CN203066412U - Installing component of plug-in quickly-installed boards - Google Patents

Installing component of plug-in quickly-installed boards Download PDF

Info

Publication number
CN203066412U
CN203066412U CN 201320013404 CN201320013404U CN203066412U CN 203066412 U CN203066412 U CN 203066412U CN 201320013404 CN201320013404 CN 201320013404 CN 201320013404 U CN201320013404 U CN 201320013404U CN 203066412 U CN203066412 U CN 203066412U
Authority
CN
China
Prior art keywords
plug
quick
keel
quickly
boards
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320013404
Other languages
Chinese (zh)
Inventor
马兆勇
邱磊
马兆川
杨利利
杨四根
艾先英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU TONGKUAI PURIFICATION TECHNOLOGY Co Ltd
Original Assignee
SUZHOU TONGKUAI PURIFICATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU TONGKUAI PURIFICATION TECHNOLOGY Co Ltd filed Critical SUZHOU TONGKUAI PURIFICATION TECHNOLOGY Co Ltd
Priority to CN 201320013404 priority Critical patent/CN203066412U/en
Application granted granted Critical
Publication of CN203066412U publication Critical patent/CN203066412U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to an installing component of plug-in quickly-installed boards. The installing component comprises connecting keys, a horizontal T-bar component and a ceiling hook, wherein the horizontal T-bar component is used for installing plug-in quickly-installed wall boards, and the ceiling hook is used for being connected with plug-in quickly-installed top boards. The plug-in quickly-installed wall boards are connected with the ground of a building through the horizontal T-bar component. The plug-in quickly-installed top boards are connected with a suspended part and a ceiling of the building through the ceiling hook. The plug-in quickly-installed wall boards are connected through connecting keys, the plug-in quickly-installed wall boards and the horizontal T-bar component are connected through connecting keys, and the plug-in quickly-installed top boards are connected through connecting keys. The installing component of the plug-in quickly-installed boards has the advantages of enabling the wall boards and the top boards to be connected and installed in a plugged and spliced mode in an installing spot, technical requirements on personnel by on-spot construction are lowered, the level of standardized operation is improved, construction quality is ensured, and a construction period is shortened.

Description

Grafting fast-assembling plate installation component
Technical field
The utility model relates to the building finishing field, especially a kind of grafting fast-assembling plate installation component of using of the metope end face used of clean environment.
Background technology
Along with improving constantly of people's living standard, people are also more and more higher to inhabitation and working environment requirement, thereby promoted the development of finishing industry.At present, building finishing all be by at the scene by multiple working procedure progressively order finish, it is in proper order, and lightgage steel joist is installed earlier, and basal plate is installed then, last installed surface laminate; Therefore this mounting means is not the pin-connected panel technology of standard, does not just have or the installation component of few standard, thereby causes the responsibility of field control and installation very big and cost is higher, and directly have influence on final construction quality.
Summary of the invention
Technical problem to be solved in the utility model is, provide a kind of have can to building finishing can Fast Installation grafting fast-assembling plate installation component.
In order to solve the problems of the technologies described above, the utility model is achieved through the following technical solutions: a kind of grafting fast-assembling plate installation component comprises connecting key, is used for the horizontal keel assembly of installation grafting fast-assembling wallboard and the furred ceiling hook that is used for connecting grafting fast-assembling top board; Described horizontal keel assembly is formed by being fixedly installed on the lower keel spare on the building floor and the last keel that is plugged on the lower keel spare, between by being arranged on the screw mechanism adjustment level in the lower keel spare, described grafting fast-assembling wallboard is plugged on the keel; Described furred ceiling hook connects to be hung part and is connected with construction ceiling, and its top is the spill mouth, and the bottom is the double-hook type wall, between connect by connecting wall, the double-hook type wall bottom described furred ceiling is linked up with is arranged between the grafting fast-assembling top board of two butt joints; All be connected by connecting key between described grafting fast-assembling wallboard and grafting fast-assembling wallboard, grafting fast-assembling wallboard and last keel and grafting fast-assembling top board and the grafting fast-assembling top board.
Preferably, described lower keel spare and building floor and furred ceiling hook is connected to hang between part and the construction ceiling and all fixedlys connected by swell fixture.
Preferably, the described connecting key first half is that conical wall and Lower Half are rectangular wall.
Compared with prior art, usefulness of the present utility model is: this grafting fast-assembling plate installation component makes wallboard and top board install in the erecting bed only need inlaying grafting assembly to get final product, reduced the technical requirements of site operation to personnel, improved the standardized work level, guarantee construction quality, shortened the construction period.
Description of drawings:
Below in conjunction with accompanying drawing the utility model is further specified.
Fig. 1 is keel end face structure schematic diagram on the horizontal keel assembly;
Fig. 2 is keel end face structure schematic diagram under the horizontal keel assembly;
Fig. 3 is connecting key end face structure schematic diagram;
Fig. 4 is furred ceiling hook structure end view;
Fig. 5 is horizontal keel assembly, connecting key and grafting fast-assembling wallboard mounting structure schematic diagram;
Fig. 6 is furred ceiling hook lifting grafting fast-assembling top board mounting structure schematic diagram;
Fig. 7 is connecting key grafting fast-assembling wallboard and wallboard or top board and top board mounting structure schematic diagram.
Among the figure: 1, go up keel; 2, lower keel spare; 3, connecting key; 4, furred ceiling hook; 5, grafting fast-assembling wallboard; 6, grafting fast-assembling top board; 7, building floor; 8, construction ceiling; 9, swell fixture.
The specific embodiment:
Below in conjunction with the drawings and the specific embodiments the utility model is described in detail:
A kind of grafting fast-assembling plate installation component, the furred ceiling hook 4 that comprises connecting key 3, is used for that the horizontal keel assembly of grafting fast-assembling wallboard 5 is installed and is used for connection grafting fast-assembling top board 6; As Fig. 1, Fig. 2 and shown in Figure 5, described horizontal keel assembly is formed by being fixedly installed on the lower keel spare 2 on the building floor 7 and the last keel 1 that is plugged on the lower keel spare 2, between by being arranged on the screw mechanism adjustment level in the lower keel spare 2, be connected by swell fixture 9 between lower keel spare 2 and the building floor 7; Described keel 1 top of going up is provided with the spill interface, and described grafting fast-assembling wallboard 5 and grafting fast-assembling top board 6 outsides are provided with the aluminum alloy framework frame, and the outer avris of aluminum alloy framework frame is provided with groove; Grafting fast-assembling wallboard 5 is plugged on the keel 1, be connected by connecting key 3 between the outer avris groove of spill interface on the last keel 1 and grafting fast-assembling wallboard 5 outside aluminum alloy framework frames, and be connected by connecting key 3 between grafting fast-assembling wallboard 5 and the grafting fast-assembling wallboard 5.
As shown in Figure 3, described connecting key 3 first halves are that conical wall and Lower Half are rectangular wall.
As shown in Figure 4, it is the spill mouth that described furred ceiling is linked up with 4 tops, and the bottom is the double-hook type wall, between connect by connecting wall; As shown in Figure 6, described furred ceiling hook 4 connects to hang between part and the construction ceiling 8 and is connected by swell fixture 9, wherein, described spill mouth and swell fixture 9 are connected, and the double-hook type wall of furred ceiling hook bottom is arranged between the grafting fast-assembling top board 6 of two butt joints; As shown in Figure 7, in the groove on the described grafting fast-assembling top board 6 outside aluminum alloy framework frames connecting key 3 can be installed, two adjacent grafting fast-assembling top boards 6 can be connected.
This grafting fast-assembling plate installation component only needs inlaying grafting assembly to get final product in the erecting bed, reduced the technical requirements of site operation to personnel, has improved the standardized work level, has guaranteed construction quality, has shortened the construction period.
It is emphasized that: above only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any simple modification, equivalent variations and modification that above embodiment does.

Claims (3)

1.一种插接快装板安装组件,其特征在于:包括连接键(3)、用于安装插接快装墙板(5)的水平龙骨组件以及用于连接插接快装顶板(6)的吊顶挂钩(4);所述水平龙骨组件由固定设置在建筑地面(7)上的下龙骨件(2)和插接在下龙骨件(2)上的上龙骨件(1)组成,之间通过设置在下龙骨件(2)内的螺旋机构调整水平,所述插接快装墙板(5)插接在上龙骨件(1)上;所述吊顶挂钩(4)连接吊挂零件与建筑顶面(8)连接,其顶部为凹形口,底部为双勾形壁,之间通过连接壁连接,所述吊顶挂钩(4)底部的双勾形壁设置在两个对接的插接快装顶板(6)之间;所述插接快装墙板(5)与插接快装墙板(5)、插接快装墙板(5)与上龙骨件(1)以及插接快装顶板(6)与插接快装顶板(6)之间均通过连接键(3)连接。 1. A plug-in quick-release plate installation assembly, characterized in that it includes a connection key (3), a horizontal keel component for installing a plug-in quick-install wallboard (5) and a plug-in quick-install top plate (6 ) of the ceiling hook (4); the horizontal keel assembly consists of a lower keel piece (2) fixed on the building ground (7) and an upper keel piece (1) plugged into the lower keel piece (2). The level is adjusted by the screw mechanism set in the lower keel (2), the plug-in quick-install wallboard (5) is plugged on the upper keel (1); the ceiling hook (4) connects the hanging parts with the The top surface of the building (8) is connected, the top of which is a concave opening, and the bottom is a double-hook-shaped wall, which is connected by a connecting wall. Between the quick-installation top boards (6); the plug-in quick-installation wallboard (5) and the plug-in quick-installation wallboard (5), the plug-in quick-installation wallboard (5) and the upper keel (1) and the insertion Both the fast loading top plate (6) and the plug-in quick loading top plate (6) are connected by connecting keys (3). 2.根据权利要求1所述的插接快装板安装组件,其特征在于:所述下龙骨件(2)与建筑地面(7)以及吊顶挂钩(4)连接吊挂零件与建筑顶面(8)之间均通过膨胀螺钉(9)固定连接。 2. The plug-in quick-release plate installation assembly according to claim 1, characterized in that: the lower keel (2) is connected to the building ground (7) and the ceiling hook (4) to connect the hanging parts and the building top surface ( 8) are fixedly connected by expansion screws (9). 3.根据权利要求1所述的插接快装板安装组件,其特征在于:所述连接键(3)上半部为锥形壁和下半部为方形壁。 3. The plug-in quick release plate installation assembly according to claim 1, characterized in that: the upper half of the connecting key (3) is a tapered wall and the lower half is a square wall.
CN 201320013404 2013-01-11 2013-01-11 Installing component of plug-in quickly-installed boards Expired - Lifetime CN203066412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320013404 CN203066412U (en) 2013-01-11 2013-01-11 Installing component of plug-in quickly-installed boards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320013404 CN203066412U (en) 2013-01-11 2013-01-11 Installing component of plug-in quickly-installed boards

Publications (1)

Publication Number Publication Date
CN203066412U true CN203066412U (en) 2013-07-17

Family

ID=48765222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320013404 Expired - Lifetime CN203066412U (en) 2013-01-11 2013-01-11 Installing component of plug-in quickly-installed boards

Country Status (1)

Country Link
CN (1) CN203066412U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040944A (en) * 2015-08-14 2015-11-11 苏州通快净化科技有限公司 Integrally-installed wallboard
CN105672546A (en) * 2016-01-21 2016-06-15 苏州凯奥净化科技有限公司 Ceiling for clean room
CN105756260A (en) * 2016-04-25 2016-07-13 江苏中电创新环境科技有限公司 Adjustable hanging device for clean room roof
CN107327069A (en) * 2017-07-07 2017-11-07 山东大溪地新材料科技有限公司 A kind of two grades of furred ceiling components, two grades of furred ceilings and three-level furred ceiling component, three-level furred ceiling
CN108204070A (en) * 2018-02-07 2018-06-26 苏州通快净化科技有限公司 A kind of hanging top plate mounting structure

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040944A (en) * 2015-08-14 2015-11-11 苏州通快净化科技有限公司 Integrally-installed wallboard
CN105672546A (en) * 2016-01-21 2016-06-15 苏州凯奥净化科技有限公司 Ceiling for clean room
CN105756260A (en) * 2016-04-25 2016-07-13 江苏中电创新环境科技有限公司 Adjustable hanging device for clean room roof
CN105756260B (en) * 2016-04-25 2018-06-08 江苏中电创新环境科技有限公司 A kind of adjustable erecting by overhang for toilet's top plate
CN107327069A (en) * 2017-07-07 2017-11-07 山东大溪地新材料科技有限公司 A kind of two grades of furred ceiling components, two grades of furred ceilings and three-level furred ceiling component, three-level furred ceiling
CN107327069B (en) * 2017-07-07 2023-08-29 山东大溪地新材料科技有限公司 Second grade furred ceiling subassembly, second grade furred ceiling and tertiary furred ceiling subassembly, tertiary furred ceiling
CN108204070A (en) * 2018-02-07 2018-06-26 苏州通快净化科技有限公司 A kind of hanging top plate mounting structure

Similar Documents

Publication Publication Date Title
CN203066412U (en) Installing component of plug-in quickly-installed boards
CN206016146U (en) Dry-hang body of wall mounting structure
CN204645336U (en) A kind of mounting plug-in type aluminum facade
CN104060745B (en) The three-dimensional adjustable fastener of steel construction conversion layer
CN103291043B (en) The installation suspension assembly of finishing material
CN202324292U (en) Full-rigid connection structure for suspended ceiling
CN103452214A (en) Back-tied stone curtain wall
CN203475674U (en) Composite hoisting structure for flat pasting of mineral-wool acoustic board
CN110607857A (en) An installation structure of a prefabricated keel partition wall
CN107514088B (en) Integrated modular flat top and construction method thereof
CN203640132U (en) Stereoscopic hanging system
CN102535830A (en) Machine position adhesion device for monolithic climbing scaffold for constructing prefabricated building
CN211421565U (en) Height-adjustable point structure of suspended ceiling
CN208473060U (en) A kind of metal curtain wall
CN103382748B (en) A kind of Terracotta panel curtain wall installation structure
CN204715603U (en) A kind of parallel wide keel smallpox
CN205063122U (en) Open stone material curtain
CN204626853U (en) A kind of unit assembled mounting structure of special-shaped cambered surface moulding GRG decoration panel
CN204826392U (en) Fixed connection's wallboard fast
CN204920092U (en) Device is hung futilely to metal sheet
CN203846655U (en) Short-cantilever dry-hanging device of stone curtain wall
CN108035454A (en) Metope abatvoix system of perforating and its installation method
CN204804136U (en) Mounting structure of inclined plane buckle and compound furred ceiling medium dip face
CN205894388U (en) A bathroom assembly structure
CN205276893U (en) Building body outer wall hoists built -in fitting of trying to stop people from fighting each other

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130717