CN104405071A - Structure and method for increasing height of corridor ceiling - Google Patents
Structure and method for increasing height of corridor ceiling Download PDFInfo
- Publication number
- CN104405071A CN104405071A CN201410659723.2A CN201410659723A CN104405071A CN 104405071 A CN104405071 A CN 104405071A CN 201410659723 A CN201410659723 A CN 201410659723A CN 104405071 A CN104405071 A CN 104405071A
- Authority
- CN
- China
- Prior art keywords
- ceiling
- suspension
- support
- pipeline
- furred ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The invention provides a structure and a method for increasing the height of a corridor ceiling. The structure comprises a pipeline ceiling combined supporting hanger, a strong current wire groove and an air-conditioner cold water supply and water returning pipe which are arranged along the longitudinal direction of a main beam, wherein the pipeline ceiling combined supporting hanger is hung to a secondary beam or a floor top plate; the air-conditioner cold water supply-return pipe is directly arranged on the pipeline ceiling combined supporting hanger; the strong current wire groove is hung below the floor top plate. Due to the fact that except the part, which passes the secondary beam and is provided with a lower concave part used for crossing the secondary beam, of the strong current wire groove, the other parts of the strong current wire groove are arranged in the space between the bottom surface of the secondary beam and the bottom surface of the floor top plate, the ceiling elevation of a corridor is obviously improved. Due to the fact that a pipeline supporting hanger and a ceiling supporting hanger are combined into the pipeline ceiling combined supporting hanger, and the pipeline ceiling combined supporting hanger simultaneously plays the role of supporting the air-conditioner cold water supply-return pipe, a keel and a ceiling, so that a main keel in the original ceiling supporting hanger is eliminated, and the ceiling is further lifted.
Description
Technical field
The present invention relates to the technical field of auxiliary equipment of building structure, particularly improve structure and the method for corridor ceiling height.
Background technology
At present, in the furred ceiling of civilian construction corridor, traditional electromechanical pipeline and decorative ceiling adopt respective suspension and support.Need to carry out decoration construction after described electromechanics construction, construct each other and likely collide, particularly narrow space region, therefore have to reduce furred ceiling absolute altitude.
Refer to Fig. 1, the independently pipeline suspension and support 2 that air conditioner cold water adopts for return pipe 1, decorative ceiling 3 also adopts independently furred ceiling suspension and support 4.Show two groups of air conditioner cold waters in Fig. 1 and support 2 by respective pipeline suspension and support respectively for return pipe 3.Described pipeline suspension and support 2 comprises base and suspension rod respectively with described furred ceiling suspension and support 4, and the lower end of described suspension rod is connected to described base.Described air conditioner cold water is directly arranged on the base of described pipeline suspension and support 2 respectively for return pipe 1.Refer to Fig. 2 and incorporated by reference to consulting Fig. 1, the base in described furred ceiling suspension and support 4 comprises main joist 4.2 and rider keel 4.3, and described main joist 4.2 is arranged with described rider keel 4.3 intersecting vertical, and the lower end of suspension rod 4.1 is connected on described main joist 4.2.Arrange pipeline suspension and support 2 for air conditioner cold water for return pipe 1, arrange furred ceiling suspension and support 4 again in the below of pipeline suspension and support 2, not only working procedure is loaded down with trivial details, waste material, and because occurs that two bases cause furred ceiling 3 absolute altitude to reduce.
Further, existing electromechanical pipeline is when arranging, and the mode that forceful electric power wire casing 5 adopts Fang Ping under beam to walk, namely forceful electric power wire casing 5 is located in the same horizontal plane arrangement.Because the location comparison of forceful electric power wire casing 5 is low, and air conditioner cold water must be arranged on the below of forceful electric power wire casing for return pipe 1, causes furred ceiling 3 absolute altitude seriously to drop.
Summary of the invention
For solving the problem that in prior art, corridor space narrow and small furred ceiling absolute altitude is too low, the invention provides a kind of structure and the method that improve corridor ceiling height, make full use of the spatial placement forceful electric power wire casing between beam and floor roof, thus the corresponding absolute altitude significantly improving air conditioner cold water confession return pipe and furred ceiling, and by existing pipeline suspension and support and decorative ceiling suspension and support are united two into one as pipeline furred ceiling combines suspension and support, space shared by suspension and support can be compressed, further lifting corridor furred ceiling absolute altitude.
The technical solution adopted for the present invention to solve the technical problems is:
Improve a structure for corridor ceiling height, comprise the combination of pipeline furred ceiling suspension and support, forceful electric power wire casing and air conditioner cold water that the longitudinal direction along girder arranges for return pipe, described pipeline furred ceiling combination suspension and support is lifted on secondary beam or floor roof; Described air conditioner cold water is directly arranged on described pipeline furred ceiling combination suspension and support for return pipe; Described forceful electric power wire casing is lifted on the below of floor roof, described forceful electric power wire casing is except having except the lower concave part for crossing described secondary beam in the place through secondary beam, and remainder is arranged in the space between the bottom surface of described secondary beam and the bottom surface of described floor roof.
Preferably, described lower concave part comprise two outer transverse slot portion, an intermediate lateral groove portion and with two oblique slot portions, described two outer transverse parts are connected to the two ends in described intermediate lateral groove portion respectively through described two oblique slot portions.
Preferably, described pipeline furred ceiling combination suspension and support comprises base and suspension rod, described suspension rod is arranged on described base along the longitudinal separation of described base, and the upper end of described suspension rod is fixedly connected on corresponding secondary beam respectively, and described air conditioner cold water is directly arranged on described base for return pipe.
Preferably, arrange the connecting rod strengthened between described suspension rod, the upper end of described suspension rod is fixed on the side surface of corresponding secondary beam by steel plate and bolt.
Preferably, the transverse ends of described base is upwards dug.
Preferably, described base comprises transverse bar and the longitudinal rod of square crossing setting, and described transverse bar and longitudinal rod adopt square steel.
In the structure of above-mentioned raising corridor ceiling height, also comprise the rider keel for arranging decorative ceiling, described rider keel is arranged on described base.
The invention also discloses a kind of method improving corridor ceiling height, adopt the structure improving corridor ceiling height as above, comprise the steps:
Step one, lifting forceful electric power wire casing is on described floor roof;
Step 2, pipeline furred ceiling combination suspension and support arranges air conditioner cold water for return pipe, and is lifted on described floor roof or secondary beam by pipeline furred ceiling combination suspension and support.
Effect of the present invention is: the structure of raising corridor provided by the invention ceiling height and method, this structure, comprise the combination of pipeline furred ceiling suspension and support, forceful electric power wire casing and air conditioner cold water that the longitudinal direction along girder arranges for return pipe, described pipeline furred ceiling combination suspension and support is lifted on secondary beam or floor roof; Described air conditioner cold water is directly arranged on described pipeline furred ceiling combination suspension and support for return pipe; Described forceful electric power wire casing is lifted on the below of floor roof, described forceful electric power wire casing is except having except the lower concave part for crossing described secondary beam in the place through secondary beam, and remainder is arranged in the space between the bottom surface of described secondary beam and the bottom surface of described floor roof.Middle forceful electric power wire casing is all positioned at side's walking under beam compared to existing technology, due in the space of the major part of described forceful electric power wire casing between beam and floor roof in the present invention, thus air conditioner cold water can be made to raise for return pipe is corresponding, and then pipeline furred ceiling combination suspension and support is raised, finally make the furred ceiling absolute altitude in corridor significantly improve, approximately can improve furred ceiling absolute altitude 340 millimeters.In addition, described pipeline furred ceiling combination suspension and support and forceful electric power wire casing can adopt serial pre-fabrication, effectively can save construction material, shorten the engineering time.
In addition, in compared to existing technology, the method that pipeline suspension and support and furred ceiling suspension and support are independently arranged, pipeline suspension and support and furred ceiling suspension and support unite two into one as pipeline furred ceiling combines suspension and support by the application, this pipeline furred ceiling combination suspension and support is born simultaneously and is supported the effect of air conditioner cold water for return pipe, keel and furred ceiling, thus eliminate the setting of main joist in original furred ceiling suspension and support, save vertical direction spatial, space shared by suspension and support can be compressed, make the absolute altitude of furred ceiling raise 45 millimeter.And by pipeline suspension and support and decorative ceiling suspension and support are united two into one, the unified layout of suspension and support in corridor can be made, simplify construction technology.
In addition, base compared to existing technology in middle suspension and support adopts No. 10 channel-section steels, be highly 100 millimeters, base in the present invention in pipeline furred ceiling combination suspension and support adopts square steel, thus under the prerequisite obtaining identical bearing capacity, the height of square steel can be reduced, thus further save vertical direction spatial, the absolute altitude of furred ceiling is raised further, approximately improves 60 millimeters.
Accompanying drawing explanation
Fig. 1 is existing corridor furred ceiling gut line support arrangement schematic diagram;
Fig. 2 is the structural representation of existing furred ceiling suspension and support;
Fig. 3 is the schematic diagram of the structure of the raising corridor ceiling height of one embodiment of the invention;
Fig. 4 is the side-looking partial schematic sectional view of the structure of the raising corridor ceiling height of one embodiment of the invention.Fig. 5 is the structural representation of pipeline furred ceiling combination suspension and support in one embodiment of the invention.
In figure: 1-air conditioner cold water is for return pipe, 2-pipeline suspension and support, 3-furred ceiling, 4-furred ceiling suspension and support, 4.1-suspension rod, 4.2-main joist, 4.3-rider keel, 5-forceful electric power wire casing, 5.1-lower concave part, the combination of 6-pipeline furred ceiling suspension and support, 6.1-suspension rod, 6.2-transverse bar, 6.3-longitudinal rod, 6.4-connecting rod, 7-steel plate, 8-bolt, 9-girder, 10-secondary beam, 11-floor roof, 12-floor base plate, 13-wall, 14-fan coil, 15-fire chief, 16-condensate pipe.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments to the present invention propose a kind of improve corridor ceiling height structure and method be described in further detail.According to explanation below and claims, advantages and features of the invention will be clearer.Below by cited embodiment by reference to the accompanying drawings, technology contents of the present invention and feature will be described in detail.Need to illustrate in addition, accompanying drawing all adopts the form that simplifies very much and all uses non-ratio accurately, only in order to object that is convenient, the aid illustration embodiment of the present invention lucidly.
Refer to Fig. 3 to Fig. 5, present embodiment discloses a kind of structure improving corridor ceiling height, comprise the combination of pipeline furred ceiling suspension and support 6, forceful electric power wire casing 5 and air conditioner cold water that the longitudinal direction (i.e. the bearing of trend of girder 9) along girder 9 arranges for return pipe 1, described pipeline furred ceiling combination suspension and support 6 is lifted on secondary beam 10 or floor roof 11; Described air conditioner cold water is directly arranged on described pipeline furred ceiling combination suspension and support 6 for return pipe 1; Described forceful electric power wire casing 5 is lifted on the below of floor roof 11, described forceful electric power wire casing 5 is except having the lower concave part 5.1 for crossing described secondary beam 10 in the place through secondary beam 10, remainder is being arranged in the horizontal direction in the space between the bottom surface and the bottom surface of described floor roof 11 of described secondary beam 10.Middle forceful electric power wire casing 5 is all positioned at side's walking under beam compared to existing technology, due in the space of the major part of described forceful electric power wire casing 5 between beam and floor roof 11 in the present invention, thus air conditioner cold water can be made to raise for return pipe 1 is corresponding, and then pipeline furred ceiling combination suspension and support 6 is raised, finally make furred ceiling 3 absolute altitude in corridor significantly improve, approximately can improve furred ceiling 3 absolute altitude 340 millimeters.In addition, described pipeline furred ceiling combination suspension and support 6 can adopt serial pre-fabrication with forceful electric power wire casing 5, effectively can save construction material, shorten the engineering time.
Preferably, described lower concave part 5.1 comprise two outer transverse slot portion, an intermediate lateral groove portion and with two oblique slot portions, described two outer transverse parts are connected to the two ends in described intermediate lateral groove portion respectively through described two oblique slot portions.The lower concave part 5.1 of described forceful electric power wire casing 5 can adopt serial pre-fabrication, effectively to save construction material, to shorten the engineering time.
Preferably, described pipeline furred ceiling combination suspension and support 6 comprises base and suspension rod 6.1, described suspension rod 6.1 is arranged on described base along the longitudinal separation of described base, the upper end of described suspension rod 6.1 is fixedly connected on corresponding secondary beam 10 respectively, described air conditioner cold water is directly arranged on described base for return pipe 1, thus without the need to arranging a pipeline suspension and support 2 for return pipe 1 to as prior art often group air conditioner cold water, not only simplify technique, save material, and therefore eliminate the height of a base, the height of the height of a usual base mainly its main joist, approximately can save the vertical height of 45 millimeters.
Preferably, arrange the connecting rod 6.4 strengthened between described suspension rod 6.1, the upper end of described suspension rod 6.1 is fixed on the side surface of corresponding secondary beam 10 by steel plate 7 and bolt 8.The upper end of described suspension rod 6.1 is adopted to be fixed on the mode on the side surface of corresponding secondary beam 10 by steel plate 7 and bolt 8, compare suspension rod 6.1 to be connected with floor top layer, not only can shorten the length of suspension rod 6.1 to save material, and be more convenient to realize being connected between suspension rod 6.1 with fixed buildings (floor roof or secondary beam 10), improve the firmness connected.
Preferably, described base comprises transverse bar 6.2 and the longitudinal rod 6.3 of square crossing setting, and described transverse bar 6.2 adopts square steel with longitudinal rod 6.3.In the present embodiment, described transverse bar 6.2 adopts 40 × 30 square steel, and described longitudinal rod 6.3 adopts 60 × 40 square steel, and above unit is millimeter.
Preferably, the transverse ends of described base is upwards dug.Specifically refer to that the horizontal level of the longitudinal rod 6.3 of the longitudinal both sides of displacement pipeline furred ceiling suspension and support 4 is higher than the longitudinal rod 6.3 in the middle part of displacement, described in each, the two ends of transverse bar 6.2 upwards bend, and so, can expand the space below furred ceiling 3.
In the structure of above-mentioned raising corridor furred ceiling 3 height, also comprise the rider keel for arranging decorative ceiling 3, described rider keel is arranged along the longitudinal direction of described girder, and described rider keel is arranged on described base.By arranging rider keel, can so that install described furred ceiling 3.
The invention also discloses a kind of method improving corridor furred ceiling 3 height, adopt the structure improving corridor furred ceiling 3 height as above, comprise the steps:
Step one, lifting forceful electric power wire casing 5 is on described floor roof 11;
Step 2, pipeline furred ceiling combination suspension and support 6 arranges air conditioner cold water for return pipe 1, and is lifted on described floor roof 11 or secondary beam 10 by pipeline furred ceiling combination suspension and support 6.
The structure of raising corridor provided by the invention ceiling height and method, this structure, comprise the combination of pipeline furred ceiling suspension and support, forceful electric power wire casing and air conditioner cold water that the longitudinal direction along girder arranges for return pipe, described pipeline furred ceiling combination suspension and support is lifted on secondary beam or floor roof; Described air conditioner cold water is directly arranged on described pipeline furred ceiling combination suspension and support for return pipe; Described forceful electric power wire casing is lifted on the below of floor roof, described forceful electric power wire casing is except having except the lower concave part for crossing described secondary beam in the place through secondary beam, and remainder is arranged in the space between the bottom surface of described secondary beam and the bottom surface of described floor roof.Middle forceful electric power wire casing is all positioned at side's walking under beam compared to existing technology, due in the space of the major part of described forceful electric power wire casing between beam and floor roof in the present invention, thus air conditioner cold water can be made to raise for return pipe is corresponding, and then pipeline furred ceiling combination suspension and support is raised, finally make the furred ceiling absolute altitude in corridor significantly improve, approximately can improve furred ceiling absolute altitude 340 millimeters.In addition, described pipeline furred ceiling combination suspension and support and forceful electric power wire casing can adopt serial pre-fabrication, effectively can save construction material, shorten the engineering time.
In addition, in compared to existing technology, the method that pipeline suspension and support and furred ceiling suspension and support are independently arranged, pipeline suspension and support and furred ceiling suspension and support unite two into one as pipeline furred ceiling combines suspension and support by the application, this pipeline furred ceiling combination suspension and support is born simultaneously and is supported the effect of air conditioner cold water for return pipe, keel and furred ceiling, thus eliminate the setting of main joist in original furred ceiling suspension and support, save vertical direction spatial, space shared by suspension and support can be compressed, make the absolute altitude of furred ceiling raise 45 millimeter.And by pipeline suspension and support and decorative ceiling suspension and support are united two into one, the unified layout of suspension and support in corridor can be made, simplify construction technology.
In addition, transverse bar in base compared to existing technology in middle suspension and support and longitudinal rod adopt No. 10 channel-section steels, be highly 100 millimeters, transverse bar and the longitudinal rod of the base in the present invention in pipeline furred ceiling combination suspension and support adopt square steel, thus under the prerequisite obtaining identical bearing capacity, the height of square steel can be reduced, thus further save vertical direction spatial, the absolute altitude of furred ceiling is raised further, approximately improves 60 millimeters.
Foregoing description is only the description to present pre-ferred embodiments, any restriction not to the scope of the invention, and any change that the those of ordinary skill in field of the present invention does according to above-mentioned disclosure, modification, all belong to the protection domain of claims.
Claims (8)
1. one kind is improved the structure of corridor ceiling height, it is characterized in that, comprise the combination of pipeline furred ceiling suspension and support, forceful electric power wire casing and air conditioner cold water that the longitudinal direction along girder arranges for return pipe, described pipeline furred ceiling combination suspension and support is lifted on secondary beam or floor roof; Described air conditioner cold water is directly arranged on described pipeline furred ceiling combination suspension and support for return pipe; Described forceful electric power wire casing is lifted on the below of floor roof, described forceful electric power wire casing is except having except the lower concave part for crossing described secondary beam in the place through secondary beam, and remainder is arranged in the space between the bottom surface of described secondary beam and the bottom surface of described floor roof.
2. the structure of raising corridor according to claim 1 ceiling height, it is characterized in that: described lower concave part comprise two outer transverse slot portion, an intermediate lateral groove portion and with two oblique slot portions, described two outer transverse parts are connected to the two ends in described intermediate lateral groove portion respectively through described two oblique slot portions.
3. the structure of raising corridor according to claim 1 ceiling height, it is characterized in that: described pipeline furred ceiling combination suspension and support comprises base and suspension rod, described suspension rod is arranged on described base along the longitudinal separation of described base, the upper end of described suspension rod is fixedly connected on corresponding secondary beam respectively, and described air conditioner cold water is directly arranged on described base for return pipe.
4. the structure of raising corridor according to claim 3 ceiling height, is characterized in that: arrange the connecting rod strengthened between described suspension rod, the upper end of described suspension rod is fixed on the side surface of corresponding secondary beam by steel plate and bolt.
5. the structure of raising corridor according to claim 3 ceiling height, is characterized in that: the transverse ends of described base is upwards dug.
6. the structure of raising corridor according to claim 3 ceiling height, is characterized in that: described base comprises transverse bar and the longitudinal rod of square crossing setting, and described transverse bar and longitudinal rod adopt square steel.
7. the structure of raising corridor according to claim 3 ceiling height, is characterized in that: also comprise the rider keel for arranging decorative ceiling, described rider keel is arranged on described base.
8. improve a method for corridor ceiling height, it is characterized in that, adopt the structure as the raising corridor ceiling height in claim 1-7 as described in any one, comprise the steps:
Step one, lifting forceful electric power wire casing is on described floor roof;
Step 2, pipeline furred ceiling combination suspension and support arranges air conditioner cold water for return pipe, and is lifted on described floor roof or secondary beam by pipeline furred ceiling combination suspension and support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410659723.2A CN104405071B (en) | 2014-11-19 | 2014-11-19 | A kind of structure improving corridor ceiling height and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410659723.2A CN104405071B (en) | 2014-11-19 | 2014-11-19 | A kind of structure improving corridor ceiling height and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104405071A true CN104405071A (en) | 2015-03-11 |
CN104405071B CN104405071B (en) | 2016-10-12 |
Family
ID=52642729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410659723.2A Active CN104405071B (en) | 2014-11-19 | 2014-11-19 | A kind of structure improving corridor ceiling height and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104405071B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107687541A (en) * | 2016-08-05 | 2018-02-13 | 五冶集团上海有限公司 | A kind of pipeline provided with people's row access path shares suspension bracket |
CN109322435A (en) * | 2018-09-26 | 2019-02-12 | 潘峥毅 | A kind of ceiling system |
WO2019218201A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having water pipe installed therein |
WO2019218220A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling |
WO2019218210A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having water pipe and low-voltage cable installed therein |
WO2019218229A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Method for construction of suspended ceiling system |
WO2019218200A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having high-voltage cable installed therein |
CN110499861A (en) * | 2018-05-16 | 2019-11-26 | 深圳市君盈建筑科技有限公司 | A kind of furred ceiling electricity separation system |
CN110499933A (en) * | 2018-05-16 | 2019-11-26 | 深圳市君盈建筑科技有限公司 | A kind of house that pipeline is separated with main structure |
CN111148882A (en) * | 2018-05-16 | 2020-05-12 | 增城市碧桂园物业发展有限公司 | Ceiling system provided with water pipe and weak current electric wire |
CN113566021A (en) * | 2021-06-04 | 2021-10-29 | 中铁电气化局集团北京建筑工程有限公司 | Construction method for suspended-ceiling-free comprehensive pipeline at entrance and exit of subway station |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101886441A (en) * | 2009-05-11 | 2010-11-17 | 金元杰 | Waterproof ceiling with multiple levels |
CN201704839U (en) * | 2010-02-25 | 2011-01-12 | 北新集团建材股份有限公司 | Practical novel ceiling system for corridor passageway |
KR101241325B1 (en) * | 2010-12-15 | 2013-03-18 | 대안스틸 주식회사 | Carrying channel with symbol indication part |
CN203420399U (en) * | 2013-08-02 | 2014-02-05 | 查子庭 | Suspended ceiling |
CN204326340U (en) * | 2014-11-19 | 2015-05-13 | 上海市安装工程集团有限公司 | A kind of structure improving corridor ceiling height |
-
2014
- 2014-11-19 CN CN201410659723.2A patent/CN104405071B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101886441A (en) * | 2009-05-11 | 2010-11-17 | 金元杰 | Waterproof ceiling with multiple levels |
CN201704839U (en) * | 2010-02-25 | 2011-01-12 | 北新集团建材股份有限公司 | Practical novel ceiling system for corridor passageway |
KR101241325B1 (en) * | 2010-12-15 | 2013-03-18 | 대안스틸 주식회사 | Carrying channel with symbol indication part |
CN203420399U (en) * | 2013-08-02 | 2014-02-05 | 查子庭 | Suspended ceiling |
CN204326340U (en) * | 2014-11-19 | 2015-05-13 | 上海市安装工程集团有限公司 | A kind of structure improving corridor ceiling height |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107687541A (en) * | 2016-08-05 | 2018-02-13 | 五冶集团上海有限公司 | A kind of pipeline provided with people's row access path shares suspension bracket |
CN110499933A (en) * | 2018-05-16 | 2019-11-26 | 深圳市君盈建筑科技有限公司 | A kind of house that pipeline is separated with main structure |
CN111148882A (en) * | 2018-05-16 | 2020-05-12 | 增城市碧桂园物业发展有限公司 | Ceiling system provided with water pipe and weak current electric wire |
WO2019218220A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling |
WO2019218210A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having water pipe and low-voltage cable installed therein |
WO2019218229A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Method for construction of suspended ceiling system |
WO2019218200A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having high-voltage cable installed therein |
WO2019218201A1 (en) * | 2018-05-16 | 2019-11-21 | 增城市碧桂园物业发展有限公司 | Suspended ceiling system having water pipe installed therein |
CN112313383A (en) * | 2018-05-16 | 2021-02-02 | 增城市碧桂园物业发展有限公司 | Ceiling system provided with water pipe and weak current electric wire |
CN110499861A (en) * | 2018-05-16 | 2019-11-26 | 深圳市君盈建筑科技有限公司 | A kind of furred ceiling electricity separation system |
CN112166222A (en) * | 2018-05-16 | 2021-01-01 | 增城市碧桂园物业发展有限公司 | Construction method of suspended ceiling system |
CN112166223A (en) * | 2018-05-16 | 2021-01-01 | 增城市碧桂园物业发展有限公司 | Suspended ceiling |
CN109322435A (en) * | 2018-09-26 | 2019-02-12 | 潘峥毅 | A kind of ceiling system |
CN109322435B (en) * | 2018-09-26 | 2023-12-29 | 潘峥毅 | Smallpox system |
CN113566021A (en) * | 2021-06-04 | 2021-10-29 | 中铁电气化局集团北京建筑工程有限公司 | Construction method for suspended-ceiling-free comprehensive pipeline at entrance and exit of subway station |
CN113566021B (en) * | 2021-06-04 | 2022-12-13 | 中铁电气化局集团北京建筑工程有限公司 | Construction method for suspended-ceiling-free comprehensive pipeline at entrance and exit of subway station |
Also Published As
Publication number | Publication date |
---|---|
CN104405071B (en) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104405071A (en) | Structure and method for increasing height of corridor ceiling | |
CN204326340U (en) | A kind of structure improving corridor ceiling height | |
CN201417657Y (en) | Installation device of indoor transformer | |
CN201144515Y (en) | Steel structure high altitude construction platform | |
CN203066412U (en) | Installing component of plug-in quickly-installed boards | |
CN105604229A (en) | Clamping type keel double integrated ceiling structure | |
CN202390996U (en) | Lifting hook for connecting integrated suspended ceiling with keel | |
CN104499625A (en) | Profiled steel sheet and composite floor | |
CN201797251U (en) | 10kV urban power distribution network high-low rod type overhead device | |
CN205000518U (en) | Take combination formula floor board in stair hole | |
CN209114648U (en) | A kind of assembling type outer wall structure | |
CN204357139U (en) | Suspender | |
CN103603266B (en) | Multilayer bridge overhanging isolation structure | |
CN106764075A (en) | For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed | |
CN204266444U (en) | A kind of profiled sheet and composite floor | |
CN202831303U (en) | Light composite wall | |
CN204001963U (en) | Inside establish the tent of bedstead | |
CN206299900U (en) | For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed | |
CN203531228U (en) | Double-layered compound cross steel beam | |
CN206271506U (en) | A kind of firm formula European-type box becomes | |
CN202850288U (en) | Modularization floor slab used for building | |
CN203867058U (en) | Novel U-shaped cross section component | |
CN206693491U (en) | A kind of hollow heat-insulation building block with reinforcing bar locating framework structure | |
CN205689897U (en) | A kind of detachable cable support | |
CN205617565U (en) | Upper assembling type steel corbel of thermal power factory structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |