CN204456071U - A kind of prefabricated square pipe pile - Google Patents

A kind of prefabricated square pipe pile Download PDF

Info

Publication number
CN204456071U
CN204456071U CN201520113338.8U CN201520113338U CN204456071U CN 204456071 U CN204456071 U CN 204456071U CN 201520113338 U CN201520113338 U CN 201520113338U CN 204456071 U CN204456071 U CN 204456071U
Authority
CN
China
Prior art keywords
pile
prefabricated
square pipe
pipe pile
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520113338.8U
Other languages
Chinese (zh)
Inventor
王国富
韩林
王威汐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201520113338.8U priority Critical patent/CN204456071U/en
Application granted granted Critical
Publication of CN204456071U publication Critical patent/CN204456071U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of prefabricated square pipe pile, its cross section is the ring section of rectangle, be provided with therein and the circle of pile tube coaxial line or square through hole, projection is provided with in one end of prefabricated tubular pile, the other end is provided with groove, and is formed when the projection of contiguous prefabricated square pipe pile and groove pile extension and weld skylight hole.First weld prefabricated tubular pile external surface junction, secondly welding prefabricated tubular pile inner surface, then installs connecting bolt, and the 3rd closes welding hole, the 4th grouting treatment.This method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.

Description

A kind of prefabricated square pipe pile
Technical field
The utility model relates to a kind of prefabricated tubular pile and method of attachment, belongs to construction engineering technical field.
Background technology
Along with the fast development of builing industry, prefabricated tubular pile is low with its cost of production, and reinforcement ratio is little, saving steel, and bearing capacity is large, and short construction period, the plurality of advantages such as technical difficulty is low are applied more and more extensive in builing industry.In prefabricated tubular pile use procedure, if the stake of design is long, just needs many prefabricated tubular piles and combinationally use.Current pile tube is generally tubular structure, and two ends are enclosed with steel hoop, and steel hoop surface is concordant, and can only carry out as outside weldings during welding, bonding strength is poor.This connected mode is only the link on surface, and bonding strength is poor, there is potential safety hazard.In addition because execution control is not good at, after welding completes, do not reach welding quality and require or do not reach the time interval just to proceed piling work, easily occur pile breaking phenomenon.
Utility model content
The purpose of this utility model is to provide a kind of prefabricated tubular pile and quick connecting method, and this pile extension method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.
The technical solution adopted in the utility model is as follows:
A kind of prefabricated square pipe pile, its cross section is the ring section of rectangle, is provided with therein and the circle of pile tube coaxial line or square through hole, is provided with projection in one end of prefabricated tubular pile, the other end is provided with groove, and is formed when the projection of contiguous prefabricated square pipe pile and groove pile extension and weld skylight hole.
Be provided with the projection with upper strata square pipe pile fit depressions on the top of described prefabricated tubular pile, bottom is provided with and the protruding groove matched of lower floor's square pipe pile, and groove is provided with the bolt hole for connecting upper and lower pile body.
The height of described projection is less than the degree of depth with groove.
Described prefabricated tubular pile two ends projection and groove are wrapped up by steel hoop.
Between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
Described prefabricated tubular pile tube wall is connected by not through four bolts;
The welding skylight hole of described prefabricated tubular pile is finally by H profile steel plate welding shutoff;
Described welding skylight hole is by arc H profile steel plate welding shutoff.
Injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
The concrete method of attachment of said apparatus is as follows:
Step 1, according to after the true fixed pile of designing requirement, the first root canal pile is pressed into below ground, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, make the groove of the second root canal pile and the first root canal pile and protruding grafting, and ensure verticality;
Step 3, the external surface of employing electric welding to upper and lower two root canal piles weld;
Step 4, welding skylight opening that is protruding by two root canal pile stake ends and groove formation carry out pile tube interior welds;
Step 5, erection bolt, complete the connection work of two root canal piles;
Step 6, employing arc H steel plate carry out shutoff to welding skylight opening;
Step 7, carry out next step piling work;
Step 8, repetition step 1-7, until reach design elevation;
Step 9, finally carry out the inner grouting treatment of pile tube.
The beneficial effects of the utility model are as follows:
This prefabricated square pile tube, upper and lower two ends have projection and groove respectively, and projection and groove can form welding skylight.The prefabricated tubular pile of this structure, not only can surface soldered, and can carry out interior welds and be connected with bolt, ensure that weld strength, greatly reduces the appearance of broken pile.
Accompanying drawing explanation
Fig. 1 (a)-Fig. 1 (c) for prefabricated tubular pile external surface seam crossing welded after generalized section;
Fig. 2 (a)-Fig. 2 (c) for prefabricated tubular pile inner surface seam crossing welded after generalized section;
Fig. 3 (a)-Fig. 3 (c) is the generalized section after connecting bolt installation;
Fig. 4 (a)-Fig. 4 (c) for skylight hole shutoff complete after generalized section;
Fig. 5 (a)-Fig. 5 (b) for the slip casting of prefabricated tubular pile inside complete after generalized section;
In figure: the prefabricated square pipe pile of 1-; 1-1 steel hoop; 1-2 bolt hole; 1-3-external joint soldered; 1-4 skylight hole; 2-shutoff steel plate; Grouting body in 3-prefabricated tubular pile.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail:
As shown in Fig. 1 (a)-Fig. 1 (c), a kind of prefabricated square pipe pile 1, its cross section is rectangular loop cross section, be provided with therein and the circle of pile tube coaxial line or square through hole, projection is provided with in one end of prefabricated tubular pile, the other end is provided with groove, and is formed when the projection of contiguous prefabricated square pipe pile and groove pile extension and weld skylight hole 1-4.
Be provided with the projection with upper strata square pipe pile fit depressions on the top of described prefabricated tubular pile, bottom is provided with and the protruding groove matched of lower floor's square pipe pile; Groove is provided with bolt hole 1-2; Protruding height is less than the degree of depth with groove, forms welding skylight hole during pile extension.Prefabricated tubular pile two ends projection and groove are wrapped up by steel hoop.
Between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole, and its external joint soldered 1-3 is as shown in Fig. 3 (a)-Fig. 3 (c).
Prefabricated tubular pile tube wall is connected by not through four bolts; The welding skylight hole of prefabricated tubular pile welds shutoff finally by H type shutoff steel plate 2; Welding skylight hole is by arc H profile steel plate welding shutoff.Injecting treatment is carried out in prefabricated tubular pile inside after pile extension completes, the generalized section after the inner slip casting of the prefabricated tubular pile as shown in Fig. 5 (a)-Fig. 5 (b) completes, and in wherein-prefabricated tubular pile, grouting body 3 as shown in the figure.
Concrete connected mode is as follows:
Step 1, according to after the true fixed pile of designing requirement, the first root canal pile is pressed into below ground, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, make the groove of the second root canal pile and the first root canal pile and protruding grafting, and ensure verticality;
Step 3, the external surface of employing electric welding to upper and lower two root canal piles weld;
Step 4, welding skylight opening that is protruding by two root canal pile stake ends and groove formation carry out pile tube interior welds;
Step 5, erection bolt, complete the connection work of two root canal piles;
Step 6, employing arc H steel plate carry out shutoff to welding skylight opening;
Step 7, carry out next step piling work;
Step 8, repetition step 1-7, until reach design elevation;
Step 9, finally carry out the inner grouting treatment of pile tube.
By reference to the accompanying drawings detailed description of the invention of the present utility model is described although above-mentioned; but the restriction not to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection domain of the present utility model.

Claims (8)

1. a prefabricated square pipe pile, it is characterized in that, its cross section is the ring section of rectangle, be provided with therein and the circle of pile tube coaxial line or square through hole, projection is provided with in one end of prefabricated tubular pile, the other end is provided with groove, and is formed when the projection of contiguous prefabricated square pipe pile and groove pile extension and weld skylight hole.
2. prefabricated square pipe pile as claimed in claim 1, is characterized in that, is provided with the projection with upper strata square pipe pile fit depressions on the top of described prefabricated tubular pile, and bottom is provided with and the protruding groove matched of lower floor's square pipe pile; Groove is provided with the bolt hole for connecting upper and lower pile body.
3. prefabricated square pipe pile as claimed in claim 1, is characterized in that, the height of described projection is less than the degree of depth with groove.
4. prefabricated square pipe pile as claimed in claim 1, is characterized in that, described prefabricated tubular pile two ends projection and groove are wrapped up by steel hoop.
5. prefabricated square pipe pile as claimed in claim 1, is characterized in that, between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
6. prefabricated square pipe pile as claimed in claim 5, is characterized in that, described prefabricated tubular pile tube wall is connected by not through four bolts.
7. prefabricated square pipe pile as claimed in claim 1, is characterized in that, the welding skylight hole of described prefabricated tubular pile welds shutoff by the H profile steel plate of arc.
8. prefabricated square pipe pile as claimed in claim 1, is characterized in that, injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
CN201520113338.8U 2015-02-16 2015-02-16 A kind of prefabricated square pipe pile Expired - Fee Related CN204456071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520113338.8U CN204456071U (en) 2015-02-16 2015-02-16 A kind of prefabricated square pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520113338.8U CN204456071U (en) 2015-02-16 2015-02-16 A kind of prefabricated square pipe pile

Publications (1)

Publication Number Publication Date
CN204456071U true CN204456071U (en) 2015-07-08

Family

ID=53662980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520113338.8U Expired - Fee Related CN204456071U (en) 2015-02-16 2015-02-16 A kind of prefabricated square pipe pile

Country Status (1)

Country Link
CN (1) CN204456071U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674789A (en) * 2015-02-16 2015-06-03 济南轨道交通集团有限公司 Prefabricated square tubular pile and connecting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104674789A (en) * 2015-02-16 2015-06-03 济南轨道交通集团有限公司 Prefabricated square tubular pile and connecting method
CN104674789B (en) * 2015-02-16 2016-04-13 济南轨道交通集团有限公司 A kind of prefabricated square pipe pile and method of attachment

Similar Documents

Publication Publication Date Title
CN104652421B (en) A kind of prefabricated pipe stake and method of attachment
CN104674789B (en) A kind of prefabricated square pipe pile and method of attachment
CN203977582U (en) A kind of steel core concrete column and beam connecting node
CN104032838A (en) Connection joint of concrete filled steel tubular column and beams
CN106760054B (en) Prefabricated reinforced concrete shear wall
CN110670598A (en) Cold joint treatment structure and method for secant pile construction
CN203821876U (en) Concrete column reinforcement device
CN105804102A (en) Construction method for water cofferdam with double-barrel-shaped buckle piles
CN203855954U (en) Square pile with tooth-shaped joints
CN203050729U (en) Earth pressure balance rectangular jacking pipe joint for large-section motor vehicle tunnel
CN212077915U (en) Pile extension connecting device for steel-bottom mixed variable-section combined piles with different diameters
CN204435358U (en) A kind of prefabricated pipe stake
CN204456071U (en) A kind of prefabricated square pipe pile
CN103790160A (en) Method for pulling out structural steel and conducting grouting through SMW construction method
CN206360705U (en) The major diameter New pipe curtain supporting construction constructed for underground digging in subway station
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN205475710U (en) Steel -pipe column concrete jacking interface turnover device
CN103195050B (en) Construction method of tube-jet combined pile supporting underground wall structure
CN209837117U (en) Connecting structure of assembled structural member
CN215406560U (en) Connection node of sectional type steel pipe confined concrete column and concrete beam
CN203270550U (en) Pipe pile-jet grouting pile united supporting underground wall structure
CN216551935U (en) Open type anchor rod static pressure pile sinking-assisting structure
CN206158226U (en) Quick reinforced concrete column structure of steel pipe slip casting
CN210482760U (en) A steel bar sleeve grout connects overlap joint for assembled structure
CN211498871U (en) Steel pipe slant internal stay underground structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20170216