CN103590414A - Structure for connecting concrete tubular pile with bearing platform - Google Patents
Structure for connecting concrete tubular pile with bearing platform Download PDFInfo
- Publication number
- CN103590414A CN103590414A CN201310583167.0A CN201310583167A CN103590414A CN 103590414 A CN103590414 A CN 103590414A CN 201310583167 A CN201310583167 A CN 201310583167A CN 103590414 A CN103590414 A CN 103590414A
- Authority
- CN
- China
- Prior art keywords
- pile
- tubular pile
- embedded
- bar
- anchor bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310583167.0A CN103590414B (en) | 2013-11-19 | 2013-11-19 | A kind of attachment structure of concrete tubular pile and cushion cap |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310583167.0A CN103590414B (en) | 2013-11-19 | 2013-11-19 | A kind of attachment structure of concrete tubular pile and cushion cap |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103590414A true CN103590414A (en) | 2014-02-19 |
| CN103590414B CN103590414B (en) | 2016-06-29 |
Family
ID=50080716
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310583167.0A Active CN103590414B (en) | 2013-11-19 | 2013-11-19 | A kind of attachment structure of concrete tubular pile and cushion cap |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103590414B (en) |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105735336A (en) * | 2016-03-14 | 2016-07-06 | 张译元 | Method for building bridge by means of bridge prefabricated bearing platform |
| CN106638587A (en) * | 2017-02-17 | 2017-05-10 | 浙江望达建材科技有限公司 | Assembly type prestress combined square pile and construction method thereof |
| CN107100185A (en) * | 2017-05-18 | 2017-08-29 | 大成科创基础建设股份有限公司 | The attachment structure of assembled architecture stake pile foundation and cushion cap |
| CN107724384A (en) * | 2017-11-24 | 2018-02-23 | 华中科技大学 | A kind of stake and stake attachment structure and its construction method |
| CN108824475A (en) * | 2018-06-29 | 2018-11-16 | 华北电力大学(保定) | A kind of transmission line of electricity equilateral triangle cushion cap stake assembling type base |
| CN109322319A (en) * | 2018-11-08 | 2019-02-12 | 江苏隆兴建设工程有限公司 | Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap |
| CN111139857A (en) * | 2020-01-20 | 2020-05-12 | 广东华科大建筑技术开发有限公司 | Anchoring device and anchoring method for newly-added steel pipe pile and rear bearing platform in foundation transformation |
| CN111206573A (en) * | 2020-02-28 | 2020-05-29 | 许顺良 | Prefabricated building structure |
| CN115305943A (en) * | 2022-08-11 | 2022-11-08 | 明阳智慧能源集团股份公司 | Offshore concrete-filled steel tube high-pile bearing platform fan foundation and construction method thereof |
| CN116289886A (en) * | 2023-03-16 | 2023-06-23 | 中国十七冶集团有限公司 | Connecting structure of steel bar and anchoring rib at cut-off position of pile top of square pile and using method |
| CN116335180A (en) * | 2023-03-21 | 2023-06-27 | 上海瓴云土木工程咨询有限公司 | Foundation engineering sedimentation control method under poor geological conditions |
| CN116733171A (en) * | 2023-08-09 | 2023-09-12 | 唐山华通水泥制品有限公司 | Reinforcing steel bar anchoring device and reinforcing steel bar tensioning method using same |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002285564A (en) * | 2001-03-26 | 2002-10-03 | Taisei Corp | STRUCTURE FOUNDATION SUPPORT STRUCTURE AND ITS CONSTRUCTION METHOD |
| CN201826323U (en) * | 2010-08-11 | 2011-05-11 | 霍宏斌 | Pile-anchor rod foundation structure |
| CN202073110U (en) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | Concrete pile and bearing platform connecting structure |
| CN202450521U (en) * | 2011-12-14 | 2012-09-26 | 盐城市同力新型建材有限公司 | Connecting sleeve for conveniently connecting bearing platform with pre-tensioned and pre-stressed concrete pile |
| CN202809633U (en) * | 2012-10-10 | 2013-03-20 | 上海市城市建设设计研究总院 | Connecting structure of pre-stressed high-strength concrete (PHC) pipe pile and bearing platform |
| CN203569582U (en) * | 2013-11-19 | 2014-04-30 | 中铁第四勘察设计院集团有限公司 | Connecting structure of concrete pipe pile and bearing platform |
-
2013
- 2013-11-19 CN CN201310583167.0A patent/CN103590414B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002285564A (en) * | 2001-03-26 | 2002-10-03 | Taisei Corp | STRUCTURE FOUNDATION SUPPORT STRUCTURE AND ITS CONSTRUCTION METHOD |
| CN201826323U (en) * | 2010-08-11 | 2011-05-11 | 霍宏斌 | Pile-anchor rod foundation structure |
| CN202073110U (en) * | 2011-05-04 | 2011-12-14 | 江苏建华管桩有限公司 | Concrete pile and bearing platform connecting structure |
| CN202450521U (en) * | 2011-12-14 | 2012-09-26 | 盐城市同力新型建材有限公司 | Connecting sleeve for conveniently connecting bearing platform with pre-tensioned and pre-stressed concrete pile |
| CN202809633U (en) * | 2012-10-10 | 2013-03-20 | 上海市城市建设设计研究总院 | Connecting structure of pre-stressed high-strength concrete (PHC) pipe pile and bearing platform |
| CN203569582U (en) * | 2013-11-19 | 2014-04-30 | 中铁第四勘察设计院集团有限公司 | Connecting structure of concrete pipe pile and bearing platform |
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105735336A (en) * | 2016-03-14 | 2016-07-06 | 张译元 | Method for building bridge by means of bridge prefabricated bearing platform |
| CN106638587A (en) * | 2017-02-17 | 2017-05-10 | 浙江望达建材科技有限公司 | Assembly type prestress combined square pile and construction method thereof |
| CN107100185A (en) * | 2017-05-18 | 2017-08-29 | 大成科创基础建设股份有限公司 | The attachment structure of assembled architecture stake pile foundation and cushion cap |
| CN107724384B (en) * | 2017-11-24 | 2023-09-15 | 华中科技大学 | A pile-to-pile connection construction method |
| CN107724384A (en) * | 2017-11-24 | 2018-02-23 | 华中科技大学 | A kind of stake and stake attachment structure and its construction method |
| CN108824475A (en) * | 2018-06-29 | 2018-11-16 | 华北电力大学(保定) | A kind of transmission line of electricity equilateral triangle cushion cap stake assembling type base |
| CN109322319A (en) * | 2018-11-08 | 2019-02-12 | 江苏隆兴建设工程有限公司 | Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap |
| CN111139857A (en) * | 2020-01-20 | 2020-05-12 | 广东华科大建筑技术开发有限公司 | Anchoring device and anchoring method for newly-added steel pipe pile and rear bearing platform in foundation transformation |
| CN111206573A (en) * | 2020-02-28 | 2020-05-29 | 许顺良 | Prefabricated building structure |
| CN115305943A (en) * | 2022-08-11 | 2022-11-08 | 明阳智慧能源集团股份公司 | Offshore concrete-filled steel tube high-pile bearing platform fan foundation and construction method thereof |
| CN115305943B (en) * | 2022-08-11 | 2024-06-18 | 明阳智慧能源集团股份公司 | Offshore steel tube concrete high-pile cap fan foundation and construction method thereof |
| CN116289886A (en) * | 2023-03-16 | 2023-06-23 | 中国十七冶集团有限公司 | Connecting structure of steel bar and anchoring rib at cut-off position of pile top of square pile and using method |
| CN116335180A (en) * | 2023-03-21 | 2023-06-27 | 上海瓴云土木工程咨询有限公司 | Foundation engineering sedimentation control method under poor geological conditions |
| CN116733171A (en) * | 2023-08-09 | 2023-09-12 | 唐山华通水泥制品有限公司 | Reinforcing steel bar anchoring device and reinforcing steel bar tensioning method using same |
| CN116733171B (en) * | 2023-08-09 | 2023-10-20 | 唐山华通水泥制品有限公司 | Reinforcing steel bar anchoring device and reinforcing steel bar tensioning method using same |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103590414B (en) | 2016-06-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203569582U (en) | Connecting structure of concrete pipe pile and bearing platform | |
| CN103590414A (en) | Structure for connecting concrete tubular pile with bearing platform | |
| CN108049498B (en) | Prefabricated column and prefabricated beam connection structure and method of prefabricated building frame structure | |
| CN106320164B (en) | Large-scale prefabricated assembled cover beam with "corbel" structure and its construction method | |
| CN103994034B (en) | Connection device of prestress concrete and steel combination wind power generation tower | |
| CN204825619U (en) | Assembled concrete bridge mound | |
| CN111576403B (en) | Pile splicing structure and bearing platform anchoring structure using PHC tubular pile | |
| CN105113389A (en) | Assembled type bridge pier column member with steel-concrete composite structure | |
| CN104018724B (en) | Connecting device of prestress concrete tower section and steel tower section of combination wind power tower | |
| CN108560544A (en) | A kind of sleeve connection assembled pile foundation and its construction method | |
| CN109322319A (en) | Connecting Mechanism of Concrete Precast Pile and Pile Foundation Cap | |
| CN102493451A (en) | Rock bolt system based on fiber reinforced plastic bolt and ultrahigh-performance cement-based bonding and anchoring medium | |
| CN107842132A (en) | The precast reinforced concrete shear wall attachment means and connection method that a kind of bending resistance is cut | |
| CN211171930U (en) | Bolt type connecting structure for prefabricated hollow uplift pile | |
| CN111719693A (en) | Prestressed fabricated steel-concrete socketed beam-column joint | |
| CN102912928B (en) | Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method | |
| CN203640061U (en) | Node connecting structure of reinforced concrete column of basement | |
| CN103103981B (en) | A Construction Method of Prestressed Wedge Pipe Pile Joint | |
| CN104594343A (en) | Fabricated pile and construction method thereof | |
| CN202882164U (en) | Member for restraining grouting anchor connection by using two ends of reinforcing steel bar | |
| CN204456670U (en) | Fabricated construction straight screw sleeve connection joint | |
| CN210482760U (en) | A steel bar sleeve grout connects overlap joint for assembled structure | |
| CN206768804U (en) | Precast concrete pile attachment structure | |
| CN216616577U (en) | Self-locking type steel bar sleeve | |
| CN202989911U (en) | Post-grouting pile of precast concrete |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB03 | Change of inventor or designer information |
Inventor after: Yan Aiguo Inventor after: Zhang Chiquan Inventor after: Cai Jianye Inventor after: Liu Tianpei Inventor after: Chen Jiabin Inventor after: Zhou Yan Inventor after: Peng Wencheng Inventor after: Zhou Shenggang Inventor after: Wu Weihong Inventor before: Yan Aiguo Inventor before: Zhang Chiquan Inventor before: Cai Jianye |
|
| COR | Change of bibliographic data | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |