CN207436260U - The assembling type steel structure occlusion splicing system of node rigid connection - Google Patents

The assembling type steel structure occlusion splicing system of node rigid connection Download PDF

Info

Publication number
CN207436260U
CN207436260U CN201721367360.0U CN201721367360U CN207436260U CN 207436260 U CN207436260 U CN 207436260U CN 201721367360 U CN201721367360 U CN 201721367360U CN 207436260 U CN207436260 U CN 207436260U
Authority
CN
China
Prior art keywords
crossbeam
steel structure
type steel
assembling type
rigid connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721367360.0U
Other languages
Chinese (zh)
Inventor
周广雷
苗树文
高建国
郑建康
史振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Classic Heavy Industry Group Co.,Ltd.
Original Assignee
SHANDONG CLASSIC HEAVY INDUSTRY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG CLASSIC HEAVY INDUSTRY GROUP Co Ltd filed Critical SHANDONG CLASSIC HEAVY INDUSTRY GROUP Co Ltd
Priority to CN201721367360.0U priority Critical patent/CN207436260U/en
Application granted granted Critical
Publication of CN207436260U publication Critical patent/CN207436260U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

Assembling type steel structure the utility model discloses node rigid connection is engaged splicing system, including column and is fixedly mounted on the flanged plates one of the column upper and lower ends, one upper end of flanged plate is provided with flanged plate two, and the flanged plate two is fixedly mounted on crossbeam.Advantageous effect is:The cross bar can be fixed on the crossbeam by the assembling type steel structure occlusion splicing system of node rigid connection described in the utility model using the mounting groove one and the mounting groove two, so as to eliminate the fixed trouble of bolt, assembling type steel structure can be engaged the fixed technique effect of splicing system using less bolt by realizing, in addition, the assembling type steel structure occlusion splicing system installation of node rigid connection described in the utility model is simple and convenient, construction workload is small, installation speed is fast, efficient, and practicability is good.

Description

The assembling type steel structure occlusion splicing system of node rigid connection
Technical field
The utility model is related to technical field of structural engineering, and in particular to the assembling type steel structure occlusion splicing of node rigid connection System.
Background technology
At present, country advocates development green building material energetically, promotes building industrialization.It is required that the portions such as house town and country construction Door wants the standards system of the links such as the design, construction, component production of Speed-up Establishment promotion building industrialization, pushing structure part, portion The species of standard component is enriched in the standardization of product, component, improves versatility and substitutability.It promotes and is suitble to the pre- of industrialized production The building systems such as steel construction processed accelerate development the prefabricated and mounting technology of construction project, improve building industrialization Integration ofTechnology water It is flat.It supports the industrialization construction of base for integrating design, production, construction, carries out industrialized building demonstration pilot project.Prefabrication and assembly construction Formula steel house can preferably embody the essence of green building, and " green building action " is corresponding for China's light-duty steel construction house System innovation and industrialization provide major opportunity.
At present, assembling type steel structure system is the important directions of system of steel residential structure development.Traditional steel house Substantial amounts of site welding is employed during construction, speed of application is slow, to the seriously polluted of environment, it is most important that the matter of weld seam Amount should not control, and seriously affect the security performance of building, and assembling type steel structure system can be efficiently against traditional steel construction The shortcomings that house.In assembling type steel structure system, the on-site consolidation of bean column node and Liang Heliang, which are one, needs primary study The problem of.
In existing assembling type steel structure system, generally use is that two channel steels carry out assembly, the abdomen of two channel steels Plate docks, and is attached by bolt, forms assembled H shaped steel.But in this connecting method, shearing is to pass through spiral shell Bolt passes to web, and web is plain plate, so required Number of Bolts and the steel using amount of web are very big.Traditional assembling type steel structure The rigid connection of node is realized in bolt connection at node, causes the deficiency of system.It can be seen that by traditional shaped steel Effect is less desirable among component is used in assembling type steel structure, not only influences the stress performance of component, but also needs to consume big The steel of amount generate unnecessary waste.Exist so creating applied to the new primary structure member gesture of assembling type steel structure system It must go.
Utility model content
The purpose of this utility model is that the assembling type steel structure for providing node rigid connection to solve the above-mentioned problems is stung Junctor system is merged, it is substantial amounts of to solve to need in assembling type steel structure occlusion splicing system installation process traditional in the prior art The problems such as bolt and web, installation is complicated, and speed of application is slow, and efficiency is low, and worker's construction amount of labour is larger.The utility model provides Many technical solutions in preferred technical solution can realize assembling type steel structure can be engaged using less bolt and spell The technologies effects such as junctor system is fixed, and installation is simple and convenient, and construction workload is small, and installation speed is fast, efficient, and practicability is good Fruit, elaboration as detailed below.
To achieve the above object, the utility model provides following technical scheme:
The assembling type steel structure occlusion splicing system of node rigid connection provided by the utility model, including column and fixed peace Mounted in the flanged plate one of the column upper and lower ends, one upper end of flanged plate is provided with flanged plate two, and the flanged plate two is solid Dingan County is on crossbeam, and the crossbeam includes crossbeam one and crossbeam two, and one upper surface of crossbeam is provided with mounting groove one, described Two upper surface of crossbeam is provided with mounting groove two, and cross bar is equipped in the mounting groove one and the mounting groove two.
Preferably, there are two one quantity of crossbeam, respectively positioned at the both ends of the cross bar.
Preferably, every one upper surface of crossbeam is both provided with multiple mounting grooves one in yi word pattern arrangement, Wherein, the distance between two neighboring described mounting groove one is equal.
Preferably, the mounting groove one is blind slot.
Preferably, the crossbeam two is located in the middle part of the cross bar side, the mounting groove two is straight slot.
Preferably, the flanged plate two is respectively in two lower surface both sides rectangular array of the crossbeam one and the crossbeam Distribution.
Preferably, fluted, the groove inner wall and two inner wall of mounting groove are set in the middle part of the cross bar two sides It is in close contact.
The assembling type steel structure occlusion splicing system of above-mentioned node rigid connection, during installation, by the both ends of the more cross bars point It is not connected in two crossbeams one, then crossbeam two is connected to the middle part of the more cross bars from bottom to top, then will Column is arranged on the underface of the crossbeam, and the flanged plate one is made to align with the flanged plate two, then uses fastening bolt The crossbeam and column are fixed together, since the mounting groove one and the mounting groove two can be by the horizontal strokes Bar is fixed on the crossbeam, therefore eliminates the fixed trouble of bolt, and realizing can will be assembled using less bolt The fixed technique effect of formula steel construction occlusion splicing system, in addition, the assembled of node rigid connection described in the utility model Steel construction occlusion splicing system installation is simple and convenient, and construction workload is small, and installation speed is fast, efficient, and practicability is good.
Advantageous effect is:The assembling type steel structure occlusion splicing system of node rigid connection described in the utility model uses institute Stating mounting groove one and the mounting groove two can be fixed on the cross bar on the crossbeam, be fixed so as to eliminate bolt Trouble, the fixed technique effect of splicing system can be engaged using less bolt by assembling type steel structure by realizing, In addition, the assembling type steel structure occlusion splicing system of node rigid connection described in the utility model installs simple and convenient, construction working Measure small, installation speed is fast, efficient, and practicability is good.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the front view of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the front view of the crossbeam one of the utility model;
Fig. 4 is the rearview of the crossbeam one of the utility model;
Fig. 5 is the top view of the crossbeam one of the utility model;
Fig. 6 is the front view of the crossbeam two of the utility model;
Fig. 7 is the top view of the crossbeam two of the utility model;
Fig. 8 is the front view of the cross bar of the utility model;
Fig. 9 is the top view of the cross bar of the utility model;
Figure 10 is the left view of the cross bar of the utility model;
Figure 11 is the structure diagram of the column of the utility model;
Figure 12 is the structure diagram of the flanged plate one of the utility model.
The reference numerals are as follows:
1st, column;2nd, flanged plate one;3rd, crossbeam one;4th, flanged plate two;5th, mounting groove one;6th, crossbeam two;7th, mounting groove two; 8th, cross bar;9th, groove.
Specific embodiment
It, below will be to the technology of the utility model to make the purpose of this utility model, technical solution and advantage clearer Scheme is described in detail.Obviously, the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not before creative work is made Obtained all other embodiment is put, belongs to the scope that the utility model is protected.
Referring to shown in Fig. 1-Figure 12, the assembling type steel structure of node rigid connection provided by the utility model is engaged splicing system, Including column 1 and the flanged plates 1 of 1 upper and lower ends of column is fixedly mounted on, one 2 upper end of flanged plate is provided with flanged plate 24, Flanged plate 24 is fixedly mounted on crossbeam, and crossbeam includes crossbeam 1 and crossbeam 26, and one 3 upper surface of crossbeam is provided with mounting groove One 5,26 upper surface of crossbeam is provided with mounting groove 27, and cross bar 8 is equipped in mounting groove 1 and mounting groove 27.
As optional embodiment, there are two one 3 quantity of crossbeam, respectively positioned at the both ends of cross bar 8.
Every one 3 upper surface of crossbeam is both provided with multiple mounting grooves 1 in yi word pattern arrangement, wherein, two neighboring peace The distance between tankage 1 is equal.
Mounting groove 1 is blind slot, is so designed, and facilitates installation cross bar 8, prevents cross bar 8 from moving.
Crossbeam 26 is located in the middle part of 8 side of cross bar, and mounting groove 27 is straight slot.
Flanged plate 24 is respectively in the 26 lower surface both sides rectangular array distribution of crossbeam 1 and crossbeam.
Fluted 9 are set in the middle part of 8 two sides of cross bar, 9 inner wall of groove is in close contact with 27 inner wall of mounting groove, and groove 9 is used for Prevent crossbeam 26 from being slided on cross bar 8.
The assembling type steel structure occlusion splicing system of above-mentioned node rigid connection, during installation, the both ends of more cross bars 8 are blocked respectively It is connected in two crossbeams 1, then crossbeam 26 is connected to the middle part of more cross bars 8 from bottom to top, then column 1 is set In the underface of crossbeam, and flanged plate 1 is made to align with flanged plate 24, then with fastening bolt by 1 company of fixation of crossbeam and column It is connected together, since cross bar 8 can be fixed on crossbeam by mounting groove 1 and mounting groove 27, therefore eliminates bolt Fixed trouble, assembling type steel structure can be engaged the fixed technology of splicing system using less bolt by, which realizing, imitates Fruit, in addition, the assembling type steel structure occlusion splicing system of the node rigid connection of the utility model installs simple and convenient, construction workload Small, installation speed is fast, efficient, and practicability is good.
The above is only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to In this, in the technical scope that any one skilled in the art discloses in the utility model, variation can be readily occurred in Or replace, it should be covered within the scope of the utility model.Therefore, the scope of protection of the utility model should be with the power Subject to the protection domain of profit requirement.

Claims (7)

1. a kind of assembling type steel structure occlusion splicing system of node rigid connection, including column and is fixedly mounted on the column The flanged plate one at lower both ends, it is characterised in that:One upper end of flanged plate is provided with flanged plate two, and the flanged plate two fixes peace On crossbeam, the crossbeam includes crossbeam one and crossbeam two, and one upper surface of crossbeam is provided with mounting groove one, the crossbeam Two upper surfaces are provided with mounting groove two, and cross bar is equipped in the mounting groove one and the mounting groove two.
2. the assembling type steel structure occlusion splicing system of node rigid connection according to claim 1, it is characterised in that:The horizontal stroke There are two one quantity of beam, respectively positioned at the both ends of the cross bar.
3. the assembling type steel structure occlusion splicing system of node rigid connection according to claim 1, it is characterised in that:Every institute It states one upper surface of crossbeam and is both provided with multiple mounting grooves one in yi word pattern arrangement, wherein, the two neighboring mounting groove The distance between one is equal.
4. the assembling type steel structure occlusion splicing system of node rigid connection according to claim 1, it is characterised in that:The peace Tankage one is blind slot.
5. the assembling type steel structure occlusion splicing system of node rigid connection according to claim 1, it is characterised in that:The horizontal stroke Beam two is located in the middle part of the cross bar side, and the mounting groove two is straight slot.
6. the assembling type steel structure occlusion splicing system of node rigid connection according to claim 1, it is characterised in that:The method Blue plate two is respectively in the two lower surface both sides rectangular array distribution of the crossbeam one and the crossbeam.
7. the assembling type steel structure occlusion splicing system of node rigid connection according to claim 1, it is characterised in that:The horizontal stroke Fluted, the groove inner wall and two inner wall of mounting groove close contact are set in the middle part of bar two sides.
CN201721367360.0U 2017-10-23 2017-10-23 The assembling type steel structure occlusion splicing system of node rigid connection Active CN207436260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721367360.0U CN207436260U (en) 2017-10-23 2017-10-23 The assembling type steel structure occlusion splicing system of node rigid connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721367360.0U CN207436260U (en) 2017-10-23 2017-10-23 The assembling type steel structure occlusion splicing system of node rigid connection

Publications (1)

Publication Number Publication Date
CN207436260U true CN207436260U (en) 2018-06-01

Family

ID=62293757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721367360.0U Active CN207436260U (en) 2017-10-23 2017-10-23 The assembling type steel structure occlusion splicing system of node rigid connection

Country Status (1)

Country Link
CN (1) CN207436260U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197636A (en) * 2021-11-18 2022-03-18 安徽省建筑科学研究设计院 Bolt connecting structure for reducing number of sheared bolts

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197636A (en) * 2021-11-18 2022-03-18 安徽省建筑科学研究设计院 Bolt connecting structure for reducing number of sheared bolts

Similar Documents

Publication Publication Date Title
CN103334488B (en) Assembled steel structure deformed column framework support system
CN107386435A (en) The assembled of prestressed node connection can recover function steel frame support system
CN103967166A (en) Low-yield-point steel plate shear wall with two connected edges
CN104652610A (en) Corner splice joint structure for box-type module building
CN206053121U (en) A kind of new steel structure beam
CN201953070U (en) Repeatedly usable assembly type processing shed on building construction sites
CN203531445U (en) Novel steel structure workshop
CN201202289Y (en) Rigid connection frame of steel structure workshop
CN207436260U (en) The assembling type steel structure occlusion splicing system of node rigid connection
CN107503358B (en) Modularized foundation pit steel truss supporting structure
CN103276839B (en) The how high-rise assembled steel framework-eccentrical braces of a kind of hollow irregular column
CN203701386U (en) Steel-structure floor slab group
CN102864746A (en) Bearing frame for bridge construction
CN206538900U (en) The bracing means of assembled wall
CN205134660U (en) Light steel concrete slab post structure of prefabricated assembly
CN103470077A (en) Novel steel-structured plant
CN204959995U (en) Modular structure of room roof beam
CN203859400U (en) Bus framework for 110kV outdoor power distribution unit
CN202913356U (en) Load-bearing frame for bridge construction
CN204662804U (en) A kind of assembled steel structure stair
CN203393721U (en) Inner support main purlin component
CN203961026U (en) The syndeton of a kind of crossbeam and post
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN208455880U (en) A kind of novel fabricated clod wash heavy wall structural steel frame-shear wall structure system
CN103388336B (en) Main purline part for inner support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Occlusive splicing system of fabricated steel structure with rigid joints

Effective date of registration: 20210630

Granted publication date: 20180601

Pledgee: Jining Yanzhou sub branch of Postal Savings Bank of China

Pledgor: SHANDONG THE CLASSIC HEAVY INDUSTRY GROUP Co.,Ltd.

Registration number: Y2021980005579

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 2722199 north of Xishou Road, Chuangye Road, economic development zone, Yanzhou District, Jining City, Shandong Province

Patentee after: Classic Heavy Industry Group Co.,Ltd.

Address before: 2722199 north of Xishou Road, Chuangye Road, economic development zone, Yanzhou District, Jining City, Shandong Province

Patentee before: SHANDONG THE CLASSIC HEAVY INDUSTRY GROUP Co.,Ltd.