CN206569235U - A kind of ship hanger bracket and boat scaffold - Google Patents

A kind of ship hanger bracket and boat scaffold Download PDF

Info

Publication number
CN206569235U
CN206569235U CN201621460906.2U CN201621460906U CN206569235U CN 206569235 U CN206569235 U CN 206569235U CN 201621460906 U CN201621460906 U CN 201621460906U CN 206569235 U CN206569235 U CN 206569235U
Authority
CN
China
Prior art keywords
column
ship
hanger bracket
board support
jump board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621460906.2U
Other languages
Chinese (zh)
Inventor
李胜新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuchang Shipbuilding Industry Group Co Ltd
Original Assignee
Wuchang Shipbuilding Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuchang Shipbuilding Industry Group Co Ltd filed Critical Wuchang Shipbuilding Industry Group Co Ltd
Priority to CN201621460906.2U priority Critical patent/CN206569235U/en
Application granted granted Critical
Publication of CN206569235U publication Critical patent/CN206569235U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of ship hanger bracket, it is related to shipbuilding field, the hanging plate of " U " type that the device includes column and Open Side Down and is fixed on the upside of the column, many are further fixed on the column in the jump board support pipe being spaced apart up and down, the jump board support pipe and hanging plate are located at the relative both sides of column respectively, and are mutually perpendicular between the jump board support pipe and column.Side of the column provided with hanging plate is fixed with many in the support tube being spaced apart up and down, and is mutually perpendicular between the support tube and column.The utility model can effectively improve the convenience of scaffold building.

Description

A kind of ship hanger bracket and boat scaffold
Technical field
The utility model is related to shipbuilding field, and in particular to a kind of ship is with hanger bracket and a kind of ship suspension type Scaffold.
Background technology
Building berth during shipbuilding is built and the harbour installation and debugging stage is, it is necessary in the stem or some lines of ship The operations such as the place of type big rise and fall is polished, touch-up paint, it is some because these position line styles fluctuatings and upper-lower height difference are larger Even up to more than 20 meters of position upper-lower height difference, when carrying out operation, for the larger position of difference in height, it is necessary to set up temporarily Super-high scaffold, not only wastes time and energy, meanwhile, with the increase of scaffold building height, the high-altitude of scaffold building personnel Task difficulty and danger are consequently increased, the serious danger that even personnel of setting up slip.
Utility model content
For defect present in prior art, the purpose of this utility model is to provide a kind of ship hanger bracket and one Ship boat scaffold is planted, the convenience of scaffold building is effectively improved.
To achieve the above objectives, the utility model is adopted the technical scheme that:Including column and Open Side Down and is fixed on Many are further fixed on the hanging plate of " U " type on the upside of the column, the column in the jump board support pipe being spaced apart up and down, institute State jump board support pipe and hanging plate and be located at the relative both sides of column respectively, and be mutually perpendicular between the jump board support pipe and column.
On the basis of above-mentioned technical proposal, side of the column provided with hanging plate is fixed with many and is spaced apart above and below Support tube, and be mutually perpendicular between the support tube and column.
On the basis of above-mentioned technical proposal, the support pipe end is provided with steel pipe seal plate.
On the basis of above-mentioned technical proposal, connecting tube is additionally provided with the column, one end connection of the connecting tube is vertical Post, other end connection hanging plate.
On the basis of above-mentioned technical proposal, the described one end of jump board support pipe away from the column is fixed with and springboard branch The vertical guardrail pipe of stay tube.
On the basis of above-mentioned technical proposal, a reinforcing plate is provided with below the jump board support pipe between column.
On the basis of above-mentioned technical proposal, the jump board support pipe connects below one end away from the column between column It is connected to down tube.
The utility model also provides a kind of ship boat scaffold, including multiple ships with hanger bracket hanging side by side in On the ship side of ship, and a springboard is placed with the jump board support pipe of sustained height layer.
On the basis of above-mentioned technical proposal, the width of the springboard is identical with the length of jump board support pipe.
Compared with prior art, a kind of ship of the utility model is with the advantage of hanger bracket:
(1) hanging plate of " U " type is provided with above column, hanger bracket is fixed on ship side by hang, operation is simple It is single, the danger of scaffold building personal height operation is effectively reduced, meanwhile, when hanging plate is hung on ship side, hanger bracket suspension is solid Due to after ship side, springboard is positioned on the jump board support pipe of hanging plate, that is, completes the work of setting up of whole scaffold, greatly drops It is low to set up the time, improve operating efficiency.
(2) many are fixed with column in the support tube for being used to support hull being spaced apart up and down, protect column Vertical state is held, is easy to follow-up construction requirement.
(3) reinforcing plate and down tube, structure between increase jump board support pipe and column are connected between jump board support pipe and column Stability.
A kind of ship of the utility model is with the advantage of boat scaffold:By the way that multiple ships are hung with hanger bracket In on ship side, then springboard is placed on jump board support pipe, you can quickly build construction scaffold, it is time saving and energy saving, and The security of staff's construction can be improved.
Brief description of the drawings
Fig. 1 is a kind of structural representation of ship hanger bracket of the utility model.
In figure:1- columns, 2- hanging plates, 3- jump board support pipes, 4- support tubes, 5- steel pipe seal plates, 6- connecting tubes, 7- guardrails Pipe, 8- reinforcing plates, 9- down tubes.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
Shown in Figure 1, the utility model provides a kind of ship hanger bracket, for meeting pin hand during shipbuilding Frame sets up demand, and the ship hanger bracket includes column 1 and Open Side Down and is fixed on the hanging plate of " U " type of the upside of column 1 2, hanging plate 2 is typically secured on the one side on the top of column 1, and the opening of " U " type of hanging plate 2 is easy to be fastened on ship side, without By other auxiliary fixing equipments, you can hanger bracket of the present utility model is fixed on ship.Connecting tube is additionally provided with column 1 6, one end connection column 1 of connecting tube 6, other end connection hanging plate 2 is vertical between connecting tube 6 and column 1, is controlled by connecting tube 6 The distance between column 1 and ship hull.
Side of the column 1 provided with hanging plate 2 is fixed with many in the support tube for being used to support hull being spaced apart up and down 4, support tube 4 is general to be uniformly distributed up and down on column 1, between adjacent supports pipe 4 between the upper and lower away from the same, support tube 4 and column 1 On the homonymy of hanging plate 2, i.e. support tube 4 and hanging plate 2 is located on the same side of column 1, and is mutually hung down between support tube 4 and column 1 Directly, the end of support tube 4 is provided with steel pipe seal plate 5, it is to avoid the scratch hull of support tube 4.The length of support tube 4 and connecting tube 6 can According to real work scene smart, to make when hanging plate 2 is fastened on ship side, support tube 4 is held in after hull, column 1 Vertical state can be kept.
Many are further fixed on column 1 in the jump board support pipe 3 being spaced apart up and down, jump board support pipe 3 is general in column 1 It is upper in being uniformly distributed up and down, adjacent springboard support tube 3 between the upper and lower away from identical, jump board support pipe 3 is located at column respectively with hanging plate 2 1 relative both sides, and be mutually perpendicular between jump board support pipe 3 and column 1, it is used to place springboard on jump board support pipe 3, is jumped to improve The stability of structure between plate support tube 3 and column 1, junction is provided with a reinforcing plate 8 between the lower section of jump board support pipe 3 and column 1, plus Strong plate 8 is a right angled triangle, and two right-angle sides of reinforcing plate 8 are connected and fixed with jump board support pipe 3 and column 1 respectively, springboard Support tube 3 is also associated with down tube 9 below one end away from column 1 between column 1.
The one end of jump board support pipe 3 away from column 1 is fixed with the guardrail pipe 7 vertical with jump board support pipe 3, to operating personnel Play a protective effect.
The utility model also includes a kind of ship boat scaffold being made up of multiple above-mentioned ships with hanger bracket, many Individual ship on the ship side of ship with hanger bracket hanging side by side in constituting, i.e., ship boat scaffold of the present utility model makes Used time, by multiple ship hanger bracket hanging side by side on the ship side of ship i.e. constitute boat scaffold of the present utility model, Support tube 4 is held on the hull of ship, and the column 1 made keeps placing on vertical state, the jump board support pipe 3 of sustained height layer There is a springboard, staff, which stands on, can carry out operation on springboard, because ship with boat scaffold is by multiple hanging side by side Ship constituted with hanger bracket, therefore each ship can be with other ship hanger brackets with the jump board support pipe 3 in hanger bracket In jump board support pipe 3 be in sustained height, that is, presenting has multiple jump board support pipes 3 on multiple height layers, each height layer, Springboard is positioned on the jump board support pipe 3 of sustained height layer, you can is kept horizontality, is easy to the operation of staff, springboard Width it is identical with the length of jump board support pipe 3, it can use bolt or other fixed forms by springboard and jump board support pipe 3 Between be fixed.
Guardrail pipe 7 in each ship hanger bracket coordinates with the guardrail pipe 7 in other ship hanger brackets, forms shield Column, and protection network can be laid on guardrail, to ensure workmen's safety.
It is time saving by the way that multiple ships are hung on ship side with hanger bracket, you can quickly build construction scaffold It is laborsaving, and the security of staff's construction can be improved.
The utility model is not only limited to above-mentioned preferred forms, and anyone can obtain under enlightenment of the present utility model Go out other various forms of products, however, make any change in its shape or structure, it is every to have and the utility model phase Same or close technical scheme, within its protection domain.

Claims (9)

1. a kind of ship hanger bracket, it is characterised in that:Including column (1) and Open Side Down and is fixed on the column (1) Many are further fixed on the hanging plate (2) of " U " type of side, the column (1) in the jump board support pipe (3) being spaced apart up and down, institute State jump board support pipe (3) and be located at the relative both sides of column (1), and the jump board support pipe (3) and column respectively with hanging plate (2) (1) it is mutually perpendicular between.
2. a kind of ship hanger bracket as claimed in claim 1, it is characterised in that:The column (1) is provided with the one of hanging plate (2) Side is fixed with many in the support tube (4) being spaced apart up and down, and is mutually perpendicular between the support tube (4) and column (1).
3. a kind of ship hanger bracket as claimed in claim 2, it is characterised in that:Support tube (4) end is provided with steel pipe Hush panel (5).
4. a kind of ship hanger bracket as claimed in claim 1, it is characterised in that:Connecting tube is additionally provided with the column (1) (6), one end connection column (1) of the connecting tube (6), other end connection hanging plate (2).
5. a kind of ship hanger bracket as claimed in claim 1, it is characterised in that:The jump board support pipe (3) is away from described One end of column (1) is fixed with the guardrail pipe (7) vertical with jump board support pipe (3).
6. a kind of ship hanger bracket as claimed in claim 1, it is characterised in that:With standing below the jump board support pipe (3) A reinforcing plate (8) is provided between post (1).
7. a kind of ship hanger bracket as claimed in claim 1, it is characterised in that:The jump board support pipe (3) is away from described Below one end of column (1) down tube (9) is connected between column (1).
8. a kind of ship that ship by any one of multiple claims 1 to 7 is constituted with hanger bracket suspension type pin hand Frame, it is characterised in that:Multiple ships with hanger bracket hanging side by side on the ship side of ship, and the jump board support pipe of sustained height layer (3) springboard is placed with.
9. a kind of ship boat scaffold as claimed in claim 8, it is characterised in that:The width and springboard of the springboard The length of support tube (3) is identical.
CN201621460906.2U 2016-12-28 2016-12-28 A kind of ship hanger bracket and boat scaffold Active CN206569235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621460906.2U CN206569235U (en) 2016-12-28 2016-12-28 A kind of ship hanger bracket and boat scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621460906.2U CN206569235U (en) 2016-12-28 2016-12-28 A kind of ship hanger bracket and boat scaffold

Publications (1)

Publication Number Publication Date
CN206569235U true CN206569235U (en) 2017-10-20

Family

ID=60061473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621460906.2U Active CN206569235U (en) 2016-12-28 2016-12-28 A kind of ship hanger bracket and boat scaffold

Country Status (1)

Country Link
CN (1) CN206569235U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107600361A (en) * 2017-10-25 2018-01-19 台山市东扩钢构有限公司 A kind of underslung scaffold peculiar to vessel
CN107672761A (en) * 2017-10-25 2018-02-09 台山市东扩钢构有限公司 A kind of scaffold peculiar to vessel
CN107757842A (en) * 2017-10-25 2018-03-06 台山市东扩钢构有限公司 A kind of orientable scaffold
CN107824355A (en) * 2017-11-09 2018-03-23 江苏新扬子造船有限公司 The spraying equipment of the glass flake paint of large ship
CN109319040A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A kind of scaffold building method for hull turn of the bilge region
CN112009644A (en) * 2020-08-31 2020-12-01 涡阳县信隆船舶附件有限公司 Scaffold for boats and ships
CN112478102A (en) * 2020-11-27 2021-03-12 中船澄西船舶修造有限公司 Ship floating repairing suspension scaffold assembly

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107600361A (en) * 2017-10-25 2018-01-19 台山市东扩钢构有限公司 A kind of underslung scaffold peculiar to vessel
CN107672761A (en) * 2017-10-25 2018-02-09 台山市东扩钢构有限公司 A kind of scaffold peculiar to vessel
CN107757842A (en) * 2017-10-25 2018-03-06 台山市东扩钢构有限公司 A kind of orientable scaffold
CN107824355A (en) * 2017-11-09 2018-03-23 江苏新扬子造船有限公司 The spraying equipment of the glass flake paint of large ship
CN109319040A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A kind of scaffold building method for hull turn of the bilge region
CN112009644A (en) * 2020-08-31 2020-12-01 涡阳县信隆船舶附件有限公司 Scaffold for boats and ships
CN112478102A (en) * 2020-11-27 2021-03-12 中船澄西船舶修造有限公司 Ship floating repairing suspension scaffold assembly
CN112478102B (en) * 2020-11-27 2022-02-08 中船澄西船舶修造有限公司 Ship floating repairing suspension scaffold assembly

Similar Documents

Publication Publication Date Title
CN206569235U (en) A kind of ship hanger bracket and boat scaffold
CN201261942Y (en) Stand platform for cantilevered concrete structure construction
CN204401997U (en) A kind of suspension type ceiling construction scaffold
CN204126230U (en) Assembly scaffold unit
CN105350759A (en) Suspended scaffold
CN204552054U (en) A kind of telescopic work high above the ground hanger bracket
CN205477339U (en) A cage ladder that is used for steel construction factory building shingle nail to install
CN206664894U (en) One kind auxiliary hatch board middle hinge latch mounting operation platform
CN102635226A (en) Flexible hanging self-expansion operating platform and construction method
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN205956559U (en) Pipeline gallows
CN104264781A (en) Grid-shaped, cylindrical-surface and steel structured latticed shell and construction method thereof
CN104533092A (en) Truss roof ceiling construction method
CN204040441U (en) Combination assembled operating platform
CN201864018U (en) Temporary scaffold device used in cross bulkhead subsection closure
CN204038917U (en) Dismountable external hanging service platform
CN205472340U (en) People's passageway on instrument formula tower crane
CN204056256U (en) A kind of boats and ships and ocean engineering structure close up uses scaffold
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN204826727U (en) Reinforcing bar processing protection canopy that can dismantle, has enough to meet need
CN204370828U (en) Tool-type protective screening
CN212337125U (en) Combined type climbing tool for straight bulkhead of cargo hold
CN101597956B (en) Suspended scaffold
CN203514813U (en) Novel overhanging discharging platform
CN207362706U (en) Load carrying type hanging basket operating platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant