Installing component of plug-in quickly-installed boards Download PDFInfo
- Publication number
- CN203066412U CN203066412U CN 201320013404 CN201320013404U CN203066412U CN 203066412 U CN203066412 U CN 203066412U CN 201320013404 CN201320013404 CN 201320013404 CN 201320013404 U CN201320013404 U CN 201320013404U CN 203066412 U CN203066412 U CN 203066412U
- Authority
- CN
- China
- Prior art keywords
- plug
- quick
- keel
- quickly
- boards
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model relates to an installing component of plug-in quickly-installed boards. The installing component comprises connecting keys, a horizontal T-bar component and a ceiling hook, wherein the horizontal T-bar component is used for installing plug-in quickly-installed wall boards, and the ceiling hook is used for being connected with plug-in quickly-installed top boards. The plug-in quickly-installed wall boards are connected with the ground of a building through the horizontal T-bar component. The plug-in quickly-installed top boards are connected with a suspended part and a ceiling of the building through the ceiling hook. The plug-in quickly-installed wall boards are connected through connecting keys, the plug-in quickly-installed wall boards and the horizontal T-bar component are connected through connecting keys, and the plug-in quickly-installed top boards are connected through connecting keys. The installing component of the plug-in quickly-installed boards has the advantages of enabling the wall boards and the top boards to be connected and installed in a plugged and spliced mode in an installing spot, technical requirements on personnel by on-spot construction are lowered, the level of standardized operation is improved, construction quality is ensured, and a construction period is shortened.
Description
Technical field
The utility model relates to the building finishing field, especially a kind of grafting fast-assembling plate installation component of using of the metope end face used of clean environment.
Background technology
Along with improving constantly of people's living standard, people are also more and more higher to inhabitation and working environment requirement, thereby promoted the development of finishing industry.At present, building finishing all be by at the scene by multiple working procedure progressively order finish, it is in proper order, and lightgage steel joist is installed earlier, and basal plate is installed then, last installed surface laminate; Therefore this mounting means is not the pin-connected panel technology of standard, does not just have or the installation component of few standard, thereby causes the responsibility of field control and installation very big and cost is higher, and directly have influence on final construction quality.
Summary of the invention
Technical problem to be solved in the utility model is, provide a kind of have can to building finishing can Fast Installation grafting fast-assembling plate installation component.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions: a kind of grafting fast-assembling plate installation component comprises connecting key, is used for the horizontal keel assembly of installation grafting fast-assembling wallboard and the furred ceiling hook that is used for connecting grafting fast-assembling top board; Described horizontal keel assembly is formed by being fixedly installed on the lower keel spare on the building floor and the last keel that is plugged on the lower keel spare, between by being arranged on the screw mechanism adjustment level in the lower keel spare, described grafting fast-assembling wallboard is plugged on the keel; Described furred ceiling hook connects to be hung part and is connected with construction ceiling, and its top is the spill mouth, and the bottom is the double-hook type wall, between connect by connecting wall, the double-hook type wall bottom described furred ceiling is linked up with is arranged between the grafting fast-assembling top board of two butt joints; All be connected by connecting key between described grafting fast-assembling wallboard and grafting fast-assembling wallboard, grafting fast-assembling wallboard and last keel and grafting fast-assembling top board and the grafting fast-assembling top board.
Preferably, described lower keel spare and building floor and furred ceiling hook is connected to hang between part and the construction ceiling and all fixedlys connected by swell fixture.
Preferably, the described connecting key first half is that conical wall and Lower Half are rectangular wall.
Compared with prior art, usefulness of the present utility model is: this grafting fast-assembling plate installation component makes wallboard and top board install in the erecting bed only need inlaying grafting assembly to get final product, reduced the technical requirements of site operation to personnel, improved the standardized work level, guarantee construction quality, shortened the construction period.
Description of drawings:
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 is keel end face structure schematic diagram on the horizontal keel assembly;
Fig. 2 is keel end face structure schematic diagram under the horizontal keel assembly;
Fig. 3 is connecting key end face structure schematic diagram;
Fig. 4 is furred ceiling hook structure end view;
Fig. 5 is horizontal keel assembly, connecting key and grafting fast-assembling wallboard mounting structure schematic diagram;
Fig. 6 is furred ceiling hook lifting grafting fast-assembling top board mounting structure schematic diagram;
Fig. 7 is connecting key grafting fast-assembling wallboard and wallboard or top board and top board mounting structure schematic diagram.
Among the figure: 1, go up keel; 2, lower keel spare; 3, connecting key; 4, furred ceiling hook; 5, grafting fast-assembling wallboard; 6, grafting fast-assembling top board; 7, building floor; 8, construction ceiling; 9, swell fixture.
The specific embodiment:
Below in conjunction with the drawings and the specific embodiments the utility model is described in detail:
A kind of grafting fast-assembling plate installation component, the furred ceiling hook 4 that comprises connecting key 3, is used for that the horizontal keel assembly of grafting fast-assembling wallboard 5 is installed and is used for connection grafting fast-assembling top board 6; As Fig. 1, Fig. 2 and shown in Figure 5, described horizontal keel assembly is formed by being fixedly installed on the lower keel spare 2 on the building floor 7 and the last keel 1 that is plugged on the lower keel spare 2, between by being arranged on the screw mechanism adjustment level in the lower keel spare 2, be connected by swell fixture 9 between lower keel spare 2 and the building floor 7; Described keel 1 top of going up is provided with the spill interface, and described grafting fast-assembling wallboard 5 and grafting fast-assembling top board 6 outsides are provided with the aluminum alloy framework frame, and the outer avris of aluminum alloy framework frame is provided with groove; Grafting fast-assembling wallboard 5 is plugged on the keel 1, be connected by connecting key 3 between the outer avris groove of spill interface on the last keel 1 and grafting fast-assembling wallboard 5 outside aluminum alloy framework frames, and be connected by connecting key 3 between grafting fast-assembling wallboard 5 and the grafting fast-assembling wallboard 5.
As shown in Figure 3, described connecting key 3 first halves are that conical wall and Lower Half are rectangular wall.
As shown in Figure 4, it is the spill mouth that described furred ceiling is linked up with 4 tops, and the bottom is the double-hook type wall, between connect by connecting wall; As shown in Figure 6, described furred ceiling hook 4 connects to hang between part and the construction ceiling 8 and is connected by swell fixture 9, wherein, described spill mouth and swell fixture 9 are connected, and the double-hook type wall of furred ceiling hook bottom is arranged between the grafting fast-assembling top board 6 of two butt joints; As shown in Figure 7, in the groove on the described grafting fast-assembling top board 6 outside aluminum alloy framework frames connecting key 3 can be installed, two adjacent grafting fast-assembling top boards 6 can be connected.
This grafting fast-assembling plate installation component only needs inlaying grafting assembly to get final product in the erecting bed, reduced the technical requirements of site operation to personnel, has improved the standardized work level, has guaranteed construction quality, has shortened the construction period.
It is emphasized that: above only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any simple modification, equivalent variations and modification that above embodiment does.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320013404 CN203066412U (en) | 2013-01-11 | 2013-01-11 | Installing component of plug-in quickly-installed boards |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320013404 CN203066412U (en) | 2013-01-11 | 2013-01-11 | Installing component of plug-in quickly-installed boards |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203066412U true CN203066412U (en) | 2013-07-17 |
Family
ID=48765222
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201320013404 Expired - Lifetime CN203066412U (en) | 2013-01-11 | 2013-01-11 | Installing component of plug-in quickly-installed boards |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203066412U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105040944A (en) * | 2015-08-14 | 2015-11-11 | 苏州通快净化科技有限公司 | Integrally-installed wallboard |
| CN105672546A (en) * | 2016-01-21 | 2016-06-15 | 苏州凯奥净化科技有限公司 | Ceiling for clean room |
| CN105756260A (en) * | 2016-04-25 | 2016-07-13 | 江苏中电创新环境科技有限公司 | Adjustable hanging device for clean room roof |
| CN107327069A (en) * | 2017-07-07 | 2017-11-07 | 山东大溪地新材料科技有限公司 | A kind of two grades of furred ceiling components, two grades of furred ceilings and three-level furred ceiling component, three-level furred ceiling |
| CN108204070A (en) * | 2018-02-07 | 2018-06-26 | 苏州通快净化科技有限公司 | A kind of hanging top plate mounting structure |
-
2013
- 2013-01-11 CN CN 201320013404 patent/CN203066412U/en not_active Expired - Lifetime
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105040944A (en) * | 2015-08-14 | 2015-11-11 | 苏州通快净化科技有限公司 | Integrally-installed wallboard |
| CN105672546A (en) * | 2016-01-21 | 2016-06-15 | 苏州凯奥净化科技有限公司 | Ceiling for clean room |
| CN105756260A (en) * | 2016-04-25 | 2016-07-13 | 江苏中电创新环境科技有限公司 | Adjustable hanging device for clean room roof |
| CN105756260B (en) * | 2016-04-25 | 2018-06-08 | 江苏中电创新环境科技有限公司 | A kind of adjustable erecting by overhang for toilet's top plate |
| CN107327069A (en) * | 2017-07-07 | 2017-11-07 | 山东大溪地新材料科技有限公司 | A kind of two grades of furred ceiling components, two grades of furred ceilings and three-level furred ceiling component, three-level furred ceiling |
| CN107327069B (en) * | 2017-07-07 | 2023-08-29 | 山东大溪地新材料科技有限公司 | Second grade furred ceiling subassembly, second grade furred ceiling and tertiary furred ceiling subassembly, tertiary furred ceiling |
| CN108204070A (en) * | 2018-02-07 | 2018-06-26 | 苏州通快净化科技有限公司 | A kind of hanging top plate mounting structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203066412U (en) | Installing component of plug-in quickly-installed boards | |
| CN206016146U (en) | Dry-hang body of wall mounting structure | |
| CN204645336U (en) | A kind of mounting plug-in type aluminum facade | |
| CN104060745B (en) | The three-dimensional adjustable fastener of steel construction conversion layer | |
| CN103291043B (en) | The installation suspension assembly of finishing material | |
| CN202324292U (en) | Full-rigid connection structure for suspended ceiling | |
| CN103452214A (en) | Back-tied stone curtain wall | |
| CN203475674U (en) | Composite hoisting structure for flat pasting of mineral-wool acoustic board | |
| CN110607857A (en) | An installation structure of a prefabricated keel partition wall | |
| CN107514088B (en) | Integrated modular flat top and construction method thereof | |
| CN203640132U (en) | Stereoscopic hanging system | |
| CN102535830A (en) | Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building | |
| CN211421565U (en) | Height-adjustable point structure of suspended ceiling | |
| CN208473060U (en) | A kind of metal curtain wall | |
| CN103382748B (en) | A kind of Terracotta panel curtain wall installation structure | |
| CN204715603U (en) | A kind of parallel wide keel smallpox | |
| CN205063122U (en) | Open stone material curtain | |
| CN204626853U (en) | A kind of unit assembled mounting structure of special-shaped cambered surface moulding GRG decoration panel | |
| CN204826392U (en) | Fixed connection's wallboard fast | |
| CN204920092U (en) | Device is hung futilely to metal sheet | |
| CN203846655U (en) | Short-cantilever dry-hanging device of stone curtain wall | |
| CN108035454A (en) | Metope abatvoix system of perforating and its installation method | |
| CN204804136U (en) | Mounting structure of inclined plane buckle and compound furred ceiling medium dip face | |
| CN205894388U (en) | A bathroom assembly structure | |
| CN205276893U (en) | Building body outer wall hoists built -in fitting of trying to stop people from fighting each other |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20130717 |