CN104652421A - Prefabricated round pipe pile and connecting method thereof - Google Patents
Prefabricated round pipe pile and connecting method thereof Download PDFInfo
- Publication number
- CN104652421A CN104652421A CN201510084856.6A CN201510084856A CN104652421A CN 104652421 A CN104652421 A CN 104652421A CN 201510084856 A CN201510084856 A CN 201510084856A CN 104652421 A CN104652421 A CN 104652421A
- Authority
- CN
- China
- Prior art keywords
- pile
- prefabricated
- pipe pile
- hole
- prefabricated tubular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000003466 welding Methods 0.000 claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 210000004262 dental pulp cavity Anatomy 0.000 claims description 18
- 238000007569 slipcasting Methods 0.000 claims description 6
- 238000004873 anchoring Methods 0.000 abstract 2
- 239000004568 cement Substances 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
- E02D5/665—Mould-pipes or other moulds for making piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a prefabricated round pipe pile and a connecting method thereof. A cross section of the prefabricated round pipe pile is a circular ring-shaped cross section, a round through hole coaxial with the pipe pile is arranged inside the prefabricated round pipe pile, the two ends of the prefabricated round pipe pile are provided with mutually symmetrical hole grooves used for forming welding skylights during pile connection, and the prefabricated pipe pile positioned in the upper layer is inserted into a top anchor hole of a lower layer prefabricated pipe pile through a bottom anchoring steel bar for anchoring connection. The concrete connecting method of the device comprises the following steps that firstly, an outer surface connecting part of the prefabricated pipe pile is welded, then, the inner surface of the prefabricated pipe pile is welded, next, a connecting screw bolt is installed, thirdly, a welding hole is sealed, and fourthly, grouting treatment is carried out. The method has the advantages that on the premise of not prolonging the pile connecting time, the connecting intensity of the prefabricated pipe pile is greatly improved, and the pile fracturing phenomenon in the file pressing process is effectively avoided.
Description
Technical field
The present invention relates to a kind of prefabricated tubular pile and method of attachment, belong to construction engineering technical field.
Background technology
Along with the fast development of builing industry, prefabricated tubular pile is low with its cost of production, and reinforcement ratio is little, saving steel, and bearing capacity is large, and short construction period, the plurality of advantages such as technical difficulty is low are applied more and more extensive in builing industry.In prefabricated tubular pile use procedure, if the stake of design is long, just needs many prefabricated tubular piles and combinationally use.Current pile tube is generally tubular structure, and two ends are enclosed with steel hoop, and steel hoop surface is concordant, and can only carry out as outside weldings during welding, bonding strength is poor.This connected mode is only the link on surface, and bonding strength is poor, there is potential safety hazard.In addition because execution control is not good at, after welding completes, do not reach welding quality and require or do not reach the time interval just to proceed piling work, easily occur pile breaking phenomenon.
Summary of the invention
The object of the present invention is to provide a kind of prefabricated tubular pile quick connecting method, this pile extension method, under the prerequisite not extending the pile extension time, substantially increases the bonding strength of prefabricated tubular pile, effectively prevent the pile breaking phenomenon occurred in piling process.
The technical solution used in the present invention is as follows:
A kind of prefabricated pipe stake, its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
The ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved anchor bar on the ring surface of bottom.
The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
Between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
Groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
Described welding skylight hole is by arc H profile steel plate welding shutoff.
Injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
Beneficial effect of the present invention is as follows:
This prefabricated circular pile tube, upper and lower two ends are all fluted, form welding skylight, and the ring surface at prefabricated tubular pile top are provided with anchor hole, reserved anchor bar on the ring surface of bottom.Be connected with anchor hole by dowel between upper and lower pile tube, external surface is by being welded to connect, and inner surface carries out interior welds by welding skylight, ensure that weld strength, greatly reduces the appearance of broken pile.
Accompanying drawing explanation
Fig. 1 (a)-Fig. 1 (c) for the dowel hole slip casting of prefabricated tubular pile top complete after generalized section;
Fig. 2 (a)-Fig. 2 (c) is the generalized section after the upper pipe joint stake top-portion apertures injected hole of reserved steel bar insertion bottom prefabricated tubular pile;
Fig. 3 (a)-Fig. 3 (c) for prefabricated tubular pile external surface seam crossing welded after generalized section;
Fig. 4 (a)-Fig. 4 (c) for prefabricated tubular pile inner surface seam crossing welded after generalized section;
Fig. 5 (a)-Fig. 5 (c) is the generalized section after skylight hole shutoff;
Fig. 6 (a)-Fig. 6 (c) for the slip casting of pile tube inside complete after generalized section;
Fig. 7 is the schematic diagram of skylight hole shutoff steel plate;
Fig. 8 is the schematic diagram of single prefabricated tubular pile.
In figure: 1-prefabricated tubular pile; 1-1-steel hoop; 1-2-anchor hole; Injecting cement paste in 1-3 dowel hole; 1-4 anchor bar, 1-5 external surface soldered; 2-skylight hole shutoff steel plate; Injecting cement paste in 3 prefabricated tubular piles; 4-skylight hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail:
As shown in Figure 1, prefabricated tubular pile 1 is a column structure, and its cross section is circular ring section, and there is circular through hole inside; Prefabricated tubular pile two ends are all fluted, form welding skylight hole 4 during pile extension;
Anchor hole 1-2 is arranged at prefabricated tubular pile top, and reserved anchor bar 1-4 is arranged at bottom; The top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
Described prefabricated tubular pile two ends groove is all wrapped up by steel hoop 1-1;
As shown in Fig. 3, Fig. 4, by Jointing outside described prefabricated tubular pile, inside described prefabricated tubular pile, carry out interior welds by skylight hole; Concrete soldered external surface soldered 1-5 as shown in Figure 3, Figure 4, inner surface soldered 1-6.
The welding skylight hole of prefabricated tubular pile is finally by arc H profile steel plate welding shutoff;
After described precast pipe pile splicing, inside needs to carry out injecting treatment, be illustrated in figure 6 the inner slip casting of pile tube complete after generalized section in injecting cement paste 3 in the prefabricated tubular pile that formed.
The concrete method of attachment of said apparatus is as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.
Claims (9)
1. a prefabricated pipe stake, is characterized in that: its cross section is circular ring section, is provided with the manhole with pile tube coaxial line therein, is provided with symmetrical and for forming welding skylight hole groove during pile extension at the two ends of prefabricated tubular pile.
2. prefabricated pipe stake as claimed in claim 1, is characterized in that: the ring surface at described prefabricated tubular pile top is provided with anchor hole, reserved and anchor bar on the ring surface of bottom.
3. prefabricated pipe stake as claimed in claim 2, is characterized in that: the top anchor hole that the prefabricated tubular pile being positioned at upper strata inserts lower floor's prefabricated tubular pile by the anchor bar of bottom carries out anchor connection.
4. prefabricated pipe stake as claimed in claim 1, is characterized in that: described prefabricated tubular pile two ends groove is all wrapped up by steel hoop.
5. prefabricated pipe stake as claimed in claim 1, it is characterized in that: between adjacent prefabricated tubular pile, Jointing is passed through in its outer ring; Its inner ring carries out interior welds by skylight hole.
6. prefabricated pipe stake as claimed in claim 1, is characterized in that: groove mutually corresponding between adjacent prefabricated tubular pile forms welding skylight hole.
7. prefabricated pipe stake as claimed in claim 6, is characterized in that: described welding skylight hole is by arc H profile steel plate welding shutoff.
8. prefabricated pipe stake as claimed in claim 1, is characterized in that: injecting treatment is carried out in described prefabricated tubular pile inside after pile extension completes.
9. the method for attachment of prefabricated pipe stake as claimed in claim 1, is characterized in that, as follows:
Step 1, be pressed into below ground according to after the true fixed pile of designing requirement through the first root canal pile, more than ground, reserved about 1m carries out pile extension;
Step 2, lift the second root canal pile, slip casting in anchor hole, by the dowel of the second root canal pile and the first root canal pile and anchor hole anchor connection, and ensure verticality;
Step 3, the external surface of upper and lower two root canal piles to be welded;
Step 4, by two root canal pile stake end grooves formed welding skylight opening carry out pile tube interior welds;
Step 5, employing circular arc H profile steel plate shutoff welding skylight;
Step 6, carry out next step piling work;
Step 7, repetition above-mentioned steps 1-6, until reach design elevation;
Step 8, finally carry out the inner grouting treatment of pile tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510084856.6A CN104652421B (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake and method of attachment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510084856.6A CN104652421B (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake and method of attachment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104652421A true CN104652421A (en) | 2015-05-27 |
CN104652421B CN104652421B (en) | 2016-11-30 |
Family
ID=53244015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510084856.6A Active CN104652421B (en) | 2015-02-16 | 2015-02-16 | A kind of prefabricated pipe stake and method of attachment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104652421B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759304A (en) * | 2017-03-23 | 2017-05-31 | 广州市建筑科学研究院新技术开发中心有限公司 | A kind of new Quick Connect Kit and method for drilling follow pile tube |
CN106917403A (en) * | 2017-03-21 | 2017-07-04 | 中冶成都勘察研究总院有限公司 | A kind of novel foundation pile of efficient rapid construction |
CN107034875A (en) * | 2017-03-22 | 2017-08-11 | 深圳市福田建安建设集团有限公司 | A kind of circular test pile of assembled and preparation method |
CN108867635A (en) * | 2018-09-18 | 2018-11-23 | 赵文富 | A kind of prestressing steel pipe concrete pipe pile |
CN109083130A (en) * | 2018-08-16 | 2018-12-25 | 滨州学院 | A kind of quick coupling of armored concrete prefabricated tubular pile |
CN109208583A (en) * | 2018-09-27 | 2019-01-15 | 陈溯源 | A kind of precast pipe pile splicing multi-section reinforced joint structure |
CN109339040A (en) * | 2018-11-19 | 2019-02-15 | 宁波大学 | Prefabricated taper pipe wall opening hollow pile and its pile extension method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2296365Y (en) * | 1996-11-21 | 1998-11-04 | 曹沂风 | Pile forming device for various section hollow pile |
JP2001011871A (en) * | 1999-06-28 | 2001-01-16 | Masayo Tanaka | Pile head end structure by projecting metal fixture of precast pile |
JP2006016777A (en) * | 2004-06-30 | 2006-01-19 | Tama Engineering Kk | Rotatingly press-fitted pile |
CN202012075U (en) * | 2011-03-05 | 2011-10-19 | 广州市建筑科学研究院有限公司 | Fast connection device of prestressed concrete pipe pile |
CN202175946U (en) * | 2011-07-04 | 2012-03-28 | 张跃民 | Pipe pile without steel end plate |
CN102971464A (en) * | 2010-06-18 | 2013-03-13 | 宋奇镛 | Complex pile, and method for fabricating the complex pile |
CN204435358U (en) * | 2015-02-16 | 2015-07-01 | 济南轨道交通集团有限公司 | A kind of prefabricated pipe stake |
-
2015
- 2015-02-16 CN CN201510084856.6A patent/CN104652421B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2296365Y (en) * | 1996-11-21 | 1998-11-04 | 曹沂风 | Pile forming device for various section hollow pile |
JP2001011871A (en) * | 1999-06-28 | 2001-01-16 | Masayo Tanaka | Pile head end structure by projecting metal fixture of precast pile |
JP2006016777A (en) * | 2004-06-30 | 2006-01-19 | Tama Engineering Kk | Rotatingly press-fitted pile |
CN102971464A (en) * | 2010-06-18 | 2013-03-13 | 宋奇镛 | Complex pile, and method for fabricating the complex pile |
CN202012075U (en) * | 2011-03-05 | 2011-10-19 | 广州市建筑科学研究院有限公司 | Fast connection device of prestressed concrete pipe pile |
CN202175946U (en) * | 2011-07-04 | 2012-03-28 | 张跃民 | Pipe pile without steel end plate |
CN204435358U (en) * | 2015-02-16 | 2015-07-01 | 济南轨道交通集团有限公司 | A kind of prefabricated pipe stake |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106917403A (en) * | 2017-03-21 | 2017-07-04 | 中冶成都勘察研究总院有限公司 | A kind of novel foundation pile of efficient rapid construction |
CN107034875A (en) * | 2017-03-22 | 2017-08-11 | 深圳市福田建安建设集团有限公司 | A kind of circular test pile of assembled and preparation method |
CN106759304A (en) * | 2017-03-23 | 2017-05-31 | 广州市建筑科学研究院新技术开发中心有限公司 | A kind of new Quick Connect Kit and method for drilling follow pile tube |
CN109083130A (en) * | 2018-08-16 | 2018-12-25 | 滨州学院 | A kind of quick coupling of armored concrete prefabricated tubular pile |
CN108867635A (en) * | 2018-09-18 | 2018-11-23 | 赵文富 | A kind of prestressing steel pipe concrete pipe pile |
CN108867635B (en) * | 2018-09-18 | 2020-07-07 | 浙江正大管桩有限公司 | Prestressed steel pipe concrete tubular pile |
CN109208583A (en) * | 2018-09-27 | 2019-01-15 | 陈溯源 | A kind of precast pipe pile splicing multi-section reinforced joint structure |
CN109339040A (en) * | 2018-11-19 | 2019-02-15 | 宁波大学 | Prefabricated taper pipe wall opening hollow pile and its pile extension method |
CN109339040B (en) * | 2018-11-19 | 2023-12-01 | 喀什市市政建设工程有限责任公司 | Prefabricated wedge-shaped pipe wall opening hollow pile and pile splicing method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN104652421B (en) | 2016-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104652421A (en) | Prefabricated round pipe pile and connecting method thereof | |
CN104674789B (en) | A kind of prefabricated square pipe pile and method of attachment | |
CN203514315U (en) | Reinforced connecting structure between pile and pile cap | |
CN106760054B (en) | Prefabricated reinforced concrete shear wall | |
CN111576403B (en) | Pile splicing structure and bearing platform anchoring structure using PHC tubular pile | |
CN105201530A (en) | Repairing and strengthening method for large cracks on rock tunnel lining | |
CN108130911A (en) | Upright controling slip casting steel floral tube bar planting mini pile and its construction method | |
CN111119410A (en) | Column splicing structure and method suitable for reinforced concrete assembled structure | |
CN204435358U (en) | A kind of prefabricated pipe stake | |
CN212077915U (en) | Pile extension connecting device for steel-bottom mixed variable-section combined piles with different diameters | |
CN104762967B (en) | The envelope stake device of the anchor jacked pile of a kind of improvement and construction method | |
CN104563101A (en) | Composite pile structure serving as main structure stand column and construction method thereof | |
CN103410529B (en) | A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method | |
CN104196023B (en) | A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device | |
CN204456071U (en) | A kind of prefabricated square pipe pile | |
CN108533269A (en) | A kind of the corrugated steel concrete guard wall and construction method of extra deep shaft | |
CN206128081U (en) | Prefabricated guan liang | |
CN205475710U (en) | Steel -pipe column concrete jacking interface turnover device | |
CN204418167U (en) | A kind of novel slurry filling pile body structure | |
CN203701087U (en) | Prestressed concrete uplift pipe pile | |
CN206829149U (en) | A kind of stand column pile combining structure | |
CN210482760U (en) | A steel bar sleeve grout connects overlap joint for assembled structure | |
CN202881986U (en) | Single-pile vertical static test pile head steel bar connection node | |
CN111022084B (en) | Single arch truss of primary support for excavating large-section loess tunnel and method | |
CN204570997U (en) | The horizontal piece linkage of a kind of fabricated shear wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |