CN203963265U - Pipeline layout support - Google Patents

Pipeline layout support Download PDF

Info

Publication number
CN203963265U
CN203963265U CN201420402841.0U CN201420402841U CN203963265U CN 203963265 U CN203963265 U CN 203963265U CN 201420402841 U CN201420402841 U CN 201420402841U CN 203963265 U CN203963265 U CN 203963265U
Authority
CN
China
Prior art keywords
support bar
support
fixedly connected
bar
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420402841.0U
Other languages
Chinese (zh)
Inventor
李兆龙
杨海江
王晓琴
贾杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Jianan Construction Group Co Ltd
Original Assignee
Qingdao Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jianan Construction Group Co Ltd filed Critical Qingdao Jianan Construction Group Co Ltd
Priority to CN201420402841.0U priority Critical patent/CN203963265U/en
Application granted granted Critical
Publication of CN203963265U publication Critical patent/CN203963265U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to pipeline support technical field, relate to a kind of pipeline layout support for basement common trench gut line layout, comprise upper support bar, lower support bar, left support bar and right support bar, upper support bar is fixedly connected with left and right supporting bar top respectively, and lower support bar is fixedly connected with left and right strut intermediate portion respectively; Upper support bar and lower support bar are provided with tapped through hole, and left and right strut bottom is fixedly connected with support embedded part respectively, and support embedded part is provided with tapped hole; Between upper support bar and lower support bar, be provided with T-shaped support, T-shaped support is fixedly connected with right support bar with upper and lower strut, and upper and lower strut is provided with U-shaped card; Contained fire hose reel, Heater hose, air-conditioning water pipe, cable testing bridge, easy construction, has improved working efficiency; Reduce suspension and support quantity, saved saving steels cost; Improve space availability ratio, pipeline layout is clear, attractive in appearance; Line distribution is reasonable, and later stage working service is simple.

Description

Pipeline layout support
Technical field
The utility model belongs to pipeline support technical field, specifically, relates to a kind of pipeline layout support for basement common trench gut line layout.
Background technique
Raising along with economy and state-of-art, all kinds of buildings and super-high buildings are more and more, people are more and more higher to the requirement of superelevation or building, building functions increases thereupon, the problem of bringing is thus that electromechanical pipeline is arranged also more sophisticated, and the pipeline of concentrated expression in basement common trench, in energy centre piping lane and basement corridor furred ceiling arranged upper, because space, area are limited, pipeline is installed too concentrated, and laying difficulty is large.In work progress in the past, each pipeline fitting-up gang is centered by oneself, and that pipeline is installed is unordered, level is chaotic, for meeting local absolute altitude, status requirement, often stop work to rectify and improve, mutually delay the duration, serious meeting causes quality and safety hidden danger, uses and maintenance brings inconvenience to the later stage.
To rationally solve above-mentioned contradiction, just need to be by using comprehensive pipeline support comprehensively to arrange electromechanical pipeline, concentrated positions such as basement common trench of pipeline particularly, line distribution is concentrated, its pipeline is carried out to comprehensive layout to be laid, be conducive to the raising of construction speed and the assurance of construction quality, be conducive to later stage use and maintenance.
Model utility content
The shortcoming existing in order to solve prior art, a kind of comprehensive pipeline support that can be used for the intensive places of line distribution such as basement common trench of the utility model design.
The technical solution adopted in the utility model is: a kind of pipeline layout support, comprise upper support bar, lower support bar, left support bar and right support bar, upper support bar is fixedly connected with right support masthead end with left support bar respectively, and lower support bar is fixedly connected with right support bar intermediate portion with left support bar respectively; Described upper support bar and lower support bar are provided with tapped through hole, and described left support bar is fixedly connected with support embedded part respectively with right support bar bottom, and support embedded part is provided with tapped hole; Between described upper support bar and lower support bar, be provided with T-shaped support, T-shaped support is fixedly connected with upper support bar, lower support bar and right support bar respectively, and described upper support bar and lower support bar are provided with dismountable U-shaped card.
Preferably, described upper support bar, lower support bar, left support bar and right support bar adopt No. 16 channel-section steels, and described T-shaped support adopts No. 12 channel-section steels.
Preferably, described support embedded part is rectangular, adopts 12 millimeters thick steel plates.
During use, support embedded part is fixed on crossbeam by EXPANSION ANCHOR BOLTS, comprehensive pipeline support is arranged successively along basement common trench, heating installation return pipe is laid between upper support bar and lower support bar to heating installation water pipe be laid on upper support bar top corresponding to heating installation return pipe; Fire-fighting spray pipe is laid between upper support bar and lower support bar, fire hose reel be laid on upper support bar top corresponding to fire-fighting spray pipe; Air-conditioning water pipe and air-conditioning return pipe are laid between upper support bar and lower support bar side by side; Article two, fire fighting gun tube is laid on upper support bar top side by side; Heating installation water pipe, fire hose reel and fire fighting gun tube fasten on upper support bar by U-shaped, and heating installation return pipe, fire-fighting spray pipe, air-conditioning water pipe and air-conditioning return pipe fasten on lower support bar by U-shaped; Two cable testing bridges are respectively laid in the above and below of T-shaped rack cross-bar, and two cable testing bridges are laid in upper support bar top, and cable testing bridge is secured by bolts on strut.
Pipeline erection sequence is that Heater hose installation → fire hose reel installation → air-conditioning water pipe installation → crane span structure is installed.
The beneficial effects of the utility model are: adopt same comprehensive support, contained fire hose reel, Heater hose, air-conditioning water pipe, cable testing bridge, easy construction, has improved working efficiency; Reduce suspension and support quantity, saved saving steels cost; Improve space availability ratio, pipeline layout is clear, attractive in appearance; Line distribution is reasonable, and later stage working service is simple.
Accompanying drawing explanation
Fig. 1 is that the utility model is used phase diagram;
Embodiment
Below by specific embodiment, by reference to the accompanying drawings the utility model is further described:
Embodiment 1
The pipeline layout support of the present embodiment, comprise upper support bar 3, lower support bar 13, left support bar 2 and right support bar 12, upper support bar 3 is fixedly connected with the top of right support bar 12 with left support bar 2 respectively, and lower support bar 13 is fixedly connected with the intermediate portion of right support bar 12 with left support bar 2 respectively; Upper support bar 3 and lower support bar 13 are provided with tapped through hole, and the bottom of left support bar 2 and right support bar 12 is fixedly connected with support embedded part 1 respectively, and support embedded part 1 is provided with tapped hole; Between upper support bar 3 and lower support bar 13, be provided with T-shaped support 11, T-shaped support 11 is fixedly connected with upper support bar 3, lower support bar 13 and right support bar 12 respectively, and upper support bar 3 and lower support bar 13 are provided with dismountable U-shaped card 15.
Upper support bar 3, lower support bar 13, left support bar 2 and right support bar 12 adopt No. 16 channel-section steels, and T-shaped support 11 adopts No. 12 channel-section steels.
Support embedded part 1 is rectangular, adopts 12 millimeters thick steel plates.
During use, support embedded part 1 is fixed on crossbeam by EXPANSION ANCHOR BOLTS 14, comprehensive pipeline support is arranged successively along basement common trench, heating installation return pipe 5 is laid between upper support bar 3 and lower support bar 13 to heating installation water pipe 4 be laid on upper support bar 3 tops corresponding to heating installation return pipe 5; Fire-fighting spray pipe 7 is laid between upper support bar 3 and lower support bar 13, fire hose reel 6 be laid on upper support bar 3 tops corresponding to fire-fighting spray pipe 7; Air-conditioning water pipe 8 and air-conditioning return pipe 9 are laid between upper support bar 3 and lower support bar 13 side by side; Article two, fire fighting gun tube 8 is laid on the top of upper support bar 3 side by side; Heating installation water pipe 4, fire hose reel 6 and fire fighting gun tube 8 fasten on upper support bar 3 by U-shaped, and heating installation return pipe 5, fire-fighting spray pipe 7, air-conditioning water pipe 8 and air-conditioning return pipe 9 are fixed on lower support bar 13 by U-shaped card 15; Two cable testing bridges 10 are respectively laid in cross bar top and the cross bar below of T-shaped support 11, and two cable testing bridges 10 are laid in upper support bar 3 tops, and cable testing bridge 10 is secured by bolts on strut.
Pipeline erection sequence is that Heater hose installation → fire hose reel installation → air-conditioning water pipe installation → crane span structure is installed.
Embodiment 2
The pipeline layout support of the present embodiment, divided by lower difference outer other with embodiment 1:
Upper support bar 3, lower support bar 13, left support bar 2 and right support bar 12 adopt 80*6 type angle steel, and T-shaped support 11 adopts 70*6 type angle steel; Support embedded part 1 is rectangular, adopts 10 millimeters thick steel plates.

Claims (1)

1. a pipeline layout support, it is characterized in that: comprise upper support bar, lower support bar, left support bar and right support bar, upper support bar is fixedly connected with right support masthead end with left support bar respectively, and lower support bar is fixedly connected with right support bar intermediate portion with left support bar respectively; Described upper support bar and lower support bar are provided with tapped through hole, and described left support bar is fixedly connected with support embedded part respectively with right support bar bottom, and support embedded part is provided with tapped hole; Between described upper support bar and lower support bar, be provided with T-shaped support, T-shaped support is fixedly connected with upper support bar, lower support bar and right support bar respectively, and described upper support bar and lower support bar are provided with dismountable U-shaped card.
CN201420402841.0U 2014-07-21 2014-07-21 Pipeline layout support Expired - Fee Related CN203963265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420402841.0U CN203963265U (en) 2014-07-21 2014-07-21 Pipeline layout support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420402841.0U CN203963265U (en) 2014-07-21 2014-07-21 Pipeline layout support

Publications (1)

Publication Number Publication Date
CN203963265U true CN203963265U (en) 2014-11-26

Family

ID=51923847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420402841.0U Expired - Fee Related CN203963265U (en) 2014-07-21 2014-07-21 Pipeline layout support

Country Status (1)

Country Link
CN (1) CN203963265U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104566880A (en) * 2014-12-17 2015-04-29 合肥三艾汽车配件有限公司 Air-conditioner pipe bracket cover plate
CN104832711A (en) * 2015-05-14 2015-08-12 珠海格力电器股份有限公司 Pipeline fixing support and air conditioner
CN107131355A (en) * 2017-05-24 2017-09-05 五冶集团上海有限公司 A kind of method and device for changing heavy caliber aerial pipeline
CN107687541A (en) * 2016-08-05 2018-02-13 五冶集团上海有限公司 A kind of pipeline provided with people's row access path shares suspension bracket
CN112483728A (en) * 2020-11-23 2021-03-12 张同勇 Underground water supply pipeline and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104566880A (en) * 2014-12-17 2015-04-29 合肥三艾汽车配件有限公司 Air-conditioner pipe bracket cover plate
CN104832711A (en) * 2015-05-14 2015-08-12 珠海格力电器股份有限公司 Pipeline fixing support and air conditioner
CN104832711B (en) * 2015-05-14 2018-09-28 珠海格力电器股份有限公司 Pipeline fixing support and air conditioner
CN107687541A (en) * 2016-08-05 2018-02-13 五冶集团上海有限公司 A kind of pipeline provided with people's row access path shares suspension bracket
CN107131355A (en) * 2017-05-24 2017-09-05 五冶集团上海有限公司 A kind of method and device for changing heavy caliber aerial pipeline
CN112483728A (en) * 2020-11-23 2021-03-12 张同勇 Underground water supply pipeline and construction method thereof

Similar Documents

Publication Publication Date Title
CN203963265U (en) Pipeline layout support
CN206569235U (en) A kind of ship hanger bracket and boat scaffold
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN104606832A (en) Stereo garage energy saving water circulation fire extinguishing combined device
CN204212383U (en) Plug-in type steel pipe scaffold
CN203626275U (en) Steel beam structure and under-beam clamp used for hanging horizontal safety net thereof
CN205956559U (en) Pipeline gallows
CN102767644A (en) Assembly type heavy pipeline hanger
CN104533092B (en) The construction method of rack roofing furred ceiling
CN203291426U (en) Temporary fire extinguishing system for buildings
CN103272351A (en) Temporary fire-fighting system used in building
CN203977840U (en) A kind of high-altitude long-span strengthening concrete vestibule braced structures
CN204418658U (en) Integrated hydraulic creeping formwork periphery protection unit
CN205013862U (en) Roofing piping erection support
CN203569759U (en) Steel box hidden beam composite floor system
CN203989639U (en) Super High continuous relay formula construction fire-fighting system
CN102777703A (en) Assembly type light pipeline hanger
CN203701555U (en) Movable type pipe truss installation platform
CN207234231U (en) A kind of buried electricity box of overhead type
CN202519960U (en) Overhung type scaffold
CN202187455U (en) Suspended-ceiling suspension device below a floor support plate in a steel structure
CN207349576U (en) Mobile toilet's fire protection pipeline system
CN202031308U (en) Inverted-hanging type scaffold
CN203878501U (en) Water carrying rail
CN202209055U (en) Protection rail for construction site

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

Termination date: 20180721