CN107687541A - A kind of pipeline provided with people's row access path shares suspension bracket - Google Patents
A kind of pipeline provided with people's row access path shares suspension bracket Download PDFInfo
- Publication number
- CN107687541A CN107687541A CN201610635560.3A CN201610635560A CN107687541A CN 107687541 A CN107687541 A CN 107687541A CN 201610635560 A CN201610635560 A CN 201610635560A CN 107687541 A CN107687541 A CN 107687541A
- Authority
- CN
- China
- Prior art keywords
- people
- tube layer
- access path
- layer
- row access
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 51
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 56
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 55
- 239000010959 steel Substances 0.000 claims abstract description 55
- 230000008014 freezing Effects 0.000 claims description 14
- 238000007710 freezing Methods 0.000 claims description 14
- 238000009413 insulation Methods 0.000 claims description 8
- 239000007921 spray Substances 0.000 claims description 6
- 238000004891 communication Methods 0.000 claims description 5
- 238000009434 installation Methods 0.000 abstract description 4
- 238000012423 maintenance Methods 0.000 abstract description 3
- 238000005457 optimization Methods 0.000 abstract description 2
- 238000004378 air conditioning Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 9
- 238000010276 construction Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 229910003460 diamond Inorganic materials 0.000 description 3
- 239000010432 diamond Substances 0.000 description 3
- 229910052751 metal Inorganic materials 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 229910052782 aluminium Inorganic materials 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000011888 foil Substances 0.000 description 2
- 239000011491 glass wool Substances 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 229910000746 Structural steel Inorganic materials 0.000 description 1
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 229910052725 zinc Inorganic materials 0.000 description 1
- 239000011701 zinc Substances 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/22—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
- F16L3/221—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals having brackets connected together by means of a common support
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Building Environments (AREA)
Abstract
A kind of pipeline provided with people's row access path shares suspension bracket, pipeline shares suspension bracket and is provided with some sections according to actual, it is fixed on by some columns below the beam sides and Roofing slab with certain altitude position of architecture storey, people's row access path is located among suspension bracket, and the side of people's row access path two respectively sets two layers of pipeline mounting layer, including electric bridge layer up and down, air-conditioner wind tube layer, fire water tube layer, air conditioner water tube layer, it is characterised in that:The electric bridge layer and air-conditioner wind tube layer are arranged on the side of people's row access path, the fire water tube layer and air conditioner water tube layer are arranged on the opposite side of people's row access path, separated between electric bridge layer and air-conditioner wind tube layer with angle steel, separated between fire water tube layer and air conditioner water tube layer with channel-section steel.The present invention has optimization pipeline layout arrangement, and pipeline, equipment integral layout in order, rationally, farthest improve space utilization rate, improve installation quality and the advantages of maintenance management.
Description
Technical field
The present invention relates to a kind of pipeline suspension bracket, is that a kind of pipeline provided with people's row access path shares suspension bracket specifically.
Background technology
For modern construction engineering, particularly there is the intelligent building compared with sophisticated functions, its Mechatronic Systems pipeline, equipment phase
To huge and complicated, and occupy the main positions of whole building installing space.Often occurs pipeline, equipment in engineering construction
Absolute altitude intersects collision phenomenon, thus brings great difficulty to construction.
Therefore known pipeline hanger system there are problems that above-mentioned a variety of inconvenience and.
The content of the invention
The purpose of the present invention, it is to propose that a kind of safe and reliable pipeline provided with people's row access path shares suspension bracket.
It is another object of the present invention to propose that a kind of pipeline provided with people's row access path for maintaining easily, running is total to
Use suspension bracket.
To achieve the above object, technical solution of the invention is:
A kind of pipeline provided with people's row access path shares suspension bracket, and pipeline shares suspension bracket and is provided with some sections according to actual, often section pipe
It is long 9-10m, width >=2980mm, height >=1030mm steel frame that line, which shares suspension bracket, is fixed on architecture storey by some columns
Below beam sides and Roofing slab with certain altitude position, people's row access path is located among suspension bracket, people's row access path two
Side respectively sets two layers of pipeline mounting layer, including electric bridge layer up and down, and air-conditioner wind tube layer, fire water tube layer, air conditioner water tube layer, it is special
Sign is:
The electric bridge layer and air-conditioner wind tube layer are arranged on the side of people's row access path, electric bridge layer and air-conditioner wind tube layer
Width≤1380mm, and electric bridge layer is above air-conditioner wind tube layer, wherein:The floor height of air-conditioner wind tube layer is 780mm, electrically
Crane span structure a height of 250mm layer by layer;The fire water tube layer and air conditioner water tube layer are arranged on the opposite side of people's row access path, and fire-fighting
Water pipe layer above air conditioner water tube layer, wherein:The floor height of air conditioner water tube layer is 790mm, and the floor height of fire water tube layer is 270mm;
Wherein:Separated between electric bridge layer and air-conditioner wind tube layer with angle steel, the square of the airduct insulation shell in air-conditioner wind tube layer
Tee section 1200 × 540mm of size, communication, fire-fighting, security protection, power pipeline are provided with electric bridge layer;Fire water tube layer
Separated between air conditioner water tube layer with channel-section steel, be arranged in parallel freezing feed pipe and freezing return pipe in air conditioner water tube layer, fire water
Be arranged in parallel spray header and fire hydrant water pipe in tube layer.
The pipeline provided with people's row access path of the present invention, which shares suspension bracket, to enter one using following technical measures
Step is realized.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the angle steel specification is 5# angle steel.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the channel-section steel specification is 6# channel-section steels.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the column makes for channel-section steel.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the column makes for angle steel.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the spray header and fire hydrant water pipe is straight
Footpath is each≤DN150.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the freezing feed pipe and freezing return pipe
Diameter is each≤DN150.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the bottom of the steel frame is provided with some horizontal strokes
Shelves.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the crosspiece makes for channel-section steel.
The foregoing pipeline provided with people's row access path shares suspension bracket, wherein the crosspiece makes for angle steel.
After adopting the above technical scheme, the shared suspension bracket of the pipeline provided with people's row access path of the present invention have it is following excellent
Point:
1st, pipeline layout arrangement is optimized, pipeline, equipment integral layout in order, rationally, farthest improve space and utilized
Rate, improve installation quality;
2nd, reach and improve pipeline installation quality and space availability ratio, be advantageous to operation and maintenance management.
Brief description of the drawings
Fig. 1 is the shared hanger structure schematic diagram of the embodiment of the present invention;
Fig. 2 is installed on angle steel column schematic diagram on floor roof for the embodiment of the present invention;
Fig. 3 is Fig. 2 upward view;
Fig. 4 is installed on channel steel upright post schematic diagram on floor roof for the embodiment of the present invention;
Fig. 5 is Fig. 4 upward view;
Fig. 6 is people's row access path floor level schematic diagram of the embodiment of the present invention;
Fig. 7 is the schematic diagram that people's row access path of the embodiment of the present invention is installed on room beam and floor roof.
In figure:1 airduct insulation shell, 2 columns, 3 angle steel crosspieces, 4 fire lines, 5 communication lines, 6 room beams, 7 fix steel
Plate, 8 bolts, 9 security protection pipelines, 10 power pipelines, 11 people's row access paths, 12 steel mesh pieces, 13 spray headers, 14 fire hydrants
Water pipe, 15 channel-section steel crosspieces, 16 freezing feed pipes, 17 freezing return pipes, 18 water pipe insulation shells, 19 angle steel columns, 20 channel-section steels are stood
Post, 21 floor roofs, 22 airducts.
Embodiment
With reference to embodiments and its accompanying drawing illustrates further to the present invention.
Embodiment 1
The pipeline provided with people's row access path of the embodiment of the present invention shares suspension bracket, and pipeline shares suspension bracket according to actual provided with some
Section, it is long 9-10m, a width of 2980mm, a height of 1030mm steel frame often to save pipeline and share suspension bracket, is fixed on and built by some columns
The side of room beam 6 with certain altitude position and the lower section of floor roof 21, people's row access path 11 for building floor are located in suspension bracket
Between, the side of people's row access path two respectively sets two layers of pipeline mounting layer, including electric bridge layer up and down, air-conditioner wind tube layer, fire extinguisher canvas hose
Layer, air conditioner water tube layer.
Referring now to Fig. 1, Fig. 1 is the shared hanger structure schematic diagram of the embodiment of the present invention.As illustrated, the electric bridge
Rack-layer and air-conditioner wind tube layer are arranged on the side of people's row access path 11, and the width of electric bridge layer and air-conditioner wind tube layer is
1380mm, and electric bridge layer is above air-conditioner wind tube layer, wherein:The floor height of air-conditioner wind tube layer is 780mm, and electric bridge is layer by layer
A height of 250mm;The fire water tube layer and air conditioner water tube layer are arranged on the opposite side of people's row access path, and fire water tube layer exists
Above air conditioner water tube layer, wherein:The floor height of air conditioner water tube layer is 790mm, and the floor height of fire water tube layer is 270mm;Wherein:Electrically
Separated between crane span structure layer and air-conditioner wind tube layer with angle steel, the square-section size of the airduct insulation shell 1 in air-conditioner wind tube layer
1200 × 540mm, communication line 5, fire line 4, security protection pipeline 9, power pipeline 10 are provided with electric bridge layer;Fire-fighting
Separated between water pipe layer and air conditioner water tube layer with channel-section steel, be arranged in parallel freezing feed pipe 16 and freezing return pipe in air conditioner water tube layer
17, be arranged in parallel in fire water tube layer spray header 13 and fire hydrant water pipe 14.
Steel used in the shared suspension bracket of the embodiment of the present invention are common low carbon structural steel.Fig. 2 is the embodiment of the present invention
The schematic diagram of angle steel column 19 on floor roof is installed on, Fig. 3 is Fig. 2 upward view.Suspension bracket column uses 5# angle steel and 6# channel-section steels,
It is welded one piece of fixation steel plate 7 respectively on every root post top and room beam is fixed on by a diameter of M8 or M10 expansible anchor of metal 8
6 sides and floor roof 21.The specification of fixation steel plate 7 shares two kinds, 100*150mm and 150*200mm, by regulation on every block of steel plate
Size outputs bolt hole.Suspension bracket is in the position without beam and can be directly mounted at by expansible anchor of metal on floor roof.People
Row access path suspension bracket column shares with both sides pipeline suspension bracket column.People's row access path is perpendicular, crosspiece uses 80*40*3mm square steel
With 6# channel steel upright post electric welding connections, it is 700mm along the elongated passage of length of pipeline to form width.Welding the passage of formation
60*30*5mm rhombus steel meshes piece 12 is laid on perpendicular, crosspiece top surface, and in the electric welding of each pitch point of rhombus mesh sheet and is erected, horizontal
Shelves square steel is fixed.People's row access path is perpendicular, crosspiece material uses specification as 80*40*3mm square steel.People's row access path width is
700mm, middle crosspiece spacing are 1500mm, and the crosspiece spacing of column 2 is 3000mm.People's row access path ground square steel frame manufacture
Complete to lay expanded steel diamond mesh above afterframe, expanded steel diamond mesh laying width, length are consistent with ground framework.Expanded steel diamond mesh
Along people's row access path total length surrounding and middle each crosspiece position and each rhombus node electric welding connection of expanded metal lath.Fig. 4 is this
Inventive embodiments are installed on the schematic diagram of channel steel upright post 20 on floor roof, and Fig. 5 is Fig. 4 upward view.
Air conditioning wind pipe specification is 1200*500mm, external thermal insulation thickness 40mm, the flank side surface of airduct two from column spacing 50mm,
Flue pipe heat-insulating layer top surface is from upper strata electric bridge bottom surface spacing 240mm.Air conditioning wind pipe insulation material is using 40mm thick aluminum foils folder muscle
Centrifugally glass-wool, by fixed after bonding and thermal insulation nail on airduct 22.Air conditioning wind pipe width two uses 40*4 angles on the crosspiece position of side
Code is fixed by M8 bolts with crosspiece.Air conditioning wind pipe suspension bracket spacing is 3000mm.
Electric bridge specification shares two kinds, wherein communication, fire-fighting, each one of security protection crane span structure 200*100mm, and an electric power
Crane span structure 500*150mm.The every kind of specification of electric bridge often saves length as 2 meters, splices on suspension bracket crane span structure crosspiece.Water between electric bridge
Flat spacing 60mm, peripheral crane span structure outer are respectively from soffit spacing from two edge column level interval 50mm, crane span structure top surface
150mm、100mm.Electric bridge is fixed, and outputs 8.5mm holes with electric hand drill by illustrated dimensions first on crane span structure and crosspiece, so
Fixed afterwards using M8 bolts through crosspiece.Electric bridge is fixed, and is opened first on crane span structure and crosspiece by illustrated dimensions with electric hand drill
Go out 8.5mm holes, then fixed using M8 bolts through crosspiece.
Fire extinguisher canvas hose pipeline is connected using groove type clip, and is passed through with Φ 10mm galvanized steel bar clips in spreader
Nut shimming pipeline is fixed.Fire extinguisher canvas hose suspension bracket spacing is 4500mm.
It is respectively freezing feed pipe and freezing return pipe that air-conditioning water pipe, which shares two, and caliber is all DN150mm.Air-conditioning water pipe
Insulation shell uses specification at crosspiece position as 40*40 anticorrosive woods using 40mm thick aluminum foils folder muscle centrifugally glass-wool, air-conditioning water pipe
Pad is adiabatic, is added gasket with nut by the end weld bolt of 30*30 zinc-coated flat steel sheets clip two and is fixed with crosspiece.Between two air-conditioning water pipes
Level interval is 160mm, and vertical interval is 540mm between air conditioner water tube top face and upper strata fire extinguisher canvas hose bottom surface, and pipeline is from two sides
Column level interval is 60mm.Air-conditioning water pipe hanging rack spacing is 4500mm.
Fig. 6 is people's row access path floor level schematic diagram of the embodiment of the present invention.
The present invention has substantive distinguishing features and significant technological progress, and the pipeline provided with people's row access path of the invention is total to
With suspension bracket, optimization pipeline layout arrangement, pipeline, equipment integral layout is set in order, rationally farthest to improve space profit
With rate, installation quality is improved.Be advantageous to pipeline in ground maintenance and the more difficult place of operational management, generally applicable architecture storey tool
There are the plant floor of certain altitude, market, complex building, gymnasium, cinema.
The shared suspension bracket of the pipeline provided with people's row access path of the present invention Sichuan Chengdu Mo Shi connectors factory and Hangzhou Ah
Used in Li Baba Taobaos city engineering, significant effect, obtained exploiting entity, supervisor and owner's abundant affirmation.
It is a large amount of to use, obtain exploiting entity, supervisor and construction unit's abundant affirmation.
Above example is used for illustrative purposes only, rather than limitation of the present invention, the technology people about technical field
Member, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, it is all equivalent
Technical scheme should also belong to scope of the invention, should be limited by each claim.
Claims (10)
1. a kind of pipeline provided with people's row access path shares suspension bracket, pipeline shares suspension bracket and is provided with some sections according to actual, often saves
It is long 9-10m, width >=2980mm, height >=1030mm steel frame that pipeline, which shares suspension bracket, is fixed on architecture storey by some columns
Beam sides with certain altitude position and Roofing slab below, people's row access path is located among suspension bracket, people's row access path
Two sides respectively set two layers of pipeline mounting layer up and down, including electric bridge layer, air-conditioner wind tube layer, fire water tube layer, air conditioner water tube layer, its
It is characterised by:
The electric bridge layer and air-conditioner wind tube layer are arranged on the side of people's row access path, electric bridge layer and air-conditioner wind tube layer
Width≤1380mm, and electric bridge layer is above air-conditioner wind tube layer, wherein:The floor height of air-conditioner wind tube layer is 780mm, electrically
Crane span structure a height of 250mm layer by layer;The fire water tube layer and air conditioner water tube layer are arranged on the opposite side of people's row access path, and fire-fighting
Water pipe layer above air conditioner water tube layer, wherein:The floor height of air conditioner water tube layer is 790mm, and the floor height of fire water tube layer is 270mm;
Wherein:Separated between electric bridge layer and air-conditioner wind tube layer with angle steel, the square of the airduct insulation shell in air-conditioner wind tube layer
Tee section 1200 × 540mm of size, communication, fire-fighting, security protection, power pipeline are provided with electric bridge layer;Fire water tube layer
Separated between air conditioner water tube layer with channel-section steel, be arranged in parallel freezing feed pipe and freezing return pipe in air conditioner water tube layer, fire water
Be arranged in parallel spray header and fire hydrant water pipe in tube layer.
2. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 1, it is characterised in that the angle steel specification
For 5# angle steel.
3. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 1, it is characterised in that the channel-section steel specification
For 6# channel-section steels.
4. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 1, it is characterised in that the column is groove
Steel makes.
5. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 1, it is characterised in that the column is angle
Steel makes.
6. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 1, it is characterised in that the spray header
With the diameter of fire hydrant water pipe it is each≤DN150.
7. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 1, it is characterised in that the freezing is supplied water
The diameter of pipe and freezing return pipe is each≤DN150.
8. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 1, it is characterised in that the steel frame
Bottom is provided with some crosspieces.
9. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 8, it is characterised in that the crosspiece is groove
Steel makes.
10. the pipeline provided with people's row access path shares suspension bracket as claimed in claim 8, it is characterised in that the crosspiece is
Angle steel makes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610635560.3A CN107687541A (en) | 2016-08-05 | 2016-08-05 | A kind of pipeline provided with people's row access path shares suspension bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610635560.3A CN107687541A (en) | 2016-08-05 | 2016-08-05 | A kind of pipeline provided with people's row access path shares suspension bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107687541A true CN107687541A (en) | 2018-02-13 |
Family
ID=61151672
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610635560.3A Pending CN107687541A (en) | 2016-08-05 | 2016-08-05 | A kind of pipeline provided with people's row access path shares suspension bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107687541A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306366A (en) * | 2019-11-21 | 2020-06-19 | 中国十七冶集团有限公司 | Universal type comprehensive pipeline support mounting method |
CN113154134A (en) * | 2021-05-25 | 2021-07-23 | 中国五冶集团有限公司 | Multi-angle adjustable suspension hoop for fixing conveying pipeline |
CN113737849A (en) * | 2021-08-11 | 2021-12-03 | 中铁二局集团有限公司 | Post-installed concrete slab lower access passage device and installation method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0560269A (en) * | 1991-07-30 | 1993-03-09 | Hitachi Cable Ltd | Method of fixing pipeline laid along bridge beam |
CN201723853U (en) * | 2010-07-16 | 2011-01-26 | 平煤建工集团有限公司土建处 | Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project |
CN203963265U (en) * | 2014-07-21 | 2014-11-26 | 青岛建安建设集团有限公司 | Pipeline layout support |
CN104405071A (en) * | 2014-11-19 | 2015-03-11 | 上海市安装工程集团有限公司 | Structure and method for increasing height of corridor ceiling |
CN204828960U (en) * | 2015-08-04 | 2015-12-02 | 中铁建大桥工程局集团第五工程有限公司 | A a support formula gallows that is used for pipeline classification rationally to arrange |
CN205026211U (en) * | 2015-07-08 | 2016-02-10 | 中建安装工程有限公司 | Gallows is synthesized to multi -functional pipeline |
CN205956559U (en) * | 2016-08-05 | 2017-02-15 | 五冶集团上海有限公司 | Pipeline gallows |
-
2016
- 2016-08-05 CN CN201610635560.3A patent/CN107687541A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0560269A (en) * | 1991-07-30 | 1993-03-09 | Hitachi Cable Ltd | Method of fixing pipeline laid along bridge beam |
CN201723853U (en) * | 2010-07-16 | 2011-01-26 | 平煤建工集团有限公司土建处 | Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project |
CN203963265U (en) * | 2014-07-21 | 2014-11-26 | 青岛建安建设集团有限公司 | Pipeline layout support |
CN104405071A (en) * | 2014-11-19 | 2015-03-11 | 上海市安装工程集团有限公司 | Structure and method for increasing height of corridor ceiling |
CN205026211U (en) * | 2015-07-08 | 2016-02-10 | 中建安装工程有限公司 | Gallows is synthesized to multi -functional pipeline |
CN204828960U (en) * | 2015-08-04 | 2015-12-02 | 中铁建大桥工程局集团第五工程有限公司 | A a support formula gallows that is used for pipeline classification rationally to arrange |
CN205956559U (en) * | 2016-08-05 | 2017-02-15 | 五冶集团上海有限公司 | Pipeline gallows |
Non-Patent Citations (2)
Title |
---|
中国建筑业协会组织: "《创建鲁班奖工程细部做法指导》", 30 April 2014 * |
张新兵: "《建筑工程质量问题控制方法及应用》", 31 December 2016 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306366A (en) * | 2019-11-21 | 2020-06-19 | 中国十七冶集团有限公司 | Universal type comprehensive pipeline support mounting method |
CN113154134A (en) * | 2021-05-25 | 2021-07-23 | 中国五冶集团有限公司 | Multi-angle adjustable suspension hoop for fixing conveying pipeline |
CN113737849A (en) * | 2021-08-11 | 2021-12-03 | 中铁二局集团有限公司 | Post-installed concrete slab lower access passage device and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205077687U (en) | Steel bar truss floor bearing plate | |
CN102162278A (en) | Light steel structure building system | |
CN103122667B (en) | Light-weight steel structure plafond of large-span underground powerhouse of hydroelectric station | |
CN205956559U (en) | Pipeline gallows | |
CN107687541A (en) | A kind of pipeline provided with people's row access path shares suspension bracket | |
CN205242629U (en) | Novel house that can peg graft and assemble | |
CN108590033A (en) | A kind of factory building roof rack project installation structure and its construction method | |
CN109780330A (en) | The fixed bracket of multi-pipeline and its construction method | |
CN205875535U (en) | Upright two interlock metal roofing structures | |
CN209604683U (en) | Multi-pipeline fixes bracket | |
CN203963265U (en) | Pipeline layout support | |
CN104631650B (en) | Screen plate outer wall with heat insulation layer and construction method | |
CN208473113U (en) | A kind of factory building roof rack project installation structure | |
CN113653272A (en) | Archaized eave of steel structure of high-rise building and construction method thereof | |
CN102864926A (en) | Construction method of steel structure conversion layer furred ceiling | |
CN202324281U (en) | Latticed steel truss ceiling structure of large-span underground workshop of hydropower station | |
CN209839352U (en) | Horizontal mounting bracket for heavy pipeline of steel structure building | |
CN102995790B (en) | Capped steel keel and light concrete combined wall | |
CN206844617U (en) | A kind of builder's jack | |
CN213597028U (en) | Underground garage | |
CN203188369U (en) | Bolt cylinder placing type high-rise block structure assembly combined type unit complex | |
CN107023079A (en) | A kind of building structure | |
CN109469338A (en) | A kind of tall and big workshop self-control grid platform and its construction method as electromechanical pipeline | |
CN209413151U (en) | A kind of fabricated roofing cornice support rod component and support unit | |
CN103340117B (en) | Automatic linkage-type simple rain protection shed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180213 |
|
RJ01 | Rejection of invention patent application after publication |