CN110410121A CN201910735345.4A CN201910735345A CN110410121A CN 110410121 A CN110410121 A CN 110410121A CN 201910735345 A CN201910735345 A CN 201910735345A CN 110410121 A CN110410121 A CN 110410121A
Authority
CN
China
Prior art keywords
rock body
fragmented rock
anchor pole
fixed
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910735345.4A
Other languages
Chinese (zh)
Other versions
CN110410121B (en
Inventor
郑恒祥
袁志刚
宋彦军
杨波
杨志涛
穆林
董鸿良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN201910735345.4A priority Critical patent/CN110410121B/en
Publication of CN110410121A publication Critical patent/CN110410121A/en
Application granted granted Critical
Publication of CN110410121B publication Critical patent/CN110410121B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/021Grouting with inorganic components, e.g. cement
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of fragmented rock body anchor bar suspension devices, including anchor pole and protective layer;Extend in drilling on anchor pole insertion fragmented rock body and to outside fragmented rock body, anchor pole is T-shaped including wing plate and the web being vertically fixed at wing plate center along its length;There are assembly section between the two sides and wing plate of web, exhaust pipe and Grouting Pipe are fixed in assembly section;It is fixed section that T shape anchor pole, which is inserted into bore inner, and external to carry section, fixed section is fixed in broken ground with cement mortar;It carries and is provided with card slot on the web of section;Protective layer includes the steel mesh being arranged in outside fragmented rock body, the steel mesh matching is fixed forms concrete bearer network in card slot, in the upper sprinkling concrete of concrete bearer network, the protective layer for being bonded and being fixedly connected with fragmented rock body outer surface is formed after concrete setting;It improves work efficiency, and fixed function can be played in the position for being inconvenient to weld, keep protective layer stronger, safety coefficient is high, easy to use.

Description

A kind of fragmented rock body anchor bar suspension device
Technical field:
The invention belongs to building hydrotechnics fields, and in particular to a kind of fragmented rock body anchor bar suspension device.
Background technique:
With the continuous improvement that people live, science and technology is showing improvement or progress day by day, and it is increasing to build facility in underground, as hydraulic tunnel, Lower workshop, traffic tunnel etc., but often encounter fragmented rock body during building and danger is brought to construction personnel, because This fragmented rock body generally requires to use suspension device for reinforcing fragmented rock body, guarantees the safety of construction personnel and the stabilization of rock mass Property.
Anchor pole is the important device for supporting construction is fixed, and can effectively improve the stability of supporting construction, Due to formation condition complexity, there are tomography, joint, loose block stone, Rheological Rock Mass etc., rockbolt stress is complicated, may have tension, by Pressure, by it is curved, the operating conditions such as cut, existing common bolt is circle, since circular structure is single, and support anchor rod it is main by The power arrived is by curved and tension, and the complex geologic conditions of fragmented rock body, and circle anchor pole can not adapt to complicated and changeable break completely Detritus body, studying a kind of bending resistance, tensile property, good anchor bar suspension device is obviously necessary.
Summary of the invention:
For defect existing for existing equipment and problem, the present invention provides a kind of fragmented rock body anchor bar suspension device, effective to solve The problem of bending resistance, tensile property existing for existing equipment of having determined are poor, and safety coefficient is low and using trouble.
The present invention solves scheme used by its technical problem: a kind of fragmented rock body anchor bar suspension device, including anchor pole And protective layer;Extend in drilling on the anchor pole insertion fragmented rock body and to outside fragmented rock body;The T-shaped packet of the anchor pole The web for including wing plate and being vertically fixed at wing plate center along its length;There are assembly section between the two sides and wing plate of web, Exhaust pipe and Grouting Pipe are respectively fixed in the assembly section of two sides;It is fixed section that T shape anchor pole, which is inserted into bore inner, external to be Section is carried, the fixed section is fixed in broken ground with cement mortar;Card slot is provided on the web of the carrying section;Institute Stating protective layer includes the steel mesh being arranged in outside fragmented rock body, and the steel mesh matching fixing forms concrete in card slot and holds Support grid, the gunite concrete on concrete bearer network, formation is bonded with fragmented rock body outer surface after concrete setting and fixation connects The protective layer connect.
Further, the anchor pole inner end is the inclined-plane in 45 degree.
Further, grout stopping device is provided at the aperture of the drilling.
Further, the strength grade of concrete is not less than C20.
Further, the card slot is the translot of opening outwardly, the bar diameter of the width of translot and the steel mesh It is adapted.
Beneficial effects of the present invention: the present invention provides a kind of support anchor rod devices for fragmented rock body, by T shape anchor pole It in insertion fragmented rock body and reinforces, and is fixed with protective layer in the outer end of T shape anchor pole, according to material mechanics principle, in material phase Under conditions of equal with, section, the bearing capacity of tension, compression anchor pole is unrelated with section configuration, but by bent anchor bar bending resistance, It is very big with section configuration relationship;Meanwhile compared to traditional round anchor pole, phase equal section T shape anchor pole side surface area is bigger, has Preferably bonding withdrawal resistance, and the edge of a wing setting of T shape anchor pole has preferable anti-bending strength in tension side, and compared to traditional Anchor pole also has additional the card slot for being fixed temporarily steel mesh in the outer end of T shape anchor pole, can preliminarily form after steel mesh again to reinforcing bar Net is welded, and is reduced the construction time and number of doing over again, is improved work efficiency, and can rise in the position for being inconvenient to weld To fixed function, keep protective layer stronger, safety coefficient is high, easy to use, resists existing for effective solution existing equipment Curved, the problem of tensile property is poor, and safety coefficient is low and using trouble.
Detailed description of the invention:
Fig. 1 is invention use state diagram.
Fig. 2 is the structural schematic diagram of anchor pole.
Fig. 3 is anchor pole side view.
Fig. 4 is fixed section structural schematic diagram.
Fig. 5 is supporting section structural schematic diagram.
Figure label are as follows: 1 is anchor pole, and 2 be protective layer, and 3 be steel mesh, and 4 be wing plate, and 5 be web, and 6 be card slot, and 7 be row Tracheae, 8 be Grouting Pipe, and 9 be cement mortar.
Specific embodiment:
Present invention will be further explained below with reference to the attached drawings and examples.
Embodiment 1: a kind of anchor rod device for fragmented rock body supporting is present embodiments provided, compared to traditional doughnut Bar has better bending resistance and extraction-resistant behavior, copes with complicated geological environment;As shown in Figure 1, a kind of fragmented rock body anchor pole Suspension device, including anchor pole 1 and protective layer 2;Output the circular bore that diameter is 42-90mm in advance on fragmented rock body, it is described Anchor pole insertion fragmented rock body on drilling in and extend to outside fragmented rock body, wherein anchor pole insertion bore inner is fixation Section, fixed section are poured through cement mortar 9 and are fixed in drilling, and the injecting cement paste strength standard value of cement mortar 9 is typically no less than 30MPa, so that the inner segment of anchor pole 1 is fixed in fragmented rock body, for carrying section, the carrying section is fixed to be connected the external anchor pole that drills It is connected to and the matched protective layer in fragmented rock body outer surface.
As shown in Fig. 2, the anchor pole 1 is T shape made of reinforcing bar after common hot-rolled steel or high-strength heat treatment, including the wing Edge towards tension side wing plate 4 and be along its length vertically fixed on web 5 at wing plate center.Injecting cement paste and surrounding formations rock Cohesive force between body, depending on the hardness and bore diameter of rock mass, and the bonding withdrawal resistance between injecting cement paste and anchor bar body, depend on In outside bolt diameter, rock-bolt length, anchor pole shape is additionally depended on;T shape anchor pole is compared to existing round anchor pole, and T shape anchor pole is than circle The side surface area of shape anchor pole is big, thus in terms of bonding withdrawal resistance angle, performance is more preferable;The present embodiment select anchor pole wall thickness be The length of 4-8mm, wing plate and web is 30mm, length 3-9m;As shown in Figure 3-4, the two sides of the web 5 and wing plate it Between there are assembly section, the assembly section of two sides is respectively arranged with exhaust pipe 7 and Grouting Pipe 8, and Grouting Pipe 8 and exhaust pipe 7 are respectively arranged At T shape anchor pole wing plate 4 and 5 angle of cut of web, fixed aperture can be reserved at the web 5 of anchor pole, with the fixed Grouting Pipe 8 of galvanized wire of perforating And exhaust pipe 7, Grouting Pipe 8 and exhaust pipe 7 are fixed on T shape anchor pole and form integral structure, and together in insertion drilling.
As shown in figure 5, being provided with card slot 6 on the web of the carrying section;The protective layer 2 includes being arranged in kata-rocks External steel mesh 3, steel mesh 3 are formed by the reinforcing bar spelling group that diameter is 6mm -12mm;The matching of steel mesh 3 is fixed in card Weld together in slot 6 and with anchor pole 1, to form concrete bearer network, the coagulation in fragmented rock body appearance face interval The spacing of native bearer network and fragmented rock body outer surface is 100mm, takes proportioned concrete ejection to carry in concrete with pumping That nets is upper, and the protective layer that the fitting of fragmented rock body outer surface is formd after concrete setting and is fixedly connected, protective layer 2 is i.e. with steel Muscle net is the armored concrete of keel;The strength grade of concrete is not less than C20.
Embodiment 2: the present embodiment is substantially the same manner as Example 1, and difference is: the anchor pole inner end is in 45 degree Inclined-plane.
As shown in Fig. 2, the inner face of anchor pole 1 is in 45 degree of inclined-plane, what inner end can be stronger is fixed in drilling And go deep into the inside of fragmented rock body, while anchor pole inner end is 45 degree of sharp inclined-planes, and anchor pole can be hammered from anchor pole outer end, it will The length exposed to anchor pole in fragmented rock body of squeezing into of anchor pole by a small margin is finely adjusted, and not only increases anchor pole 1 in fragmented rock body Interior stability and fastness can also adjust distance of the card slot relative to fragmented rock body, so as to adjust steel mesh relative to broken The distance of detritus body increases or reduces the jet thickness of concrete.
Embodiment 3: the present embodiment is substantially the same manner as Example 1, and difference is: being provided with only at the aperture of the drilling Starch device.
In the construction process, it is the density for guaranteeing injecting cement paste, according to the position and orientation of drilling, can be inserted after first slip casting Bar, or first inserted link grouting behind shaft or drift lining.When for facing upward inclined borehole elder generation inserted link grouting behind shaft or drift lining, grout stopping device should be set at hell, it is described only to starch Device be with the matched cylinder of drilling, be provided with round or taper through-hole at cylindrical center, the end of anchor pole be provided with The compatible sealing shroud of through-hole, in sealing shroud, Grouting Pipe waits for exhaust pipe pulp for anchor pole, exhaust pipe and the equal sealing shroud of Grouting Pipe After can only starch.When injecting cement mortar 9 into drilling, exhaust pipe is connected to cement mortar, is equivalent to linker, works as exhaust pipe At gas outlet after pulp, it is known that drilling is full of by cement mortar 9, stops the slip casting into drilling, easy to use, is applicable in Range is wide, and function is more.
Embodiment 4: the present embodiment is substantially the same manner as Example 1, and difference is: the card slot is the cross of opening outwardly Slot.
Match referring to Fig. 3 with Fig. 5, the opening size of the card slot 6 with steel mesh, and the translot outwardly that is open, it is horizontal The width of slot is adapted with the bar diameter of the steel mesh, is carried and is provided with aperture on the wing plate 4 of section, and steel wire or galvanized wire are across small Hole, end are banded on steel mesh, can further be fixed to steel mesh, card slot 6 is set as translot not only manufacture craft Simply, and facilitate in reinforcing bar card entry slot, it is easy to use, it is at low cost, steel mesh can be fixed in advance and form preliminary steel Muscle net, the hook being correspondingly arranged with translot can further reinforced steel net, prevent steel mesh from shifting, then again to steel Muscle net is welded, not only convenient welding, and reduces the construction time and number of doing over again, in the place that welding is inconvenient, even It can also fix without welding by the very secured of steel mesh.

Claims (5)

1. a kind of fragmented rock body anchor bar suspension device, including anchor pole and protective layer;Brill on the anchor pole insertion fragmented rock body Extend in hole and to outside fragmented rock body;Include wing plate it is characterized by: the anchor pole is T-shaped and vertically fix along its length Web at wing plate center;There are assembly section between the two sides and wing plate of web, the row of being respectively fixed in the assembly section of two sides Tracheae and Grouting Pipe;It is fixed section that T shape anchor pole, which is inserted into bore inner, external for carrying section, the fixed section cement bonded sand Slurry is fixed in broken ground;Card slot is provided on the web of the carrying section;The protective layer includes being arranged in kata-rocks External steel mesh, the steel mesh matching is fixed forms concrete bearer network in card slot, sprays on concrete bearer network Concrete is penetrated, forms the protective layer for being bonded and being fixedly connected with fragmented rock body outer surface after concrete setting.
2. fragmented rock body anchor bar suspension device according to claim 1, it is characterised in that: the anchor pole inner end is in 45 The inclined-plane of degree.
3. fragmented rock body anchor bar suspension device according to claim 1, it is characterised in that: be arranged at the aperture of the drilling There is grout stopping device.
4. fragmented rock body anchor bar suspension device according to claim 1, it is characterised in that: the strength grade of concrete Not less than C20.
5. fragmented rock body anchor bar suspension device according to claim 1, it is characterised in that: the card slot is to be open outwardly Translot, the width of translot is adapted with the bar diameter of the steel mesh.
CN201910735345.4A 2019-08-09 2019-08-09 Broken rock mass anchor bolt supporting device Expired - Fee Related CN110410121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910735345.4A CN110410121B (en) 2019-08-09 2019-08-09 Broken rock mass anchor bolt supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910735345.4A CN110410121B (en) 2019-08-09 2019-08-09 Broken rock mass anchor bolt supporting device

Publications (2)

Publication Number Publication Date
CN110410121A true CN110410121A (en) 2019-11-05
CN110410121B CN110410121B (en) 2021-06-25

Family

ID=68367057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910735345.4A Expired - Fee Related CN110410121B (en) 2019-08-09 2019-08-09 Broken rock mass anchor bolt supporting device

Country Status (1)

Country Link
CN (1) CN110410121B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761676A (en) * 2021-02-04 2021-05-07 岳阳市公路桥梁基建总公司 UHPC tunnel lining structure and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102235002A (en) * 2011-04-11 2011-11-09 董兰田 Fixed anchor pile for farmland
KR20120101801A (en) * 2011-03-07 2012-09-17 (주)케이에스텍 Steel pipe for supporting a structure
CN203049591U (en) * 2013-01-09 2013-07-10 中国水电顾问集团贵阳勘测设计研究院 Reinforced structure of fractured rock mass and high oriented side slope
CN104929670A (en) * 2015-07-02 2015-09-23 徐州工程学院 Wing type anchor rod
CN205776152U (en) * 2016-05-27 2016-12-07 福建工程学院 Prestressed anchor waveform sheet pile retaining structure
CN108533273A (en) * 2018-04-11 2018-09-14 北京市政建设集团有限责任公司 A kind of novel pipe shed for Support System in Soft Rock Tunnels leading pre-supporting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20120101801A (en) * 2011-03-07 2012-09-17 (주)케이에스텍 Steel pipe for supporting a structure
CN102235002A (en) * 2011-04-11 2011-11-09 董兰田 Fixed anchor pile for farmland
CN203049591U (en) * 2013-01-09 2013-07-10 中国水电顾问集团贵阳勘测设计研究院 Reinforced structure of fractured rock mass and high oriented side slope
CN104929670A (en) * 2015-07-02 2015-09-23 徐州工程学院 Wing type anchor rod
CN205776152U (en) * 2016-05-27 2016-12-07 福建工程学院 Prestressed anchor waveform sheet pile retaining structure
CN108533273A (en) * 2018-04-11 2018-09-14 北京市政建设集团有限责任公司 A kind of novel pipe shed for Support System in Soft Rock Tunnels leading pre-supporting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112761676A (en) * 2021-02-04 2021-05-07 岳阳市公路桥梁基建总公司 UHPC tunnel lining structure and construction method thereof

Also Published As

Publication number Publication date
CN110410121B (en) 2021-06-25

Similar Documents

Publication Publication Date Title
CN106193030A (en) The prestressing force grouted anchor bar of a kind of band agnail head and construction method
CN105604593B (en) A kind of three stages anchoring Combined hollow grouted anchor bar
CN104895073B (en) Can being dismounted for multiple times anchor cable construction system and its construction method
CN207878485U (en) A kind of slope anchorage structure based on SNS soft protecting nets
CN102330427B (en) Stiffening pile with high uplift resistance
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN204959746U (en) Expand integral type stock soon
CN202509533U (en) Single reinforcement pulling force type anti-floating anchor rod
CN108035754A (en) A kind of roadway bolt anchor cable combination supporting method
CN106836179A (en) Vertical strengthening ribs enhanced bellows grouting pile and construction method
CN108914945A (en) A kind of deep basal pit pile for prestressed pipe, prestress anchorage cable combined supporting construction method
CN108221972A (en) A kind of built pile and its construction method and vertical bearing capacity of single pile computational methods
CN110410121A (en) A kind of fragmented rock body anchor bar suspension device
CN106836217A (en) A kind of construction method of expansion end formula soil bolt or soil nailing
CN107447755A (en) A kind of anchor pole equipment and armature boring construction method
CN201635074U (en) Ground anchor
CN207160041U (en) Anchor rod type artificial digging pile
CN109183786A (en) A kind of post-tensioned prestressing resistance to plucking small diameter long screw pouring piles and its construction method
CN206581314U (en) Screw head muscle body posttension pile foundation
CN110158589A (en) The Water sealing method and its seal water structure of the anchor cable hole of water rich strata diaphram wall
CN205089339U (en) Cavity slip casting anchor rope
CN211777457U (en) Double-primary-support hole-entering structure of ingate
CN212248235U (en) Ground anchor fixing system for stay wire iron tower
CN208039240U (en) A kind of built pile
CN209585034U (en) It can whirl spraying reaming, hole flushing, the integrated umbrella enlarged footing of slip casting for anti-floating anchor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210625