CN203270550U - Pipe pile-jet grouting pile united supporting underground wall structure - Google Patents

Pipe pile-jet grouting pile united supporting underground wall structure Download PDF

Info

Publication number
CN203270550U
CN203270550U CN 201320215283 CN201320215283U CN203270550U CN 203270550 U CN203270550 U CN 203270550U CN 201320215283 CN201320215283 CN 201320215283 CN 201320215283 U CN201320215283 U CN 201320215283U CN 203270550 U CN203270550 U CN 203270550U
Authority
CN
China
Prior art keywords
pile
wall
ring
basement
prestressed pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320215283
Other languages
Chinese (zh)
Inventor
肖纹篯
肖斯熔
肖斯昕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou No3 Construction Engineering Co Ltd
Original Assignee
Fuzhou No3 Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou No3 Construction Engineering Co Ltd filed Critical Fuzhou No3 Construction Engineering Co Ltd
Priority to CN 201320215283 priority Critical patent/CN203270550U/en
Application granted granted Critical
Publication of CN203270550U publication Critical patent/CN203270550U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A pipe pile-jet grouting pile united supporting underground wall structure comprises prestressed pipe piles pressed into earth at intervals. The prestressed pipe piles surround the periphery of a basement to be constructed for a circle. High-pressure jet grouting soil-cement piles are tightly arranged between every two adjacent prestressed pipe piles side by side so that united piles can be formed. The earth is dug from top to bottom in sections. Reinforced concrete basement annular wall bodies are poured from top to bottom in sections at the inner sides of the united piles. The annular wall body at the upper layer and the annular wall body at the lower layer are connected through the instant grouting method, so that a basement continuous wall is formed by the annular wall bodies at the layers. Wall attached columns can be arranged in each annular wall body. Anchoring pulling ribs or pile hoops are arranged on each prestressed pipe pile at intervals in the length direction and connected with pulling connection pieces of the basement continuous wall, so that a whole waterproof body is formed by the basement continuous wall and the prestressed pipe piles. The pipe pile-jet grouting pile united supporting underground wall structure is convenient to construct, reliable in construction, capable of omitting temporary supporting cost, free of bad influence on the environment, free of the requirement for earthwork backfilling and short in work period.

Description

Pipe-spray associating stake supporting subterranean wall structure
Technical field
The utility model relates to technical field of building construction, and especially a kind of pipe-spray associating stake supporting subterranean wall structure can be used for the underground interim or permanent support structure that all kinds of forms support.
Background technology
In the weak soil underground structure, soil excavation need to be provided with supporting facility in advance, and underground structure also needs to establish protection structure all around.The supporting facility of soil excavation is temporary lining body independently, its objective is to guarantee the peripheral soil stabilization of Underground Construction process and construction safety.Therefore the supporting facility requirement is high, but again that it is discarded after the underground construction completion, not only waste of manpower, financial resources, and easily to harm such as environment generation pollutions.
The utility model content
In order to solve the problems of the technologies described above, the utility model provides a kind of pipe-spray associating stake supporting subterranean wall structure, and this subterranean wall structure construction is easy to be reliable; Can save the expense that temporary support facility is set; Do not need backfilling of earthwork, the duration is short; Do not produce the adverse effect to environment.
One of the technical solution of the utility model is: a kind of pipe-spray associating stake supporting subterranean wall structure, and this subterranean wall structure comprises that the interval is pressed into the pile for prestressed pipe in soil, these pile for prestressed pipe form a circle along basement periphery to be onstructed; Closely be arranged side by side the high-pressure rotary-spray cement earth pile between two adjacent pile for prestressed pipe, formed the associating stake of pile for prestressed pipe and high-pressure rotary-spray cement earth pile; Steel concrete basement ring-type body of wall is built in inboard segmentation from top to bottom in the associating stake; Adopt the jog docking between upper and lower layer ring-type body of wall, make each layer annular wall body form the basement diaphragm wall.
Further, described ring-type body of wall inboard is provided with responde.According to actual needs, this responde can be along the arranging around the direction interval of ring-type body of wall, and the interval between adjacent two respondes can be set according to actual needs.
Further, be arranged at intervals with along its length anchor lacing wire or pile ring on described pile for prestressed pipe, described anchor lacing wire or pile ring are connected with the tension member of basement diaphragm wall, make basement diaphragm wall and pile for prestressed pipe form an integral body.
Further, the lower outside of described upper strata ring-type body of wall is low inboard high, form and bore slope shape profile of tooth mouth, the lower inside of described upper strata ring-type body of wall is along being arranged at intervals with Grouting Pipe around direction, the cone slope shape profile of tooth mouth that the top of described lower floor ring-type body of wall builds that the bottom with upper strata ring-type body of wall adapts.
Further, described anchor lacing wire is the interior built-in fitting of pile for prestressed pipe, namely when making, pile for prestressed pipe establishes built-in fitting according to staying in advance, to guarantee during piling this built-in fitting orientation accurately, from top to bottom piecemeal during earth excavation, the tension member of this built-in fitting and basement diaphragm wall is welded one by one.
Further, described pile ring is the two arc hoops of cuff on the pile for prestressed pipe outer wall, connect through joint bolt between the connection end plate of described two arc hoops, to guarantee during piling this joint bolt orientation accurately, from top to bottom piecemeal during earth excavation, the tension member of this pile ring and basement diaphragm wall is welded one by one or is spirally connected.
Further, when the reinforcing bar binding of upper strata ring-type body of wall is installed, its perpendicular muscle is squeezed in advance in the space soil of lower floor's ring-type body of wall.
The spout of flare further, is set on the inner side template top of lower floor's ring-type body of wall; Until substantially building when full, establish the envelope template in spout, described envelope template is with pusher direction rotation Zhi Li; Inject neat cement paste with pressure in the Grouting Pipe of upper strata ring-type body of wall at last, to guarantee good docking and the water resistance of upper and lower layer ring-type body of wall.
Compared with prior art, the beneficial effects of the utility model are: the one, and temporary support facility is saved in the permanent fender body unification of temporary lining body and structure, saves construction cost; The 2nd, be the permanent fender body of temporary lining body and structure, reduced the earth excavation amount for the underground construction space; The 3rd, easy construction is reliable; The 4th, do not produce the adverse effect to environment, the 5th, do not need backfilling of earthwork, shorten the construction period.
Description of drawings
Fig. 1 is the plan view of pipe-spray associating stake supporting subterranean wall structure.
Fig. 2 is the plan view with pile for prestressed pipe of anchor lacing wire.
Fig. 3 is the plan view with pile for prestressed pipe of pile ring.
Fig. 4 is the docking structure schematic diagram of upper and lower layer ring-type body of wall.
In figure: 1 is pile for prestressed pipe; 2 is the high-pressure rotary-spray cement earth pile; 3 is the basement diaphragm wall; 4 is responde; 5 is tension member; 6 is the anchor lacing wire; 7 is pile ring; 8 is upper strata ring-type body of wall; 9 is lower floor's ring-type body of wall; 10 is Grouting Pipe; 11 is inner side template; 12 are the envelope template; 13 are perpendicular muscle; 14 is spout; 15 is major arc arc hoop; 16 is minor arc arc hoop; 17 is joint bolt; 18 is stiffener.
The specific embodiment
For above-mentioned feature and advantage of the present utility model can be become apparent, embodiment cited below particularly, and cooperation accompanying drawing are described in detail below.
Please refer to Fig. 1 to 4, a kind of pipe-spray associating stake supporting subterranean wall structure, this subterranean wall structure comprises that the interval is pressed into the pile for prestressed pipe 1 in soil, these pile for prestressed pipe 1 form a circle along basement surrounding to be onstructed; Closely be arranged side by side high-pressure rotary-spray cement earth pile 2 between two adjacent pile for prestressed pipe 1, form the associating stake of pile for prestressed pipe 1 and high-pressure rotary-spray cement earth pile 2, the associating stake can be used as waterproof, the effect of gear soil in short height distance, for the operation of follow-up basement diaphragm wall provides reliable construction environment; Steel concrete basement ring-type body of wall is built in inboard segmentation from top to bottom in the associating stake; Adopt the jog docking between upper strata ring-type body of wall 8 and lower floor's ring-type body of wall 9, make each layer annular wall body form basement diaphragm wall 3.
Above-mentioned ring-type body of wall inboard is provided with responde 4.According to actual needs, this responde can be along the arranging around the direction interval of ring-type body of wall, and the interval between adjacent two respondes can be set according to actual needs.
Be arranged at intervals with along its length anchor lacing wire or pile ring on above-mentioned pile for prestressed pipe 1, described anchor lacing wire 6 or pile ring 7 are connected with the tension member 5 of basement diaphragm wall, make basement diaphragm wall and pile for prestressed pipe 1 form a waterproof integral body.Described pile ring 7 comprises major arc arc hoop 15 and minor arc arc hoop 16.Described major arc arc hoop is connected end plate through one group of one or more composition of joint bolt 17(with minor arc arc hoop) connect, make it to hold tightly on pile for prestressed pipe, the center line of described joint bolt is parallel with the pile for prestressed pipe circle tangent line in conjunction with the position, and described end plate is vertical with the pile for prestressed pipe circle tangent line of combination position.In order to strengthen structural stability, also be provided with stiffener 18 between described major arc arc hoop and its corresponding end plate of minor arc arc hoop.As shown in Figure 3, described stiffener is arranged on the upper and lower sides position of end plate and major arc arc hoop and minor arc arc hoop junction.
The lower outside of above-mentioned upper strata ring-type body of wall is low inboard high, form and bore slope shape profile of tooth mouth, the lower inside of described upper strata ring-type body of wall 8 is along being reserved with steel Grouting Pipe 10 around the direction interval, the cone slope shape profile of tooth mouth that the top of described lower floor ring-type body of wall 9 builds that the bottom with upper strata ring-type body of wall adapts.
The job practices of above-mentioned pipe-spray associating stake supporting subterranean wall structure, the method is carried out according to the following steps:
(1) interval according to designing requirement is pressed into pile for prestressed pipe 1, and these pile for prestressed pipe 1 form a circle along basement periphery to be onstructed;
(2) tight high-pressure churning cement earth pile side by side between two adjacent pile for prestressed pipe 1, form the associating stake of pile for prestressed pipe 1 and high-pressure rotary-spray cement earth pile;
(3) the excavation section by section earthwork from top to bottom, and build steel concrete basement ring-type body of wall in the inboard segmentation from top to bottom of associating stake; Adopt instant slip casting method to connect between upper and lower layer ring-type body of wall, make each layer annular wall body form the basement diaphragm wall; According to actual needs, described ring-type body of wall inboard can be with responde, be arranged at intervals with along its length anchor lacing wire or pile ring on described pile for prestressed pipe 1, described anchor lacing wire or pile ring are connected with the tension member of basement diaphragm wall, make basement diaphragm wall and pile for prestressed pipe 1 form an integral body.
Above-mentioned anchor lacing wire is the interior built-in fitting of pile for prestressed pipe 1, namely when making, pile for prestressed pipe 1 establishes built-in fitting according to staying in advance, to guarantee during piling this built-in fitting orientation accurately, from top to bottom piecemeal during earth excavation, the tension member of this built-in fitting and basement diaphragm wall is welded one by one.
Above-mentioned pile ring is the two arc hoops of cuff on pile for prestressed pipe 1 outer wall, connect through joint bolt between the connection end plate of described two arc hoops, to guarantee during piling this joint bolt orientation accurately, from top to bottom piecemeal during earth excavation, the tension member of this pile ring and basement diaphragm wall is welded one by one or is spirally connected.
When the reinforcing bar binding of upper strata ring-type body of wall is installed, its perpendicular muscle 13 is squeezed in the space soil of lower floor's ring-type body of wall in advance, be connected with the perpendicular muscle of lower floor ring-type body of wall thereafter.
The lower outside of above-mentioned upper strata ring-type body of wall is low inboard high, form and bore slope shape profile of tooth mouth, the lower inside of described upper strata ring-type body of wall is along being arranged at intervals with Grouting Pipe 10 around direction, the cone slope shape profile of tooth mouth that the top of described lower floor ring-type body of wall builds that the bottom with upper strata ring-type body of wall adapts.
The spout of flare is set on inner side template 11 tops of lower floor's ring-type body of wall; Until substantially building when full, establish envelope template 12(steel plate in spout 14), described envelope template 12 is with pusher direction rotation Zhi Li; Inject neat cement paste with pressure in the Grouting Pipe 10 of upper strata ring-type body of wall at last, to guarantee the good docking of upper and lower layer ring-type body of wall.
The utility model does not limit to above-mentioned preferred forms, and anyone can draw other various forms of products under enlightenment of the present utility model.All equalizations of doing according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.

Claims (4)

1. stake supporting subterranean wall structure is united in pipe-spray, and it is characterized in that: comprise that the interval is pressed into the pile for prestressed pipe in soil, these pile for prestressed pipe form a circle along basement periphery to be onstructed; Closely be arranged side by side the high-pressure rotary-spray cement earth pile between two adjacent pile for prestressed pipe, formed the associating stake of pile for prestressed pipe and high-pressure rotary-spray cement earth pile; Steel concrete basement ring-type body of wall is built in inboard segmentation from top to bottom in the associating stake; Adopt the jog docking between upper and lower layer ring-type body of wall, make each layer annular wall body form the basement diaphragm wall.
2. a pipe according to claim 1-spray associating stake supporting subterranean wall structure is characterized in that: described ring-type body of wall inboard is provided with responde.
3. stake supporting subterranean wall structure is united in pipe according to claim 1-spray, it is characterized in that: be arranged at intervals with along its length anchor lacing wire or pile ring on described pile for prestressed pipe, described anchor lacing wire or pile ring are connected with the tension member of basement diaphragm wall, make basement diaphragm wall and pile for prestressed pipe form an integral body.
4. stake supporting subterranean wall structure is united in pipe according to claim 1-spray, it is characterized in that: the lower outside of described upper strata ring-type body of wall is low inboard high, form and bore slope shape profile of tooth mouth, the lower inside of described upper strata ring-type body of wall is along being arranged at intervals with Grouting Pipe around direction, the cone slope shape profile of tooth mouth that the top of described lower floor ring-type body of wall builds that the bottom with upper strata ring-type body of wall adapts.
CN 201320215283 2013-04-25 2013-04-25 Pipe pile-jet grouting pile united supporting underground wall structure Expired - Fee Related CN203270550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320215283 CN203270550U (en) 2013-04-25 2013-04-25 Pipe pile-jet grouting pile united supporting underground wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320215283 CN203270550U (en) 2013-04-25 2013-04-25 Pipe pile-jet grouting pile united supporting underground wall structure

Publications (1)

Publication Number Publication Date
CN203270550U true CN203270550U (en) 2013-11-06

Family

ID=49500991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320215283 Expired - Fee Related CN203270550U (en) 2013-04-25 2013-04-25 Pipe pile-jet grouting pile united supporting underground wall structure

Country Status (1)

Country Link
CN (1) CN203270550U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195050A (en) * 2013-04-25 2013-07-10 福州市第三建筑工程公司 Tube-jet combined pile supporting underground wall structure and construction method for same
CN103938615A (en) * 2014-04-09 2014-07-23 东南大学 Clamp for grating-type underground diaphragm wall construction die
CN107262324A (en) * 2017-06-29 2017-10-20 苏州安飞荣工业科技有限公司 A kind of lithium battery coating machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195050A (en) * 2013-04-25 2013-07-10 福州市第三建筑工程公司 Tube-jet combined pile supporting underground wall structure and construction method for same
CN103195050B (en) * 2013-04-25 2015-03-18 福州市第三建筑工程公司 Construction method of tube-jet combined pile supporting underground wall structure
CN103938615A (en) * 2014-04-09 2014-07-23 东南大学 Clamp for grating-type underground diaphragm wall construction die
CN107262324A (en) * 2017-06-29 2017-10-20 苏州安飞荣工业科技有限公司 A kind of lithium battery coating machine

Similar Documents

Publication Publication Date Title
CN102828509B (en) Joint grouting method from bottom and side of prestressed pipe pile
CN101649744B (en) Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN103993607B (en) Steel floral tube controls slip casting antiskid composite construction and rapid constructing method thereof
AU2018102180A6 (en) Anti-clogging strengthened permeable pile and construction method
CN206090653U (en) Anchor rod static pressure pile slip casting structure
CN103741683A (en) Bag bottom expanding rigid-flexible combined pile and construction method thereof
CN103195050B (en) Construction method of tube-jet combined pile supporting underground wall structure
CN203270550U (en) Pipe pile-jet grouting pile united supporting underground wall structure
CN201486566U (en) Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN101793027A (en) Core-grouted static pressure anchor rod pile
CN204326094U (en) The polygon steel pile foundation of transmission of electricity steel pipe pole
CN204491645U (en) A kind of deep foundation pit precipitation well-sealing device
CN211735285U (en) A hang well structure upside down for earth dam hole of collapsing is handled
CN206360705U (en) The major diameter New pipe curtain supporting construction constructed for underground digging in subway station
CN108487250A (en) Uplift pile stake side post-grouting device and construction method
CN211285576U (en) Manual hole digging pile structure
CN109577998B (en) Construction method for backfilling and station-crossing of piston air duct in shield interval
CN104234217B (en) Light-duty pressure grouting device for overall and grout construction method thereof
CN203834469U (en) Bag bottom expansion rigid and flexible combined pile
CN201635072U (en) Centrally grouted static-pressured anchor pile former
CN102518129A (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN204780892U (en) Tubular pile crack reinforcement structure of high strength
CN211773883U (en) Underground pipeline with integrated supporting piles and pipeline wall
CN107190742A (en) For grouting method outside slip casting structure outside the stake of steel-pipe pile and stake
CN102561378A (en) Concrete pile cap structure and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131106