CN204435358U - A kind of prefabricated pipe stake - Google Patents
A kind of prefabricated pipe stake Download PDFInfo
- Publication number
- CN204435358U CN204435358U CN201520114721.5U CN201520114721U CN204435358U CN 204435358 U CN204435358 U CN 204435358U CN 201520114721 U CN201520114721 U CN 201520114721U CN 204435358 U CN204435358 U CN 204435358U
- Authority
- CN
- China
- Prior art keywords
- pile
- tubular pile
- prefabricated
- prefabricated tubular
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a kind of prefabricated pipe stake, its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.The method of attachment that device is concrete: first weld prefabricated tubular pile external surface junction, secondly welding prefabricated tubular pile inner surface, then installs connecting bolt, and the 3rd closes welding hole, the 4th grouting treatment.This method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.
Description
Technical field
The utility model relates to a kind of prefabricated tubular pile and method of attachment, belongs to construction engineering technical field.
Background technology
Along with the fast development of builing industry, prefabricated tubular pile is low with its cost of production, and reinforcement ratio is little, saving steel, and bearing capacity is large, and short construction period, the plurality of advantages such as technical difficulty is low are applied more and more extensive in builing industry.In prefabricated tubular pile use procedure, if the stake of design is long, just needs many prefabricated tubular piles and combinationally use.Current pile tube is generally tubular structure, and two ends are enclosed with steel hoop, and steel hoop surface is concordant, and can only carry out as outside weldings during welding, bonding strength is poor.This connected mode is only the link on surface, and bonding strength is poor, there is potential safety hazard.In addition because execution control is not good at, after welding completes, do not reach welding quality and require or do not reach the time interval just to proceed piling work, easily occur pile breaking phenomenon.
utility model object
The purpose of this utility model is to provide a kind of prefabricated tubular pile quick connecting method, and this pile extension method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.
The technical solution adopted in the utility model is as follows:
A kind of prefabricated pipe stake, its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
The ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved anchor bar on the ring surface of bottom.
The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
Between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
Groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
Described welding skylight hole is by arc H profile steel plate welding shutoff.
Injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
the beneficial effects of the utility model are as follows:
This prefabricated circular pile tube, upper and lower two ends are all fluted, form welding skylight, and the ring surface at prefabricated tubular pile top are provided with anchor hole, reserved anchor bar on the ring surface of bottom.Be connected with anchor hole by dowel between upper and lower pile tube, external surface is by being welded to connect, and inner surface carries out interior welds by welding skylight, ensure that weld strength, greatly reduces the appearance of broken pile.
Accompanying drawing explanation
Fig. 1 (a)-Fig. 1 (c) for the dowel hole slip casting of prefabricated tubular pile top complete after generalized section;
Fig. 2 (a)-Fig. 2 (c) is the generalized section after the upper pipe joint stake top-portion apertures injected hole of reserved steel bar insertion bottom prefabricated tubular pile;
Fig. 3 (a)-Fig. 3 (c) for prefabricated tubular pile external surface seam crossing welded after generalized section;
Fig. 4 (a)-Fig. 4 (c) for prefabricated tubular pile inner surface seam crossing welded after generalized section;
Fig. 5 (a)-Fig. 5 (c) is the generalized section after skylight hole shutoff;
Fig. 6 (a)-Fig. 6 (c) for the slip casting of pile tube inside complete after generalized section;
Fig. 7 is the schematic diagram of skylight hole shutoff steel plate;
Fig. 8 is the schematic diagram of single prefabricated tubular pile.
In figure: 1-prefabricated tubular pile; 1-1-steel hoop; 1-2-anchor hole; Injecting cement paste in 1-3 dowel hole; 1-4 anchor bar, 1-5 external surface soldered; 2-skylight hole shutoff steel plate; Injecting cement paste in 3 prefabricated tubular piles; 4-skylight hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail:
As shown in Figure 1, prefabricated tubular pile 1 is a column structure, and its cross section is circular ring section, and there is circular through hole inside;
Prefabricated tubular pile two ends are all fluted, form welding skylight hole 4 during pile extension;
Anchor hole 1-2 is arranged at prefabricated tubular pile top, and reserved anchor bar 1-4 is arranged at bottom; The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop 1-1;
As shown in Fig. 3, Fig. 4, by Jointing outside described prefabricated tubular pile, inside described prefabricated tubular pile, carry out interior welds by skylight hole; Concrete soldered external surface soldered 1-5 as shown in Figure 3, Figure 4, inner surface soldered 1-6.
The welding skylight hole of prefabricated tubular pile is finally by arc H profile steel plate welding shutoff;
After described precast pipe pile splicing, inside needs to carry out injecting treatment, be illustrated in figure 6 the inner slip casting of pile tube complete after generalized section in injecting cement paste 3 in the prefabricated tubular pile that formed.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
By reference to the accompanying drawings detailed description of the invention of the present utility model is described although above-mentioned; but the restriction not to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection domain of the present utility model.
Claims (8)
1. a prefabricated pipe stake, is characterized in that: its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
2. prefabricated pipe stake as claimed in claim 1, is characterized in that: the ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved and anchor bar on the ring surface of bottom.
3. prefabricated pipe stake as claimed in claim 2, is characterized in that: the top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
4. prefabricated pipe stake as claimed in claim 1, is characterized in that: described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
5. prefabricated pipe stake as claimed in claim 1, it is characterized in that: between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
6. prefabricated pipe stake as claimed in claim 1, is characterized in that: groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
7. prefabricated pipe stake as claimed in claim 6, is characterized in that: described welding skylight hole is by arc H profile steel plate welding shutoff.
8. prefabricated pipe stake as claimed in claim 1, is characterized in that: injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520114721.5U CN204435358U (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520114721.5U CN204435358U (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204435358U true CN204435358U (en) | 2015-07-01 |
Family
ID=53603245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520114721.5U Expired - Fee Related CN204435358U (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204435358U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652421A (en) * | 2015-02-16 | 2015-05-27 | 济南轨道交通集团有限公司 | Prefabricated round pipe pile and connecting method thereof |
CN105421460A (en) * | 2015-11-16 | 2016-03-23 | 广东工业大学 | Tubular pile bottom grouting device and method |
-
2015
- 2015-02-16 CN CN201520114721.5U patent/CN204435358U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652421A (en) * | 2015-02-16 | 2015-05-27 | 济南轨道交通集团有限公司 | Prefabricated round pipe pile and connecting method thereof |
CN105421460A (en) * | 2015-11-16 | 2016-03-23 | 广东工业大学 | Tubular pile bottom grouting device and method |
CN105421460B (en) * | 2015-11-16 | 2017-06-06 | 广东工业大学 | A kind of pile tube bottom grouting device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652421B (en) | A kind of prefabricated pipe stake and method of attachment | |
CN104674789B (en) | A kind of prefabricated square pipe pile and method of attachment | |
CN203514315U (en) | Reinforced connecting structure between pile and pile cap | |
CN103850363B (en) | Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall | |
CN102536252B (en) | Method for digging backward hole of tunnel with quite small clear distance | |
CN203977582U (en) | A kind of steel core concrete column and beam connecting node | |
CN106760054B (en) | Prefabricated reinforced concrete shear wall | |
CN108412128A (en) | A kind of connection structure of steel core concrete column | |
CN203821876U (en) | Concrete column reinforcement device | |
CN111576403A (en) | Sleeve end plate for realizing grouting connection and PHC tubular pile | |
CN204435358U (en) | A kind of prefabricated pipe stake | |
CN103046788B (en) | Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin | |
CN204456071U (en) | A kind of prefabricated square pipe pile | |
CN104196023B (en) | A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device | |
CN206360705U (en) | The major diameter New pipe curtain supporting construction constructed for underground digging in subway station | |
CN108533269A (en) | A kind of the corrugated steel concrete guard wall and construction method of extra deep shaft | |
CN209838429U (en) | Back anchor shield constructs lining cutting supporting construction | |
CN205475710U (en) | Steel -pipe column concrete jacking interface turnover device | |
CN209837117U (en) | Connecting structure of assembled structural member | |
CN215406560U (en) | Connection node of sectional type steel pipe confined concrete column and concrete beam | |
CN202881986U (en) | Single-pile vertical static test pile head steel bar connection node | |
CN203701087U (en) | Prestressed concrete uplift pipe pile | |
CN210482760U (en) | A steel bar sleeve grout connects overlap joint for assembled structure | |
CN102852167B (en) | Single-pile vertical static test pile head steel bar connection node and construction method thereof | |
CN202925975U (en) | Steel funnel for coal blending bunker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150701 Termination date: 20170216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |