CN205639870U - A pipeline gallows is synthesized in heavy construction - Google Patents

A pipeline gallows is synthesized in heavy construction Download PDF

Info

Publication number
CN205639870U
CN205639870U CN201620318322.5U CN201620318322U CN205639870U CN 205639870 U CN205639870 U CN 205639870U CN 201620318322 U CN201620318322 U CN 201620318322U CN 205639870 U CN205639870 U CN 205639870U
Authority
CN
China
Prior art keywords
suspension
support
testing bridge
cable testing
heavy construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620318322.5U
Other languages
Chinese (zh)
Inventor
吕永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Xinhe Electromechanical Engineering Co Ltd
Original Assignee
Guangdong Xinhe Electromechanical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Xinhe Electromechanical Engineering Co Ltd filed Critical Guangdong Xinhe Electromechanical Engineering Co Ltd
Priority to CN201620318322.5U priority Critical patent/CN205639870U/en
Application granted granted Critical
Publication of CN205639870U publication Critical patent/CN205639870U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a pipeline gallows is synthesized in heavy construction belongs to building appurtenant work technical field. The purpose provides a simple structure, and spatial layout is reasonable, material saving's a pipeline gallows is synthesized in heavy construction, and including a hot -water heating gallows part and an electric power gallows part, a hot -water heating gallows part is including last baffle, median septum, lower baffle and two jibs, upward baffle, median septum, lower baffle are all connected between two jibs, go up the baffle and connect the floor embedded bar, be equipped with the air conditioner tuber pipe on the median septum, be equipped with pipe -line system down on the baffle, expansion bolts and floor fixed connection are passed through including cable testing bridge, cable testing bridge support, two fixed plates, fixed plate to an electric power gallows part, cable testing bridge leg joint fixed plate, and the cable testing bridge is placed on the cable testing bridge support. The utility model discloses an it especially is suitable for the heavy construction use to prop up the gallows.

Description

A kind of heavy construction comprehensive pipeline suspension and support
Technical field
The utility model discloses a kind of heavy construction comprehensive pipeline suspension and support, belong to building appurtenant work skill Art field.
Background technology
In recent years, along with socioeconomic continuous progress, various heavy constructions get more and more, build large-scale In building, requisite various pipeline is set, including air-conditioning, fire-fighting, water supply, electric power, communication, Heating etc., in construction, specialized pipeline suspension and support is used to lay the various pipelines of laying, existing Some pipeline suspension and supports, owing to version is more single, often result in the excessively complicated of pipeline layout, The working place safeguarded and change is narrow and small, it is impossible to changes layout flexibly, and wastes a lot of buildings Material.
Utility model content
For the deficiencies in the prior art, the purpose of this utility model is to be to provide a kind of structure letter Single, space layout is reasonable, saves the heavy construction comprehensive pipeline suspension and support of material, including hot-water heating suspension and support Part and electric power suspension and support part, described hot-water heating suspension and support part includes upper spacer, median septum, lower clapboard And two suspension rods, described upper spacer, median septum, lower clapboard be both connected between two suspension rods, described on Dividing plate connects floor embedded bar, and septum plate is provided with air conditioning wind pipe, and described lower clapboard is provided with pipe Road system, described electric power suspension and support part includes cable testing bridge, cable testing bridge support, two pieces of fixed plates, Fixed plate is connected by expansion bolt and floor are fixing, and cable testing bridge support connects fixed plate, cable testing bridge It is placed on cable testing bridge support.
Further, described heavy construction comprehensive pipeline suspension and support also includes a non-firm power suspension and support portion Point.
Further, described suspension rod is zinc-plated harness cord suspension rod.
Further, described tubing include fire-fighting spraying pipeline, water supply line, heating feed pipe, Heating return pipe.
In sum, the beneficial effects of the utility model are: a kind of heavy construction of the present utility model is comprehensive Pipeline suspension and support, is divided into two elementary cells by pipeline, and the support hanger structure of installation is compact, possesses The biggest working place, it is simple to the maintenance of pipeline and replacing, and saved construction material on the whole, electricity Power suspension and support part can be adjusted flexibly setting according to actual needs, and suspension and support of the present utility model is the suitableeest Use together in heavy construction.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model a kind of heavy construction comprehensive pipeline suspension and support.
In figure, 1, hot-water heating suspension and support part, 2, electric power suspension and support part, 3, upper spacer, 4, in every Plate, 5, lower clapboard, 6, suspension rod, 7, floor embedded bar, 8, air conditioning wind pipe, 9, cable testing bridge, 10, cable testing bridge support, 11, fixed plate, 12, expansion bolt, 13, fire-fighting spraying pipeline, 14, Water supply line, 15, heating feed pipe, 16, heating return pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing and detailed description of the invention, this utility model is further described:
As it is shown in figure 1, a kind of heavy construction comprehensive pipeline suspension and support, including hot-water heating suspension and support part 1 and Electric power suspension and support part 2, hot-water heating suspension and support part 1 include upper spacer 3, median septum 4, lower clapboard 5 and Two suspension rods 6, upper spacer 3, median septum 4, lower clapboard 5 be both connected between two suspension rods 6, on every Plate 3 connects floor embedded bar 7, and median septum 4 is provided with air conditioning wind pipe 8, and lower clapboard 5 is provided with pipeline System, electric power suspension and support part 2 includes cable testing bridge 9,10, two pieces of fixed plates 11 of cable testing bridge support, Fixed plate 11 is connected by expansion bolt 12 and floor are fixing, and cable testing bridge support 10 connects fixed plate 11, cable testing bridge 9 is placed on cable testing bridge support 10.
Preferably, heavy construction comprehensive pipeline suspension and support also includes a non-firm power suspension and support part.When When the forceful electric power of building, weak current equipment are more, a part of electric power electricity can be placed on cable in stock suspension and support Cable.
Preferably, suspension rod 6 is zinc-plated harness cord suspension rod.
Preferably, tubing include fire-fighting spraying pipeline 13, water supply line 14, heating feed pipe 15, Heating return pipe 16.Other various pipeline facilities can also be arranged as required to.
When suspension and support of the present utility model is installed, first by upper spacer 3 and floor embedded bar 7 company of welding Connect, suspension rod 6 is sequentially passed through upper spacer 3, median septum 4, lower clapboard 5 and fixes, by two pieces of fixed plates 11 use expansion bolt 12 to be fixed on floor, and the position of fixed plate 11 can be according to place situation and pipe Line practical situation is arranged flexibly, then welding cable crane span structure support 10, finally installation erection air conditioning wind pipe 8, Various pipelines and cable testing bridge 9.
For a person skilled in the art, can be made other according to above technical scheme and design Various corresponding changes and deformation, and all these changes and deformation all should belong to this utility model Within scope of the claims.

Claims (4)

1. a heavy construction comprehensive pipeline suspension and support, including hot-water heating suspension and support part and electric power suspension and support part, it is characterized in that, described hot-water heating suspension and support part includes upper spacer, median septum, lower clapboard and two suspension rods, described upper spacer, median septum, lower clapboard is both connected between two suspension rods, described upper spacer connects floor embedded bar, septum plate is provided with air conditioning wind pipe, described lower clapboard is provided with tubing, described electric power suspension and support part includes cable testing bridge, cable testing bridge support, two pieces of fixed plates, fixed plate is connected by expansion bolt and floor are fixing, cable testing bridge support connects fixed plate, cable testing bridge is placed on cable testing bridge support.
Heavy construction comprehensive pipeline suspension and support the most according to claim 1, it is characterised in that described heavy construction comprehensive pipeline suspension and support also includes a non-firm power suspension and support part.
Heavy construction comprehensive pipeline suspension and support the most according to claim 1, it is characterised in that described suspension rod is zinc-plated harness cord suspension rod.
Heavy construction comprehensive pipeline suspension and support the most according to claim 1, it is characterised in that described tubing includes fire-fighting spraying pipeline, water supply line, heating feed pipe, heating return pipe.
CN201620318322.5U 2016-04-15 2016-04-15 A pipeline gallows is synthesized in heavy construction Expired - Fee Related CN205639870U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620318322.5U CN205639870U (en) 2016-04-15 2016-04-15 A pipeline gallows is synthesized in heavy construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620318322.5U CN205639870U (en) 2016-04-15 2016-04-15 A pipeline gallows is synthesized in heavy construction

Publications (1)

Publication Number Publication Date
CN205639870U true CN205639870U (en) 2016-10-12

Family

ID=57065389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620318322.5U Expired - Fee Related CN205639870U (en) 2016-04-15 2016-04-15 A pipeline gallows is synthesized in heavy construction

Country Status (1)

Country Link
CN (1) CN205639870U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760096A (en) * 2016-11-25 2017-05-31 中国建筑第八工程局有限公司 Assembled sound insulating floor slab and its construction method
CN108716571A (en) * 2018-06-26 2018-10-30 上海市安装工程集团有限公司 Adjustable machine electric line suspension and support and its application method
CN109038397A (en) * 2018-06-26 2018-12-18 上海市安装工程集团有限公司 Assembled arthitecutral structure and its installation method with electromechanical pipeline bracket
CN110552368A (en) * 2019-08-05 2019-12-10 宁波华讯通信服务有限公司 Mounting method of steel member bracket and steel member bracket
CN112178280A (en) * 2020-09-25 2021-01-05 罗恩(上海)建筑科技有限公司 Combined type anti-seismic support and hanger
CN112576816A (en) * 2020-12-29 2021-03-30 长江勘测规划设计研究有限责任公司 Comprehensive support and hanger system for oil-gas water pipeline and cable bridge of hydropower station

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760096A (en) * 2016-11-25 2017-05-31 中国建筑第八工程局有限公司 Assembled sound insulating floor slab and its construction method
CN108716571A (en) * 2018-06-26 2018-10-30 上海市安装工程集团有限公司 Adjustable machine electric line suspension and support and its application method
CN109038397A (en) * 2018-06-26 2018-12-18 上海市安装工程集团有限公司 Assembled arthitecutral structure and its installation method with electromechanical pipeline bracket
CN109038397B (en) * 2018-06-26 2024-03-29 上海市安装工程集团有限公司 Fabricated building structure with electromechanical pipeline bracket and mounting method thereof
CN110552368A (en) * 2019-08-05 2019-12-10 宁波华讯通信服务有限公司 Mounting method of steel member bracket and steel member bracket
CN112178280A (en) * 2020-09-25 2021-01-05 罗恩(上海)建筑科技有限公司 Combined type anti-seismic support and hanger
CN112178280B (en) * 2020-09-25 2021-12-31 罗恩(上海)建筑科技有限公司 Combined type anti-seismic support and hanger
CN112576816A (en) * 2020-12-29 2021-03-30 长江勘测规划设计研究有限责任公司 Comprehensive support and hanger system for oil-gas water pipeline and cable bridge of hydropower station
CN112576816B (en) * 2020-12-29 2022-06-03 长江勘测规划设计研究有限责任公司 Comprehensive support and hanger system for oil-gas water pipeline and cable bridge of hydropower station

Similar Documents

Publication Publication Date Title
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN204901062U (en) A three -dimensional antidetonation gallows
CN201496669U (en) Pipeline supporting and hanging frame
CN204478334U (en) modular integrated refrigeration station
CN201176703Y (en) Tripod for construction of hyperbola cooling tower cylinder
CN203963265U (en) Pipeline layout support
CN204164505U (en) Universal Joining clasp lifting device
CN207003782U (en) A kind of ceiling support system
CN202466923U (en) Suspended ceiling counter support
CN205276504U (en) Beam -column connecting joint of activity board house
CN204113295U (en) A kind of municipal shield tunnel
CN205479755U (en) A synthesize integrated suspension system of pipe support that is used for motor car application storehouse of inspecting
CN206667926U (en) A kind of municipal works fence
CN213061799U (en) Vehicle restriction device for bridge engineering
CN205781389U (en) Land disjunctor support at a kind of turning
CN204828960U (en) A a support formula gallows that is used for pipeline classification rationally to arrange
CN212327756U (en) Dust device for construction site
CN208664041U (en) A kind of quick assembly mold of concrete double-T plate
CN102777703A (en) Assembly type light pipeline hanger
CN203656365U (en) Combination-type transition cable leading cage based on cable leading towards lower bridge surface
CN204112790U (en) A kind of integral quick-mounting base station
CN207251110U (en) A kind of large span power cable crane span structure
CN207569004U (en) A kind of hanger fixing device of a Preembedded
CN202790959U (en) Steel pipe truss structure based on aloft lateral support
CN202899436U (en) B-type beam-column member

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20210415