CN107034875B - A kind of assembled circle test pile and production method - Google Patents

A kind of assembled circle test pile and production method Download PDF

Info

Publication number
CN107034875B
CN107034875B CN201710173557.9A CN201710173557A CN107034875B CN 107034875 B CN107034875 B CN 107034875B CN 201710173557 A CN201710173557 A CN 201710173557A CN 107034875 B CN107034875 B CN 107034875B
Authority
CN
China
Prior art keywords
pile
pile body
body assembly
keyhole
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710173557.9A
Other languages
Chinese (zh)
Other versions
CN107034875A (en
Inventor
吴金兴
吴晓斌
吴晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Original Assignee
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd filed Critical SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority to CN201710173557.9A priority Critical patent/CN107034875B/en
Publication of CN107034875A publication Critical patent/CN107034875A/en
Application granted granted Critical
Publication of CN107034875B publication Critical patent/CN107034875B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0094Moulds for concrete test samples
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/26Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to a kind of assembled circle test pile and production methods, it is characterized in that it is assembled by spiral pile top, several pile body assembly units;Ring screw slot is set in spiral pile top;Made of pile body assembly unit is prefabricated, it be by annular bolt, toroidal helical keyhole, instrument hole, steel reinforcement cage and coagulation local soil type at.Spiral pile top and pile body assembly unit are prefabricated in advance, pile body assembly unit is made using a kind of prefabricated mould, and the assembly and pile body assembly unit between pile body assembly unit and spiral pile top are mutual to be fitted by the ring screw slot being mounted in spiral pile top, is mounted in what being threadedly coupled between the annular bolt in pile body assembly unit and toroidal helical keyhole was completed.Pile body is constructed and is mutually separated with the installation of test equipment by the present invention, and pile body of first constructing buries test equipment afterwards, both ensure that the assembling quality of pile body, and also can guarantee the installation quality of test equipment.

Description

A kind of assembled circle test pile and production method
Technical field
The present invention relates to a kind of assembled circle test pile production method, in particular to a kind of circle of live quick assembling The production method of test pile and pile body.
Background technique
The characteristics of traditional experiment stake:
(1) when pile body is prefabricated, test equipment and pile foundation are prefabricated together, then squeeze into ground.Its disadvantage exists Prestressing force and temperature effect effect are generated to test equipment in the setting and hardening and maintenance processes of 1. concrete, this can be in certain journey Lead to test equipment misalignment or failure on degree;2. during pile foundation construction, pre-buried test equipment receives construction power inside pile foundation It acts on (static pressure, impact, shock etc.), it is most likely that destroy instrument;3. test equipment makes and installs two processes by pile foundation Afterwards, precision and accuracy are necessarily significantly influenced, and can not measure the extent of damage of each test equipment at this time, Measurement result is not easy to guarantee, brings to engineering and much test hidden danger.
(2) when pile body is cast-in-place, test equipment welds together with steel reinforcement cage in advance, is then inserted into cast-in-place hole, Placing concrete in hole forms pile body.Its shortcoming is that 1. the precision of the installation site of test equipment is lower;2. test equipment Verticality or levelness are difficult to guarantee;3. prestressing force and temperature that the setting and hardening of concrete and maintenance processes generate test equipment Effect is difficult to estimate, and the accuracy of measurement and reliability are difficult to hold;4. damage of the test equipment in the construction work of pile foundation Degree is unable to test and counts, and measurement result is not easy to guarantee, also brings many test hidden danger to engineering.
To sum up, main problem existing for traditional experiment stake is: 1. the installation quality of measuring instrument be difficult to ensure, 2. pile body It constructs and is difficult to estimate to the test equipment bring extent of damage, 3. there is more engineering test hidden danger.
Therefore, it needs to seek at present a kind of to can guarantee that instrument installation and pile body construction quality can guarantee test equipment again Accuracy of measurement, the test pile of live quick assembling pile body and production method seem particularly significant.
Summary of the invention
The object of the invention is to overcome drawbacks described above, a kind of assembled circle test pile and production method are provided.
The purpose of the present invention is what is be achieved through the following technical solutions: assembled circle test pile, comprising: spiral pile top and Several pile body assembly units;Ring screw slot is set in spiral pile top;Pile body assembly unit is by annular bolt, toroidal helical bolt Hole, instrument hole, steel reinforcement cage and coagulation local soil type at;By being mounted in spiral pile top between pile body assembly unit and spiral pile top Ring screw slot is connected with the annular bolt thread being mounted in pile body assembly unit, and pile body assembly unit passes through annular each other Threaded connection between spiral keyhole and annular bolt head and the tail.
As preferred: the both ends of steel reinforcement cage are arranged in annular bolt and toroidal helical keyhole, and are mounted in concrete together In.
The prefabricated mould of assembled circle test pile, including precast base, support rod, prefab-form and prefabricated top cover, In, precast base is arranged circular die board slot, fixed keyhole and annular slot, prefabricated top cover and fill orifice, hole of vibrating, circular die is arranged Board slot, fixed keyhole and annular plug;Circular die board slot is arranged on the outside of prefabricated top cover, is that annular is inserted on the inside of circular die board slot Head, fixed keyhole are sequentially distributed in the centre of prefabricated top cover, fill orifice and hole of vibrating in the two sides of fixed keyhole.
As preferred: shaft, the instrument hole being used to form in pile body assembly unit is arranged in prefabricated mould centre.
The production method of assembled circle test pile, includes the following steps:
1) spiral pile top is made, and ring screw slot is set in spiral pile top;
2) annular bolt, toroidal helical keyhole and steel reinforcement cage are made respectively, and annular bolt and toroidal helical keyhole are set It sets at steel reinforcement cage both ends, is stitched together;
3) the annular bolt spliced, toroidal helical keyhole and steel reinforcement cage are placed in the annular slot of precast base, Then shaft is mounted in the fixation keyhole of precast base;
4) prefab-form is placed in the circular die board slot of precast base, and support rod is set and fixes prefab-form;
5) prefabricated top cover is installed, make circular die board slot on prefabricated top cover, fixed keyhole and annular plug respectively with it is prefabricated Template, shaft and the intact docking of toroidal helical keyhole;
6) by the fill orifice placing concrete in prefabricated top cover, while by the hole of vibrating in prefabricated top cover to concrete Carry out vibration compacting;
7) prefabricated top cover and prefab-form are removed after the completion of concrete curing, respectively, and by pile body assembly unit from pre- It is hung out in pedestal processed, transfers shaft, form instrument hole;
8) step 2)~7 are repeated) the multiple pile body assembly units of production, then multiple pile body assembly units and spiral pile top into Row is threadedly coupled, and forms assembled circle test pile.
The invention has the characteristics that and benefit:
Pile body is constructed and is mutually separated with the installation of test equipment by the present invention, and pile body of first constructing buries test equipment afterwards, both protects The assembling quality of pile body has been demonstrate,proved, also can guarantee the installation quality of test equipment.
Preferably guaranteed by the installation quality of test equipment, can avoid pile foundation construction and damaged to test equipment bring, test As a result the loading characteristic of pile foundation can be accurately reflected.
Each component in the present invention is prefabricated in the factory in advance, and then assembling construction and installation at the scene, substantially increases and build Build the industrialization degree of pile foundation.
The present invention is the pile foundation for being applicable to compression stake, being equally applicable to uplift pile, also can be suitably used for bearing horizontal loading, And it can be realized by prefabrication and assembly construction.
Detailed description of the invention
Fig. 1 is spiral pile top;
Fig. 2 is pile body assembly unit;
Fig. 3 is prefabricated mould;
Fig. 4 is precast base;
Fig. 5 is prefabricated top cover;
Fig. 6 is that annular bolt, toroidal helical keyhole, steel reinforcement cage and shaft schematic diagram are installed in prefabricated mould;
Fig. 7 is the placing concrete in prefabricated mould;
Fig. 8 is annular bolt, toroidal helical keyhole and the spliced sectional axonometric drawing of steel reinforcement cage;
Fig. 9 is the sectional axonometric drawing of pile body assembly unit.
Wherein, 1- spiral pile top;2- ring screw slot;3- pile body assembly unit;4- annular bolt;5- toroidal helical bolt Hole;6- instrument hole;7- steel reinforcement cage;8- concrete;9- shaft;10- precast base;11- support rod;12- prefab-form;13- is pre- Top cover processed;14- fill orifice;15- vibrates hole;16- circular die board slot;17- fixes keyhole;18- annular plug;19- annular slot.
Specific embodiment
According to shown in Fig. 1, spiral pile top 1 is made, and ring screw slot 2 is set in spiral pile top 1.
According to shown in Fig. 2 and Fig. 8, annular bolt 4, toroidal helical keyhole 5 and steel reinforcement cage 7 are made respectively, and by annular spiral shell Bolt 4 and toroidal helical keyhole 5 are arranged at 7 both ends of steel reinforcement cage, are stitched together, as shown in Figure 8.
According to Fig.3, precast base 10, prefab-form 12 and prefabricated top cover 13 are successively made, and gets out support rod 11, and need that circular die board slot 16, fixed keyhole 17 and annular slot 19 is arranged in precast base 10, as shown in figure 4, prefabricated Fill orifice 14, hole 15 of vibrating, circular die board slot 16, fixed keyhole 17 and annular plug 18 are set in top cover 13, as shown in Figure 5.
According to shown in Fig. 6, the annular bolt 4 spliced, toroidal helical keyhole 5 and steel reinforcement cage 7 are placed in precast base In 10 annular slot 19, then shaft 9 is mounted in the fixation keyhole 17 of precast base 10;At the same time, at prefabricated bottom Prefab-form 12 is placed in the circular die board slot 16 of seat 10, and support rod 11 is set and fixes prefab-form 12, and then installation is pre- Top cover 13 processed, make circular die board slot 16 on prefabricated top cover 13, fixed keyhole 17 and annular plug 18 respectively with prefab-form 12, Shaft 9 and the intact docking of toroidal helical keyhole 5.
Referring to Fig. 7, by 14 placing concrete 8 of fill orifice in prefabricated top cover 13, while by prefabricated top cover 13 Hole 15 of vibrating carries out vibration compacting to concrete eight, after the completion of concrete eight maintenance, removes prefabricated top cover 13 and prefabricated molds respectively Plate 12, and pile body assembly unit 3 is hung out from precast base 10, shaft 9 is transferred, instrument hole 6 is formed.
Aforesaid operations are repeated, several pile body assembly units 3 are made, then multiple pile body assembly units 3 and spiral pile top 1 It is threadedly coupled, ultimately forms assembled circle test pile, as shown in Figure 9.
The kind assembled circle test pile of the present embodiment, it is assembled by spiral pile top 1, several pile body assembly units 3 Made of;Ring screw slot 2 is set in spiral pile top 1;Made of pile body assembly unit 3 is prefabricated, it be by annular bolt 4, What toroidal helical keyhole 5, instrument hole 6, steel reinforcement cage 7 and concrete eight formed.
Assembled circle test pile above-mentioned, spiral pile top 1 and pile body assembly unit 3 are prefabricated in advance, pile body dresses It is made with unit 3 using a kind of prefabricated mould, which is by precast base 10, support rod 11, prefab-form 12 and pre- What top cover 13 processed formed, wherein circular die board slot 16, fixed keyhole 17 and annular slot 19, prefabricated top is arranged in precast base 10 Fill orifice 14, hole 15 of vibrating, circular die board slot 16, fixed keyhole 17 and annular plug 18 is arranged in lid 13.
Assembled circle test pile above-mentioned, assembly and pile body assembly between pile body assembly unit 3 and spiral pile top 1 Unit 3 is mutual to be fitted by the ring screw slot 2 being mounted in spiral pile top 1, is mounted in pile body assembly unit 3 What the threaded connection between annular bolt 4 and toroidal helical keyhole 5 was completed.
Assembled circle test pile above-mentioned, the instrument hole 6 in pile body assembly unit 3 are by advance in prefabricated mould Center portion position is arranged what shaft 9 was formed, if it is desired, multiple instrument holes 6 can be arranged in pile body assembly unit 3.
The both ends of steel reinforcement cage 7 are arranged in assembled circle test pile above-mentioned, annular bolt 4 and toroidal helical keyhole 5, and It is mounted in concrete eight, after the completion of concrete eight maintenance, pile body assembly unit 3 is removed from prefabricated mould, and extracts out together The shaft 9 at center forms instrument hole 6.
A kind of production method of assembled circle test pile, includes the following steps:
(1) spiral pile top 1 is made, and ring screw slot 2 is set in spiral pile top 1.
(2) annular bolt 4, toroidal helical keyhole 5 and steel reinforcement cage 7 are made respectively, and by annular bolt 4 and toroidal helical bolt Hole 5 is arranged at 7 both ends of steel reinforcement cage, is stitched together.
(3) annular that the annular bolt 4 spliced, toroidal helical keyhole 5 and steel reinforcement cage 7 are placed in precast base 10 is inserted In slot 19, then shaft 9 is mounted in the fixation keyhole 17 of precast base 10.
(4) in the circular die board slot 16 of precast base 10 place prefab-form 12, and be arranged support rod 11 fix it is pre- Pallet 12.
(5) prefabricated top cover 13 is installed, circular die board slot 16, fixed keyhole 17 and annular plug 18 on prefabricated top cover 13 are made Respectively with prefab-form 12, shaft 9 and toroidal helical keyhole 5 is intact docks.
(6) by 14 placing concrete 8 of fill orifice in prefabricated top cover 13, while passing through the hole of vibrating in prefabricated top cover 13 15 pairs of concrete eights carry out vibration compacting.
(7) after the completion of concrete eight maintenance, prefabricated top cover 13 and prefab-form 12 are removed respectively, and pile body is assembled into list Member 3 is hung out from precast base 10, transfers shaft 9, forms instrument hole 6.
(8) step (2)~(7) are repeated and makes multiple pile body assembly units 3, then multiple pile body assembly units 3 and spiral Pile top 1 is threadedly coupled, and assembled circle test pile is formed.

Claims (3)

1. a kind of assembled circle test pile characterized by comprising spiral pile top (1) and several pile body assembly units (3);Ring screw slot (2) are set in spiral pile top (1);Pile body assembly unit (3) is by annular bolt (4), toroidal helical keyhole (5), instrument hole (6), steel reinforcement cage (7) and concrete (8) composition;By embedding between pile body assembly unit (3) and spiral pile top (1) Gu connecting in the ring screw slot (2) on spiral pile top (1) and annular bolt (4) screw thread being mounted in pile body assembly unit (3) It connects, pile body assembly unit (3) passes through the threaded connection between toroidal helical keyhole (5) and annular bolt (4) head and the tail each other;Ring Shape bolt (4) and toroidal helical keyhole (5) are arranged at the both ends of steel reinforcement cage (7), and are mounted in concrete (8) together;Including Precast base (10), support rod (11), prefab-form (12) and prefabricated top cover (13), wherein precast base (10) setting annular Template slot (16), fixed keyhole (17) and annular slot (19), prefabricated top cover (13) setting fill orifice (14), hole of vibrating (15), Circular die board slot (16), fixed keyhole (17) and annular plug (18);Circular die board slot (16) setting prefabricated top cover (13) outside Side, circular die board slot (16) inside is annular plug (18), the centre of fixed keyhole (17) in prefabricated top cover (13), fill orifice (14) it is sequentially distributed with hole of vibrating (15) in the two sides of fixed keyhole (17).
2. the prefabricated mould of assembled circle test pile according to claim 1, it is characterised in that: prefabricated mould central part Position setting shaft (9), the instrument hole (6) being used to form in pile body assembly unit (3).
3. a kind of production method of assembled circle test pile as described in claim 1, it is characterised in that including step below It is rapid:
1) spiral pile top (1) is made, and ring screw slot (2) is set on spiral pile top (1);
2) annular bolt (4), toroidal helical keyhole (5) and steel reinforcement cage (7) are made respectively, and by annular bolt (4) and annular spiral shell It revolves keyhole (5) to be arranged at steel reinforcement cage (7) both ends, be stitched together;
3) the annular bolt (4) spliced, toroidal helical keyhole (5) and steel reinforcement cage (7) are placed in the ring of precast base (10) In shape slot (19), then shaft (9) is mounted in the fixation keyhole (17) of precast base (10);
4) prefab-form (12) are placed in the circular die board slot (16) of precast base (10), and support rod (11) is set and is fixed Prefab-form (12);
5) prefabricated top cover (13) are installed, insert the circular die board slot (16) on prefabricated top cover (13), fixed keyhole (17) and annular Head (18) respectively with prefab-form (12), shaft (9) and toroidal helical keyhole (5) is intact docks;
6) by fill orifice (14) placing concrete (8) in prefabricated top cover (13), while passing through the vibration in prefabricated top cover (13) It smashes hole (15) and vibration compacting is carried out to concrete (8);
7) after the completion of concrete (8) maintenance, prefabricated top cover (13) and prefab-form (12) are removed respectively, and pile body is assembled into list First (3) are hung out from precast base (10), are transferred shaft (9), are formed instrument hole (6);
8) step 2)~7 are repeated) the multiple pile body assembly units (3) of production, then multiple pile body assembly units (3) and spiral pile top (1) it is threadedly coupled, forms assembled circle test pile.
CN201710173557.9A 2017-03-22 2017-03-22 A kind of assembled circle test pile and production method Active CN107034875B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710173557.9A CN107034875B (en) 2017-03-22 2017-03-22 A kind of assembled circle test pile and production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710173557.9A CN107034875B (en) 2017-03-22 2017-03-22 A kind of assembled circle test pile and production method

Publications (2)

Publication Number Publication Date
CN107034875A CN107034875A (en) 2017-08-11
CN107034875B true CN107034875B (en) 2019-02-22

Family

ID=59534586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710173557.9A Active CN107034875B (en) 2017-03-22 2017-03-22 A kind of assembled circle test pile and production method

Country Status (1)

Country Link
CN (1) CN107034875B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107989080B (en) * 2018-01-04 2023-08-22 宁波宁大工程建设监理有限公司 Assembled rectangular model pile and manufacturing method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4609627B2 (en) * 2004-03-17 2011-01-12 三谷セキサン株式会社 Joining method of ready-made piles, Joined hardware of ready-made piles
CN201722711U (en) * 2010-05-13 2011-01-26 机械工业勘察设计研究院 Internal force testing device for PHC tubular pile load test
CN103603336B (en) * 2013-10-31 2017-01-11 周兆弟 Grouting precast pile and grouting method
CN104652421B (en) * 2015-02-16 2016-11-30 济南轨道交通集团有限公司 A kind of prefabricated pipe stake and method of attachment
CN206768882U (en) * 2017-03-22 2017-12-19 深圳市福田建安建设集团有限公司 A kind of assembled circle test pile

Also Published As

Publication number Publication date
CN107034875A (en) 2017-08-11

Similar Documents

Publication Publication Date Title
CN106460355B (en) The pedestal of wind turbine
JP5232106B2 (en) Construction method of seismic isolation structure
US20160108600A1 (en) Concrete Foundation, Method for Producing a Concrete Foundation for a Wind Power Tower, and Positioning Device for Positioning Jacket Pipes in a Concrete Foundation
CN102953394B (en) Precise foundation bolt positioning device
CN109853610A (en) Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method
CN117646384B (en) Assembled pier without bearing platform for conventional area and construction method
CN107034875B (en) A kind of assembled circle test pile and production method
CN102979109B (en) Design method of assembled-type prestressed concrete cylindrical column base
JP6924683B2 (en) Pile head seismic isolation structure and its construction method
JP6924682B2 (en) Pile head seismic isolation structure and its construction method
US11028551B2 (en) Foundation for a tower of a wind-turbine
CN111660409A (en) Large-span tunnel lining model prefabricating device and method in geomechanical model test
CN206768882U (en) A kind of assembled circle test pile
CN215594016U (en) Mounting structure of shock insulation support
JP6624797B2 (en) Construction method of pile foundation structure and pile foundation structure
CN104278798A (en) Fastening process of steel structure column foot concrete and fixed connection device of steel structure column foot concrete
CN206768883U (en) A kind of prefabricated mould of the circular experiment pile body of assembled
US20160201289A1 (en) Reinforcement block construction process and piles prolongation for dynamic pile tests, metallic mold and reinforcement block
KR20110049811A (en) Installation method of equipment and anchor member supporting mechanism and anchor bolt unit
CN114263206B (en) Assembled concrete foundation and construction method thereof
CN115508035A (en) Anti-seismic civil test equipment and arrangement method
CN109201971A (en) For making the positioning device and its construction method of pile foundation steel bar cage
GB1599341A (en) Method and a device for mounting points in mounting areas
CN109898540B (en) Wet joint structure among bridge pier, bearing platform and pile foundation and construction process thereof
CN208346841U (en) Load-bearing basis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant