CN102002912A - 宽翼缘同步施工式牵索挂篮 - Google Patents

宽翼缘同步施工式牵索挂篮 Download PDF

Info

Publication number
CN102002912A
CN102002912A CN2010102559411A CN201010255941A CN102002912A CN 102002912 A CN102002912 A CN 102002912A CN 2010102559411 A CN2010102559411 A CN 2010102559411A CN 201010255941 A CN201010255941 A CN 201010255941A CN 102002912 A CN102002912 A CN 102002912A
Authority
CN
China
Prior art keywords
transverse beam
cross beam
construction
main longitudinal
wide width
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102559411A
Other languages
English (en)
Inventor
余秀平
牛子民
李道显
孙小猛
黄新
欧阳石
李军
裴培
岳雷
王国正
张勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN2010102559411A priority Critical patent/CN102002912A/zh
Publication of CN102002912A publication Critical patent/CN102002912A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种宽翼缘同步施工式牵索挂篮,包括有前横梁、中横梁、后横梁,前横梁、中横梁、后横梁之间连接有主纵梁、次纵梁,中横梁与后横梁的两端分别延伸到主纵梁外侧构成宽翼缘板浇筑平台,中横梁的两端分别固定连接有C型挂钩,中横梁、后横梁上固定连接有方形的抗剪柱,抗剪柱伸入到桥体的斜腹板与底板交界处开设的定位孔内。本发明的止推系统构造简单、受力明确、可操作性强,能够充分发挥高强混凝土局部承压能力,完全可以满足施工需要,每个悬浇节段施工周期缩短了2-3天的时间,提高了施工速度,缩短了悬浇段施工周期。

Description

宽翼缘同步施工式牵索挂篮 
技术领域
本发明涉及桥梁的悬浇段宽翼缘箱梁施工工艺,具体属于宽翼缘同步施工式牵索挂篮。 
背景技术
宽翼缘主梁施工一般采用两种方法:一是宽翼缘悬臂后浇,该方法虽然减小了C型挂钩的设计难度,但是需要增加两只挂篮进行两侧翼缘板后浇施工,将会延长循环节段工期,增加了人力和物资投入。二是设计强大的C型挂钩,但是超长悬臂给C型挂钩的设计增加了很大难度。采用牵索挂篮悬浇的混凝土斜拉桥,其翼缘板悬臂一般都不大,大多在1.5m以内,而本桥为5.7m,牵索挂篮弧形首和主纵梁必须与斜拉索在同一平面内,且翼缘板较薄,也就是说其C型挂钩从挂篮主纵梁出发,绕过5.7m的悬臂翼缘板,最终挂在箱室边缘部分,这势必造成C型挂钩设计过于庞大。 
一般的牵索挂篮抗剪止推系统和牵索面在同一竖直平面内,从设计角度上来看,此止推系统堪称完美,从施工角度来说,此止推系统安装难度颇大;有以下几个缺点:①首先精轧螺纹钢预留孔穿过底板混凝土,易造成预留孔平面位置精度不够、倾斜度偏大,达不到安装质量要求;②受操作空间限制,止推系统的螺杆和螺母旋紧困难,千斤顶的油管连接也不方便;③实际施工中止推系统安装误差较大,不得不在止推系统的螺杆前端增设钢垫板,或取下螺杆、螺母而直接以钢垫板替代。④此止推系统要求混凝土止推部分完全处于同一面上。 
发明内容
本发明的目的是提供一种宽翼缘同步施工式牵索挂篮,每个循环节段同时施工待浇段箱梁和已浇段箱梁两侧的宽翼缘,止推系统构造简单、受力明确、可操作性强,能够充分发挥高强混凝土局部承压能力,完全可以满足施工需要, 每个悬浇节段浇施工周期缩短了2-3天的时间,提高了施工速度,缩短了悬浇段施工周期。 
本发明的技术方案如下: 
宽翼缘同步施工式牵索挂篮,包括有前横梁、中横梁、后横梁,前横梁、中横梁、后横梁之间连接有主纵梁、次纵梁,中横梁与后横梁的两端分别延伸到主纵梁外侧构成宽翼缘板浇筑平台,中横梁的两端分别固定连接有C型挂钩,中横梁、后横梁上固定连接有方形的抗剪柱,抗剪柱伸入到桥体的斜腹板与底板交界处开设的定位孔内。 
所述主纵梁与次纵梁之间连接有斜撑,前横梁与中横梁之间连接有纵撑。 
所述的主纵梁的前端固定连接有弧形首。 
本发明的宽翼缘同步施工式牵索挂篮的总体施工布置为待浇段(n+1)块箱梁部分和已浇段n块两侧的翼缘板同步施工,即(n+1)块箱梁部分和n块宽翼缘板同步施工。 
本发明的C型挂钩设置于中横梁外侧,与箱梁侧面保留一定距离。根据规范要求,箱梁外侧预留钢筋(受拉)搭接长度不小于35d,d为预留钢筋直径,因此C型挂钩与箱梁侧面的距离应大于45d,从而避免预留钢筋反复弯折影响工程质量。 
本发明为了平衡挂篮后重同时保证宽翼缘能与箱梁同步施工,在挂篮中、后横梁外侧处悬挑翼缘施工平台。每个循环节段同时施工待浇段箱梁和已浇段箱梁两侧的宽翼缘,这样比翼缘板后浇缩短了2-3天的时间,提高了施工速度,缩短了悬浇段施工周期。 
本发明为了克服传统止推系统的缺点,在本桥的斜腹板与底板交界处开一55cm×55cm的方形孔洞,抗剪柱截面为50cm×50cm的正方形,抗剪柱直接焊在中、后横梁上。抗剪柱与斜腹板之间在纵向留有2.5cm的空隙,能够满足挂篮定位误差。抗剪柱与斜腹板之间用钢板垫块垫置,可以满足止推和顶紧功能。止推系统构造简单、受力明确、可操作性强,能够充分发挥高强混凝土局部承压能力,完全可以满足施工需要。 
与已有技术相比,本发明的有益效果如下: 
本发明的采用该挂篮悬浇段箱梁施工可与宽翼缘施工同步进行,周期一般为8天,缩短了施工时间,提高了工效;充分利用了挂篮施工平台的作用,增大了 节段划分长度,减少了架设所需要的预应力钢材;挂篮前端斜拉索可以分担混凝土的浇筑重量,降低了安全成本,利用刚度大的挂篮作宽翼缘施工支撑平台,避免了两次混凝土施工交接面处错台的出现,对宽翼缘安全施工也有了可靠保证。 
本发明牵索挂篮止推系统不同于传统的牵索挂篮止推系统,此止推系统构造简单,可操作性强,且安全可靠,只要挂篮前移时保证挂篮的轴线,挂篮提升时抗剪柱即可自动进入预留孔洞,抄垫方便,缩短了调整挂篮时间,降低了安全风险。 
本发明的牵索挂篮施工在在悬臂浇筑施工中具有安全、节省、快捷等特点,对提高我国宽翼缘预应力混凝土斜拉桥的施工技术水平具有较大的推动和促进作用。同时,该挂篮所进行创新性地设计研发、应用研究,使该套牵索挂篮具有更广阔的推广价值。 
附图说明
图1为本发明的结构示意图。 
具体实施方式
参见附图1,宽翼缘同步施工式牵索挂篮,包括有前横梁1、中横梁2、后横梁3,前横梁、中横梁、后横梁之间连接有主纵梁4、次纵梁5,主纵梁的前端固定连接有弧形首6。中横梁与后横梁的两端分别延伸到主纵梁外侧构成宽翼缘板浇筑平台7,中横梁的两端分别固定连接有C型挂钩8,中横梁、后横梁上固定连接有方形的抗剪柱9,抗剪柱伸入到桥体的斜腹板与底板交界处开设的定位孔内,主纵梁与次纵梁之间连接有斜撑10,前横梁与中横梁之间连接有纵撑11。 

Claims (3)

1.宽翼缘同步施工式牵索挂篮,包括有前横梁、中横梁、后横梁,前横梁、中横梁、后横梁之间连接有主纵梁、次纵梁,其特征在于:中横梁与后横梁的两端分别延伸到主纵梁外侧构成宽翼缘板浇筑平台,中横梁的两端分别固定连接有C型挂钩,中横梁、后横梁上固定连接有方形的抗剪柱,抗剪柱伸入到桥体的斜腹板与底板交界处开设的定位孔内。
2.根据权利要求1所述宽翼缘同步施工式牵索挂篮,其特征在于:所述主纵梁与次纵梁之间连接有斜撑,前横梁与中横梁之间连接有纵撑。
3.根据权利要求1所述宽翼缘同步施工式牵索挂篮,其特征在于:所述的主纵梁的前端固定连接有弧形首。
CN2010102559411A 2010-08-11 2010-08-11 宽翼缘同步施工式牵索挂篮 Pending CN102002912A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102559411A CN102002912A (zh) 2010-08-11 2010-08-11 宽翼缘同步施工式牵索挂篮

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102559411A CN102002912A (zh) 2010-08-11 2010-08-11 宽翼缘同步施工式牵索挂篮

Publications (1)

Publication Number Publication Date
CN102002912A true CN102002912A (zh) 2011-04-06

Family

ID=43810600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102559411A Pending CN102002912A (zh) 2010-08-11 2010-08-11 宽翼缘同步施工式牵索挂篮

Country Status (1)

Country Link
CN (1) CN102002912A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102230314A (zh) * 2011-04-19 2011-11-02 中铁五局(集团)有限公司 一种牵索挂篮结构
CN103850170A (zh) * 2012-11-29 2014-06-11 中铁工程设计咨询集团有限公司 一种双承轨台式轨道交通u型梁
CN103924531A (zh) * 2014-04-28 2014-07-16 中建三局集团有限公司 一种超宽幅前支点挂篮
CN109853403A (zh) * 2019-03-29 2019-06-07 中交路桥华南工程有限公司 宽幅悬臂主梁施工用挂篮及其底篮系统
CN112127288A (zh) * 2020-10-29 2020-12-25 中建八局第二建设有限公司 悬臂浇筑梁新型无轨道三角挂篮施工方法
CN112709145A (zh) * 2020-12-25 2021-04-27 中铁大桥局集团有限公司 一种用于施工超宽斜拉桥主梁的方法及挂篮

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1123861A (zh) * 1995-08-28 1996-06-05 铁道部大桥工程局 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺
CN2291443Y (zh) * 1996-08-29 1998-09-16 湖南省公路桥梁建设总公司 前支点挂篮
JP2000144640A (ja) * 1998-11-11 2000-05-26 Ps Corp コンクリートアーチ橋のアーチリブ構築装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1123861A (zh) * 1995-08-28 1996-06-05 铁道部大桥工程局 预应力混凝土斜拉桥短平台复合型牵索挂篮施工工艺
CN2291443Y (zh) * 1996-08-29 1998-09-16 湖南省公路桥梁建设总公司 前支点挂篮
JP2000144640A (ja) * 1998-11-11 2000-05-26 Ps Corp コンクリートアーチ橋のアーチリブ構築装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《安徽建筑》 20100610 黄新 宽翼缘预应力混凝土斜拉桥牵索挂篮设计与应用 第82-85页 1-3 , 第03期 2 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102230314A (zh) * 2011-04-19 2011-11-02 中铁五局(集团)有限公司 一种牵索挂篮结构
CN102230314B (zh) * 2011-04-19 2016-06-15 中铁五局(集团)有限公司 一种牵索挂篮结构
CN103850170A (zh) * 2012-11-29 2014-06-11 中铁工程设计咨询集团有限公司 一种双承轨台式轨道交通u型梁
CN103924531A (zh) * 2014-04-28 2014-07-16 中建三局集团有限公司 一种超宽幅前支点挂篮
CN109853403A (zh) * 2019-03-29 2019-06-07 中交路桥华南工程有限公司 宽幅悬臂主梁施工用挂篮及其底篮系统
CN112127288A (zh) * 2020-10-29 2020-12-25 中建八局第二建设有限公司 悬臂浇筑梁新型无轨道三角挂篮施工方法
CN112709145A (zh) * 2020-12-25 2021-04-27 中铁大桥局集团有限公司 一种用于施工超宽斜拉桥主梁的方法及挂篮
CN112709145B (zh) * 2020-12-25 2022-04-29 中铁大桥局集团有限公司 一种用于施工超宽斜拉桥主梁的方法

Similar Documents

Publication Publication Date Title
CN101935987B (zh) 曲线桥大跨度钢管拱整体滑移施工方法
CN102002912A (zh) 宽翼缘同步施工式牵索挂篮
CN202658536U (zh) 一种连续梁桥悬臂边跨现浇段和合拢段同步施工用装置
CN203462764U (zh) 一种大悬挑提升反力架
CN201395769Y (zh) 修建桥梁索塔砼上横梁用的系杆拱式支架
CN101173503A (zh) 三点走行单索面牵索挂篮
CN107100074A (zh) 一种下承式拱桥混凝土桥面施工方法
CN201506952U (zh) 无支架临时索配合挂篮建筑混凝土斜拉桥
CN105178200A (zh) 悬浇拱桥一号节段施工的斜拉组合支架施工方法
CN101781878A (zh) 独塔无背索斜拉桥主塔整体提升模板及其提升施工方法
CN104532749A (zh) 一种用于悬索桥主塔上横梁施工的支架
CN202544854U (zh) 地铁车站衬砌台车
CN202830785U (zh) 高墩桥梁悬臂浇筑混凝土0#块墩顶托架
CN107268455B (zh) 混凝土主梁钢横梁组合结构梁挂篮施工方法
CN101298796A (zh) 自承式预加工构件、自承式预加工混凝土结构及其施工方法
CN209456892U (zh) 斜拉桥钢悬挑人行道结构
CN102454292A (zh) 高空大跨度悬挑结构模架的支撑钢架
CN104314013A (zh) 一种极不对称组合梁的双悬臂施工方法
CN204385629U (zh) 一种用于悬索桥主塔上横梁施工的支架
CN211815595U (zh) 用于索塔的下塔柱拉压结构
CN201158932Y (zh) 高层建筑电梯井道模板支撑专用自卡紧式平台
CN207079714U (zh) 一种悬挑阳台支撑系统
CN201981483U (zh) 拱肋现浇支架用钢筋砼异型帽梁
CN204919371U (zh) 悬浇拱桥一号节段施工的斜拉组合支架装置
CN201943350U (zh) 高空大跨度悬挑结构模架的支撑钢架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110406