CN104652421B - A kind of prefabricated pipe stake and method of attachment - Google Patents
A kind of prefabricated pipe stake and method of attachment Download PDFInfo
- Publication number
- CN104652421B CN104652421B CN201510084856.6A CN201510084856A CN104652421B CN 104652421 B CN104652421 B CN 104652421B CN 201510084856 A CN201510084856 A CN 201510084856A CN 104652421 B CN104652421 B CN 104652421B
- Authority
- CN
- China
- Prior art keywords
- pile
- prefabricated tubular
- root canal
- tubular pile
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000003466 welding Methods 0.000 claims abstract description 24
- 210000004262 dental pulp cavity Anatomy 0.000 claims description 19
- 229910000831 Steel Inorganic materials 0.000 claims description 15
- 239000010959 steel Substances 0.000 claims description 15
- 238000007569 slipcasting Methods 0.000 claims description 6
- 239000004568 cement Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
- E02D5/665—Mould-pipes or other moulds for making piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of prefabricated pipe stake and method of attachment, its cross section is circular ring section, is provided with therein and the manhole of pile tube coaxial line, is provided with at the two ends of prefabricated tubular pile symmetrical and forms welding skylight hole groove during for pile extension.The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.The method of attachment that device is concrete: first welding prefabricated tubular pile outer surface junction, secondly welding prefabricated tubular pile inner surface, then installs connecting bolt, and the 3rd closes welding hole, the 4th grouting treatment.This method, on the premise of not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred during piling.
Description
Technical field
The present invention relates to a kind of prefabricated tubular pile and method of attachment, belong to construction engineering technical field.
Background technology
Along with the fast development of building industry, prefabricated tubular pile is low with its production cost, and the ratio of reinforcement is little, saving steel, and bearing capacity is big,
Short construction period, the plurality of advantages such as technical difficulty is low are applied more and more extensive in building industry.During prefabricated tubular pile uses,
If the stake of design is long, it is desirable to many prefabricated tubular piles are applied in combination.Pile tube is usually tubular structure at present, and two ends are wrapped
Being wrapped with steel hoop, steel hoop flush, can only carry out as outside weldings during welding, bonding strength is poor.This connected mode is only
Being the link on surface, bonding strength is poor, there is potential safety hazard.It is not good at additionally, due to construction management, after welding completes, reaches not
Require or do not reach time interval to welding quality and continue with piling work, pile breaking phenomenon easily occurs.
Summary of the invention
It is an object of the invention to provide a kind of prefabricated tubular pile quick connecting method, this pile extension method is not extending the pile extension time
Under premise, substantially increase the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred during piling.
The technical solution used in the present invention is as follows:
A kind of prefabricated pipe stake, its cross section is circular ring section, is provided with therein and the manhole of pile tube coaxial line, prefabricated
The two ends of pile tube are provided with symmetrical and form welding skylight hole groove when pile extension.
The ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved anchor bar on the ring surface of bottom.
The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
Between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring;Its inner ring carries out interior welds by skylight hole.
Groove the most corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
Described welding skylight hole is by the welding closure of arc H profile steel plate.
Described prefabricated tubular pile is internal after pile extension completes carries out injecting treatment.
The concrete method of attachment of said apparatus is as follows:
Step 1, require true fixed pile according to design after be pressed into below ground through the first root canal pile, more than ground, reserved 1m is left
The right side carries out pile extension;
Step 2, lifting the second root canal pile, slip casting in anchor hole, by the second root canal pile and the dowel of the first root canal pile and anchor hole anchor
It is solidly connected, and ensures perpendicularity;
Step 3, outer surface to upper and lower two root canal piles weld;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate closure welding skylight;
Step 6, carry out next step piling work;
Step 7, repeat the above steps 1-6, until reaching designed elevation;
Step 8, finally carry out the internal grouting treatment of pile tube.
Beneficial effects of the present invention is as follows:
This prefabricated circular pile tube, upper and lower two ends are the most fluted, formed and set on welding skylight, and the ring surface at prefabricated tubular pile top
There is anchor hole, reserved anchor bar on the ring surface of bottom.Being attached by dowel and anchor hole between pile tube up and down, outer surface leads to
Crossing and be welded to connect, inner surface carries out interior welds by welding skylight, it is ensured that weld strength, greatly reduces the appearance of broken pile.
Accompanying drawing explanation
Fig. 1 (a)-Fig. 1 (c) is the generalized section after the dowel hole slip casting of prefabricated tubular pile top completes;
Fig. 2 (a)-Fig. 2 (c) is that bottom prefabricated tubular pile, reserved steel bar inserts the section after a upper pipe joint stake top-portion apertures injected hole and shows
It is intended to;
Fig. 3 (a)-Fig. 3 (c) is the generalized section after prefabricated tubular pile outer surface seam crossing has welded;
Fig. 4 (a)-Fig. 4 (c) is the generalized section after prefabricated tubular pile inner surface seam crossing has welded;
Fig. 5 (a)-Fig. 5 (c) is the generalized section after skylight hole closure;
Fig. 6 (a)-Fig. 6 (c) is the generalized section after the internal slip casting of pile tube completes;
Fig. 7 is the schematic diagram of skylight hole closure steel plate;
Fig. 8 is the schematic diagram of single prefabricated tubular pile.
In figure: 1-prefabricated tubular pile;1-1-steel hoop;1-2-anchor hole;Injecting cement paste in 1-3 dowel hole;1-4 anchor bar, 1-5
Outer surface soldered;2-skylight hole closure steel plate;Injecting cement paste in 3 prefabricated tubular piles;4-skylight hole.
Detailed description of the invention
The present invention is described in detail below in conjunction with the accompanying drawings:
As it is shown in figure 1, prefabricated tubular pile 1 is a column structure, its cross section is circular ring section, and there is the through hole of circle inside;
Prefabricated tubular pile two ends are the most fluted, form welding skylight hole 4 during pile extension;
Anchor hole 1-2 is arranged at prefabricated tubular pile top, and reserved anchor bar 1-4 is arranged at bottom;It is positioned at the prefabricated tubular pile anchor by bottom on upper strata
Gu the top anchor hole that reinforcing bar inserts lower floor's prefabricated tubular pile carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop 1-1;
Such as Fig. 3, shown in Fig. 4, by Jointing outside described prefabricated tubular pile, entered by skylight hole inside described prefabricated tubular pile
Row interior welds;Concrete soldered outer surface soldered 1-5 as shown in Figure 3, Figure 4, inner surface soldered 1-6.
The welding skylight hole of prefabricated tubular pile is finally by the welding closure of arc H profile steel plate;
After described precast pipe pile splicing, inside needs to carry out injecting treatment, is illustrated in figure 6 the section after the internal slip casting of pile tube completes
Injecting cement paste 3 in the prefabricated tubular pile formed in schematic diagram.
The concrete method of attachment of said apparatus is as follows:
Step 1, require true fixed pile according to design after be pressed into below ground through the first root canal pile, more than ground, reserved 1m is left
The right side carries out pile extension;
Step 2, lifting the second root canal pile, slip casting in anchor hole, by the second root canal pile and the dowel of the first root canal pile and anchor hole anchor
It is solidly connected, and ensures perpendicularity;
Step 3, outer surface to upper and lower two root canal piles weld;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate closure welding skylight;
Step 6, carry out next step piling work;
Step 7, repeat the above steps 1-6, until reaching designed elevation;
Step 8, finally carry out the internal grouting treatment of pile tube.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not limit to scope
System, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art need not pay
Go out various amendments or deformation that creative work can make still within protection scope of the present invention.
Claims (2)
1. the method for attachment of a prefabricated pipe stake, described prefabricated pipe stake, its cross section is circular ring section, it is provided with therein and the manhole of pile tube coaxial line, it is provided with at the two ends of prefabricated tubular pile symmetrical and forms welding skylight hole groove during for pile extension, the ring surface at described prefabricated tubular pile top is provided with anchor hole, and the ring surface of bottom is reserved with anchor bar;It is characterized in that,
Step 1, require true fixed pile according to design after the first root canal pile is pressed into below ground, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in the first root canal pile anchor hole, by anchor bar and the anchor hole anchor connection of the first root canal pile of the second root canal pile, and ensure perpendicularity;
Step 3, outer surface to upper and lower two root canal piles weld;
Step 4, by two root canal pile stake end grooves formed welding skylight hole carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate closure welding skylight hole;
Step 6, carry out next step piling work;
Step 7, repeat the above steps 1-6, until reaching designed elevation;
Step 8, finally carry out the internal grouting treatment of pile tube.
2. method of attachment as claimed in claim 1, it is characterised in that: described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510084856.6A CN104652421B (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake and method of attachment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510084856.6A CN104652421B (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake and method of attachment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104652421A CN104652421A (en) | 2015-05-27 |
CN104652421B true CN104652421B (en) | 2016-11-30 |
Family
ID=53244015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510084856.6A Active CN104652421B (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake and method of attachment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104652421B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917403A (en) * | 2017-03-21 | 2017-07-04 | 中冶成都勘察研究总院有限公司 | A kind of novel foundation pile of efficient rapid construction |
CN107034875B (en) * | 2017-03-22 | 2019-02-22 | 深圳市福田建安建设集团有限公司 | A kind of assembled circle test pile and production method |
CN106759304B (en) * | 2017-03-23 | 2022-09-16 | 广州建筑产业开发有限公司 | Quick connecting device and method for follow-up pipe pile while drilling |
CN109083130A (en) * | 2018-08-16 | 2018-12-25 | 滨州学院 | A kind of quick coupling of armored concrete prefabricated tubular pile |
CN108867635B (en) * | 2018-09-18 | 2020-07-07 | 浙江正大管桩有限公司 | Prestressed steel pipe concrete tubular pile |
CN109208583A (en) * | 2018-09-27 | 2019-01-15 | 陈溯源 | A kind of precast pipe pile splicing multi-section reinforced joint structure |
CN109339040B (en) * | 2018-11-19 | 2023-12-01 | 喀什市市政建设工程有限责任公司 | Prefabricated wedge-shaped pipe wall opening hollow pile and pile splicing method thereof |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2296365Y (en) * | 1996-11-21 | 1998-11-04 | 曹沂风 | Pile forming device for various section hollow pile |
JP2001011871A (en) * | 1999-06-28 | 2001-01-16 | Masayo Tanaka | Pile head end structure by projecting metal fixture of precast pile |
JP2006016777A (en) * | 2004-06-30 | 2006-01-19 | Tama Engineering Kk | Rotatingly press-fitted pile |
KR101043027B1 (en) * | 2010-06-18 | 2011-06-21 | 송기용 | Complex pile and fabrication method for the same |
CN202012075U (en) * | 2011-03-05 | 2011-10-19 | 广州市建筑科学研究院有限公司 | Fast connection device of prestressed concrete pipe pile |
CN202175946U (en) * | 2011-07-04 | 2012-03-28 | 张跃民 | Pipe pile without steel end plate |
CN204435358U (en) * | 2015-02-16 | 2015-07-01 | 济南轨道交通集团有限公司 | A kind of prefabricated pipe stake |
-
2015
- 2015-02-16 CN CN201510084856.6A patent/CN104652421B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104652421A (en) | 2015-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652421B (en) | A kind of prefabricated pipe stake and method of attachment | |
CN105569224B (en) | Concrete filled steel tube edge constraint overlaps monoblock type shear wall and preparation and installation method | |
CN204753844U (en) | Circular steel tube concrete column sleeve connected node | |
CN104674789B (en) | A kind of prefabricated square pipe pile and method of attachment | |
CN103850363B (en) | Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall | |
CN203514315U (en) | Reinforced connecting structure between pile and pile cap | |
CN111576403B (en) | Pile splicing structure and bearing platform anchoring structure using PHC tubular pile | |
CN103485548B (en) | Assembling hollow concrete overlapped shear wall Vertical bar connection method | |
CN108412128A (en) | A kind of connection structure of steel core concrete column | |
CN203821876U (en) | Concrete column reinforcement device | |
CN103590414A (en) | Structure for connecting concrete tubular pile with bearing platform | |
CN111119410A (en) | Column splicing structure and method suitable for reinforced concrete assembled structure | |
CN204435358U (en) | A kind of prefabricated pipe stake | |
CN104563101A (en) | Composite pile structure serving as main structure stand column and construction method thereof | |
CN104196023B (en) | A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device | |
CN212926718U (en) | Prefabricated horizontal grouting sleeve connecting wall unit and wall | |
CN104594343A (en) | Fabricated pile and construction method thereof | |
CN206128081U (en) | Prefabricated guan liang | |
CN209838429U (en) | Back anchor shield constructs lining cutting supporting construction | |
CN209837117U (en) | Connecting structure of assembled structural member | |
CN204456071U (en) | A kind of prefabricated square pipe pile | |
CN217631632U (en) | Hollow interlayer composite material tower | |
CN215406560U (en) | Connection node of sectional type steel pipe confined concrete column and concrete beam | |
CN204151835U (en) | The vertical piece structure of connection of the basement wall and cast-in-place buttress | |
CN206887936U (en) | A kind of prefabricated pile and foundation connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |