CN107034875A - A kind of circular test pile of assembled and preparation method - Google Patents
A kind of circular test pile of assembled and preparation method Download PDFInfo
- Publication number
- CN107034875A CN107034875A CN201710173557.9A CN201710173557A CN107034875A CN 107034875 A CN107034875 A CN 107034875A CN 201710173557 A CN201710173557 A CN 201710173557A CN 107034875 A CN107034875 A CN 107034875A
- Authority
- CN
- China
- Prior art keywords
- pile
- pile body
- body assembly
- prefabricated
- keyhole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 28
- 238000002360 preparation method Methods 0.000 title claims abstract description 10
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 23
- 230000002787 reinforcement Effects 0.000 claims abstract description 23
- 239000010959 steel Substances 0.000 claims abstract description 23
- 238000012423 maintenance Methods 0.000 claims description 6
- 238000012546 transfer Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 8
- 230000015271 coagulation Effects 0.000 abstract description 2
- 238000005345 coagulation Methods 0.000 abstract description 2
- 239000002689 soil Substances 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 7
- 230000006378 damage Effects 0.000 description 5
- 238000005259 measurement Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 238000002474 experimental method Methods 0.000 description 2
- 238000003032 molecular docking Methods 0.000 description 2
- 230000002277 temperature effect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0094—Moulds for concrete test samples
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/26—Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/54—Piles with prefabricated supports or anchoring parts; Anchoring piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
- E02D5/665—Mould-pipes or other moulds for making piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to a kind of circular test pile of assembled and preparation method, its feature is that it is assembled by spiral pile top, several pile body assembly units;Ring screw groove is set in spiral pile top;Pile body assembly unit be it is prefabricated form, it be by annular bolt, toroidal helical keyhole, instrument hole, steel reinforcement cage and coagulation local soil type into.Spiral pile top and pile body assembly unit are prefabricated in advance, pile body assembly unit is made using a kind of prefabricated mould, the mutual ring screw groove for being fitted by being mounted in spiral pile top of the assembling and pile body assembly unit between pile body assembly unit and spiral pile top, is mounted between the annular bolt in pile body assembly unit and toroidal helical keyhole and is threadedly coupled what is completed.The installation of the invention that pile body is constructed with tester is separated, pile body of first constructing, afterwards embedded tester, both ensure that the assembling quality of pile body, and also can guarantee that the installation quality of tester.
Description
Technical field
The present invention relates to a kind of circular test pile preparation method of assembled, more particularly to a kind of circle of live quick assembling
The preparation method of test pile and pile body.
Background technology
The characteristics of traditional experiment stake:
(1) when pile body is prefabricated, together with tester is prefabricated with pile foundation, then squeeze into ground.Its shortcoming exists
Prestressing force is produced to tester in the setting and hardening and maintenance processes of 1. concrete and temperature effect is acted on, this can be in certain journey
Cause tester misalignment or failure on degree;2. during pile foundation construction, pre-buried tester receives construction power inside pile foundation
Act on (static pressure, impact, shock etc.), it is most likely that destruction instrument;3. tester makes and installed two processes by pile foundation
Afterwards, its precision and accuracy are necessarily significantly influenceed, and the extent of damage of each tester can not be now weighed,
Measurement result is difficult to ensure, is brought to engineering and much test hidden danger.
(2) when pile body is cast-in-place, tester welds together with steel reinforcement cage in advance, is then inserted into cast-in-place hole,
Placing concrete in hole, forms pile body.Its shortcoming is that the precision of the 1. installation site of tester is relatively low;2. tester
Perpendicularity or levelness are difficult to ensure card;3. the setting and hardening and maintenance processes of concrete are produced to tester prestressing force and temperature
Effect is difficult to estimate, and the degree of accuracy of measurement and reliability are difficult to hold;4. damage of the tester in the construction work of pile foundation
Degree can not be tested and counted, and measurement result is difficult to ensure, also bring many test hidden danger to engineering.
To sum up, the subject matter of traditional experiment stake presence is:1. the installation quality of measuring instrument be difficult to ensure that, 2. pile body
The extent of damage brought to tester of constructing is difficult to estimate, 3. there is more engineering test hidden danger.
Therefore, need badly at present seek it is a kind of can guarantee that instrument install and pile body construction quality can guarantee that tester again
Accuracy of measurement, the test pile of live quick assembling pile body and preparation method seem particularly significant.
The content of the invention
The purpose of the present invention is exactly to overcome drawbacks described above there is provided a kind of circular test pile of assembled and preparation method.
The purpose of the present invention is achieved through the following technical solutions:Assembled circle test pile, including:Spiral pile top and
Several pile body assembly units;Ring screw groove is set in spiral pile top;Pile body assembly unit is by annular bolt, toroidal helical bolt
Hole, instrument hole, steel reinforcement cage and coagulation local soil type into;By being mounted in spiral pile top between pile body assembly unit and spiral pile top
Ring screw groove and the annular bolt thread connection being mounted in pile body assembly unit, pile body assembly unit pass through annular each other
Threaded connection between spiral keyhole and annular bolt head and the tail.
As preferred:Annular bolt and toroidal helical keyhole are arranged on the two ends of steel reinforcement cage, and are mounted in concrete together
In.
The prefabricated mould of assembled circle test pile, including precast base, support bar, prefab-form and prefabricated top cover, its
In, precast base sets circular die board slot, fixed keyhole and annular slot, and prefabricated top cover sets fill orifice, hole of vibrating, circular die
Board slot, fixed keyhole and annular plug;Circular die board slot is arranged on the outside of prefabricated top cover, is that annular is inserted on the inside of circular die board slot
Head, fixed keyhole is sequentially distributed in the both sides of fixed keyhole in the centre of prefabricated top cover, fill orifice and hole of vibrating.
As preferred:Prefabricated mould centre sets axostylus axostyle, for forming the instrument hole in pile body assembly unit.
The preparation method of assembled circle test pile, comprises the following steps:
1) spiral pile top, and the setting ring screw groove in spiral pile top are made;
2) annular bolt, toroidal helical keyhole and steel reinforcement cage are made respectively, and annular bolt and toroidal helical keyhole are set
Put at steel reinforcement cage both ends, be stitched together;
3) the annular bolt spliced, toroidal helical keyhole and steel reinforcement cage are placed in the annular slot of precast base,
Then axostylus axostyle is arranged in the fixation keyhole of precast base;
4) prefab-form is laid in the circular die board slot of precast base, and sets support bar to fix prefab-form;
5) prefabricated top cover is installed, make circular die board slot on prefabricated top cover, fixed keyhole and annular plug respectively with it is prefabricated
Template, axostylus axostyle and the intact docking of toroidal helical keyhole;
6) by the fill orifice placing concrete in prefabricated top cover, while by the hole of vibrating in prefabricated top cover to concrete
Carry out vibration compacting;
7) prefabricated top cover and prefab-form are removed after the completion for the treatment of concrete curing, respectively, and by pile body assembly unit from pre-
Hung out in base processed, transfer axostylus axostyle, form instrument hole;
8) repeat step 2)~multiple pile body assembly units 7) are made, then multiple pile body assembly units enter with spiral pile top
Row threaded connection, forms the circular test pile of assembled.
The invention has the characteristics that and benefit:
The installation of the invention that pile body is constructed with tester is separated, pile body of first constructing, afterwards embedded tester, both protects
The assembling quality of pile body has been demonstrate,proved, the installation quality of tester is also can guarantee that.
Preferably ensured by the installation quality of tester, the damage that pile foundation construction can be avoided to be brought to tester, tested
As a result the loading characteristic of pile foundation can be accurately reflected.
Each component in the present invention is prefabricated in the factory in advance, and then assembling construction and installation at the scene, substantially increases and build
Build the industrialization degree of pile foundation.
The present invention is applicable to compression stake, the pile foundation for being equally applicable to uplift pile, also can be suitably used for bearing horizontal loading,
And can be realized by prefabrication and assembly construction.
Brief description of the drawings
Fig. 1 is spiral pile top;
Fig. 2 is pile body assembly unit;
Fig. 3 is prefabricated mould;
Fig. 4 is precast base;
Fig. 5 is prefabricated top cover;
Fig. 6 is that annular bolt, toroidal helical keyhole, steel reinforcement cage and axostylus axostyle schematic diagram are installed in prefabricated mould;
Fig. 7 is the placing concrete in prefabricated mould;
Fig. 8 is annular bolt, toroidal helical keyhole and the spliced sectional axonometric drawing of steel reinforcement cage;
Fig. 9 is the sectional axonometric drawing of pile body assembly unit.
Wherein, 1- spirals pile top;2- ring screw grooves;3- pile body assembly units;4- annular bolts;5- toroidal helical bolts
Hole;6- instrument holes;7- steel reinforcement cages;8- concrete;9- axostylus axostyles;10- precast bases;11- support bars;12- prefab-forms;13- is pre-
Top cover processed;14- fill orifices;15- vibrates hole;16- circular die board slots;17- fixes keyhole;18- annular plugs;19- annular slots.
Embodiment
According to shown in Fig. 1, spiral pile top 1 is made, and ring screw groove 2 is set in spiral pile top 1.
According to shown in Fig. 2 and Fig. 8, annular bolt 4, toroidal helical keyhole 5 and steel reinforcement cage 7 are made respectively, and by annular spiral shell
Bolt 4 and toroidal helical keyhole 5 are arranged on the both ends of steel reinforcement cage 7, are stitched together, as shown in Figure 8.
According to Fig. 3, precast base 10, prefab-form 12 and prefabricated top cover 13 are made successively, and get out support bar
11, and need to set circular die board slot 16, fixed keyhole 17 and annular slot 19 in precast base 10, as shown in figure 4, prefabricated
Fill orifice 14, hole 15 of vibrating, circular die board slot 16, fixed keyhole 17 and annular plug 18 are set in top cover 13, as shown in Figure 5.
According to shown in Fig. 6, the annular bolt 4 spliced, toroidal helical keyhole 5 and steel reinforcement cage 7 are placed in precast base
In 10 annular slot 19, then axostylus axostyle 9 is arranged in the fixation keyhole 17 of precast base 10;At the same time, at prefabricated bottom
Prefab-form 12 is laid in the circular die board slot 16 of seat 10, and sets support bar 11 to fix prefab-form 12, then installs pre-
Top cover 13 processed, make circular die board slot 16 on prefabricated top cover 13, fixed keyhole 17 and annular plug 18 respectively with prefab-form 12,
Axostylus axostyle 9 and the intact docking of toroidal helical keyhole 5.
Reference picture 7, by the placing concrete 8 of fill orifice 14 in prefabricated top cover 13, while by prefabricated top cover 13
Hole 15 vibrate to concrete eight progress vibration compacting, treats after the completion of concrete eight maintenance, prefabricated top cover 13 and prefabricated molds is removed respectively
Plate 12, and pile body assembly unit 3 is hung out from precast base 10, axostylus axostyle 9 is transferred, instrument hole 6 is formed.
Aforesaid operations are repeated, several pile body assembly units 3 are made, then multiple pile body assembly units 3 and spiral pile top 1
It is threadedly coupled, ultimately forms the circular test pile of assembled, as shown in Figure 9.
The circular test pile of the kind assembled of the present embodiment, it is assembled by spiral pile top 1, several pile body assembly units 3
;Ring screw groove 2 is set in spiral pile top 1;Pile body assembly unit 3 be it is prefabricated form, it be by annular bolt 4,
What toroidal helical keyhole 5, instrument hole 6, steel reinforcement cage 7 and concrete eight were constituted.
The circular test pile of foregoing assembled, spiral pile top 1 and pile body assembly unit 3 are prefabricated in advance, pile body dresses
It is made with unit 3 using a kind of prefabricated mould, the mould is by precast base 10, support bar 11, prefab-form 12 and pre-
What top cover 13 processed was constituted, wherein, precast base 10 sets circular die board slot 16, fixed keyhole 17 and annular slot 19, prefabricated top
Lid 13 sets fill orifice 14, hole 15 of vibrating, circular die board slot 16, fixed keyhole 17 and annular plug 18.
The circular test pile of foregoing assembled, assembling and pile body assembling between pile body assembly unit 3 and spiral pile top 1
The mutual ring screw groove 2 for being fitted by being mounted in spiral pile top 1 of unit 3, it is mounted in pile body assembly unit 3
What the threaded connection between annular bolt 4 and toroidal helical keyhole 5 was completed.
Instrument hole 6 in the circular test pile of foregoing assembled, pile body assembly unit 3 is by advance in prefabricated mould
Center portion position sets the formation of axostylus axostyle 9, if it is desired, multiple instrument holes 6 can be set in pile body assembly unit 3.
The circular test pile of foregoing assembled, annular bolt 4 and toroidal helical keyhole 5 are arranged on the two ends of steel reinforcement cage 7, and
It is mounted in together in concrete eight, treats after the completion of concrete eight maintenance, pile body assembly unit 3 is removed from prefabricated mould, and extracts out
The axostylus axostyle 9 at center, forms instrument hole 6.
A kind of preparation method of the circular test pile of assembled, comprises the following steps:
(1) spiral pile top 1, and the setting ring screw groove 2 in spiral pile top 1 are made.
(2) annular bolt 4, toroidal helical keyhole 5 and steel reinforcement cage 7 are made respectively, and by annular bolt 4 and toroidal helical bolt
Hole 5 is arranged on the both ends of steel reinforcement cage 7, is stitched together.
(3) annular that the annular bolt 4 spliced, toroidal helical keyhole 5 and steel reinforcement cage 7 are placed in into precast base 10 is inserted
In groove 19, then axostylus axostyle 9 is arranged in the fixation keyhole 17 of precast base 10.
(4) prefab-form 12 is laid in the circular die board slot 16 of precast base 10, and it is pre- to set support bar 11 to fix
Pallet 12.
(5) prefabricated top cover 13 is installed, makes circular die board slot 16, fixed keyhole 17 and the annular plug 18 on prefabricated top cover 13
Respectively with prefab-form 12, axostylus axostyle 9 and toroidal helical keyhole 5 is intact docks.
(6) by the placing concrete 8 of fill orifice 14 in prefabricated top cover 13, while passing through the hole of vibrating in prefabricated top cover 13
15 pairs of concrete eights carry out vibration compacting.
(7) treat after the completion of concrete eight maintenance, prefabricated top cover 13 and prefab-form 12 are removed respectively, and pile body is assembled single
Member 3 is hung out from precast base 10, transfers axostylus axostyle 9, forms instrument hole 6.
(8) repeat step (2)~(7) make multiple pile body assembly units 3, then multiple pile body assembly units 3 and spiral
Pile top 1 is threadedly coupled, and forms the circular test pile of assembled.
Claims (5)
1. a kind of circular test pile of assembled, it is characterised in that including:Spiral pile top (1) and several pile body assembly units
(3);Ring screw groove (2) is set in spiral pile top (1);Pile body assembly unit (3) is by annular bolt (4), toroidal helical keyhole
(5), instrument hole (6), steel reinforcement cage (7) and concrete (8) composition;By embedding between pile body assembly unit (3) and spiral pile top (1)
Gu ring screw groove (2) in spiral pile top (1) and annular bolt (4) screw thread being mounted in pile body assembly unit (3) connect
Connect, pile body assembly unit (3) passes through the threaded connection between toroidal helical keyhole (5) and annular bolt (4) head and the tail each other.
2. the circular test pile of assembled according to claim 1, it is characterised in that:Annular bolt (4) and toroidal helical bolt
Hole (5) is arranged on the two ends of steel reinforcement cage (7), and is mounted in together in concrete (8).
3. a kind of prefabricated mould of the circular test pile of assembled as claimed in claim 1, it is characterised in that:Including precast base
(10), support bar (11), prefab-form (12) and prefabricated top cover (13), wherein, precast base (10) sets circular die board slot
(16), fixed keyhole (17) and annular slot (19), prefabricated top cover (13) set fill orifice (14), hole of vibrating (15), circular die
Board slot (16), fixed keyhole (17) and annular plug (18);Circular die board slot (16) is arranged on the outside of prefabricated top cover (13), annular
It is annular plug (18) on the inside of template groove (16), fixed keyhole (17) fill orifice (14) and is shaken in the centre of prefabricated top cover (13)
Hole (15) is smash to be sequentially distributed in the both sides of fixed keyhole (17).
4. the prefabricated mould of the circular test pile of assembled according to claim 4, it is characterised in that:Prefabricated mould central part
Position sets axostylus axostyle (9), for forming the instrument hole (6) in pile body assembly unit (3).
5. a kind of preparation method of the circular test pile of assembled as claimed in claim 1, it is characterised in that including following step
Suddenly:
1) spiral pile top (1), and the setting ring screw groove (2) in spiral pile top (1) are made;
2) annular bolt (4), toroidal helical keyhole (5) and steel reinforcement cage (7) are made respectively, and by annular bolt (4) and annular spiral shell
Rotation keyhole (5) is arranged on steel reinforcement cage (7) both ends, is stitched together;
3) the annular bolt (4) spliced, toroidal helical keyhole (5) and steel reinforcement cage (7) are placed in the ring of precast base (10)
In shape slot (19), then axostylus axostyle (9) is arranged in the fixation keyhole (17) of precast base (10);
4) prefab-form (12) is laid in the circular die board slot (16) of precast base (10), and sets support bar (11) to fix
Prefab-form (12);
5) prefabricated top cover (13) is installed, the circular die board slot (16) on prefabricated top cover (13), fixed keyhole (17) and annular is inserted
Head (18) respectively with prefab-form (12), axostylus axostyle (9) and toroidal helical keyhole (5) is intact docks;
6) by fill orifice (14) placing concrete (8) in prefabricated top cover (13), while passing through shaking in prefabricated top cover (13)
Smash hole (15) and vibration compacting is carried out to concrete (8);
7) treat after the completion of concrete (8) maintenance, prefabricated top cover (13) and prefab-form (12) are removed respectively, and pile body is assembled single
First (3) are hung out from precast base (10), transfer axostylus axostyle (9), form instrument hole (6);
8) repeat step 2)~multiple pile body assembly units (3) 7) are made, then multiple pile body assembly units (3) and spiral pile top
(1) it is threadedly coupled, forms the circular test pile of assembled.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710173557.9A CN107034875B (en) | 2017-03-22 | 2017-03-22 | A kind of assembled circle test pile and production method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710173557.9A CN107034875B (en) | 2017-03-22 | 2017-03-22 | A kind of assembled circle test pile and production method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107034875A true CN107034875A (en) | 2017-08-11 |
CN107034875B CN107034875B (en) | 2019-02-22 |
Family
ID=59534586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710173557.9A Active CN107034875B (en) | 2017-03-22 | 2017-03-22 | A kind of assembled circle test pile and production method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107034875B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989080A (en) * | 2018-01-04 | 2018-05-04 | 宁波大学 | A kind of fabricated rectangular model stake and preparation method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005264479A (en) * | 2004-03-17 | 2005-09-29 | Mitani Sekisan Co Ltd | Method of joining prefabricated pile, and joint hardware for prefabricated pile |
CN201722711U (en) * | 2010-05-13 | 2011-01-26 | 机械工业勘察设计研究院 | Internal force testing device for PHC tubular pile load test |
CN103603336A (en) * | 2013-10-31 | 2014-02-26 | 周兆弟 | Grouting precast pile and grouting method |
CN104652421A (en) * | 2015-02-16 | 2015-05-27 | 济南轨道交通集团有限公司 | Prefabricated round pipe pile and connecting method thereof |
CN206768882U (en) * | 2017-03-22 | 2017-12-19 | 深圳市福田建安建设集团有限公司 | A kind of assembled circle test pile |
-
2017
- 2017-03-22 CN CN201710173557.9A patent/CN107034875B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005264479A (en) * | 2004-03-17 | 2005-09-29 | Mitani Sekisan Co Ltd | Method of joining prefabricated pile, and joint hardware for prefabricated pile |
CN201722711U (en) * | 2010-05-13 | 2011-01-26 | 机械工业勘察设计研究院 | Internal force testing device for PHC tubular pile load test |
CN103603336A (en) * | 2013-10-31 | 2014-02-26 | 周兆弟 | Grouting precast pile and grouting method |
CN104652421A (en) * | 2015-02-16 | 2015-05-27 | 济南轨道交通集团有限公司 | Prefabricated round pipe pile and connecting method thereof |
CN206768882U (en) * | 2017-03-22 | 2017-12-19 | 深圳市福田建安建设集团有限公司 | A kind of assembled circle test pile |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107989080A (en) * | 2018-01-04 | 2018-05-04 | 宁波大学 | A kind of fabricated rectangular model stake and preparation method thereof |
CN107989080B (en) * | 2018-01-04 | 2023-08-22 | 宁波宁大工程建设监理有限公司 | Assembled rectangular model pile and manufacturing method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN107034875B (en) | 2019-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5232106B2 (en) | Construction method of seismic isolation structure | |
US10378173B2 (en) | Method of building a foundation comprising a steel monopile and a concrete part and associated foundation for construction work | |
KR101819533B1 (en) | A Base Bracket for the Deck-road | |
CN107034875A (en) | A kind of circular test pile of assembled and preparation method | |
CN206768882U (en) | A kind of assembled circle test pile | |
CN206768883U (en) | A kind of prefabricated mould of the circular experiment pile body of assembled | |
KR101893658B1 (en) | Apparatus for a mold for joint part between case in place uper end of pile and rear bridge for monopile construnction | |
JP6624797B2 (en) | Construction method of pile foundation structure and pile foundation structure | |
JP2019100088A (en) | Pile head isolation structure and construction method thereof | |
CN115508035A (en) | Anti-seismic civil test equipment and arrangement method | |
GB1599341A (en) | Method and a device for mounting points in mounting areas | |
JP2018100488A (en) | Base-isolation construction, base plate and method for construction of lower foundation member | |
JP2022551760A (en) | Anchor devices, anchors including anchor devices, and methods of manufacturing anchors | |
KR101961279B1 (en) | Method for reinforcing ground using connection structure of hollow type pile and horizontal rebar | |
CN109898540A (en) | Wet-make connection structure and its construction technology between bridge pier, cushion cap and pile foundation | |
JPH1181343A (en) | Embedded footing | |
JP2019100087A (en) | Pile head isolation structure and construction method thereof | |
JP2002097818A (en) | Method of installing base isolating foundation frame for building | |
JP6953723B2 (en) | Construction method of seismic isolation structure | |
CN218622305U (en) | Prefabricated steel formwork device of security protection rail basis | |
JPH09296565A (en) | Precast concrete column, its manufacture, and execution method | |
CN211774533U (en) | Novel integral beam column of high-efficient installation node assembly | |
CN210828065U (en) | Prefabricated part | |
CN211774537U (en) | A ground beam and post connecting device for prefabricated building | |
KR102518313B1 (en) | Bridge Construction Method For Deck Rod Having Configuration For Securing Ease Of On-Site Assembly Using Precast And Configuration For Height Adjustment To Prevent Height Errors |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |