CN203222809U - Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line - Google Patents

Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line Download PDF

Info

Publication number
CN203222809U
CN203222809U CN 201320136996 CN201320136996U CN203222809U CN 203222809 U CN203222809 U CN 203222809U CN 201320136996 CN201320136996 CN 201320136996 CN 201320136996 U CN201320136996 U CN 201320136996U CN 203222809 U CN203222809 U CN 203222809U
Authority
CN
China
Prior art keywords
pile
pipe pile
concrete pipe
column
pile tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320136996
Other languages
Chinese (zh)
Inventor
孟宪乔
叶超
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Anhui Electric Power Design Institute Co Ltd
Priority to CN 201320136996 priority Critical patent/CN203222809U/en
Application granted granted Critical
Publication of CN203222809U publication Critical patent/CN203222809U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a pre-stressed concrete pipe pile foundation for a pole and tower of a power transmission line. The pre-stressed concrete pipe pile foundation is characterized in that two or more than two micro pipe piles are arranged into a pile group in the foundation, wherein the distance between every two adjacent micro pipe piles is 3-5 d; d is the diameter of each micro pipe pile; each micro pipe pile is a pipe pile of which the diameter is not greater than 300 mm and the pile length is 3-6 m; and a reinforced concrete bearing platform and a stand column are formed on the upper part of the pile group through pouring. The high-strength pre-stressed concrete pipe pile is applied to the pole and tower foundation of the power transmission line, so that the pile body quality is effectively guaranteed, the construction is facilitated, the consumption of the concrete is effectively reduced, the construction spoil is reduced, and the foundation is an energy-saving and environment-friendly foundation form.

Description

A kind of electric power line pole tower pre-stressed concrete pipe pile foundation
Technical field
The utility model relates to a kind of high strength prestressed concrete pipe pile basis, more particularly in particular for the high strength prestressed concrete pipe pile basis of electric power line pole tower.
Background technology
At present, high strength prestressed concrete pipe pile has been widely used in industry and the engineerings such as civilian construction, railway, highway, bridge and harbour.In power industry, pile tube is mainly used in power plant, the transformer station basis.Because the power transmission line column position disperses, foundation construction place conditions of transportation is poor, the construction plant geological conditions is complicated and changeable, tube pile construction machinery mainly contains static pressure machine and impact pile driving machine at present, but mechanical build is bigger, is difficult to enter ungetable tower position, admission fee is used less economical in the electric power line pole tower Foundation Design with high.Generally more than 400mm, weight is bigger for the pipe fitting diameter of pile tube commonly used in the engineering, needs mechanical coordinative constructions such as oversize vehicle and crane, therefore also can't extensively adopt in work transmission line.
The utility model content
The utility model is for avoiding above-mentioned existing in prior technology weak point, a kind of electric power line pole tower pre-stressed concrete pipe pile foundation is provided, applying so that high strength prestressed concrete pipe pile can access on the transmission line of electricity basis.
The utility model adopts following technical scheme for the technical solution problem:
The design feature of the utility model electric power line pole tower pre-stressed concrete pipe pile foundation is: adopt the miniature pile tube more than two or two to be arranged to a clump of piles in the basis, the spacing of adjacent miniature pile tube is 3 ~ 5d, and d is miniature pile tube diameter; Described miniature pile tube is the pile tube that diameter is not more than 300mm, the long 3 ~ 6m of being of stake; Build on the top of a described clump of piles and to form steel concrete cushion cap and column.
The design feature of the utility model electric power line pole tower pre-stressed concrete pipe pile foundation also is:
The pile crown of described miniature pile tube is provided with end bracket and pile tube cuff, and configuration stake end anchor rib.
Described column is the right cylinder type, and anchoring stone bolt in described cushion cap and column is connected with the top shaft tower with described stone bolt.
Described column is the batter post type, and anchoring oblique cutting angle steel in described cushion cap and column is connected with the top shaft tower with described oblique cutting angle steel.
Compared with the prior art, the utility model beneficial effect is embodied in:
The utility model makes high strength prestressed concrete pipe pile be applied to the electric power line pole tower basis; can effectively guarantee pile quality; the transportation of convenient construction machinery and pile tube material; shorten the construction period on basis; the tube pile construction process need not earth excavation and discharging mud, is conducive to protect basic surrounding enviroment, effectively reduces the concrete consumption; reducing the construction spoir, is a kind of basic pattern of energy-conserving and environment-protective.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is another embodiment structural representation of the utility model;
Number in the figure: 1 miniature pile tube, 2 cushion caps, 3 columns, 4 cushion cap reinforcing bars, 5 column reinforcing bars, 6 stone bolt, 7 oblique cutting angle steel.
The specific embodiment
Referring to Fig. 1, the electric power line pole tower pre-stressed concrete pipe pile foundation is to adopt the miniature pile tube 1 more than two or two to be arranged to a clump of piles in the basis in the present embodiment, and the spacing of adjacent miniature pile tube is 3 ~ 5d, and d is miniature pile tube diameter; Miniature pile tube 1 is the pile tube that diameter is not more than 300mm, the long 3 ~ 6m of being of stake; Build on the top of a clump of piles and to form steel concrete cushion cap 2 and column 3.
In concrete the enforcement, column 2 can be two kinds on right cylinder type and batter post type:
As shown in Figure 1, column 3 is set is the right cylinder type, anchoring stone bolt 6 in cushion cap 2 and column 3 is connected with the top shaft tower with stone bolt 6.
As shown in Figure 2, column 3 also can be set be the batter post type, anchoring oblique cutting angle steel 7 in cushion cap 2 and column 3 is connected with the top shaft tower with oblique cutting angle steel 7.
Miniature pile tube is prefabricated component, and pile body adopts the centrifugal process moulding, and pile body prestressing force master muscle is cold-drawn low-carbon wire, adopts pre-tensioning system to apply prestressing force.
Be provided with pile body prestressing force master muscle in the miniature pile tube, be provided with spiral stirrup at the excircle of pile body prestressing force master muscle, interior week erection hoop reinforcement is set at pile body prestressing force master muscle; Be to improve the resistance to plucking ability of pile tube, the pile crown of miniature pile tube is provided with end bracket and pile tube cuff, and a configuration stake end anchor rib, when needs carry out two sections miniature pile tubes butt joints, at first finishes the welding of butt weld between the end bracket, and weld all around outside afterwards is fishplate bar in succession.
In the present embodiment, the weight of single miniature pile tube is not more than 131kg/m, is convenient to transportation.Because the stake footpath is little, reduced the bearing capacity of single pile, can reduce the requirement to the pile follower ability of piling machinery; Illustrated in figures 1 and 2 is to form a clump of piles with four miniature pile tubes, and the mini pile pipe adopts cross stake point, uses the ringing engine tool to carry out hammer piling, carries out piling construction as adopting diesel hammer or hydraulic hammer in the mode of hammering.
When all miniature pile tubes in the basis after all pile sinking finishes on request, according to geological condition, sand need stop 7 days, and silt and saturated cohesive soil need stop 15 days, carried out the excavation of foundation pit operation then, and excavation spoir piling height around foundation ditch can not surpass 1m.
Excavation of foundation pit is during to the designing requirement size, colligation cushion cap reinforcing bar 4 and column reinforcing bar 5, and the pile crown of miniature pile tube gos deep into cushion cap 100mm, and model of the column is made in stone bolt 6 or 7 installations in place of oblique cutting angle steel; Concreting subsequently adopts machinery to vibrate, and finishes the back in cushion cap and column concreting base concrete is carried out maintenance, and reaching design strength 70% can split tower erection, reaches design strength 100% and carries out integral body and found tower.

Claims (4)

1. an electric power line pole tower pre-stressed concrete pipe pile foundation is characterized in that adopting in the basis the miniature pile tube more than two or two to be arranged to a clump of piles, and the spacing of adjacent miniature pile tube is 3 ~ 5d, and d is miniature pile tube diameter; Described miniature pile tube is the pile tube that diameter is not more than 300mm, the long 3 ~ 6m of being of stake; Build on the top of a described clump of piles and to form steel concrete cushion cap (2) and column (3).
2. electric power line pole tower pre-stressed concrete pipe pile foundation according to claim 1, it is characterized in that: the pile crown of described miniature pile tube is provided with end bracket and pile tube cuff, and a configuration stake end anchor rib.
3. electric power line pole tower pre-stressed concrete pipe pile foundation according to claim 1, it is characterized in that: described column (3) is the right cylinder type, anchoring stone bolt (6) in described cushion cap (2) and column (3) is connected with the top shaft tower with described stone bolt (6).
4. electric power line pole tower pre-stressed concrete pipe pile foundation according to claim 1, it is characterized in that: described column (3) is the batter post type, anchoring oblique cutting angle steel (7) in described cushion cap (2) and column (3) is connected with the top shaft tower with described oblique cutting angle steel (7).
CN 201320136996 2013-03-25 2013-03-25 Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line Expired - Lifetime CN203222809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320136996 CN203222809U (en) 2013-03-25 2013-03-25 Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320136996 CN203222809U (en) 2013-03-25 2013-03-25 Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line

Publications (1)

Publication Number Publication Date
CN203222809U true CN203222809U (en) 2013-10-02

Family

ID=49249816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320136996 Expired - Lifetime CN203222809U (en) 2013-03-25 2013-03-25 Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line

Country Status (1)

Country Link
CN (1) CN203222809U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726503A (en) * 2014-01-08 2014-04-16 中铁十一局集团有限公司 Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof
CN104452795A (en) * 2014-12-12 2015-03-25 北京筑福国际工程技术有限责任公司 Additional elevator foundation structure of old building and construction method of additional elevator foundation structure
CN106638666A (en) * 2017-01-13 2017-05-10 成都启立辰智科技有限公司 Civil engineering pile foundation
CN108222050A (en) * 2018-03-20 2018-06-29 江苏融宝达新能源科技有限公司 Prefabricated components concrete tower fan foundation structure and preparation method thereof
CN110273431A (en) * 2019-07-22 2019-09-24 重庆众誉材工科技有限公司 A kind of construction method of the column of the belt conveyer in high landfill area
CN113389216A (en) * 2021-07-27 2021-09-14 国网河南省电力公司经济技术研究院 Transmission tower pile foundation structure
CN114396192A (en) * 2021-12-13 2022-04-26 中国能源建设集团安徽省电力设计院有限公司 Plug-in type concrete-filled steel tube column base for large power transmission tower and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726503A (en) * 2014-01-08 2014-04-16 中铁十一局集团有限公司 Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof
CN103726503B (en) * 2014-01-08 2015-07-08 中铁十一局集团有限公司 Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof
CN104452795A (en) * 2014-12-12 2015-03-25 北京筑福国际工程技术有限责任公司 Additional elevator foundation structure of old building and construction method of additional elevator foundation structure
CN106638666A (en) * 2017-01-13 2017-05-10 成都启立辰智科技有限公司 Civil engineering pile foundation
CN108222050A (en) * 2018-03-20 2018-06-29 江苏融宝达新能源科技有限公司 Prefabricated components concrete tower fan foundation structure and preparation method thereof
CN110273431A (en) * 2019-07-22 2019-09-24 重庆众誉材工科技有限公司 A kind of construction method of the column of the belt conveyer in high landfill area
CN113389216A (en) * 2021-07-27 2021-09-14 国网河南省电力公司经济技术研究院 Transmission tower pile foundation structure
CN114396192A (en) * 2021-12-13 2022-04-26 中国能源建设集团安徽省电力设计院有限公司 Plug-in type concrete-filled steel tube column base for large power transmission tower and construction method thereof
CN114396192B (en) * 2021-12-13 2024-03-15 中国能源建设集团安徽省电力设计院有限公司 Inserted steel tube concrete column base for large power transmission tower and construction method thereof

Similar Documents

Publication Publication Date Title
CN203222809U (en) Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN104294753A (en) Bridge prefabricated hollow pier stud connecting structure and construction method thereof
CN107435338A (en) Overhead transmission line concrete precast pipe pile cushion cap attachment means
CN204097864U (en) A kind of bridge prefabrication hollow pier stud delay-pour joint structure
CN104074197B (en) The construction method of large diameter thin wall cylinder stake compound anchor rod-type foundation pit enclosure structure
CN108360535A (en) Foundation pit supporting construction based on campshed and inner support and its construction method
CN103015414A (en) Precast concrete post grouting pile and grouting process
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN107237342A (en) New low pile cap foundation structure and its construction method
CN201756699U (en) Hoop type steel sheet pile cofferdam platform
CN204174527U (en) The hollow pier stud syndeton of a kind of bridge prefabrication
CN202989911U (en) Post-grouting pile of precast concrete
CN104805843A (en) Foundation pit supporting method
CN205776152U (en) Prestressed anchor waveform sheet pile retaining structure
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support
CN204112858U (en) The prefabricated enclosure wall of a kind of prestressed concrete
CN105421446A (en) Mixed soil extruded and cured precast pile for soft foundation treatment as well as construction method
CN206173949U (en) Concatenation formula does not have spin of spoir and strengthens piling bar
CN218263972U (en) Foundation pit operation pipeline protection device
CN220550544U (en) Beaded karst cave pile foundation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA ENERGY ENGINEERING GROUP ANHUI ELECTRIC POWE

Free format text: FORMER NAME: CHINA ENERGY CONSTRUCTION GROUP ANHUI ELECTRIC POWER DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder

Address after: 230601, No. 369, prosperous road, Hefei economic and Technological Development Zone, Anhui

Patentee after: CEEC ANHUI ELECTRIC POWER DESIGN INSTITUTE Co.,Ltd.

Address before: 230601, No. 369, prosperous road, Hefei economic and Technological Development Zone, Anhui

Patentee before: Anhui Electric Power Design Institute, CEEC

CX01 Expiry of patent term

Granted publication date: 20131002

CX01 Expiry of patent term