CN104480861B - 消除人行天桥y型桥墩不平衡荷载安全吊装方法 - Google Patents
消除人行天桥y型桥墩不平衡荷载安全吊装方法 Download PDFInfo
- Publication number
- CN104480861B CN104480861B CN201410683512.2A CN201410683512A CN104480861B CN 104480861 B CN104480861 B CN 104480861B CN 201410683512 A CN201410683512 A CN 201410683512A CN 104480861 B CN104480861 B CN 104480861B
- Authority
- CN
- China
- Prior art keywords
- bridge pier
- type bridge
- unbalanced load
- steel
- short beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410683512.2A CN104480861B (zh) | 2014-11-24 | 2014-11-24 | 消除人行天桥y型桥墩不平衡荷载安全吊装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410683512.2A CN104480861B (zh) | 2014-11-24 | 2014-11-24 | 消除人行天桥y型桥墩不平衡荷载安全吊装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104480861A CN104480861A (zh) | 2015-04-01 |
CN104480861B true CN104480861B (zh) | 2016-09-14 |
Family
ID=52755459
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410683512.2A Active CN104480861B (zh) | 2014-11-24 | 2014-11-24 | 消除人行天桥y型桥墩不平衡荷载安全吊装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104480861B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105335572B (zh) * | 2015-11-24 | 2019-04-23 | 中国航空工业集团公司沈阳飞机设计研究所 | 一种飞机结构连接载荷错峰分流设计方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS611193Y2 (zh) * | 1980-12-06 | 1986-01-16 | ||
JP2005090108A (ja) * | 2003-09-18 | 2005-04-07 | Sumitomo Metal Ind Ltd | 橋梁の架設工法 |
CN101487233A (zh) * | 2009-03-03 | 2009-07-22 | 四川公路桥梁建设集团有限公司 | 大跨径钢箱梁斜拉桥临时墩墩顶梁段的安装方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6111193Y2 (zh) * | 1981-03-13 | 1986-04-09 |
-
2014
- 2014-11-24 CN CN201410683512.2A patent/CN104480861B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS611193Y2 (zh) * | 1980-12-06 | 1986-01-16 | ||
JP2005090108A (ja) * | 2003-09-18 | 2005-04-07 | Sumitomo Metal Ind Ltd | 橋梁の架設工法 |
CN101487233A (zh) * | 2009-03-03 | 2009-07-22 | 四川公路桥梁建设集团有限公司 | 大跨径钢箱梁斜拉桥临时墩墩顶梁段的安装方法 |
Non-Patent Citations (2)
Title |
---|
大跨连续刚构桥悬臂施工阶段力学性能研究;王集忠;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20131215(第S2期);第5页 * |
预应力连续箱梁悬臂施工墩梁临时固结形式及设计计算注意事项;胡贵松;《中铁五局哈大铁路客运专线施工论文集》;20100630;第110-112页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104480861A (zh) | 2015-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104141383B (zh) | 一种贝雷梁悬吊模板支撑体系及其施工工法 | |
CN103114681B (zh) | 高空大跨度钢筋混凝土梁的待浇筑结构 | |
CN103930634B (zh) | 模板支撑件的改进 | |
CN102364012B (zh) | 一种既有大跨度桁架扩建方法 | |
CN105152032A (zh) | 封闭环境厂房内桥式起重机的安装方法 | |
CN203947771U (zh) | 一种贝雷梁悬吊模板支撑体系 | |
Morgenthal et al. | Engineering the tower and main span construction of stonecutters bridge | |
CN104452603A (zh) | 一种箱梁桥水平转体施工的平衡称重结构及方法 | |
CN203296361U (zh) | 大跨度钢结构跨外组对吊装平台 | |
Shi et al. | Failure analysis of a girder bridge collapse under eccentric heavy vehicles | |
CN204589822U (zh) | 一种独柱双悬臂盖梁抱箍施工支撑系统 | |
CN103774560B (zh) | 悬挂式现浇模板弯桥施工工法 | |
CN102134832B (zh) | 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架 | |
CN104963295A (zh) | 非落地内力平衡式现浇梁支撑架及其施工方法 | |
CN103233426A (zh) | 一种软基中无支墩的贝雷梁支架及其支护方法 | |
CN104480861B (zh) | 消除人行天桥y型桥墩不平衡荷载安全吊装方法 | |
CN102002912A (zh) | 宽翼缘同步施工式牵索挂篮 | |
CN105088961B (zh) | 一种边跨合拢段与现浇段合并的施工方法 | |
CN101649603A (zh) | 50米t型梁预制安装工艺 | |
CN103523665B (zh) | 一种门座式起重机的运输迁移装置及方法 | |
CN104775363B (zh) | 上塔柱钢筋节段的组拼方法 | |
CN201722604U (zh) | 竖向传力支座 | |
CN106906750A (zh) | 一种多功能跨铁路线平转桥梁合龙施工模架及其施工方法 | |
CN203729211U (zh) | 悬挂式弯桥面板现浇模板 | |
CN206902913U (zh) | 一种高空大跨度悬挑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Ou Zhiyong Inventor after: Liao Libo Inventor after: Li Yi Inventor after: Li Shuling Inventor after: Zhou Shanxue Inventor after: He Yong Inventor after: Qin Sen Inventor after: Huang Xiaozhang Inventor before: Ou Zhiyong Inventor before: Liao Libo Inventor before: Li Yi Inventor before: Hu Daolin Inventor before: Wei Baojuan Inventor before: Qin Sen Inventor before: Li Shuzhen Inventor before: Wei Yuanji |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee after: Guangxi Construction Industry Group Metallurgical Construction Co., Ltd. Address before: No. 115 Beiqiao Road, Liuzhou City, Guangxi Zhuang Autonomous Region Patentee before: Guangxi Zhuang Autonomous Region metallurgical construction company |
|
CP01 | Change in the name or title of a patent holder |