CN204435358U - A kind of prefabricated pipe stake - Google Patents

A kind of prefabricated pipe stake Download PDF

Info

Publication number
CN204435358U
CN204435358U CN201520114721.5U CN201520114721U CN204435358U CN 204435358 U CN204435358 U CN 204435358U CN 201520114721 U CN201520114721 U CN 201520114721U CN 204435358 U CN204435358 U CN 204435358U
Authority
CN
China
Prior art keywords
pile
tubular pile
prefabricated
prefabricated tubular
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520114721.5U
Other languages
Chinese (zh)
Inventor
王国富
韩林
王威汐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201520114721.5U priority Critical patent/CN204435358U/en
Application granted granted Critical
Publication of CN204435358U publication Critical patent/CN204435358U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of prefabricated pipe stake, its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.The method of attachment that device is concrete: first weld prefabricated tubular pile external surface junction, secondly welding prefabricated tubular pile inner surface, then installs connecting bolt, and the 3rd closes welding hole, the 4th grouting treatment.This method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.

Description

A kind of prefabricated pipe stake
Technical field
The utility model relates to a kind of prefabricated tubular pile and method of attachment, belongs to construction engineering technical field.
Background technology
Along with the fast development of builing industry, prefabricated tubular pile is low with its cost of production, and reinforcement ratio is little, saving steel, and bearing capacity is large, and short construction period, the plurality of advantages such as technical difficulty is low are applied more and more extensive in builing industry.In prefabricated tubular pile use procedure, if the stake of design is long, just needs many prefabricated tubular piles and combinationally use.Current pile tube is generally tubular structure, and two ends are enclosed with steel hoop, and steel hoop surface is concordant, and can only carry out as outside weldings during welding, bonding strength is poor.This connected mode is only the link on surface, and bonding strength is poor, there is potential safety hazard.In addition because execution control is not good at, after welding completes, do not reach welding quality and require or do not reach the time interval just to proceed piling work, easily occur pile breaking phenomenon.
utility model object
The purpose of this utility model is to provide a kind of prefabricated tubular pile quick connecting method, and this pile extension method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.
The technical solution adopted in the utility model is as follows:
A kind of prefabricated pipe stake, its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
The ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved anchor bar on the ring surface of bottom.
The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
Between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
Groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
Described welding skylight hole is by arc H profile steel plate welding shutoff.
Injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
the beneficial effects of the utility model are as follows:
This prefabricated circular pile tube, upper and lower two ends are all fluted, form welding skylight, and the ring surface at prefabricated tubular pile top are provided with anchor hole, reserved anchor bar on the ring surface of bottom.Be connected with anchor hole by dowel between upper and lower pile tube, external surface is by being welded to connect, and inner surface carries out interior welds by welding skylight, ensure that weld strength, greatly reduces the appearance of broken pile.
Accompanying drawing explanation
Fig. 1 (a)-Fig. 1 (c) for the dowel hole slip casting of prefabricated tubular pile top complete after generalized section;
Fig. 2 (a)-Fig. 2 (c) is the generalized section after the upper pipe joint stake top-portion apertures injected hole of reserved steel bar insertion bottom prefabricated tubular pile;
Fig. 3 (a)-Fig. 3 (c) for prefabricated tubular pile external surface seam crossing welded after generalized section;
Fig. 4 (a)-Fig. 4 (c) for prefabricated tubular pile inner surface seam crossing welded after generalized section;
Fig. 5 (a)-Fig. 5 (c) is the generalized section after skylight hole shutoff;
Fig. 6 (a)-Fig. 6 (c) for the slip casting of pile tube inside complete after generalized section;
Fig. 7 is the schematic diagram of skylight hole shutoff steel plate;
Fig. 8 is the schematic diagram of single prefabricated tubular pile.
In figure: 1-prefabricated tubular pile; 1-1-steel hoop; 1-2-anchor hole; Injecting cement paste in 1-3 dowel hole; 1-4 anchor bar, 1-5 external surface soldered; 2-skylight hole shutoff steel plate; Injecting cement paste in 3 prefabricated tubular piles; 4-skylight hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in detail:
As shown in Figure 1, prefabricated tubular pile 1 is a column structure, and its cross section is circular ring section, and there is circular through hole inside;
Prefabricated tubular pile two ends are all fluted, form welding skylight hole 4 during pile extension;
Anchor hole 1-2 is arranged at prefabricated tubular pile top, and reserved anchor bar 1-4 is arranged at bottom; The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop 1-1;
As shown in Fig. 3, Fig. 4, by Jointing outside described prefabricated tubular pile, inside described prefabricated tubular pile, carry out interior welds by skylight hole; Concrete soldered external surface soldered 1-5 as shown in Figure 3, Figure 4, inner surface soldered 1-6.
The welding skylight hole of prefabricated tubular pile is finally by arc H profile steel plate welding shutoff;
After described precast pipe pile splicing, inside needs to carry out injecting treatment, be illustrated in figure 6 the inner slip casting of pile tube complete after generalized section in injecting cement paste 3 in the prefabricated tubular pile that formed.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
By reference to the accompanying drawings detailed description of the invention of the present utility model is described although above-mentioned; but the restriction not to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection domain of the present utility model.

Claims (8)

1. a prefabricated pipe stake, is characterized in that: its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
2. prefabricated pipe stake as claimed in claim 1, is characterized in that: the ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved and anchor bar on the ring surface of bottom.
3. prefabricated pipe stake as claimed in claim 2, is characterized in that: the top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
4. prefabricated pipe stake as claimed in claim 1, is characterized in that: described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
5. prefabricated pipe stake as claimed in claim 1, it is characterized in that: between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
6. prefabricated pipe stake as claimed in claim 1, is characterized in that: groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
7. prefabricated pipe stake as claimed in claim 6, is characterized in that: described welding skylight hole is by arc H profile steel plate welding shutoff.
8. prefabricated pipe stake as claimed in claim 1, is characterized in that: injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
CN201520114721.5U 2015-02-16 2015-02-16 A kind of prefabricated pipe stake Expired - Fee Related CN204435358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520114721.5U CN204435358U (en) 2015-02-16 2015-02-16 A kind of prefabricated pipe stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520114721.5U CN204435358U (en) 2015-02-16 2015-02-16 A kind of prefabricated pipe stake

Publications (1)

Publication Number Publication Date
CN204435358U true CN204435358U (en) 2015-07-01

Family

ID=53603245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520114721.5U Expired - Fee Related CN204435358U (en) 2015-02-16 2015-02-16 A kind of prefabricated pipe stake

Country Status (1)

Country Link
CN (1) CN204435358U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652421A (en) * 2015-02-16 2015-05-27 济南轨道交通集团有限公司 Prefabricated round pipe pile and connecting method thereof
CN105421460A (en) * 2015-11-16 2016-03-23 广东工业大学 Tubular pile bottom grouting device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652421A (en) * 2015-02-16 2015-05-27 济南轨道交通集团有限公司 Prefabricated round pipe pile and connecting method thereof
CN105421460A (en) * 2015-11-16 2016-03-23 广东工业大学 Tubular pile bottom grouting device and method
CN105421460B (en) * 2015-11-16 2017-06-06 广东工业大学 A kind of pile tube bottom grouting device and method

Similar Documents

Publication Publication Date Title
CN104652421B (en) A kind of prefabricated pipe stake and method of attachment
CN104674789B (en) A kind of prefabricated square pipe pile and method of attachment
CN203514315U (en) Reinforced connecting structure between pile and pile cap
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN102536252B (en) Method for digging backward hole of tunnel with quite small clear distance
CN203977582U (en) A kind of steel core concrete column and beam connecting node
CN106760054B (en) Prefabricated reinforced concrete shear wall
CN108412128A (en) A kind of connection structure of steel core concrete column
CN203821876U (en) Concrete column reinforcement device
CN111576403A (en) Sleeve end plate for realizing grouting connection and PHC tubular pile
CN204435358U (en) A kind of prefabricated pipe stake
CN103046788B (en) Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN204456071U (en) A kind of prefabricated square pipe pile
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN206360705U (en) The major diameter New pipe curtain supporting construction constructed for underground digging in subway station
CN108533269A (en) A kind of the corrugated steel concrete guard wall and construction method of extra deep shaft
CN209838429U (en) Back anchor shield constructs lining cutting supporting construction
CN205475710U (en) Steel -pipe column concrete jacking interface turnover device
CN209837117U (en) Connecting structure of assembled structural member
CN215406560U (en) Connection node of sectional type steel pipe confined concrete column and concrete beam
CN202881986U (en) Single-pile vertical static test pile head steel bar connection node
CN203701087U (en) Prestressed concrete uplift pipe pile
CN210482760U (en) A steel bar sleeve grout connects overlap joint for assembled structure
CN102852167B (en) Single-pile vertical static test pile head steel bar connection node and construction method thereof
CN202925975U (en) Steel funnel for coal blending bunker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20170216

CF01 Termination of patent right due to non-payment of annual fee