CN202175946U - Pipe pile without steel end plate - Google Patents

Pipe pile without steel end plate Download PDF

Info

Publication number
CN202175946U
CN202175946U CN2011202325635U CN201120232563U CN202175946U CN 202175946 U CN202175946 U CN 202175946U CN 2011202325635 U CN2011202325635 U CN 2011202325635U CN 201120232563 U CN201120232563 U CN 201120232563U CN 202175946 U CN202175946 U CN 202175946U
Authority
CN
China
Prior art keywords
plate
butt joint
pile
stretch
tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202325635U
Other languages
Chinese (zh)
Inventor
张跃民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202325635U priority Critical patent/CN202175946U/en
Application granted granted Critical
Publication of CN202175946U publication Critical patent/CN202175946U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A pipe pile without a steel end plate at least comprises a bottom section pile and an upper section pile. Two ends of the bottom section pile and two ends of the upper section pile are respectively provided with a concrete pile head plate. The concrete pile head plate comprises a peripheral plate, and a pile head solid body poured by reinforced concrete is arranged in the peripheral plate. A main rib anchor pipe and a tensioning butt joint pipe are precast in the pile head solid body. The inner end of the tensioning butt joint pipe is provided with a pipe plug, the outer end of the tensioning butt joint pipe is provided with a tensioning butt joint pipe hole, the concrete pile head plate arranged at the lower end of the upper section pile is an upper butt joint plate, and the concrete pile head plate arranged at the upper end of the bottom section pile is a lower butt joint plate. An anchor column is arranged in the tensioning butt joint pipe hole of the tensioning butt joint pipe in the upper butt joint plate, the lower section of the anchor column is an anchoring section, the anchoring section is provided with an expansion gap, and a cone-shaped anchoring supporting block matched with the anchoring section expansion gap is arranged in a butt joint pipe in the lower butt joint pipe. The pipe pile without the steel end plate adopts a novel pipe pile production and onsite construction butt joint mode, replaces an original steel end plate with the precast concrete pile head plate, achieves fast anchoring connection between two sections of columns, and reaches the aims of high saving, high environment protection, high efficiency and high quality.

Description

No steel end plate pile tube
Technical field
The utility model relates to the foundation construction technology of a kind of building and structure, is used for the production and the site operation of pre-stress hollow pile tube, particularly a kind of no steel end plate pile tube.
Background technology
Pile for prestressed pipe has occupied the whole market of worker China Democratic National Construction Association pile foundation at present basically, and use has a large capacity and a wide range, and pile tube is generally formed by two sections butt joints; All there is steel plate at the pile cutoff two ends when manufacturing; General 18 ~ 22mm is thick, and the effect of steel plate has four: 1, the anchoring presstressed reinforcing steel, and main muscle passes through passage in the stretch-draw hole; Insert in another aperture, the anchor head that utilizes main muscle end to enlarge is stuck in the aperture.2, steel plate links together two pile sections through welding.3, the end plate back side is connected with the pile crown reinforcing rib through welding.4, coxopodite stake bottom plate and the welding of piling bar point (concrete stake point directly inserts no rigid connection the in the stake hole).
Pile tube uses the steel end plate to have following drawback:
1, consume great deal of steel, φ 500 is an example with the stake footpath, and every site operation adds up to 171 kg with welding rod 6.73 kg with steel plate 164 kg, and the civilian construction that one five unit is six layers are measured about 260 with stake, then consume 30.42 tons of steel.
2, weldquality has hidden danger; Weld interval is long, and field Welding can't be supervised, and the slag inclusion space is uncontrollable; Detecting the stake that goes wrong when checking and accepting all is in welded joints; It was injection in 8 minutes that weld seam is accomplished the anticorrosion cooling of mopping, anticorrosion cutting little ice, and can weld seam reach 50 years quality guarantee period, and who can hardly be explained.It is efficient at last to accomplish 14 piles in 11 hours, calculates in view of the above, and 50 minutes every pile times spent, welding, cooling just accounted for 30-40 minute, were restricting piling efficient.
3, the end plate processing cost is high, car, bore, mill, tapping all needs specialized operation, general pile tube factory impotentia is processed, the manufacturer that has practises fraud, and cylinder iron replaces the Q235 steel, has had a strong impact on welding quality.
When 4, small strain detects the integrality of stake, because steel plate material is compared Material Strength with intensity with concrete and differed greatly, according to regulation, be not suitable for doing the condition of small strain, small strain detects and has cloudy ideas.
5, stretch-draw hole and main muscle anchor hole all have the passage of a width greater than main muscle diameter, and this can cut down main sinew anchor head is stressed, and two Kong Jiayi grooves cause steel plate that weak link is arranged simultaneously, when welding, are easy to generate distortion.
Summary of the invention
The technical problem that the utility model will solve is the deficiency to prior art, the no steel end plate pile tube that proposed a kind ofly to realize rapid abutting joint, practice thrift steel, quality is high, efficient is high.
The technical problem that the utility model will solve realizes through following technical scheme; A kind of no steel end plate pile tube comprises coxopodite stake and last joint stake at least, is characterized in: the coxopodite stake with on the two ends of joint stake be equipped with concrete pile crown plate; Concrete pile crown plate comprises peripheral board; In peripheral board, be provided with the pile crown entity of steel concrete cast, in the pile crown entity, be embedded with and the main one to one muscle anchor tube of main muscle, between every two adjacent main muscle anchor tubes, be equipped with the stretch-draw butt tube; The inner of stretch-draw butt tube is provided with plug, and the outer end of stretch-draw butt tube is provided with stretch-draw butt joint silk hole.
The concrete pile crown plate of last joint stake lower end is the butt joint upper plate; The concrete pile crown plate of coxopodite stake upper end is the butt joint lower plate; In the stretch-draw butt joint silk hole of the stretch-draw butt tube in the butt joint upper plate anchor post is housed; The hypomere of anchor post is an anchoring section, and anchoring section has dilatation joint, is provided with the taper anchoring bracer that cooperates with the anchoring section dilatation joint in the butt tube in the butt joint lower plate.
The technical problem that the utility model will solve can also realize that further the outer end of main muscle anchor tube is provided with the stretch-draw holder of main muscle end cap through following technical scheme, stretch-draw holder symmetry be provided with left and right sides two halves.
The technical problem that the utility model will solve can also further realized, is fixedly connected with reinforcing rib on the plug of the inner of stretch-draw butt tube through following technical scheme.
The technical problem that the utility model will solve can also realize that further the upper end of taper anchoring bracer is set to coniform that the lower end of the anchoring section dilatation joint of anchor post is provided with the lead-in groove that cooperates with the awl point of anchoring bracer through following technical scheme.
The utility model compared with prior art; Be a kind of novel pile tube production, site operation joint mode; Cancel original pile cutoff steel end plate, replace with prefabricated concrete pile crown plate, the concrete pile crown plate of last joint stake lower end is the butt joint upper plate; The concrete pile crown plate of coxopodite stake upper end cooperates with the anchoring bracer through anchor post for the butt joint lower plate.During coxopodite stake and last joint stake butt joint, anchor post inserts in the butt tube of butt joint lower plate, and the weight pressure anchor of joint pile body, pile cover and hammer utilizations in, anchoring bracer are dovetail shaped along the dilatation joint of anchor post with anchoring section and strut the anchor connection between the realization double sectioned column.Reach rapid abutting joint, high saving, high environmental protection, high efficiency, high-quality purpose.
Every butt joint one pile is saved 0.116 ton of steel, and the construction unit of six layers of Unit five is about 260 with the stake amount, just can save 30.42 tons of steel.Aspect construction, two joint stake docking times are zero basically in addition, and the duration then can shift to an earlier date about 4/5; The every pile of operating expenses can be saved more than 126 yuan, brings very big advantage to market competition, is a desirable construction means; Be superior to adopting steel end plate welding procedure qualitatively in butt joint, sunshine case work is calculated simple and clear; It is ineffective thoroughly to have broken away from supervision, the problem that weldquality can't guarantee.The utility model manufacturing procedure is simple, and cost of manufacture is low, equipment investment is few, can concentrate, and also can disperse to produce, and is convenient to promote the use of.
Description of drawings
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is the assembling drawing of main muscle end cap and stretch-draw holder.
The specific embodiment
A kind of no steel end plate pile tube comprises coxopodite stake 1 and last joint stake 5 at least, coxopodite stake 1 with on the two ends of joint 2 be equipped with concrete pile crown plate; Concrete pile crown plate comprises peripheral board 11; In peripheral board 11, be provided with the pile crown entity of steel concrete cast, in the pile crown entity, be embedded with and the main one to one muscle anchor tube 3 of main muscle 4, between every two adjacent main muscle anchor tubes 3, be equipped with stretch-draw butt tube 9; The inner of stretch-draw butt tube 9 is provided with plug 8, and the outer end of stretch-draw butt tube 9 is provided with stretch-draw butt joint silk hole.
The concrete pile crown plate of last joint stake 5 lower ends is butt joint upper plate 6; The concrete pile crown plate of coxopodite stake 1 upper end is butt joint lower plate 7; In the stretch-draw butt joint silk hole of the stretch-draw butt tube in the butt joint upper plate 6 anchor post 10 is housed; The hypomere of anchor post 10 is an anchoring section, and anchoring section has dilatation joint, is provided with the taper anchoring bracer 12 that cooperates with the anchoring section dilatation joint in the butt tube in butt joint lower plate 7.
The outer end of main muscle anchor tube 3 is provided with the stretch-draw holder 2 of main muscle end cap 13, stretch-draw holder 2 symmetry be provided with left and right sides two halves, be plugged on the endoporus of main muscle anchor tube 3.
Be fixedly connected with reinforcing rib 14 on the plug 8 of the inner of stretch-draw butt tube 9.Reinforcing rib 14 long 50 ~ 70cm, reinforcing rib 14 generally can be provided with 3 ~ 6.Reinforcing rib 14 is cast in pile tube.
The upper end of taper anchoring bracer 12 is set to coniform, and the lower end of the anchoring section dilatation joint of anchor post is provided with the lead-in groove that cooperates with the awl point of anchoring bracer.
When pile tube is produced, between two blocks of concrete pile crown plates, penetrate main muscle, load onto plug, in stretch-draw butt joint silk hole, load onto the stretch-draw screw mandrel, just can carry out stretch-draw then.
Concrete pile crown plate need try to join in process of production to the interface end plate, the concrete pile crown plate that examination prepares is numbered, and carve hole symbol (all the other concrete pile crown plates need not numbered).
The pile cutoff butt joint is carried out at the scene, breaks anchor post for preventing the handling process, and anchor post should screw at the scene; Before the butt joint; Stretch-draw butt joint silk hole in the butt joint lower plate needs polishing, so that to the hole, fills with thicker cement paste in the butt tube in following pile crown plate; Sand can not be arranged, then by the hole indentation is docked.
The piling bar point carried out with being connected through three bolts of end plate, had on the piling bar point with stretch-draw and docked silk corresponding three holes, hole, used bolton.
Main muscle anchor tube, stretch-draw butt tube all are embedded in the concrete pile crown plate, follow the principle that is lower than end face.

Claims (4)

1. a no steel end plate pile tube comprises coxopodite stake and last joint stake at least, it is characterized in that: the coxopodite stake with on the two ends of joint stake be equipped with concrete pile crown plate; Concrete pile crown plate comprises peripheral board, in peripheral board, is provided with the pile crown entity of steel concrete cast, in the pile crown entity, is embedded with and the main one to one muscle anchor tube of main muscle; Between every two adjacent main muscle anchor tubes, be equipped with the stretch-draw butt tube, the inner of stretch-draw butt tube is provided with plug, and the outer end of stretch-draw butt tube is provided with stretch-draw butt joint silk hole; The concrete pile crown plate of last joint stake lower end is the butt joint upper plate; The concrete pile crown plate of coxopodite stake upper end is the butt joint lower plate, in the stretch-draw butt joint silk hole of the stretch-draw butt tube in the butt joint upper plate anchor post is housed, and the hypomere of anchor post is an anchoring section; Anchoring section has dilatation joint, is provided with the taper anchoring bracer that cooperates with the anchoring section dilatation joint in the butt tube in the butt joint lower plate.
2. no steel end plate pile tube according to claim 1, it is characterized in that: the outer end of main muscle anchor tube is provided with the stretch-draw holder of main muscle end cap, stretch-draw holder symmetry be provided with left and right sides two halves.
3. no steel end plate pile tube according to claim 1 is characterized in that: be fixedly connected with reinforcing rib on the plug of the inner of stretch-draw butt tube.
4. no steel end plate pile tube according to claim 1, it is characterized in that: the upper end of taper anchoring bracer is set to coniform, and the lower end of the anchoring section dilatation joint of anchor post is provided with the lead-in groove that cooperates with the awl point of anchoring bracer.
CN2011202325635U 2011-07-04 2011-07-04 Pipe pile without steel end plate Expired - Fee Related CN202175946U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202325635U CN202175946U (en) 2011-07-04 2011-07-04 Pipe pile without steel end plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202325635U CN202175946U (en) 2011-07-04 2011-07-04 Pipe pile without steel end plate

Publications (1)

Publication Number Publication Date
CN202175946U true CN202175946U (en) 2012-03-28

Family

ID=45865834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202325635U Expired - Fee Related CN202175946U (en) 2011-07-04 2011-07-04 Pipe pile without steel end plate

Country Status (1)

Country Link
CN (1) CN202175946U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726489A (en) * 2013-12-25 2014-04-16 刘钟章 Precast solid square pile and manufacturing method thereof
CN104652421A (en) * 2015-02-16 2015-05-27 济南轨道交通集团有限公司 Prefabricated round pipe pile and connecting method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726489A (en) * 2013-12-25 2014-04-16 刘钟章 Precast solid square pile and manufacturing method thereof
CN104652421A (en) * 2015-02-16 2015-05-27 济南轨道交通集团有限公司 Prefabricated round pipe pile and connecting method thereof

Similar Documents

Publication Publication Date Title
CN203113627U (en) Nodular cast iron grout sleeve for connecting longitudinal steel bars
CN202672766U (en) Concrete pole repair strengthening hoop
CN105926775A (en) Novel concrete-filled steel tube beam column joint
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN201810323U (en) Bolt connection plate for connecting tunnel inverted arch steel frame with arch angle steel frame
CN103437493B (en) Connecting node of prefabricated reinforced concrete beam and construction method of connecting node
CN202768012U (en) Tunnel primary lining prefabricated concrete block assembly
CN202175946U (en) Pipe pile without steel end plate
CN101812871B (en) Method for horizontally connecting precast concrete members
CN201460009U (en) Precast concrete unit
CN102808511B (en) Steel box column-concrete girder connection construction method
CN104594343B (en) A kind of assembled stake and its construction method
CN203440993U (en) Connection joint of prefabricated reinforced concrete beam
CN102061702A (en) joint with anti-seismic slots for precast concrete piles
CN107675711A (en) A kind of steel pipe support structure for exempting to tear support open
CN101581098B (en) Construction method of solderless self-centring steel inclined strut
CN206942196U (en) The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework
CN202716018U (en) Steel column turning tool
CN214574622U (en) PC prefabricated column connection structure
CN109184741A (en) A kind of high-bearing capacity shield tunnel segment joint structure
CN210482760U (en) A steel bar sleeve grout connects overlap joint for assembled structure
CN209585099U (en) A kind of substation truss assembled pile foundation using flanged joint
CN203668971U (en) Waterproof formwork system for open trench tunnel
CN201738311U (en) Flange plate for uplift pile foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120328

Termination date: 20150704

EXPY Termination of patent right or utility model