CN201723853U - Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project - Google Patents
Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project Download PDFInfo
- Publication number
- CN201723853U CN201723853U CN2010202610466U CN201020261046U CN201723853U CN 201723853 U CN201723853 U CN 201723853U CN 2010202610466 U CN2010202610466 U CN 2010202610466U CN 201020261046 U CN201020261046 U CN 201020261046U CN 201723853 U CN201723853 U CN 201723853U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- suspension rod
- suspension
- public building
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to an integrated supporting and hanging frame with a comprehensive pipeline arrangement technology for a large public building installation project, which can effectively solve the problems that pipelines of the existing support and hanger are arranged disorderly, the space can not be reasonably utilized, the material and manpower are wasted, the working efficiency is low and the engineering progress is slow. The technical scheme for solving the problem is as follows: the integrated support and hanger comprise hoisting blocks, hoisting rods and crossbeams, wherein the top ends of the hoisting rods are provided with the hoisting blocks; the crossbeams crossly distributed up and down are fixed between the hoisting rods; the bottoms of the hoisting rods are fixed on bottom beams; the hoisting rods, the crossbeams and the bottom beams of the front rows and rear rows are arranged in parallel, thus forming a square frame; a first pipeline is arranged on two crossbeams of the front row and the rear row; and the bottom beams of the front row and the rear row are provided with a second pipeline, a third pipeline and a fourth pipeline respectively. In the utility model, various pipelines, cable bridges and the like of all layers of galleries can be distributed reasonably, the space can be utilized reasonably, the elevation of the suspended ceiling of the gallery can be increased, the integrated support and hanger can be assembled firmly, the material can be saved, the time and labor can be saved, the working efficiency is high, and the engineering progress is quick.
Description
One, technical field
The utility model relates to Architectural Equipment, the comprehensive suspension and support of particularly a kind of large public building installing engineering pipeline layout alignment technology.
Two, background technique
At present, when large public building installing engineering pipeline suspension and support is arranged construction, according to each professional regulation and stipulation, suspension and support and anti-shake support need be set, yet disperse planning, disperse construction, make the pipeline layout disunity, integral body is at random, both waste material and manpower, can not rationally utilize the space again, greatly reduce working efficiency, influence project progress, so a kind of reasonable use more of development space, increase work efficiency, the pipeline layout of the speeding up the work equipment of arranging is expected by many.
Three, model utility content
At above-mentioned situation, for overcoming the prior art defective, the purpose of the utility model just provides the comprehensive suspension and support of a kind of large public building installing engineering pipeline layout alignment technology, it is at random effectively to solve existing suspension and support pipeline layout, can not rationally utilize the space, both waste material and manpower, inefficiency again, the problem that project progress is slow.
The technological scheme that the utility model solves is, comprise and hang piece, suspension rod, crossbeam, the top of suspension rod is equipped with and is hung piece, all be fixed with the upper and lower crossbeam that is distribution straggly between the suspension rod, the suspension rod bottom is fixed on the bottom girder, and forward and backward row's suspension rod, crossbeam and bottom girder are all puts the parellel arrangement, constitutes quadra, be equipped with first pipeline on forward and backward row's two crossbeams, be equipped with second pipeline, the 3rd pipeline, the 4th pipeline on forward and backward row's the bottom girder respectively.
The utility model makes reasonable distribution such as the various pipelines in each layer corridor and cable testing bridge, and space utilization is reasonable, improves corridor furred ceiling absolute altitude, install firmly, and economical with materials, saving of work and time, high working efficiency, project progress is fast.
Four, description of drawings
Fig. 1 is a structural front view of the present utility model.
Fig. 2 is piece solid (amplification) figure that hangs of the present utility model.
Five, embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is elaborated.
Provide by Fig. 1-Fig. 2, structure of the present utility model is, comprise and hang piece, suspension rod, crossbeam, the top of suspension rod 2 is equipped with and is hung piece 1, all is fixed with the upper and lower crossbeam 3 that is distribution straggly between the suspension rod, and the suspension rod bottom is fixed on the bottom girder 8, forward and backward row's suspension rod, crossbeam and bottom girder are all puts the parellel arrangement, constitute quadra, be equipped with the first pipeline 5b on forward and backward row's two crossbeams, be equipped with the second pipeline 5d, the 3rd pipeline 5c, the 4th pipeline 5a on forward and backward row's the bottom girder respectively.
In order to guarantee using effect, bolt hole 6 is arranged at said piece 1 top of hanging, and long-round-shape adjustment hole 7 is arranged at the bottom, hangs piece and is horizontal adjustment through the top of long strip adjustment hole and suspension rod and is connected and fixed, and suspension rod can be adjusted the spacing deviation according to it; Said suspension rod 2 is vertical adjusting with crossbeam through double nut 4 and is connected and fixed; Said suspension rod 2 is zinc-plated harness cord suspension rod, and double nut is a galvanized nut, but life-saving.
During use, hang piece and concrete roof and can adopt the preburied iron part welding, also can adopt EXPANSION ANCHOR BOLTS to fix, hang piece and unidirectional adjustable connection of suspension rod substantially horizontal, suspension rod is connected with the hanging beam Vertical direction is adjustable, and sequence of construction is:
1, design planning: according to the situation of arranging of various pipelines, determine the composite structure of comprehensive suspension and support, each professional construction order of comprehensively arranging is carried out material selection and checking computations according to the load of every secondary suspension and support.
2, hanging piece fixes: the top board that hangs piece and reinforced concrete construction is fixed, and can weld with in advance pre-buried ironware, and also available EXPANSION ANCHOR BOLTS is fixed, but will experimentize.
3, suspension rod assembling: suspension rod is assemblied in the long-round-shape adjustment hole that hangs piece, can carry out the positional deviation adjustment.Stressed side double nut.
4, crossbeam assembling: crossbeam and suspension rod are fixed, and the position can be adjusted up and down as required, stressed side double nut 4.
5, experiment: the actual loading according to suspension and support carries out load test.
6, installing engineering construction: the construction speed of carrying out the various pipelines 5 of installing engineering according to design planning is arranged, and each professional installing engineering is constructed in order.
7, adjust.
8, anti-shake rack construction: construction and the examination for the treatment of the various pipelines 5 of each professional installing engineering finish, and carry out the anti-shake rack construction at last.
The utility model is installed firmly effectively with the spatial synthesis utilization, and layout is neat, compares with traditional suspension and support and saves cost 28.7%, and improved operating efficiency, has accelerated project progress.
Claims (4)
1. comprehensive suspension and support of large public building installing engineering pipeline layout alignment technology, comprise and hang piece, suspension rod, crossbeam, it is characterized in that, the top of suspension rod (2) is equipped with and is hung piece (1), all be fixed with the upper and lower crossbeam (3) that is distribution straggly between the suspension rod, the suspension rod bottom is fixed on the bottom girder (8), forward and backward row's suspension rod, crossbeam and bottom girder are all puts the parellel arrangement, constitute quadra, be equipped with first pipeline (5b) on forward and backward row's two crossbeams, be equipped with second pipeline (5d), the 3rd pipeline (5c), the 4th pipeline (5a) on forward and backward row's the bottom girder respectively.
2. the comprehensive suspension and support of large public building installing engineering pipeline layout alignment technology according to claim 1, it is characterized in that, bolt hole (6) is arranged at said piece (1) top of hanging, long-round-shape adjustment hole (7) is arranged at the bottom, hangs piece and is horizontal adjustment through the top of long strip adjustment hole and suspension rod and is connected and fixed.
3. the comprehensive suspension and support of large public building installing engineering pipeline layout alignment technology according to claim 1 is characterized in that, said suspension rod (2) is vertical adjusting with crossbeam through double nut (4) and is connected and fixed.
4. the comprehensive suspension and support of large public building installing engineering pipeline layout alignment technology according to claim 1 is characterized in that said suspension rod (2) is zinc-plated harness cord suspension rod, and double nut is a galvanized nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202610466U CN201723853U (en) | 2010-07-16 | 2010-07-16 | Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202610466U CN201723853U (en) | 2010-07-16 | 2010-07-16 | Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201723853U true CN201723853U (en) | 2011-01-26 |
Family
ID=43492183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202610466U Expired - Fee Related CN201723853U (en) | 2010-07-16 | 2010-07-16 | Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201723853U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102635735A (en) * | 2012-05-04 | 2012-08-15 | 上海华力微电子有限公司 | Fixed support for pipeline load-bearing spring and construction method of fixed support |
CN103234080A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes |
CN104373678A (en) * | 2014-09-05 | 2015-02-25 | 中国十七冶集团有限公司 | Infrared auxiliary installation method for trusses or pipelines in water pipe galley |
CN106958694A (en) * | 2017-04-06 | 2017-07-18 | 中铁建设集团有限公司 | A kind of electromechanical installation comprehensive support |
CN107687541A (en) * | 2016-08-05 | 2018-02-13 | 五冶集团上海有限公司 | A kind of pipeline provided with people's row access path shares suspension bracket |
CN111503380A (en) * | 2020-04-17 | 2020-08-07 | 中船黄埔文冲船舶有限公司 | Combined support for ocean platform cable and pipeline |
CN112081237A (en) * | 2020-09-21 | 2020-12-15 | 重庆建工第一市政工程有限责任公司 | Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology |
CN114057094A (en) * | 2021-12-03 | 2022-02-18 | 中建八局第二建设有限公司 | C-shaped steel combined support and hanger and construction method thereof |
-
2010
- 2010-07-16 CN CN2010202610466U patent/CN201723853U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102635735A (en) * | 2012-05-04 | 2012-08-15 | 上海华力微电子有限公司 | Fixed support for pipeline load-bearing spring and construction method of fixed support |
CN102635735B (en) * | 2012-05-04 | 2014-05-14 | 上海华力微电子有限公司 | Fixed support for pipeline load-bearing spring and construction method of fixed support |
CN103234080A (en) * | 2013-05-08 | 2013-08-07 | 内蒙古兴泰建筑有限责任公司 | Construction method for shared supporting and hanging frame for comprehensive arrangement of pipes |
CN104373678A (en) * | 2014-09-05 | 2015-02-25 | 中国十七冶集团有限公司 | Infrared auxiliary installation method for trusses or pipelines in water pipe galley |
CN107687541A (en) * | 2016-08-05 | 2018-02-13 | 五冶集团上海有限公司 | A kind of pipeline provided with people's row access path shares suspension bracket |
CN106958694A (en) * | 2017-04-06 | 2017-07-18 | 中铁建设集团有限公司 | A kind of electromechanical installation comprehensive support |
CN111503380A (en) * | 2020-04-17 | 2020-08-07 | 中船黄埔文冲船舶有限公司 | Combined support for ocean platform cable and pipeline |
CN112081237A (en) * | 2020-09-21 | 2020-12-15 | 重庆建工第一市政工程有限责任公司 | Construction method of composite support and hanger of comprehensive overhead pipe gallery based on BIM technology |
CN114057094A (en) * | 2021-12-03 | 2022-02-18 | 中建八局第二建设有限公司 | C-shaped steel combined support and hanger and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201723853U (en) | Integrated supporting and hanging frame with comprehensive pipeline arrangement technology for large public building installation project | |
CN105569358A (en) | Construction method of special-shaped curved surface roof with large span and multiple curvatures | |
CN102979312B (en) | Indoor aluminum honeycomb board suspended ceiling reverse installation technology | |
CN104060746B (en) | The anti-engineering method that supports of a kind of furred ceiling angle bar frame | |
CN101892736B (en) | High altitude moving hanging basket construction method | |
CN105350759A (en) | Suspended scaffold | |
CN202578055U (en) | Shed used for coke oven building construction and adjustable in height and width | |
CN110748194B (en) | Building supporting device and construction method | |
CN103993745A (en) | Integral transfer girder hoisting device and hoisting method thereof | |
CN214498046U (en) | Ceiling conversion layer structure | |
CN215803108U (en) | Attached beam type hanging basket | |
CN205134919U (en) | Modularization suspension type steel tubes clamps scaffold operation platform | |
CN204728554U (en) | The integral structure of channel and double-deck operation platform | |
CN203961091U (en) | The anti-bracing or strutting arrangement of a kind of furred ceiling angle bar frame and ceiling structure thereof | |
CN203188366U (en) | House system built through single independent foundation | |
CN201826320U (en) | Assembling and sinking device for double wall steel cofferdam | |
CN102174969B (en) | Steel wire hanging frame and construction method thereof | |
CN208889071U (en) | A kind of loading system suitable for armored concrete beam test practical teaching | |
CN102817617A (en) | Novel inhaul cable type shield originating backrest substrate system | |
CN202658883U (en) | Space grid template supporting system | |
CN115637810A (en) | Large-space special-shaped honeycomb aluminum plate ceiling structure and construction method | |
CN204940662U (en) | A kind of hall suspended ceiling mounting structure | |
CN204901227U (en) | Display screen installation mount | |
CN203855982U (en) | Gas engine foundation embedded bolt suspending and reinforcing device | |
CN210529486U (en) | Cable bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110126 Termination date: 20130716 |