CN205776152U - Prestressed anchor waveform sheet pile retaining structure - Google Patents
Prestressed anchor waveform sheet pile retaining structure Download PDFInfo
- Publication number
- CN205776152U CN205776152U CN201620505144.7U CN201620505144U CN205776152U CN 205776152 U CN205776152 U CN 205776152U CN 201620505144 U CN201620505144 U CN 201620505144U CN 205776152 U CN205776152 U CN 205776152U
- Authority
- CN
- China
- Prior art keywords
- anchor
- sheet pile
- hole
- section
- prestressed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 21
- 239000010959 steel Substances 0.000 claims abstract description 21
- 239000004567 concrete Substances 0.000 claims abstract description 10
- 239000002689 soil Substances 0.000 claims abstract description 7
- 210000002435 tendon Anatomy 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims description 7
- 239000003973 paint Substances 0.000 claims description 3
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims 3
- 238000004873 anchoring Methods 0.000 claims 2
- 239000008267 milk Substances 0.000 claims 1
- 210000004080 milk Anatomy 0.000 claims 1
- 235000013336 milk Nutrition 0.000 claims 1
- 238000007789 sealing Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 12
- 238000009412 basement excavation Methods 0.000 abstract description 7
- 239000000463 material Substances 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000003014 reinforcing effect Effects 0.000 abstract description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000003912 environmental pollution Methods 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本实用新型公开了一种预应力锚杆波形板桩支挡结构,包括波形板桩、锚孔、锚杆,所述波形板桩包括顶板、腹板和底板,截面形式呈现为波浪形,两侧底板分别带有一凸条和凹槽,内置预应力钢筋骨架;顶板上设有供锚杆穿过的锚孔,锚孔处设置有防止波形板桩应力集中的加强体,锚杆为单根或多根钢筋束利用常压或高压多次灌浆而成,包括锚固段、非锚固段和锚头,锚杆穿过锚孔,通过锚头将锚杆和波形板桩连接,锚杆的锚固段设置于稳定土层内;所述锚头包括锚斜托、锚具、砼封锚以及向锚孔内补浆的补浆孔。本实用新型生产效率高,节约用材;降低板桩失效率,减小板桩水平变形,达到设计要求;减少了土方开挖量,增大了开挖断面和施工空间,加快施工效率。
The utility model discloses a prestressed anchor wave sheet pile support structure, which includes a wave sheet pile, an anchor hole, and an anchor rod. The side bottom plate has a convex line and a groove respectively, with a built-in prestressed steel skeleton; the top plate is provided with an anchor hole for the anchor rod to pass through, and the anchor hole is provided with a reinforcing body to prevent the stress concentration of the wave sheet pile. The anchor rod is a single Or multiple steel tendons are grouted multiple times under normal pressure or high pressure, including the anchor section, non-anchor section and anchor head. The anchor rod passes through the anchor hole, and the anchor rod and the corrugated sheet pile are connected through the anchor head. The section is arranged in the stable soil layer; the anchor head includes an anchor bracket, an anchor, a concrete anchor and a grouting hole for grouting into the anchor hole. The utility model has high production efficiency, saves materials, reduces the failure rate of the sheet pile, reduces the horizontal deformation of the sheet pile, and meets the design requirements; reduces the excavation amount of earthwork, increases the excavation section and the construction space, and accelerates the construction efficiency.
Description
技术领域technical field
本实用新型涉及一种支护结构,特别是涉及一种预应力锚杆波形板桩支挡结构。The utility model relates to a supporting structure, in particular to a prestressed bolt corrugated sheet pile supporting structure.
背景技术Background technique
在地下工程设施建设过程中,保持基坑和围护稳定是一项重要的内容,现浇混凝土支护桩作为支护结构是常用的方法之一。支护结构形式与种类众多,如深层搅拌水泥土挡墙、加筋水泥土搅拌连续墙、钻孔灌注桩挡墙、地下连续墙、预制混凝土桩等。其中,高强预应力波形板桩作为一种预制混凝土桩因其与传统的混凝土支护桩相比具有结构挡土截面大,施工工期短,施工工艺先进等优点,在地下工程设施建设过程中迅速发展,但其截面尺寸较小,刚度较小,有可能因水平荷载过大使板桩失效或变形过大,不能满足设计要求,甚至与基坑底板连接处可能因受力过大而开裂。During the construction of underground engineering facilities, maintaining the stability of the foundation pit and enclosure is an important content, and cast-in-situ concrete support piles are one of the commonly used methods as the support structure. There are many forms and types of supporting structures, such as deep mixing cement-soil retaining wall, reinforced cement-soil mixing continuous wall, bored pile retaining wall, underground continuous wall, precast concrete pile, etc. Among them, high-strength prestressed corrugated sheet piles, as a kind of prefabricated concrete piles, have the advantages of large structural retaining section, short construction period and advanced construction technology compared with traditional concrete support piles. However, its cross-sectional size is small and its stiffness is small. It may cause the sheet pile to fail or deform too much due to excessive horizontal load, which cannot meet the design requirements, and even the joint with the foundation pit floor may crack due to excessive force.
目前,波形板桩作为支护结构其上部大都呈现为一种悬臂式,水平荷载(水、土压力等)大部分依靠板桩本身的强度支撑,因此板桩自身承受较大的弯矩和剪力,如开挖深度较大工况下,可能因水平荷载过大使板桩失效或变形过大,无法满足设计要求,甚至与基坑(河道等)底板连接处可能因受力过大而开裂,导致工程失败。At present, corrugated sheet piles are used as support structures, the upper part of which is mostly a cantilever type, and most of the horizontal loads (water, earth pressure, etc.) are supported by the strength of the sheet pile itself, so the sheet pile itself bears a large For example, under the condition of large excavation depth, the sheet pile may fail or deform too much due to excessive horizontal load, which cannot meet the design requirements, and even the connection with the bottom plate of the foundation pit (river, etc.) may be cracked due to excessive force , causing the project to fail.
实用新型内容Utility model content
本实用新型目的是利用波形板桩和锚杆支护的优点,开发一种能够广泛应用在基坑支挡、河道驳岸、海岸湖岸、堤坝边坡等基础设施建设中承受较大水平荷载工况下的预应力锚杆波形板桩复合支挡结构。。The purpose of the utility model is to utilize the advantages of corrugated sheet piles and bolt support to develop a construction that can be widely used in infrastructure constructions such as foundation pit supports, river revetments, coastal lake banks, and embankment slopes to withstand large horizontal loads. Composite retaining structure of prestressed anchor corrugated sheet piles. .
为实现上述实用新型目的,本实用新型的技术方案是:预应力锚杆波形板桩支挡结构,包括波形板桩、锚孔、锚杆,所述波形板桩为预应力钢筋混凝土结构,包括顶板、腹板和底板,截面形式呈现为波浪形,两侧腹板分别带有一凸条和凹槽,内置预应力钢筋骨架,厚度大于100mm,混凝土的等级不低于C40;顶板上设有供锚杆穿过的锚孔,锚孔呈圆柱形,锚孔的直径大于50mm,锚孔处设置有防止波形板桩应力集中的加强体,加强体上涂有防腐防锈涂料;In order to achieve the purpose of the above-mentioned utility model, the technical solution of the utility model is: a prestressed anchor wave sheet pile support structure, including a wave sheet pile, an anchor hole, and an anchor rod, and the wave sheet pile is a prestressed reinforced concrete structure, including The top plate, web plate and bottom plate have a wavy cross-section, and the web plates on both sides have a convex line and a groove respectively, with a built-in prestressed steel skeleton, the thickness is greater than 100mm, and the concrete grade is not lower than C40; The anchor hole through which the anchor rod passes, the anchor hole is cylindrical, the diameter of the anchor hole is greater than 50mm, and the anchor hole is provided with a reinforcement to prevent the stress concentration of the corrugated sheet pile, and the reinforcement is coated with anti-corrosion and anti-rust paint;
锚杆为单根或多根钢筋束利用常压和高压多次灌浆而成,包括锚固段、非锚固段和锚头,锚杆穿过锚孔,通过锚头将锚杆和波形板桩连接,锚杆的锚固段设置于稳定土层内,且按设计要求确定对锚杆施加预应力的大小;The anchor rod is made of single or multiple steel tendons with multiple grouting under normal pressure and high pressure, including the anchor section, non-anchor section and anchor head. The anchor rod passes through the anchor hole and connects the anchor rod and the wave sheet pile through the anchor head , the anchorage section of the anchor rod is set in the stable soil layer, and the prestress applied to the anchor rod is determined according to the design requirements;
所述锚头包括锚斜托、锚具、砼封锚以及向锚孔内补浆的补浆孔;The anchor head includes an anchor support, an anchor, a concrete anchor and a grouting hole for grouting into the anchor hole;
所述锚杆穿过波形板桩的外表面套接有波形钢管和螺旋钢筋。The anchor rod passes through the outer surface of the corrugated sheet pile and is sleeved with corrugated steel pipes and spiral steel bars.
作为本实用新型的一种优选,所述加强体为钢垫。As a preference of the present utility model, the reinforcing body is a steel pad.
作为本实用新型的另一种优选,所述锚杆还可以使用高强钢棒或钢绞丝,利用常压或高压,一次或多次灌浆而成。As another preference of the present invention, the anchor rod can also be formed by using high-strength steel rods or steel strands, and grouting once or multiple times under normal pressure or high pressure.
本实用新型的有益效果是:The beneficial effects of the utility model are:
1.与现有技术相比拉锚式波形板桩可工厂化生产,质量可控,生产效率高,避免了现场施工环境污染、质量控制难的问题,且其截面尺寸较小,节约用材;1. Compared with the existing technology, the anchor-type corrugated sheet pile can be produced in a factory, the quality is controllable, the production efficiency is high, and the problems of environmental pollution and difficult quality control of the construction site are avoided, and its cross-sectional size is small, saving materials;
2.与波形板桩支护相比可充分利用岩土的天然作用力,降低板桩失效率,减小板桩水平变形,达到设计要求;2. Compared with corrugated sheet pile support, it can make full use of the natural force of rock and soil, reduce the failure rate of sheet piles, reduce the horizontal deformation of sheet piles, and meet the design requirements;
3.与锚杆支护相比,工程开挖面可设为直立面,减少了土方开挖量,因此节省了财力、物力,而且还减少了因土方开挖造成的环境污染,充分响应了我国生态文明建设的号召;3. Compared with bolt support, the excavation surface of the project can be set as a vertical surface, which reduces the amount of earthwork excavation, thus saving financial and material resources, and also reduces the environmental pollution caused by earthwork excavation, which fully responds The call for the construction of ecological civilization in our country;
4.可实现无内支撑施工,增大了开挖断面和施工空间,加快施工效率,缩短施工工期。4. The construction without internal support can be realized, which increases the excavation section and construction space, speeds up the construction efficiency and shortens the construction period.
附图说明Description of drawings
图1是本实用新型结构示意图;Fig. 1 is a structural representation of the utility model;
图2是波形板桩截面示意图。Figure 2 is a schematic cross-sectional view of a corrugated sheet pile.
具体实施方式detailed description
下面将结合附图对本实用新型,对本实用新型实施例中的技术方案进行清楚、完整地描述。所描述的实施例仅仅是本实用新型专利一部分实施例,而不是全部。The utility model and the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings. The described embodiments are only some embodiments of the utility model patent, not all of them.
预应力锚杆波形板桩支挡结构,包括波形板桩1、锚孔2、锚杆3,所述波形板桩1为预应力钢筋混凝土结构,包括顶板101、腹板102和底板103,截面形式呈现为波浪形,两侧底板103分别带有一凸条和凹槽,内置预应力钢筋骨架,厚度大于100mm,混凝土的等级不低于C40;顶板101上设有供锚杆穿过的锚孔2,锚孔呈圆柱形,锚孔的直径大于50mm,锚孔2处设置有防止波形板桩应力集中的加强体4,加强体4上涂有防腐防锈涂料,所述加强体4为钢垫;Prestressed anchor corrugated sheet pile support structure, including corrugated sheet pile 1, anchor hole 2, anchor rod 3, the corrugated sheet pile 1 is a prestressed reinforced concrete structure, including a top plate 101, a web 102 and a bottom plate 103, the section The form is wavy, and the bottom plates 103 on both sides have a convex line and a groove respectively, with a built-in prestressed steel skeleton, the thickness is greater than 100mm, and the grade of concrete is not lower than C40; the top plate 101 is provided with anchor holes for anchor rods to pass through 2. The anchor hole is cylindrical, the diameter of the anchor hole is greater than 50mm, and the anchor hole 2 is provided with a reinforcement 4 to prevent the stress concentration of the corrugated sheet pile. The reinforcement 4 is coated with anti-corrosion and anti-rust paint, and the reinforcement 4 is steel pad;
锚杆2为单根或多根钢筋束利用常压和高压多次灌浆而成,包括锚固段201、非锚固段202和锚头203,锚杆2穿过锚孔3,通过锚头203将锚杆2和波形板桩1连接,锚杆2的锚固段201设置于稳定土层内,且按设计要求确定对锚杆施加预应力的大小;Anchor rod 2 is made of single or multiple steel tendons using normal pressure and high pressure multiple grouting, including anchor section 201, non-anchor section 202 and anchor head 203. Anchor rod 2 passes through anchor hole 3, and through anchor head 203 The anchor rod 2 is connected to the corrugated sheet pile 1, the anchor section 201 of the anchor rod 2 is set in the stable soil layer, and the prestress applied to the anchor rod is determined according to the design requirements;
所述锚头203包括锚斜托2031、锚具2032、砼封锚2033以及向锚孔内补浆的补浆孔2034;The anchor head 203 includes an anchor support 2031, an anchor 2032, a concrete anchor 2033, and a grouting hole 2034 for grouting into the anchor hole;
所述锚杆2穿过波形板桩1的外表面套接有波形钢管5和螺旋钢筋6。The anchor rod 2 passes through the outer surface of the corrugated sheet pile 1 and is sleeved with a corrugated steel pipe 5 and a spiral steel bar 6 .
所述锚杆还可以为高强钢棒或钢绞丝,利用常压或高压,一次或多次灌浆而成。The anchor rod can also be a high-strength steel rod or steel strand, which is grouted one or more times under normal pressure or high pressure.
所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The described embodiments are only some of the embodiments of the present utility model, but not all of them. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620505144.7U CN205776152U (en) | 2016-05-27 | 2016-05-27 | Prestressed anchor waveform sheet pile retaining structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620505144.7U CN205776152U (en) | 2016-05-27 | 2016-05-27 | Prestressed anchor waveform sheet pile retaining structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205776152U true CN205776152U (en) | 2016-12-07 |
Family
ID=59979145
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620505144.7U Expired - Fee Related CN205776152U (en) | 2016-05-27 | 2016-05-27 | Prestressed anchor waveform sheet pile retaining structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205776152U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105926581A (en) * | 2016-05-27 | 2016-09-07 | 福建工程学院 | Pre-stressed anchor rod corrugated plate pile supporting and retaining structure |
| CN110410121A (en) * | 2019-08-09 | 2019-11-05 | 华北水利水电大学 | Broken rock bolt support device |
-
2016
- 2016-05-27 CN CN201620505144.7U patent/CN205776152U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105926581A (en) * | 2016-05-27 | 2016-09-07 | 福建工程学院 | Pre-stressed anchor rod corrugated plate pile supporting and retaining structure |
| CN110410121A (en) * | 2019-08-09 | 2019-11-05 | 华北水利水电大学 | Broken rock bolt support device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113217059B (en) | Combined anchor rod with prestress rod core | |
| CN203809220U (en) | Wind driven generator tower | |
| CN205954656U (en) | Double -layer steel manages cement pipe column foundation | |
| CN201730091U (en) | Cast-in-situ pile | |
| CN110158633B (en) | Prefabricated pier slab beam type foundation of lattice type concrete wind power tower | |
| CN205776152U (en) | Prestressed anchor waveform sheet pile retaining structure | |
| CN208763050U (en) | Offshore wind turbine gravity caisson basis | |
| CN201679001U (en) | Fiber Reinforced Concrete Pullout Pile | |
| CN208472751U (en) | Offshore wind turbine prestressing force gravity type foundation | |
| CN203475289U (en) | Pile type continuous rigid frame bridge | |
| CN113700026A (en) | Static pressure steel cylinder wind generating set foundation for onshore soft soil and construction method | |
| CN108412700A (en) | A kind of ultra-tough fiber concrete generator pylon and its fabrication and installation method | |
| CN105926581A (en) | Pre-stressed anchor rod corrugated plate pile supporting and retaining structure | |
| CN210439324U (en) | Prefabricated pier plate beam type foundation of lattice type concrete wind power tower | |
| CN217782125U (en) | Composite pile fan foundation and wind turbine | |
| CN209523212U (en) | Assembled independent foundation | |
| CN202969405U (en) | A cup-shaped concrete wind power tower foundation | |
| CN209353332U (en) | A new type of glass fiber reinforced plastic uplift pile | |
| CN217231920U (en) | An offshore wind power rib beam type prestressed concrete composite cylinder foundation | |
| CN205205848U (en) | Cavity gravity type marine wind power basis | |
| CN114809014B (en) | Construction method of pile-anchor combined support structure with unloading pipe shed | |
| CN110206020A (en) | Prefabricated snowflake type concrete steel sheet pile and its construction method | |
| CN206591513U (en) | Slip casting cylinder for PHC pile tubes | |
| CN211898436U (en) | Diaphragm wall structure with high vertical bearing capacity | |
| CN211621660U (en) | Anti-pulling base is strengthened in installation of transmission tower |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 |
|