照《建筑抗震设计规范》(GB50011—2010)第13.2.1条第2款得规定:“对嵌入抗侧力构件平面内的刚性建筑非结构构件,应计入其刚度影响”,这在实际工程设计时是非常困难的工作,因为目前尚无如何计入其刚度的计算方法。
因此现有技术当中亟需要一种新形的技术方案来解决这一问题。
发明内容
本发明所要解决的技术问题是:提供一种混凝土剪力墙与填充墙一体化预制的连接方法,可以忽略填充墙对整体结构抗侧移刚度的影响,结构受力明确,传力路线清晰,保证了结构的可靠性;同时一体化预制方法简单,便于预制构件的生产和施工安装,提高了质量和效率,降低了建设成本,对于预制装配式混凝土建筑的发展具有积极的意义。
一种混凝土剪力墙与填充墙一体化预制的连接方法,其特征是:包括预制混凝土剪力墙、预制填充墙、软质材料、预制填充墙钢丝,并通过以下步骤实现:
步骤一、按照设计要求进行预制混凝土剪力墙和预制填充墙支模。
步骤二、绑扎预制混凝土剪力墙的钢筋以及预制填充墙钢丝,将预制填充墙钢丝伸入预制混凝土剪力墙内部50mm~200mm处并绑扎固定。
步骤三、预制混凝土剪力墙或预制填充墙为空心结构,则置入模具;
预制混凝土剪力墙或预制填充墙为实心结构,则直接进行步骤四。
步骤四、将软质材料固定设置于预制混凝土剪力墙与预制填充墙之间,且软质材料位于预制混凝土剪力墙外部及预制填充墙内部,其中软质材料外壁与相邻预制填充墙外壁的距离为10mm~40mm。
其中软质材料在与墙体平面内方向的厚度为10mm~50mm。
步骤五、浇筑预制混凝土剪力墙的混凝土和预制填充墙的混凝土。
步骤六、养护预制混凝土剪力墙的混凝土和预制填充墙的混凝土,在预制混凝土剪力墙的混凝土和预制填充墙的混凝土达到设计强度的70%后脱模,混凝土剪力墙与填充墙一体化预制的连接完成。
所述预制混凝土剪力墙为实心混凝土剪力墙或者空心混凝土剪力墙,预制混凝土剪力墙包括预制混凝土剪力墙墙肢和预制混凝土剪力墙连梁。
所述预制填充墙为实心填充墙或者空心填充墙。
所述预制混凝土剪力墙和预制填充墙的混凝土材料包括普通混凝土和轻质混凝土。
所述预制混凝土剪力墙的厚度为120mm~300mm,预制填充墙的厚度为120mm~300mm,预制填充墙钢丝直径为2mm~4mm。
通过上述设计方案,本发明可以带来如下有益效果:一种混凝土剪力墙与填充墙一体化预制的连接方法,预制混凝土剪力墙与预制填充墙之间有软质材料隔离,可以忽略填充墙对整体结构抗侧移刚度的影响,结构受力明确,传力路线清晰,有利于保证结构的可靠性;预制混凝土剪力墙与预制填充墙实现一体化预制,取消了现场砌筑填充墙或安装墙板的施工工序,且墙面无需抹灰,节省了材料消耗,提高工效,降低了工程建设成本;预制混凝土剪力墙与预制填充墙实现一体化预制,成品质量优良,外观整洁。
附图说明
以下结合附图和具体实施方式对本发明作进一步的说明:
图1为本发明一种混凝土剪力墙与填充墙一体化预制的连接方法连接结构示意图。
图2为本发明一种混凝土剪力墙与填充墙一体化预制的连接方法工艺流程图。
图中1-预制混凝土剪力墙、2-预制填充墙、3-软质材料、4-预制填充墙钢丝。
具体实施方式
下面参照附图1及附图2对混凝土剪力墙与填充墙一体化预制连接的实施方法,通过三个具体实施例作进一步的描述。
实施例1、
混凝土剪力墙与填充墙一体化预制的连接方法,包括以下步骤:
步骤一、按施工设计要求对要制作的预制混凝土剪力墙1和预制填充墙2进行支模工作。
步骤二、支模工作完毕后,进入到绑扎钢筋程序。
绑扎预制混凝土剪力墙1的钢筋以及预制填充墙钢丝4,并将预制填充墙钢丝4伸入预制混凝土剪力墙1内部50mm。
步骤三、如果预制混凝土剪力墙1或预制填充墙2是空心结构,就置入与其相对应的模具;
如果预制混凝土剪力墙1或预制填充墙2为实心结构,则直接进入步骤四。
步骤四、将软质材料3放置并固定在预制混凝土剪力墙1与预制填充墙2之间的位置上,软质材料3位于预制混凝土剪力墙1外部的同时位于预制填充墙2的内部,并且软质材料3的外壁与相邻的预制填充墙2的外壁距离为10mm,软质材料3在墙体平面内方向的厚度为15mm。
步骤五、浇筑预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土。
步骤六、养护预制混凝土剪力墙1混凝土和预制填充墙2混凝土,在预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土达到设计强度的70%后脱模,混凝土剪力墙与填充墙一体化预制的连接完成。
其中预制混凝土剪力墙1的厚度为140mm,预制填充墙2的厚度为140mm,预制填充墙钢丝直径为3mm。
实施例2、
混凝土剪力墙与填充墙一体化预制的连接方法,包括以下步骤:
步骤一、按施工设计要求对要制作的预制混凝土剪力墙1和预制填充墙2进行支模工作。
步骤二、支模工作完毕后,进入到绑扎钢筋程序。
绑扎预制混凝土剪力墙1的钢筋以及预制填充墙钢丝4,并将预制填充墙钢丝4伸入预制混凝土剪力墙1内部100mm。
步骤三、如果预制混凝土剪力墙1或预制填充墙2是空心结构,就置入与其相对应的模具;
如果预制混凝土剪力墙1或预制填充墙2为实心结构,则直接进入步骤四。
步骤四、将软质材料3放置并固定在预制混凝土剪力墙1与预制填充墙2之间的位置上,软质材料3位于预制混凝土剪力墙1外部的同时位于预制填充墙2的内部,并且软质材料3的外壁与相邻的预制填充墙2的外壁距离为25mm,软质材料3在墙体平面内方向的厚度为35mm。
步骤五、浇筑预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土。
步骤六、养护预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土,在预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土达到设计强度的70%后脱模,混凝土剪力墙与填充墙一体化预制的连接完成。
其中预制混凝土剪力墙1的厚度为160mm,预制填充墙2的厚度为160mm,预制填充墙钢丝直径为3.5mm。
实施例3、
混凝土剪力墙与填充墙一体化预制的连接方法,包括以下步骤:
步骤一、按施工设计要求对要制作的预制混凝土剪力墙1和预制填充墙2进行支模工作。
步骤二、支模工作完毕后,进入到绑扎钢筋程序。
绑扎预制混凝土剪力墙1的钢筋以及预制填充墙钢丝4,并将预制填充墙钢丝4伸入预制混凝土剪力墙1内部200mm。
步骤三、如果预制混凝土剪力墙1或预制填充墙2是空心结构,就置入与其相对应的模具;
如果预制混凝土剪力墙1或预制填充墙2为实心结构,则直接进入步骤四。
步骤四、将软质材料3放置并固定在预制混凝土剪力墙1与预制填充墙2之间的位置上,软质材料3位于预制混凝土剪力墙1外部的同时位于预制填充墙2的内部,并且软质材料3的外壁与相邻的预制填充墙2的外壁距离为40mm,软质材料3在墙体平面内方向的厚度为50mm。
步骤五、浇筑预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土。
步骤六、养护预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土,在预制混凝土剪力墙1的混凝土和预制填充墙2的混凝土达到设计强度的70%后脱模,混凝土剪力墙与填充墙一体化预制的连接完成。
其中预制混凝土剪力墙1的厚度为200mm,预制填充墙2的厚度为200mm,预制填充墙钢丝直径为4mm。
预制混凝土剪力墙1为实心混凝土剪力墙或者空心混凝土剪力墙;预制混凝土剪力墙1包括预制混凝土剪力墙墙肢和预制混凝土剪力墙连梁,预制填充墙2为实心填充墙或者空心填充墙,预制混凝土剪力墙1和预制填充墙2的混凝土材料包括普通混凝土和轻质混凝土。
本发明通过预制混凝土剪力墙与预制填充墙之间的软质材料隔离,致使填充墙对整体结构抗侧移刚度的影响可以忽略。本发明的方法在结构上传力路线清晰受力明确,更有利于保证结构的稳定性可靠性。本发明的一体化预制方案不再需要现场施工工序、无需抹灰,大量节省了材料消耗,成本低、工效高、品质优良、外观整洁。

Claims (5)

1.一种混凝土剪力墙与填充墙一体化预制的连接方法,其特征是:包括预制混凝土剪力墙(1)、预制填充墙(2)、软质材料(3)、预制填充墙钢丝(4),并通过以下步骤实现:
步骤一、按照设计要求进行预制混凝土剪力墙(1)和预制填充墙(2)支模;
步骤二、绑扎预制混凝土剪力墙(1)的钢筋以及预制填充墙钢丝(4),将预制填充墙钢丝(4)伸入预制混凝土剪力墙(1)内部50mm~200mm处并绑扎固定;
步骤三、预制混凝土剪力墙(1)或预制填充墙(2)为空心结构,则置入模具;
预制混凝土剪力墙(1)或预制填充墙(2)为实心结构,则直接进行步骤四;
步骤四、将软质材料(3)固定设置于预制混凝土剪力墙(1)与预制填充墙(2)之间,且软质材料(3)位于预制混凝土剪力墙(1)外部及预制填充墙(2)内部,其中软质材料(3)外壁与相邻预制填充墙(2)外壁的距离为10mm~40mm;
其中软质材料(3)在墙体平面方向的厚度为10mm~50mm;
步骤五、浇筑预制混凝土剪力墙(1)的混凝土和预制填充墙(2)的混凝土;
步骤六、养护预制混凝土剪力墙(1)的混凝土和预制填充墙(2)的混凝土,在预制混凝土剪力墙(1)的混凝土和预制填充墙(2)的混凝土达到设计强度的70%后脱模,混凝土剪力墙与填充墙一体化预制的连接完成。
2.根据权利要求1所述的一种混凝土剪力墙与填充墙一体化预制的连接方法,其特征是:所述预制混凝土剪力墙(1)为实心混凝土剪力墙或者空心混凝土剪力墙,预制混凝土剪力墙(1)包括预制混凝土剪力墙墙肢和预制混凝土剪力墙连梁。
3.根据权利要求1所述的一种混凝土剪力墙与填充墙一体化预制的连接方法,其特征是:所述预制填充墙(2)为实心填充墙或者空心填充墙。
4.根据权利要求1所述的一种混凝土剪力墙与填充墙一体化预制的连接方法,其特征是:所述预制混凝土剪力墙(1)和预制填充墙(2)的混凝土材料包括普通混凝土和轻质混凝土。
5.根据权利要求1所述的一种混凝土剪力墙与填充墙一体化预制的连接方法,其特征是:所述预制混凝土剪力墙(1)的厚度为120mm~300mm,预制填充墙(2)的厚度为120mm~300mm,预制填充墙钢丝直径为2mm~4mm。
CN201510236504.8A 2015-05-11 2015-05-11 一种混凝土剪力墙与填充墙一体化预制的连接方法 Active CN104831829B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510236504.8A CN104831829B (zh) 2015-05-11 2015-05-11 一种混凝土剪力墙与填充墙一体化预制的连接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510236504.8A CN104831829B (zh) 2015-05-11 2015-05-11 一种混凝土剪力墙与填充墙一体化预制的连接方法

Publications (2)

Publication Number Publication Date
CN104831829A CN104831829A (zh) 2015-08-12
CN104831829B true CN104831829B (zh) 2016-11-16

Family

ID=53809999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510236504.8A Active CN104831829B (zh) 2015-05-11 2015-05-11 一种混凝土剪力墙与填充墙一体化预制的连接方法

Country Status (1)

Country Link
CN (1) CN104831829B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926807B (zh) * 2016-06-06 2019-01-15 河北建筑工程学院 一种现浇整体式混凝土框架填充墙体系及其施工方法
CN105937278B (zh) * 2016-06-06 2019-06-07 河北建筑工程学院 一种装配式混凝土框架填充墙体系及其施工方法
CN106088603A (zh) * 2016-07-27 2016-11-09 张晶廷 一种现浇混凝土房屋结构的施工方法
CN107503450A (zh) * 2017-08-22 2017-12-22 中建四局第六建筑工程有限公司 一种现浇中空钢筋混凝土填充墙及其施工工艺
CN108412085B (zh) * 2018-03-16 2019-10-08 吉林建筑大学 型钢混凝土剪力墙边缘构件及建造方法
CN108412094A (zh) * 2018-05-08 2018-08-17 中建四局第四建筑工程有限公司 一种替代剪力墙间砌体的空心混凝土墙的施工方法及装置
CN109083284B (zh) * 2018-10-08 2020-03-27 孟凡林 填充墙与结构构件间使用空心管材柔性连接的方法
CN113006321B (zh) * 2021-03-12 2021-09-28 昆山市建设工程质量检测中心 一种组合式预制混凝土墙体层间连接节点的施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100203012B1 (ko) * 1995-10-26 1999-06-15 이내흔 Pc 슬라브를 이용한 건축구조물의 시공방법
JP2004156327A (ja) * 2002-11-07 2004-06-03 Taisei Corp 誘発目地構造体及び誘発目地構造体の施工方法
CN1800529A (zh) * 2005-08-29 2006-07-12 单锦春 节能建筑外围护结构复合保温墙体
CN101603336A (zh) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 带填充式墙板的预制混凝土短肢剪力墙及其连接方法
CN101812882A (zh) * 2009-06-15 2010-08-25 黑龙江宇辉新型建筑材料有限公司 带一次成型填充墙的混凝土剪力墙及其制作方法
CN201665930U (zh) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 高层建筑的保温结构外墙
CN202658766U (zh) * 2012-07-02 2013-01-09 福建省泷澄建设集团有限公司 钢筋砼拉结带结构
CN104389362A (zh) * 2014-11-14 2015-03-04 江苏南通三建集团有限公司 清水混凝土剪力墙与内填充墙交接处构造及其实施方法
CN204311649U (zh) * 2014-10-28 2015-05-06 合肥工业大学 预制装配盒式带肋加筋外墙板及外墙

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100203012B1 (ko) * 1995-10-26 1999-06-15 이내흔 Pc 슬라브를 이용한 건축구조물의 시공방법
JP2004156327A (ja) * 2002-11-07 2004-06-03 Taisei Corp 誘発目地構造体及び誘発目地構造体の施工方法
CN1800529A (zh) * 2005-08-29 2006-07-12 单锦春 节能建筑外围护结构复合保温墙体
CN101603336A (zh) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 带填充式墙板的预制混凝土短肢剪力墙及其连接方法
CN101812882A (zh) * 2009-06-15 2010-08-25 黑龙江宇辉新型建筑材料有限公司 带一次成型填充墙的混凝土剪力墙及其制作方法
CN201665930U (zh) * 2010-03-08 2010-12-08 浙江桔乡建设有限公司 高层建筑的保温结构外墙
CN202658766U (zh) * 2012-07-02 2013-01-09 福建省泷澄建设集团有限公司 钢筋砼拉结带结构
CN204311649U (zh) * 2014-10-28 2015-05-06 合肥工业大学 预制装配盒式带肋加筋外墙板及外墙
CN104389362A (zh) * 2014-11-14 2015-03-04 江苏南通三建集团有限公司 清水混凝土剪力墙与内填充墙交接处构造及其实施方法

Also Published As

Publication number Publication date
CN104831829A (zh) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104831829B (zh) 一种混凝土剪力墙与填充墙一体化预制的连接方法
CN201217890Y (zh) 套入式灌浆钢筋连接套筒
CN104358330A (zh) 自带模板的预制混凝土墙体钢筋销接连接构件及连接方法
CN105298134B (zh) 无独立注浆口钢筋灌浆连接套筒及系统及施工方法
KR101458434B1 (ko) 선제작된 pc패널을 이용한 hpc기둥의 제작방법 및 이를 이용한 시공방법
CN206157913U (zh) 一种装配式方钢管混凝土柱与钢梁连接节点
CN101812882A (zh) 带一次成型填充墙的混凝土剪力墙及其制作方法
CN208343121U (zh) 预制装配式钢结构混凝土墙板模具
CN204001270U (zh) 一种钢筋混凝土墙与砌体墙连接结构
CN201217889Y (zh) 插入式灌浆钢筋连接套筒
CN203238839U (zh) 一种装配式房屋建筑的预制混凝土复合墙板
CN103741883A (zh) 预制钢筋混凝土柱模板及其制作方法
CN206888274U (zh) 叠合板式剪力墙环锚连接节点
CN204311649U (zh) 预制装配盒式带肋加筋外墙板及外墙
CN211851013U (zh) 一种砌体墙的预制高延性混凝土加固装置
CN105781016A (zh) 水泥基复合材料与钢管组合复合柱及其制造方法
CN110238963A (zh) 预制混凝土构件间的双管型钢筋连接结构及其施工方法
CN202596025U (zh) 一种预制边框轻质大墙板
CN102287005A (zh) 钢混组合框板建筑结构体系
CN102912983B (zh) 预制非承重墙体与结构构件一体化连接的建造方法
CN111321844A (zh) 一种内管偏心放置式中空夹层钢管混凝土梁
CN204252337U (zh) 装配式建筑墙体构件
CN207711007U (zh) 一种混凝土预制墙板的预制模具
CN211622269U (zh) 一种内管偏心放置式中空夹层钢管混凝土梁
CN101004094A (zh) 抗震空心整体墙板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150812

Assignee: Fanlin Assembly Building Technology Co., Ltd

Assignor: Meng Fanlin

Contract record no.: X2020220000007

Denomination of invention: Integrated prefabrication method for connecting concrete shear wall and filler wall

Granted publication date: 20161116

License type: Common License

Record date: 20200522

Application publication date: 20150812

Assignee: Hebei Xinyan Youjian Assembly Building Technology Co., Ltd

Assignor: Meng Fanlin

Contract record no.: X2020220000008

Denomination of invention: Integrated prefabrication method for connecting concrete shear wall and filler wall

Granted publication date: 20161116

License type: Exclusive License

Record date: 20200525

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210607

Address after: Room 101, unit 0, building b3-2-1, Wanda Plaza, Changchun Auto City, west of Xihu Road, Changchun Auto Development Zone, Jilin Province, 130000

Patentee after: Changchun Jianlin Education Consulting Co.,Ltd.

Address before: 130061 Room 405, four building, Star Street, 2577 building street, Changchun, Jilin.

Patentee before: Meng Fanlin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210907

Address after: Room 101, building b3-2-1, group B3, Wanda Plaza, Changchun City, automobile economic and Technological Development Zone, Changchun City, Jilin Province, 130062

Patentee after: Fanlin Assembly Building Technology Co.,Ltd.

Address before: Room 101, unit 0, building b3-2-1, Wanda Plaza, Changchun Auto City, west of Xihu Road, Changchun Auto Development Zone, Jilin Province, 130000

Patentee before: Changchun Jianlin Education Consulting Co.,Ltd.