CN104594343B - A kind of assembled stake and its construction method - Google Patents

A kind of assembled stake and its construction method Download PDF

Info

Publication number
CN104594343B
CN104594343B CN201410712283.2A CN201410712283A CN104594343B CN 104594343 B CN104594343 B CN 104594343B CN 201410712283 A CN201410712283 A CN 201410712283A CN 104594343 B CN104594343 B CN 104594343B
Authority
CN
China
Prior art keywords
pile tube
pile
tube
stake
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410712283.2A
Other languages
Chinese (zh)
Other versions
CN104594343A (en
Inventor
张锡治
张潮
马健
蔡魏巍
陈强
李刚
易振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN PORT & CHANNEL ENGINEERING Co.,Ltd.
Tianjin University Research Institute of Architectrual Design and Urban Planning
Original Assignee
Tianjin Port & Channel Engineering Co Ltd
Tianjin University Research Institute of Architectrual Design and Urban Planning
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Port & Channel Engineering Co Ltd, Tianjin University Research Institute of Architectrual Design and Urban Planning filed Critical Tianjin Port & Channel Engineering Co Ltd
Priority to CN201410712283.2A priority Critical patent/CN104594343B/en
Publication of CN104594343A publication Critical patent/CN104594343A/en
Application granted granted Critical
Publication of CN104594343B publication Critical patent/CN104594343B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of assembled stake, it is included in lower pile tube, it is described to be provided with lower pile tube in down tube pile cages, described upper head plate is provided with lower pile tube upper end, top pile tube is equipped with the upper end of lower pile tube described, the bottom plate being fitted on the upper head plate is provided with the lower end of the top pile tube, the bottom plate is connected with the upper head plate, head tube pile cages are set in the top pile tube, one of groined type compound stirrup is set every 200~400mm on the steel reinforcement cage of the top pile tube, rear pouring concrete is provided with the top pile tube and fills core.The invention also discloses the construction method of above-mentioned assembled stake.Upper and lower two section prefabricated tubular piles are assembled together by the present invention, and by way of pouring concrete after being poured in the pile tube of top fills core, together with pile tube and the blend of predominance of cast-in-situ bored pile.The present invention has the characteristics of easy pile extension, quick, low cost, construction is fast, quality easily ensures, high capacity.

Description

A kind of assembled stake and its construction method
Technical field
The present invention relates to the technical field of building construction such as science of bridge building, work China Democratic National Construction Association and marine port engineering, particularly one kind Assembled stake and its construction method, load stake and weak soil support pile available for all kinds of Structural Engineerings.
Background technology
Prestressed reinforced concrete pipe pile system factorial praluction, material property obtain the pile tube of maximum performance.Its manufacture Technique is simple, and adaptation is wide, high financial profit, is widely used in soft soil foundation, but due to the system in production, construction technology About, the wall thickness of stake is somewhat limited, therefore pile tube horizontal bearing capacity is smaller, and horizontal bending resistance torque is small, is bearing water Applicability is poor in the multi-rise building thing pile foundation of flat load.On the other hand, cast-in-situ bored pile horizontal bearing capacity is high, but is also easy to produce The problems such as necking down, concrete piles quality are difficult to ensure that, and complex procedures, caused mud contamination environment in construction.
The content of the invention
The present invention provides a kind of assembled stake and its construction method to solve technical problem present in known technology, should The advantage of pile tube and cast-in-situ bored pile can be organically merged by assembled stake.
The present invention is for a technical scheme being taken of technical problem present in solution known technology:A kind of assembled Stake, it is included in lower pile tube, it is described to be provided with lower pile tube in down tube pile cages, it is provided with upper end in lower pile tube upper end described Plate, it is characterised in that top pile tube is equipped with the upper end of lower pile tube described, press fitting is provided with the lower end of the top pile tube Bottom plate on the upper head plate, the bottom plate are connected with the upper head plate, and top pile tube is set in the top pile tube Steel reinforcement cage, one of groined type compound stirrup is set every 200~400mm on the steel reinforcement cage of the top pile tube, on the top Rear pouring concrete is provided with portion's pile tube and fills core.It can be produced in lower pile tube with top pile tube in common pile tube production equipment.
The bottom plate is provided with lower skirtboard and the bottom plate annular projection above turned over, and the lower skirtboard is embedded in the head tube admittedly The outside of stake, the skirt intralamellar part are provided with the peg I for being anchored in top pile tube, the upper head plate be provided with down the upper skirtboard that turns over and Upper head plate annular projection, the upper skirtboard is solid to be provided with and is anchored in the outside of lower pile tube, the overskirt intralamellar part embedded in described The peg II of lower pile tube;Connect ring flat-plate to hold tightly described on the outer surface of lower pile tube and the top pile tube, the connection ring Plate is provided with the groove with upper head plate annular projection and bottom plate annular projection clamping, and the connection ring flat-plate includes passing through hinge Two valve arc monolithics, the keying end per arc monolithic described in valve respectively passes through an assembling spiral shell with the lower skirtboard and the upper skirtboard Tether and connect, the center line for assembling bolt is radially consistent with the assembled stake.
The top pile tube is partial prestressing pile tube or zero pile for prestressed pipe, if adds prestressing force according to top pile tube When lifting requirements determine major diameter.The longitudinal reinforcement of the steel reinforcement cage of the top pile tube uses prestressed steel bar and high-strength steel with ribbing Muscle hybrid reinforcement or all high tensile reinforcements with ribbing, it is high tensile reinforcement diameter with ribbing that longitudinal reinforcement, which stretches out stake end length >=10d, d, Simultaneously to meet anchorage length of steel bar in cushion cap, can continue to be welded with the high tensile reinforcement with ribbing of certain length;The top pile tube steel The stirrup of muscle cage uses tie hoop;It is described to use pile for prestressed pipe, the longitudinal direction of the steel reinforcement cage in lower pile tube in lower pile tube Reinforcing bar is formed using prestressed steel bar, and prestressing force is added by common pile tube.
The bottom plate is welded to connect with the upper head plate, reinforcing bar self-locking connects or is connected using connection ring flat-plate.
The length of the top pile tube is not less than five times of pile body diameters and passed through is not less than three times stake below thickness of soft soil Body diameter length.
The present invention is for another technical scheme for being taken of technical problem present in solution known technology:Above-mentioned assembling The construction method of formula stake, carry out according to the following steps:
One) top and uses prefabrication at pile tube in lower pile tube, during the prefabrication of top pile tube, at top One of groined type compound stirrup is set every 200~400mm on pipe pile reinforcing bar cage;
Two) transported by top pile tube and in lower pile tube to job site;
Three) pouring concrete fills core after the pile tube intracavitary of top, forms overlapping concrete solid pile;
Four) after using long spire equipment pore-forming in stake position, stake holes will be sunk in lower pile tube, the upper end for staying in lower pile tube is sink to During away from 0.8~1.2m of ground, lower pile tube is fixed on;
Five) the solid top pile tube assembling of concrete will be overlapped in the upper end of lower pile tube, progress pile connection construction;
Six) pile sinking is continued to designed elevation;
Seven) slip casing by pressure reinforcing is carried out to stake side.
The step 3), core is filled using C40-C50 concretings concrete, height is poured every time and is no more than 5m.
The present invention has the advantages and positive effects of:Upper and lower two section prefabricated tubular piles are assembled together, and by pushing up The mode that rear pouring concrete fills core is poured in portion's pile tube, together with pile tube and the blend of predominance of cast-in-situ bored pile, after pour coagulation Soil fills the horizontal bearing capacity that core improves assembled stake, using all or part of high tensile reinforcement with ribbing, avoids prolonging for high-strength steel bar Property it is poor, bond stress is weak the shortcomings that, lower compared to bored concrete pile cost, construction is more convenient, and quality is easily guaranteed that, and without mud in constructing Slurry processing, belongs to green construction.The pile extension by the way of connection ring flat-plate connection, the welding job at the scene of can saving, subtracts Few site operation amount.The present invention has the characteristics of easy pile extension, quick, low cost, construction is fast, quality easily ensures, high capacity.
Brief description of the drawings
Fig. 1 is the overall structure diagram of assembled stake of the present invention;
Fig. 2 is assembled stake coupling part profile of the present invention;
Fig. 3-1 is the elevation of assembled stake arc monolithic of the present invention;
Fig. 3-2 is Fig. 3-1 A-A sectional views;
Fig. 3-3 is Fig. 3-1 B-B sectional views;
Fig. 4 is Fig. 2 top view;
Fig. 5 is the steel reinforcement cage elevation of the top pile tube of assembled stake of the present invention;
Fig. 6 is Fig. 5 top view;
Fig. 7 be assembled stake of the present invention construction method step seven) constructing structure figure.
In figure:1 is top pile tube;11 be bottom plate;111 be lower skirtboard;112 be bottom plate annular projection;113 be peg Ⅰ;2 be in lower pile tube;21 be upper head plate;22 be prestressed steel bar;211 be upper skirtboard;212 be upper head plate annular projection;213 are Peg II;3 be connection ring flat-plate;31 be assembling bolt;32 be bolt hole;33 be bearing pin;34 be connection ring flat-plate groove;4 be top The steel reinforcement cage of pile tube;41 be top pile tube longitudinal reinforcement;42 be top pile tube tie hoop;43 be groined type compound stirrup;44 To be welded with reinforcing bar;5 be that rear pouring concrete fills core;6 be Pile side soil;7 be grouting and reinforcing structure.
Embodiment
In order to further understand the content, features and effects of the present invention, hereby enumerating following examples, and coordinate accompanying drawing Describe in detail as follows:
Accompanying drawing is referred to, a kind of assembled stake, is included in lower pile tube 2, it is described to be provided with lower pile tube 2 in lower pipe pile reinforcing bar Cage, upper head plate 21 is provided with the upper end of lower pile tube 2 described, top pile tube 1 is equipped with the upper end of lower pile tube 2 described, The lower end of the top pile tube 1 is provided with the bottom plate 11 being fitted on the upper head plate 21, the bottom plate 11 and the upper end Plate 21 connects, and head tube pile cages 4 is set in the top pile tube 1, every 200 on the steel reinforcement cage 4 of the top pile tube ~400mm sets one of groined type compound stirrup 43, and rear pouring concrete is provided with the top pile tube 1 and fills core 5.In lower pile tube 2 can produce with top pile tube 1 in common pile tube production equipment.
In the present embodiment, the top pile tube 1 carries out bolt connection in lower pile tube 2 with described by being connected ring flat-plate 3.Tool Body structure is:The bottom plate 11 is provided with the lower skirtboard 111 and bottom plate annular projection 112 above turned over, and the lower skirtboard 111 is solid embedding In the outside of the top pile tube 1, the skirt intralamellar part is provided with the peg 113 for being anchored in top pile tube 1;The upper head plate 21 The upper skirtboard 211 and upper head plate annular projection 212 turned over is provided with down, the upper skirtboard 211 is admittedly embedded in described in the outer of lower pile tube 2 Side, the overskirt intralamellar part are provided with the peg 213 being anchored in lower pile tube 2;Connection ring flat-plate 3 is held tightly described in the lower He of pile tube 2 On the outer surface of the top pile tube 1, the connection ring flat-plate is provided with and upper head plate annular projection 212 and bottom plate annular projection The groove 34 of 112 clampings, the connection ring flat-plate 3 include two valve arc monolithics being hinged by bearing pin 33, arc list described in per valve The keying end of piece is respectively connected with the lower skirtboard 111 and the upper skirtboard 211 by an assembling bolt 31, the assembling bolt 31 Center line is radially consistent with the assembled stake.Bolt hole 32 on the connection ring flat-plate 3 is counterbore, makes assembling bolt 31 can It is a part of in into counterbore, the resistance at ring flat-plate 3 is connected with protection assembling bolt 31 and when reducing pile sinking.
The top pile tube 1 can also pass through being directly welded to connect, welding procedure and tubular pile splicing with described in lower pile tube 2 Technique is identical, existing pile extension mode, existing maturation process, refers to《Prestressed concrete pipe pile》(10G409) country figure Collection.In two pile end plate junctions full weld in three times.The bottom plate and the upper head plate can also use existing reinforcing bar self-locking Formula connects.
Above-mentioned top pile tube 1 uses prefabrication, and there is bottom plate 11 lower end, and longitudinal reinforcement 41 stretches out stake end.Above-mentioned top The length of pile tube 1 is according to determination is calculated, and to ensure premised on lower pile tube 2 meets requirement for bearing capacity, and meets to be not less than five times Pile body diameter or through the detailing requiments for being not less than three times pile body diameter length below thickness of soft soil.The top pipe pile reinforcing bar Cage 4 can use the hybrid reinforcement or all of prestressed steel bar and high tensile reinforcement with ribbing with reference to bored concrete pile arrangement of reinforcement, longitudinal reinforcement 41 High tensile reinforcement with ribbing, if add prestressing force and determined according to top pile tube draw ratio and lifting requirements, longitudinal reinforcement stretches out stake end Length >=10d, d are high tensile reinforcement diameter with ribbing, while to meet anchorage length of steel bar in cushion cap, can continue to be welded with certain length High tensile reinforcement with ribbing 44.Stirrup 42 uses tie hoop.The above-mentioned longitudinal reinforcement in down tube pile cages uses prestress steel Rod 22 is formed, and prestressing force is added by common pile tube.
The construction method of above-mentioned assembled stake, is carried out according to the following steps:
One) top and uses prefabrication at pile tube 1 in lower pile tube 2, during the prefabrication of top pile tube 1, One of groined type compound stirrup 43 is set every 200~400mm on head tube pile cages 4;
Two) transported by top pile tube 1 and in lower pile tube 2 to job site;
Three) pouring concrete fills core 5 after the intracavitary of top pile tube 1, forms overlapping concrete solid pile;
Four) after using long spire equipment pore-forming in stake position, stake holes will be sunk in lower pile tube 2, the upper end for staying in lower pile tube 2 sinks During to away from 0.8~1.2m of ground, lower pile tube 2 is fixed on;
Five) the solid top pile tube 1 of concrete will be overlapped to assemble in the upper end of lower pile tube 2, progress pile connection construction.Pile extension It can be carried out by hand fit, now should ensure that pile tube surface cleaning, the gap between section is padded with iron plate up and down welds, up and down section The centerline deviation of stake cannot be greater than 10mm, and node warpage rise cannot be greater than 1 ‰ long.The connection of section stake can use weldering up and down Connect, reinforcing bar self-locking connects or is connected using connection ring flat-plate 3.Full weld in three times during welding.When connecting the connection of ring flat-plate 3, it will connect Ring flat-plate is fixed on section stake connecting portion up and down, tightens assembling bolt 31, connection ring flat-plate 3 is hugged section stake connecting portion up and down.
Six) pile sinking is continued to designed elevation;
Seven) slip casing by pressure reinforcing is carried out to stake side, grouting and reinforcing structure 7 is formed between Pile side soil 6 and assembled stake.
Above-mentioned steps three), core 5 is filled using C40-C50 concretings concrete, height is poured every time and is no more than 5m.
Although the preferred embodiments of the present invention are described above in conjunction with accompanying drawing, the invention is not limited in upper The embodiment stated, above-mentioned embodiment is only schematical, be not it is restricted, this area it is common Technical staff in the case of present inventive concept and scope of the claimed protection is not departed from, may be used also under the enlightenment of the present invention By make it is many in the form of, these are belonged within protection scope of the present invention.

Claims (6)

1. a kind of assembled stake, it is included in lower pile tube, it is described to be provided with lower pile tube in down tube pile cages, described in down tube Stake upper end is provided with upper head plate, it is characterised in that top pile tube is equipped with the upper end of lower pile tube described, in the top pile tube Lower end be provided with and be fitted in bottom plate on the upper head plate, the bottom plate is provided with bottom plate annular projection, the upper head plate Provided with upper head plate annular projection, the bottom plate is held tightly with the upper head plate using connection ring flat-plate connection, the connection ring flat-plate It is described on the outer surface of lower pile tube and the head tube staking contact portion, it is described connection ring flat-plate be provided with the upper head plate ring-type it is convex Play the groove with the bottom plate annular projection clamping;Head tube pile cages are set in the top pile tube, at the top One of groined type compound stirrup is set every 200~400mm on the steel reinforcement cage of pile tube, poured after being provided with the top pile tube mixed Solidifying soil fills core, and the two forms overlapping concrete solid pile;
The bottom plate is provided with the lower skirtboard above turned over, and the lower skirtboard is embedded in the outside of the top pile tube, the lower skirtboard admittedly Inside is provided with the peg I for being anchored in top pile tube, and the upper head plate is provided with down the upper skirtboard turned over, and the upper skirtboard is solid embedded in described In the outside of lower pile tube, the overskirt intralamellar part is provided with the peg II being anchored in lower pile tube;The connection ring flat-plate includes passing through Two valve arc monolithics of hinge, the keying end of arc monolithic passes through with the lower skirtboard and the upper skirtboard described in per valve One assembling bolt connection, the center line for assembling bolt are radially consistent with the assembled stake.
2. assembled stake according to claim 1, it is characterised in that the top pile tube is partial prestressing pile tube or zero Pile for prestressed pipe, the longitudinal reinforcement of the steel reinforcement cage of the top pile tube use prestressed steel bar and high tensile reinforcement hybrid reinforcement with ribbing Or all high tensile reinforcements with ribbing, it is with ribbing that the longitudinal reinforcement of the steel reinforcement cage of the top pile tube, which stretches out stake end length >=10d, d, High tensile reinforcement diameter, the stirrup of the steel reinforcement cage of the top pile tube use tie hoop;It is described to use prestressed pipe in lower pile tube Stake, the longitudinal reinforcement of the steel reinforcement cage in lower pile tube are formed using prestressed steel bar.
3. assembled stake according to claim 2, it is characterised in that the longitudinal reinforcement of the steel reinforcement cage of the top pile tube is stretched The upper end for going out an end is welded with high tensile reinforcement with ribbing.
4. assembled stake according to claim 1, it is characterised in that the length of the top pile tube is not less than five times of pile bodies Diameter or through being not less than three times pile body diameter length below thickness of soft soil.
5. a kind of construction method of assembled stake as claimed in claim 1, it is characterised in that carry out according to the following steps:
One) top and uses prefabrication at pile tube in lower pile tube, during the prefabrication of top pile tube, in top pile tube One of groined type compound stirrup is set every 200~400mm on steel reinforcement cage;
Two) transported by top pile tube and in lower pile tube to job site;
Three) pouring concrete fills core after the pile tube intracavitary of top, forms overlapping concrete solid pile;
Four) after using long spire equipment pore-forming in stake position, stake holes will be sunk in lower pile tube, the upper end for staying in lower pile tube is sink to away from ground During 0.8~1.2m of face, lower pile tube is fixed on;
Five) the solid top pile tube assembling of concrete will be overlapped in the upper end of lower pile tube, progress pile connection construction;
Six) pile sinking is continued to designed elevation;
Seven) slip casing by pressure reinforcing is carried out to stake side.
6. the construction method of assembled stake according to claim 5, it is characterised in that the step 3), using C40- C50 concretings concrete fills core, pours height every time and is no more than 5m.
CN201410712283.2A 2014-11-28 2014-11-28 A kind of assembled stake and its construction method Active CN104594343B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410712283.2A CN104594343B (en) 2014-11-28 2014-11-28 A kind of assembled stake and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410712283.2A CN104594343B (en) 2014-11-28 2014-11-28 A kind of assembled stake and its construction method

Publications (2)

Publication Number Publication Date
CN104594343A CN104594343A (en) 2015-05-06
CN104594343B true CN104594343B (en) 2017-12-22

Family

ID=53120370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410712283.2A Active CN104594343B (en) 2014-11-28 2014-11-28 A kind of assembled stake and its construction method

Country Status (1)

Country Link
CN (1) CN104594343B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040685B (en) * 2015-06-09 2017-10-03 周兆弟 Prefabricated component with hollow structure
CN106245642A (en) * 2016-07-27 2016-12-21 华信咨询设计研究院有限公司 A kind of pre-stressed concrete pipe pile foundation and construction method thereof
CN108677937A (en) * 2018-06-01 2018-10-19 黄河水利委员会河南黄河河务局 A kind of reinforced concrete hollow tube pile connection device and connection method
CN110424437A (en) * 2019-08-13 2019-11-08 中国电建集团山东电力建设有限公司 Photo-voltaic power generation station installation foundation construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS646414A (en) * 1987-06-27 1989-01-11 Taisei Corp Construction work of in-site concrete pile
CN102587364A (en) * 2012-03-27 2012-07-18 盐城市同力新型建材有限公司 Connecting method between piles and simple mechanical connection structure between piles
CN202899123U (en) * 2012-11-09 2013-04-24 中国十七冶集团有限公司 Pipe pile concreting reinforcement cage with circular ring internal supports
CN103556632B (en) * 2013-10-17 2018-01-02 林基 A kind of Prefabricated Reinforced Concrete Square Pile fast mechanical connector attachment means
CN104153360B (en) * 2014-09-02 2016-06-08 德翰智慧科技有限公司 Core-filled concrete pouring device and method for prestressed concrete pipe pile joints
CN204252127U (en) * 2014-11-28 2015-04-08 天津大学建筑设计研究院 A kind of assembling stake

Also Published As

Publication number Publication date
CN104594343A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN100577923C (en) Prestressed concrete steel pipe superposed pile and manufacturing and construction method thereof
CN101457548A (en) Node for connecting round steel tube concrete column with reinforced concrete floor and method for making same
CN203569582U (en) Connecting structure of concrete pipe pile and bearing platform
CN208844417U (en) A kind of outer precast construction for pier column and its outer prefabricated interior cast-in-place pier column
CN104594343B (en) A kind of assembled stake and its construction method
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
CN107905455A (en) A kind of grouting sleeve for prefabricated concrete component reinforcement connection and preparation method thereof
CN107190635A (en) Concrete-filled steel tube with dumbbell sections assembled pier and the connection structure and method with cushion cap
CN201406767Y (en) Nodes for the connection of circular steel pipe concrete columns and reinforced concrete floors
CN108978667A (en) A kind of positioning connection structure and its construction method of steel-pipe pile and bored concrete pile
CN106592658B (en) Foundation Construction Method for Demolition and Construction of House Foundation
CN202730749U (en) Prefabricated reinforced concrete H-shaped support pile
CN103103981B (en) A Construction Method of Prestressed Wedge Pipe Pile Joint
CN109440803A (en) Railroad bridge foundation structure, tubular pole and cushion cap moment connection structure and construction method
CN109898505B (en) Composite tubular pile with reinforcing structure in weak stratum
CN220504181U (en) Basement reverse construction method tubular column horizontal and vertical connection structure
CN108625359A (en) A kind of prefabricated GFRP pipe concretes hollow splicing stake
CN101545255A (en) Method for manufacturing a PHC tubular pile in soft soil region through chambering and grouting
CN204456670U (en) Fabricated construction straight screw sleeve connection joint
CN102518129A (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN106284331B (en) Method for improving vertical bearing capacity of large-diameter rock-socketed cast-in-place pile
CN204252127U (en) A kind of assembling stake
CN206768804U (en) Precast concrete pile attachment structure
CN109778894A (en) A connection structure, foundation structure and construction method of a railway bridge pipe pile and a bearing platform
CN101109180A (en) Concrete anchor stock and construction technique thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 300072 Tianda architecture creative building (Science and Technology Park), No. 192, Anshan West Road, Nankai District, Tianjin

Patentee after: Tianjin University architectural design and Planning Research Institute Co.,Ltd.

Patentee after: Zhang Xizhi

Patentee after: TIANJIN PORT & CHANNEL ENGINEERING Co.,Ltd.

Address before: 300073 Tianjin City, Nankai District Anshan West Road No. 192

Patentee before: TIANJIN University RESEARCH INSTITUTE OF ARCHITECTRUAL DESIGN & URBAN PLANNING

Patentee before: Zhang Xizhi

Patentee before: TIANJIN PORT & CHANNEL ENGINEERING Co.,Ltd.

CP03 Change of name, title or address