CN104652421A - Prefabricated round pipe pile and connecting method thereof - Google Patents

Prefabricated round pipe pile and connecting method thereof Download PDF

Info

Publication number
CN104652421A
CN104652421A CN201510084856.6A CN201510084856A CN104652421A CN 104652421 A CN104652421 A CN 104652421A CN 201510084856 A CN201510084856 A CN 201510084856A CN 104652421 A CN104652421 A CN 104652421A
Authority
CN
China
Prior art keywords
pile
prefabricated
pipe pile
hole
prefabricated tubular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510084856.6A
Other languages
Chinese (zh)
Other versions
CN104652421B (en
Inventor
王国富
王威汐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201510084856.6A priority Critical patent/CN104652421B/en
Publication of CN104652421A publication Critical patent/CN104652421A/en
Application granted granted Critical
Publication of CN104652421B publication Critical patent/CN104652421B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a prefabricated round pipe pile and a connecting method thereof. A cross section of the prefabricated round pipe pile is a circular ring-shaped cross section, a round through hole coaxial with the pipe pile is arranged inside the prefabricated round pipe pile, the two ends of the prefabricated round pipe pile are provided with mutually symmetrical hole grooves used for forming welding skylights during pile connection, and the prefabricated pipe pile positioned in the upper layer is inserted into a top anchor hole of a lower layer prefabricated pipe pile through a bottom anchoring steel bar for anchoring connection. The concrete connecting method of the device comprises the following steps that firstly, an outer surface connecting part of the prefabricated pipe pile is welded, then, the inner surface of the prefabricated pipe pile is welded, next, a connecting screw bolt is installed, thirdly, a welding hole is sealed, and fourthly, grouting treatment is carried out. The method has the advantages that on the premise of not prolonging the pile connecting time, the connecting intensity of the prefabricated pipe pile is greatly improved, and the pile fracturing phenomenon in the file pressing process is effectively avoided.

Description

A kind of prefabricated pipe stake and method of attachment
Technical field
The present invention relates to a kind of prefabricated tubular pile and method of attachment, belong to construction engineering technical field.
Background technology
Along with the fast development of builing industry, prefabricated tubular pile is low with its cost of production, and reinforcement ratio is little, saving steel, and bearing capacity is large, and short construction period, the plurality of advantages such as technical difficulty is low are applied more and more extensive in builing industry.In prefabricated tubular pile use procedure, if the stake of design is long, just needs many prefabricated tubular piles and combinationally use.Current pile tube is generally tubular structure, and two ends are enclosed with steel hoop, and steel hoop surface is concordant, and can only carry out as outside weldings during welding, bonding strength is poor.This connected mode is only the link on surface, and bonding strength is poor, there is potential safety hazard.In addition because execution control is not good at, after welding completes, do not reach welding quality and require or do not reach the time interval just to proceed piling work, easily occur pile breaking phenomenon.
Summary of the invention
The object of the present invention is to provide a kind of prefabricated tubular pile quick connecting method, this pile extension method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.
The technical solution used in the present invention is as follows:
A kind of prefabricated pipe stake, its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
The ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved anchor bar on the ring surface of bottom.
The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
Between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
Groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
Described welding skylight hole is by arc H profile steel plate welding shutoff.
Injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
Beneficial effect of the present invention is as follows:
This prefabricated circular pile tube, upper and lower two ends are all fluted, form welding skylight, and the ring surface at prefabricated tubular pile top are provided with anchor hole, reserved anchor bar on the ring surface of bottom.Be connected with anchor hole by dowel between upper and lower pile tube, external surface is by being welded to connect, and inner surface carries out interior welds by welding skylight, ensure that weld strength, greatly reduces the appearance of broken pile.
Accompanying drawing explanation
Fig. 1 (a)-Fig. 1 (c) for the dowel hole slip casting of prefabricated tubular pile top complete after generalized section;
Fig. 2 (a)-Fig. 2 (c) is the generalized section after the upper pipe joint stake top-portion apertures injected hole of reserved steel bar insertion bottom prefabricated tubular pile;
Fig. 3 (a)-Fig. 3 (c) for prefabricated tubular pile external surface seam crossing welded after generalized section;
Fig. 4 (a)-Fig. 4 (c) for prefabricated tubular pile inner surface seam crossing welded after generalized section;
Fig. 5 (a)-Fig. 5 (c) is the generalized section after skylight hole shutoff;
Fig. 6 (a)-Fig. 6 (c) for the slip casting of pile tube inside complete after generalized section;
Fig. 7 is the schematic diagram of skylight hole shutoff steel plate;
Fig. 8 is the schematic diagram of single prefabricated tubular pile.
In figure: 1-prefabricated tubular pile; 1-1-steel hoop; 1-2-anchor hole; Injecting cement paste in 1-3 dowel hole; 1-4 anchor bar, 1-5 external surface soldered; 2-skylight hole shutoff steel plate; Injecting cement paste in 3 prefabricated tubular piles; 4-skylight hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail:
As shown in Figure 1, prefabricated tubular pile 1 is a column structure, and its cross section is circular ring section, and there is circular through hole inside; Prefabricated tubular pile two ends are all fluted, form welding skylight hole 4 during pile extension;
Anchor hole 1-2 is arranged at prefabricated tubular pile top, and reserved anchor bar 1-4 is arranged at bottom; The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop 1-1;
As shown in Fig. 3, Fig. 4, by Jointing outside described prefabricated tubular pile, inside described prefabricated tubular pile, carry out interior welds by skylight hole; Concrete soldered external surface soldered 1-5 as shown in Figure 3, Figure 4, inner surface soldered 1-6.
The welding skylight hole of prefabricated tubular pile is finally by arc H profile steel plate welding shutoff;
After described precast pipe pile splicing, inside needs to carry out injecting treatment, be illustrated in figure 6 the inner slip casting of pile tube complete after generalized section in injecting cement paste 3 in the prefabricated tubular pile that formed.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (9)

1. a prefabricated pipe stake, is characterized in that: its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
2. prefabricated pipe stake as claimed in claim 1, is characterized in that: the ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved and anchor bar on the ring surface of bottom.
3. prefabricated pipe stake as claimed in claim 2, is characterized in that: the top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
4. prefabricated pipe stake as claimed in claim 1, is characterized in that: described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
5. prefabricated pipe stake as claimed in claim 1, it is characterized in that: between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
6. prefabricated pipe stake as claimed in claim 1, is characterized in that: groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
7. prefabricated pipe stake as claimed in claim 6, is characterized in that: described welding skylight hole is by arc H profile steel plate welding shutoff.
8. prefabricated pipe stake as claimed in claim 1, is characterized in that: injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
9. the method for attachment of prefabricated pipe stake as claimed in claim 1, is characterized in that, as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
CN201510084856.6A 2015-02-16 2015-02-16 A kind of prefabricated pipe stake and method of attachment Active CN104652421B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510084856.6A CN104652421B (en) 2015-02-16 2015-02-16 A kind of prefabricated pipe stake and method of attachment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510084856.6A CN104652421B (en) 2015-02-16 2015-02-16 A kind of prefabricated pipe stake and method of attachment

Publications (2)

Publication Number Publication Date
CN104652421A true CN104652421A (en) 2015-05-27
CN104652421B CN104652421B (en) 2016-11-30

Family

ID=53244015

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510084856.6A Active CN104652421B (en) 2015-02-16 2015-02-16 A kind of prefabricated pipe stake and method of attachment

Country Status (1)

Country Link
CN (1) CN104652421B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759304A (en) * 2017-03-23 2017-05-31 广州市建筑科学研究院新技术开发中心有限公司 A kind of new Quick Connect Kit and method for drilling follow pile tube
CN106917403A (en) * 2017-03-21 2017-07-04 中冶成都勘察研究总院有限公司 A kind of novel foundation pile of efficient rapid construction
CN107034875A (en) * 2017-03-22 2017-08-11 深圳市福田建安建设集团有限公司 A kind of circular test pile of assembled and preparation method
CN108867635A (en) * 2018-09-18 2018-11-23 赵文富 A kind of prestressing steel pipe concrete pipe pile
CN109083130A (en) * 2018-08-16 2018-12-25 滨州学院 A kind of quick coupling of armored concrete prefabricated tubular pile
CN109208583A (en) * 2018-09-27 2019-01-15 陈溯源 A kind of precast pipe pile splicing multi-section reinforced joint structure
CN109339040A (en) * 2018-11-19 2019-02-15 宁波大学 Prefabricated taper pipe wall opening hollow pile and its pile extension method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2296365Y (en) * 1996-11-21 1998-11-04 曹沂风 Pile forming device for various section hollow pile
JP2001011871A (en) * 1999-06-28 2001-01-16 Masayo Tanaka Pile head end structure by projecting metal fixture of precast pile
JP2006016777A (en) * 2004-06-30 2006-01-19 Tama Engineering Kk Rotatingly press-fitted pile
CN202012075U (en) * 2011-03-05 2011-10-19 广州市建筑科学研究院有限公司 Fast connection device of prestressed concrete pipe pile
CN202175946U (en) * 2011-07-04 2012-03-28 张跃民 Pipe pile without steel end plate
CN102971464A (en) * 2010-06-18 2013-03-13 宋奇镛 Complex pile, and method for fabricating the complex pile
CN204435358U (en) * 2015-02-16 2015-07-01 济南轨道交通集团有限公司 A kind of prefabricated pipe stake

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2296365Y (en) * 1996-11-21 1998-11-04 曹沂风 Pile forming device for various section hollow pile
JP2001011871A (en) * 1999-06-28 2001-01-16 Masayo Tanaka Pile head end structure by projecting metal fixture of precast pile
JP2006016777A (en) * 2004-06-30 2006-01-19 Tama Engineering Kk Rotatingly press-fitted pile
CN102971464A (en) * 2010-06-18 2013-03-13 宋奇镛 Complex pile, and method for fabricating the complex pile
CN202012075U (en) * 2011-03-05 2011-10-19 广州市建筑科学研究院有限公司 Fast connection device of prestressed concrete pipe pile
CN202175946U (en) * 2011-07-04 2012-03-28 张跃民 Pipe pile without steel end plate
CN204435358U (en) * 2015-02-16 2015-07-01 济南轨道交通集团有限公司 A kind of prefabricated pipe stake

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106917403A (en) * 2017-03-21 2017-07-04 中冶成都勘察研究总院有限公司 A kind of novel foundation pile of efficient rapid construction
CN107034875A (en) * 2017-03-22 2017-08-11 深圳市福田建安建设集团有限公司 A kind of circular test pile of assembled and preparation method
CN106759304A (en) * 2017-03-23 2017-05-31 广州市建筑科学研究院新技术开发中心有限公司 A kind of new Quick Connect Kit and method for drilling follow pile tube
CN109083130A (en) * 2018-08-16 2018-12-25 滨州学院 A kind of quick coupling of armored concrete prefabricated tubular pile
CN108867635A (en) * 2018-09-18 2018-11-23 赵文富 A kind of prestressing steel pipe concrete pipe pile
CN108867635B (en) * 2018-09-18 2020-07-07 浙江正大管桩有限公司 Prestressed steel pipe concrete tubular pile
CN109208583A (en) * 2018-09-27 2019-01-15 陈溯源 A kind of precast pipe pile splicing multi-section reinforced joint structure
CN109339040A (en) * 2018-11-19 2019-02-15 宁波大学 Prefabricated taper pipe wall opening hollow pile and its pile extension method
CN109339040B (en) * 2018-11-19 2023-12-01 喀什市市政建设工程有限责任公司 Prefabricated wedge-shaped pipe wall opening hollow pile and pile splicing method thereof

Also Published As

Publication number Publication date
CN104652421B (en) 2016-11-30

Similar Documents

Publication Publication Date Title
CN104652421A (en) Prefabricated round pipe pile and connecting method thereof
CN104674789B (en) A kind of prefabricated square pipe pile and method of attachment
CN203514315U (en) Reinforced connecting structure between pile and pile cap
CN106760054B (en) Prefabricated reinforced concrete shear wall
CN111576403B (en) Pile splicing structure and bearing platform anchoring structure using PHC tubular pile
CN105201530A (en) Repairing and strengthening method for large cracks on rock tunnel lining
CN108130911A (en) Upright controling slip casting steel floral tube bar planting mini pile and its construction method
CN111119410A (en) Column splicing structure and method suitable for reinforced concrete assembled structure
CN204435358U (en) A kind of prefabricated pipe stake
CN212077915U (en) Pile extension connecting device for steel-bottom mixed variable-section combined piles with different diameters
CN104762967B (en) The envelope stake device of the anchor jacked pile of a kind of improvement and construction method
CN104563101A (en) Composite pile structure serving as main structure stand column and construction method thereof
CN103410529B (en) A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN204456071U (en) A kind of prefabricated square pipe pile
CN108533269A (en) A kind of the corrugated steel concrete guard wall and construction method of extra deep shaft
CN206128081U (en) Prefabricated guan liang
CN205475710U (en) Steel -pipe column concrete jacking interface turnover device
CN204418167U (en) A kind of novel slurry filling pile body structure
CN203701087U (en) Prestressed concrete uplift pipe pile
CN206829149U (en) A kind of stand column pile combining structure
CN210482760U (en) A steel bar sleeve grout connects overlap joint for assembled structure
CN202881986U (en) Single-pile vertical static test pile head steel bar connection node
CN111022084B (en) Single arch truss of primary support for excavating large-section loess tunnel and method
CN204570997U (en) The horizontal piece linkage of a kind of fabricated shear wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant