CN201496669U - Pipeline supporting and hanging frame - Google Patents

Pipeline supporting and hanging frame Download PDF

Info

Publication number
CN201496669U
CN201496669U CN2009200778192U CN200920077819U CN201496669U CN 201496669 U CN201496669 U CN 201496669U CN 2009200778192 U CN2009200778192 U CN 2009200778192U CN 200920077819 U CN200920077819 U CN 200920077819U CN 201496669 U CN201496669 U CN 201496669U
Authority
CN
China
Prior art keywords
base
hanging frame
pipeline
vertical column
column
Prior art date
Application number
CN2009200778192U
Other languages
Chinese (zh)
Inventor
周晓阳
宋余贝
Original Assignee
刘纪才
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘纪才 filed Critical 刘纪才
Priority to CN2009200778192U priority Critical patent/CN201496669U/en
Application granted granted Critical
Publication of CN201496669U publication Critical patent/CN201496669U/en

Links

Abstract

The utility model discloses a pipeline supporting and hanging frame, which belongs to the field of pipeline fixing devices. The pipeline supporting and hanging frame mainly structurally comprises a base, a connecting component, a vertical column, a beam and the like, wherein the upper end of the base is provided with a plurality of fixing holes while the lower end of the base is provided with a plurality of bolt holes, two ends of the vertical column and the beam are provided with a plurality of bolt holes, the vertical column is connected fixedly with the base through bolts, the beam is fixedly connected with the vertical column through the connecting component, components such as the vertical column, the base, the beam and the like are preliminarily finished at factory according to different specifications, the supporting and hanging frame can be chosen just according to the specification to be mounted on-site for different pipelines, and the pipeline supporting and hanging frame has the advantages of simple structure, convenient mounting and dismounting, and energy-saving and environment-friendly overall mounting process.

Description

The pipeline suspension and support

Technical field:

The utility model relates to a kind of device that is used for supporting flue or restrained line displacement, is specially a kind of pipeline suspension and support (QZC).

Background technique:

Civil building and general industry architectural intermediate water pipe, cable testing bridge and bus duct, the installation of pipelines such as air-conditioning heating airduct need be used suspension and support, and the manufacturing of suspension and support often on the building site construction and installation personnel use angle bar, the field fabrication of section bar such as channel-section steel and I-steel, the field management workload of building site is very big like this, attaching a lot of potential safety hazards, a large amount of problems such as environmental hygiene, as: the building site cutting material, the security hidden trouble that reasons such as welding cause, the bits that the outer list processing of pipeline uses paint and field fabrication to produce, the environmental hygiene problem that the slag the like waste causes, the overall weight of suspension and support is than problems such as the working life of next suspension and support of heave hand and building structure main body are short.

The model utility content:

In order to solve the deficiencies in the prior art, the utility model provides a kind of pipeline suspension and support (QZC), can need not on-site cutting, welding in on-the-spot composite assembly, and installation rate is fast, and working life is of a specified duration.

The technical solution of the utility model is as follows: pipeline suspension and support (QZC) comprises on its structure: base, link, column, crossbeam; Base is mounted on the building of pipeline top, the upper end of base has a plurality of fixed holes, and the lower end has a plurality of bolts hole, has a plurality of bolts hole on the two ends of column and crossbeam, firmly be connected with bolt between column and base, crossbeam firmly is connected with link with column; Parts such as column, base, crossbeam all complete by the difference of specification in advance in factory, at different pipelines, only need to select suspension and support to carry out the scene by specification and install.

Described base, on guillotine shear, cut out base plate and U type spare by the requirement of base drawing, with base plate and U type spare acceptable product on punch press by base drawing requirement punching, U type spare is inserted the base plate positioning hole, with the base welding fabrication, handle through zinc-plated or hot galvanizing on the surface by drawing.

Described column, the material of employing are C shaped steel, and by drawing flying cutting C shaped steel on the saw cutting machine, by drawing at punch press upper punch C shaped steel two ends attachment hole, handle through zinc-plated or hot galvanizing on the surface.

Described crossbeam, the material that adopts is a C shaped steel, flying cutting C shaped steel on the saw cutting machine by drawing, by drawing at punch press upper punch C shaped steel two ends attachment hole, on guillotine shear, cut out the reinforcement gusset by drawing, to strengthen gusset by drawing and be welded in the C shaped steel, handle through zinc-plated or hot galvanizing on the surface.

Described link, on guillotine shear, cut out the link plate by drawing, with the punching by drawing on punch press of plate acceptable product, by drawing with the link plate of hole punch at the seaming machine upper hem, whether qualified, handle through zinc-plated or hot galvanizing on the surface if detecting the link finished product.

Owing to adopted above technological scheme, the utlity model has following beneficial effect:

1, installs simply, only need spanner and hammer can realize on-the-spot the installation, saved the required artificial in a large number and assembly working amount of field fabrication;

2, can regulate the absolute altitude of crossbeam within the specific limits, avoid traditional suspension and support to make the waste that causes again because of actual deviation is arranged;

3, need not cutting, welding in the installation process, safety, environmental protection sanitary, and saved the energy;

4, overall structure is simple, and weight is light partially, and is less to the influence of main house body bearing capacity, compares with traditional suspension and support, and prolong working life greatly;

5, overall appearance is generous.

Description of drawings:

Fig. 1 is the structural representation of traditional suspension and support;

Fig. 2 is a structural representation of the present utility model.

Among the figure: 1 base, 2 columns, 3 crossbeams, 4 links.

Embodiment:

Below in conjunction with accompanying drawing the utility model is further described in detail:

With reference to accompanying drawing 1, accompanying drawing 2, pipeline suspension and support (QZC) comprises on its structure: base 1, link 4, column 2, crossbeam 3; Base 1 is mounted on the building of pipeline top, the upper end of base 1 has a plurality of fixed holes, and the lower end has a plurality of bolts hole, has a plurality of bolts hole on the two ends of column 2 and crossbeam 3, column 2 firmly is connected with bolt with 1 of base, and crossbeam 3 firmly is connected with column 2 usefulness links; Parts such as column 2, base 1, crossbeam 3 all complete by the difference of specification in advance in factory, at different pipelines, only need to select suspension and support to carry out the scene by specification and install.

Difference according to pipeline specifications and field condition, select to be fit to the suspension and support of construction targetedly, in the scene base is fixed on the building, use column bolt on base again, be connected with the link bolt between column and the crossbeam at last, check installation situation,, can suitably adjust bolt and retighten if any fixing problems such as not tight.

Claims (2)

1. pipeline suspension and support is characterized in that: by base, link, column, compositions such as crossbeam, base are mounted on the building of pipeline top on the structure, firmly are connected with bolt between column and the base, firmly are connected with link between crossbeam and the column.
2. pipeline suspension and support according to claim 1 is characterized in that: the upper end of base has a plurality of fixed holes, and the lower end has a plurality of bolts hole, has a plurality of bolts hole on the two ends of column and crossbeam.
CN2009200778192U 2009-07-03 2009-07-03 Pipeline supporting and hanging frame CN201496669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200778192U CN201496669U (en) 2009-07-03 2009-07-03 Pipeline supporting and hanging frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200778192U CN201496669U (en) 2009-07-03 2009-07-03 Pipeline supporting and hanging frame

Publications (1)

Publication Number Publication Date
CN201496669U true CN201496669U (en) 2010-06-02

Family

ID=42439876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200778192U CN201496669U (en) 2009-07-03 2009-07-03 Pipeline supporting and hanging frame

Country Status (1)

Country Link
CN (1) CN201496669U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528418A (en) * 2012-01-11 2012-07-04 中国建筑第二工程局有限公司 High-precision and large-diameter flange steel pipe segmenting and track-change installation device and method
CN102767644A (en) * 2012-08-08 2012-11-07 王文滔 Assembly type heavy pipeline hanger
CN103438282A (en) * 2013-06-14 2013-12-11 镇江奇佩支吊架有限公司 Assembling integrated support hanger and connecting pieces thereof
CN104006224A (en) * 2014-05-05 2014-08-27 广东省工业设备安装公司 Three-level shock absorption combined device special for pipeline
CN104132185A (en) * 2014-07-01 2014-11-05 江苏大力城电气有限公司 Connector for supports and hangers
CN104132183A (en) * 2014-07-01 2014-11-05 江苏大力城电气有限公司 Novel connector
CN104141823A (en) * 2014-07-01 2014-11-12 江苏大力城电气有限公司 Detachable supporting hanging frame
CN105240618A (en) * 2014-07-11 2016-01-13 向荣集团有限公司 Upright pre-buried support side cover
CN106641464A (en) * 2016-12-16 2017-05-10 中国海洋石油总公司 Fixing process of pipeline bracket

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528418A (en) * 2012-01-11 2012-07-04 中国建筑第二工程局有限公司 High-precision and large-diameter flange steel pipe segmenting and track-change installation device and method
CN102528418B (en) * 2012-01-11 2013-12-04 中国建筑第二工程局有限公司 High-precision and large-diameter flange steel pipe segmenting and track-change installation method
CN102767644A (en) * 2012-08-08 2012-11-07 王文滔 Assembly type heavy pipeline hanger
CN102767644B (en) * 2012-08-08 2014-09-10 王文庭 Assembly type heavy pipeline hanger
CN103438282A (en) * 2013-06-14 2013-12-11 镇江奇佩支吊架有限公司 Assembling integrated support hanger and connecting pieces thereof
CN104006224A (en) * 2014-05-05 2014-08-27 广东省工业设备安装公司 Three-level shock absorption combined device special for pipeline
CN104132185A (en) * 2014-07-01 2014-11-05 江苏大力城电气有限公司 Connector for supports and hangers
CN104132183A (en) * 2014-07-01 2014-11-05 江苏大力城电气有限公司 Novel connector
CN104141823A (en) * 2014-07-01 2014-11-12 江苏大力城电气有限公司 Detachable supporting hanging frame
CN105240618A (en) * 2014-07-11 2016-01-13 向荣集团有限公司 Upright pre-buried support side cover
CN106641464A (en) * 2016-12-16 2017-05-10 中国海洋石油总公司 Fixing process of pipeline bracket
CN106641464B (en) * 2016-12-16 2018-08-07 中国海洋石油总公司 The technique for fixing of line holder

Similar Documents

Publication Publication Date Title
CN103924802B (en) A kind of large-scale straight tube cone segment type steel structure cooling tower
CN202755634U (en) Suspension type operational platform
CN202338110U (en) Supporting structure of truss
CN103498523A (en) Floor system
CN203334425U (en) Steel structure unit and steel structure system
CN203499229U (en) Operating platform for construction of elevator shaft
CN103216010A (en) Steel pipe column-H-shaped beam joint adopting shape memory alloy bolts
CN206667037U (en) Replaceable prefabricated assembled combined beam structure
CN201254832Y (en) Self-supporting template apparatus for conversion layer structure
CN202627475U (en) Scaffold wall connecting member
CN204609000U (en) A kind of assembling type node for building structure and assembling frame thereof
CN202248831U (en) Flying ring used for lacing diagonal steel wire rope and building structure
CN104831939A (en) Bolt ball welding ball mixed node large span cantilever grid structure construction method
CN103498509A (en) Steel structure combined column system and connecting method thereof
CN201850682U (en) Open type aluminum hanging plate curtain wall system
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN202227677U (en) Bolt type detachable wall connecting piece
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN201891171U (en) Integral bolt assembling frame
CN202114460U (en) Seabed hydraulic nut setting tool for rudderstock
CN203096608U (en) Mobile platform for bridge fixed-point overhauling
CN205153145U (en) Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam
CN204901062U (en) A three -dimensional antidetonation gallows
CN205096591U (en) Installation engineering support device of drilling

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 212200 NO. 276, XINGHUA VILLAGE, SANMAO TOWN, YANGZHONG CITY, JIANGSU PROVINCE TO: 212200 JINCHENG VILLAGE, SANMAO TOWN, YANGZHONG CITY, JIANGSU PROVINCE

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110630

Address after: Three Mao Zhen Jin Cheng Cun 212200 Jiangsu city of Yangzhong Province

Patentee after: Zhenjiang Qipei Hangers Co., Ltd.

Address before: 212200 276 Xinghua village, three Mao Town, Yangzhong, Jiangsu

Patentee before: Liu Jicai

ASS Succession or assignment of patent right

Owner name: ZHENJIANG QIPEI HANGERS CO., LTD.

Free format text: FORMER OWNER: LIU JICAI

Effective date: 20110630

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Three Mao Zhen Jin Cheng Cun 212200 Jiangsu city of Yangzhong Province

Patentee after: Jiangsu cheepay building assembly technology Co. Ltd.

Address before: Three Mao Zhen Jin Cheng Cun 212200 Jiangsu city of Yangzhong Province

Patentee before: Zhenjiang Qipei Hangers Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100602