CN204940662U - A kind of hall suspended ceiling mounting structure - Google Patents

A kind of hall suspended ceiling mounting structure Download PDF

Info

Publication number
CN204940662U
CN204940662U CN201520665419.9U CN201520665419U CN204940662U CN 204940662 U CN204940662 U CN 204940662U CN 201520665419 U CN201520665419 U CN 201520665419U CN 204940662 U CN204940662 U CN 204940662U
Authority
CN
China
Prior art keywords
zinc
galvanized steel
type galvanized
main joist
corner brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520665419.9U
Other languages
Chinese (zh)
Inventor
蔡善武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Decai Decoration Co Ltd
Original Assignee
Decai Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Decai Decoration Co Ltd filed Critical Decai Decoration Co Ltd
Priority to CN201520665419.9U priority Critical patent/CN204940662U/en
Application granted granted Critical
Publication of CN204940662U publication Critical patent/CN204940662U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model proposes a kind of hall suspended ceiling mounting structure, comprise Elements of Space Grid Truss, bolt sphere, C type galvanized steel main joist, C type galvanized steel rider keel, Zinc-coated angle steel, hang muscle and light steel keel gypsum board, Elements of Space Grid Truss arranges bolt sphere, first zinc-plated corner brace and bolt sphere are fixed, one end of first zinc-plated corner brace and one end full weld of Zinc-coated angle steel, the other end of Zinc-coated angle steel is connected with C type galvanized steel main joist, second zinc-plated corner brace side is soldered on Zinc-coated angle steel, opposite side and C type galvanized steel main joist are fixed, C type galvanized steel rider keel is arranged on above C type galvanized steel main joist, C type galvanized steel main joist and C type galvanized steel rider keel are fixed, arrange below C type galvanized steel rider keel and hang muscle, hang muscle and light steel keel gypsum board is fixed.By mounting structure of the present utility model when installing fixing without the need to realizing mainly through welding, simplify mounting process, improve operating efficiency and also reduce cost of production simultaneously.

Description

A kind of hall suspended ceiling mounting structure
Technical field
The utility model relates to construction engineering technical field, particularly relates to a kind of hall suspended ceiling mounting structure with lightweight conversion layer.
Background technology
In prior art, hall furred ceiling mostly adopts steel grid structure, the furred ceiling discrepancy in elevation in the Elements of Space Grid Truss distance hall of hall is larger, usually 2000mm-4000mm is reached, and Elements of Space Grid Truss ball node spacing is larger, general at about 3000mm, because Elements of Space Grid Truss chord member holding capacity is less, but in order to ensure that the rigidity of whole ceiling structure reaches requirement, usually select channel-section steel as conversion layer in prior art, but channel-section steel deadweight is larger, reasonable computation is needed to choose, if slightly deviation, the field of load exceeding Elements of Space Grid Truss can be caused, and cause steel grid structure to be destroyed, and adopt channel-section steel to need the steel of at substantial, add cost, every root channel-section steel is with Elements of Space Grid Truss or hang needs when muscle is connected and weld, and mounting process is loaded down with trivial details, long in time limit, reduces operating efficiency, and adopts welded and installed easily to cause environment pollution.
Summary of the invention
Technical problem to be solved in the utility model is: the utility model proposes a kind of hall suspended ceiling mounting structure, need by having welded complex process when solving the installation existed in auditorium, hall suspended ceiling mounting structure in prior art, inefficiency, the problem that cost is high, without the need to realizing mainly through welding when installing fixing, simplify mounting process, improve operating efficiency and also reduce cost of production simultaneously.
The utility model realizes by the following technical solutions:
A kind of hall suspended ceiling mounting structure, it is characterized in that, comprise Elements of Space Grid Truss, bolt sphere, C type galvanized steel main joist, C type galvanized steel rider keel, first zinc-plated corner brace, Zinc-coated angle steel, second zinc-plated corner brace, 3rd zinc-plated corner brace, hang muscle and light steel keel gypsum board, described Elements of Space Grid Truss is provided with described bolt sphere, described first zinc-plated corner brace is connected and fixed by connecting bolt one and described bolt sphere, described one end of first zinc-plated corner brace and one end full weld of described Zinc-coated angle steel, the other end of described Zinc-coated angle steel is fixedly connected with described C type galvanized steel main joist by 2 connecting bolts two, on described second zinc-plated corner brace side full weld to the Zinc-coated angle steel being positioned at described C type galvanized steel main joist lower end and opposite side be fixedly connected with C type galvanized steel main joist by connecting bolt three, described C type galvanized steel rider keel is vertically set on the top of described C type galvanized steel main joist, and described C type galvanized steel main joist and described C type galvanized steel rider keel are connected and fixed by the 3rd zinc-plated corner brace at interface point place, muscle is hung described in being provided with below described C type galvanized steel rider keel, describedly hang muscle and described light steel keel gypsum board is connected and fixed.
Further, described C type galvanized steel rider keel is arranged at intervals with many successively along on described C type galvanized steel main joist length direction, and the spacing between described C type galvanized steel rider keel is 1000-1200mm.
Further, described C type galvanized steel main joist specification is: 100x40x20x2.5mm, described C type galvanized steel rider keel specification is: 100x40x20x2.5mm, described Zinc-coated angle steel specification is: L40x40x3mm, described first zinc-plated corner brace specification is: 70x70x80mm, described second zinc-plated corner brace specification is: 50x50x80mm, and described 3rd zinc-plated corner brace specification is: 70x70x80mm.
Further, described connecting bolt one specification is: M20x80, and described connecting bolt two specification is: M10x30, and described connecting bolt three specification is: M10x30.
Further, described Zinc-coated angle steel is perpendicular to described C type galvanized steel rider keel and C type galvanized steel main joist.
The utility model advantage and good effect:
The utility model proposes a kind of hall suspended ceiling mounting structure, comprise Elements of Space Grid Truss, be arranged on the bolt sphere of Elements of Space Grid Truss lower end, one end that the first zinc-plated corner brace connects Zinc-coated angle steel is arranged through in the below of bolt sphere, the other end of Zinc-coated angle steel is fixedly connected with C type galvanized steel main joist by bolt simultaneously, for strengthening the installation strength of C type galvanized steel main joist, second zinc-plated corner brace is welded on the side of the Zinc-coated angle steel of C type galvanized steel main joist lower end, its opposite side is fixed on C type galvanized steel main joist simultaneously, the upper vertical of C type main joist is provided with C type galvanized steel rider keel, C type galvanized steel main joist and C type galvanized steel rider keel point of intersection are connected and fixed by the 3rd zinc-plated corner brace, the below of C type galvanized steel rider keel is provided with many and hangs muscle, hang muscle by many to be fixed with light steel keel gypsum board and to be connected, the frame mode that C type galvanized steel main joist and C type galvanized steel rider keel are set in the below of Elements of Space Grid Truss is mainly adopted to realize the lifting of the light steel keel gypsum board to hall in visible the present embodiment, and C type galvanized steel main joist respectively by a series of connector as Zinc-coated angle steel, first zinc-plated corner brace, second zinc-plated corner brace and the 3rd zinc-plated corner brace are corresponding is respectively fixed connection with Elements of Space Grid Truss and C type galvanized steel rider keel, compared with prior art, the connected mode of the C type galvanized steel plain sheet in the present embodiment no longer adopts channel-section steel of the prior art, alleviate overall weight, decrease the consumption expending steel, save cost, shorten the duration simultaneously, improve operating efficiency, and in the utility model, adopt C type galvanized steel main joist to be connected mainly through bolt with the connected mode of C type galvanized steel rider keel, mounting process is carried out compared with connection more simply, substantially without the need to welding, environment pollution can not be caused with mainly adopting the mode of weld in prior art.
Accompanying drawing explanation
Fig. 1 is a kind of hall suspended ceiling mounting structure of the utility model schematic diagram;
Fig. 2 is C type galvanized steel main joist and the C type galvanized steel rider keel connecting joint point diagram of the utility model hall suspended ceiling mounting structure;
Fig. 3 is C type galvanized steel main joist and the Zinc-coated angle steel connecting joint point diagram of the utility model hall suspended ceiling mounting structure.
Detailed description of the invention
See Fig. 1-Fig. 3, the embodiment of a kind of hall suspended ceiling mounting structure of the utility model, comprise Elements of Space Grid Truss 1, bolt sphere 2, C type galvanized steel main joist 3, C type galvanized steel rider keel 4, first zinc-plated corner brace 5, Zinc-coated angle steel 6, second zinc-plated corner brace 7, 3rd zinc-plated corner brace 8, hang muscle 9 and light steel keel gypsum board 10, described Elements of Space Grid Truss 1 is provided with described bolt sphere 2, described first zinc-plated corner brace 5 is connected and fixed by connecting bolt one and described bolt sphere 2, described 5 one end of first zinc-plated corner brace and one end full weld of described Zinc-coated angle steel 6, the other end of described Zinc-coated angle steel 6 is fixedly connected with described C type galvanized steel main joist 3 by 2 connecting bolts two, on described second zinc-plated corner brace 7 side full weld to the Zinc-coated angle steel 6 being positioned at described C type galvanized steel main joist 3 lower end and opposite side be fixedly connected with C type galvanized steel main joist 3 by connecting bolt three, described C type galvanized steel rider keel 4 is vertically set on the top of described C type galvanized steel main joist 3, and described C type galvanized steel main joist 3 is connected and fixed by the 3rd zinc-plated corner brace 8 at interface point place with described C type galvanized steel rider keel 4, muscle 9 is hung described in being provided with below described C type galvanized steel rider keel 4, the described muscle 9 that hangs is connected and fixed with described light steel keel gypsum board 10.
Concrete, a kind of hall suspended ceiling mounting structure is proposed in the present embodiment, comprise the Elements of Space Grid Truss 1 being arranged on top, bolt sphere 2 is provided with below Elements of Space Grid Truss 1, bolt sphere 2 is provided with screwed hole, the side of the first zinc-plated corner brace 5 is screwed in bolt sphere 2 by connecting bolt one to be fixed with bolt sphere 2, simultaneously the opposite side of the first zinc-plated corner brace 5 then full weld on Zinc-coated angle steel 6, the lower end of Zinc-coated angle steel 6 is fixedly connected with C type galvanized steel main joist 3 by 2 connecting bolts two, the bottom of C type galvanized steel main joist 3 and Zinc-coated angle steel 6 point of intersection are provided with the second zinc-plated corner brace 7 simultaneously, second zinc-plated corner brace 7 one side welds with Zinc-coated angle steel 6, another side is then fixedly connected with by the bottom of connecting bolt three with C type galvanized steel main joist 3, C type galvanized steel main joist 3 is installed after fixing, again C type galvanized steel rider keel 4 is fixed on above C type galvanized steel main joist 3, and C type galvanized steel rider keel 4 is arranged with C type galvanized steel main joist 3 is mutually vertical, between C type galvanized steel main joist 3 and C type galvanized steel rider keel 4 fixing mainly at both position of intersecting point places by bolt the 3rd zinc-plated corner brace 8 is tightened in both realize fixing, set gradually in the bottom of C type galvanized steel rider keel 4 after fixedly completing and multiplely hang muscle 9, light steel keel gypsum board 10 with hang muscle 9 and be fixedly connected with.The hall suspended ceiling mounting structure proposed in the present embodiment, when carrying out light steel keel gypsum board 10 furred ceiling mainly through by C type galvanized steel main joist 3 by Zinc-coated angle steel 6, first zinc-plated corner brace 5 and Elements of Space Grid Truss 1 are connected and fixed, C type galvanized steel rider keel 4 and C type galvanized steel main joist 3 are connected and fixed simultaneously, C type galvanized steel rider keel 4 is installed by hanging muscle 9 ceiling structure of light steel keel gypsum board 10, connected mode in the present embodiment is connected and fixed mainly through bolt, and whole installation process is substantially without the need to welding, simplify mounting process, shorten the duration, improve operating efficiency, and in the present embodiment, adopt C type galvanized steel main joist 3 and C type galvanized steel rider keel 4 lighter in weight, and more convenient when carrying out installation carrying, in addition, a large amount of steel can be saved, reduce cost.
Preferably, the set-up mode that in the present embodiment, C type galvanized steel main joist 3 and C type galvanized steel rider keel 4 are selected is: described C type galvanized steel rider keel 4 is arranged at intervals with many successively along on described C type galvanized steel main joist 3 length direction, and the spacing between described C type galvanized steel rider keel 4 is 1000-1200mm.Arranging many in the equal correspondence in below of every root C type galvanized steel rider keel 4 and hang muscle 9, carrying out the lifting of light steel keel gypsum board 10 by hanging muscle 9.
Preferably, the below of hanging muscle 9 described in is provided with and the light steel keel gypsum board 10 hanging muscle 9 and be connected.
Preferably, described C type galvanized steel main joist 3 specification is: 100x40x20x2.5mm, described C type galvanized steel rider keel 4 specification is: 100x40x20x2.5mm, described Zinc-coated angle steel 6 specification is: L40x40x3mm, described first zinc-plated corner brace 5 specification is: 70x70x80mm, described second zinc-plated corner brace 7 specification is: 50x50x80mm, and described 3rd zinc-plated corner brace 8 specification is: 70x70x80mm.
Further, described connecting bolt one specification is: M20x80, and described connecting bolt two specification is: M10x30, and described connecting bolt three specification is: M10x30.
Further, described Zinc-coated angle steel 6 is perpendicular to described C type galvanized steel rider keel 4 and C type galvanized steel main joist 3.
Last it is noted that following examples are only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to previous embodiment, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of each embodiment technical scheme of the present utility model.

Claims (4)

1. a hall suspended ceiling mounting structure, it is characterized in that, comprise Elements of Space Grid Truss, bolt sphere, C type galvanized steel main joist, C type galvanized steel rider keel, first zinc-plated corner brace, Zinc-coated angle steel, second zinc-plated corner brace, 3rd zinc-plated corner brace, hang muscle and light steel keel gypsum board, described Elements of Space Grid Truss is provided with described bolt sphere, described first zinc-plated corner brace is connected and fixed by connecting bolt one and described bolt sphere, described one end of first zinc-plated corner brace and one end full weld of described Zinc-coated angle steel, the other end of described Zinc-coated angle steel is fixedly connected with described C type galvanized steel main joist by 2 connecting bolts two, on described second zinc-plated corner brace side full weld to the Zinc-coated angle steel being positioned at described C type galvanized steel main joist lower end and opposite side be fixedly connected with C type galvanized steel main joist by connecting bolt three, described C type galvanized steel rider keel is vertically set on the top of described C type galvanized steel main joist, and described C type galvanized steel main joist and described C type galvanized steel rider keel are connected and fixed by the 3rd zinc-plated corner brace at interface point place, muscle is hung described in being provided with below described C type galvanized steel rider keel, describedly hang muscle and described light steel keel gypsum board is connected and fixed.
2. hall suspended ceiling mounting structure according to claim 1, it is characterized in that, described C type galvanized steel rider keel is arranged at intervals with many successively along on described C type galvanized steel main joist length direction, and the spacing between described C type galvanized steel rider keel is 1000-1200mm.
3. hall suspended ceiling mounting structure according to claim 2, it is characterized in that, described C type galvanized steel main joist specification is: 100x40x20x2.5mm, described C type galvanized steel rider keel specification is: 100x40x20x2.5mm, described Zinc-coated angle steel specification is: L40x40x3mm, described first zinc-plated corner brace specification is: 70x70x80mm, and described second zinc-plated corner brace specification is: 50x50x80mm, and described 3rd zinc-plated corner brace specification is: 70x70x80mm.
4. hall suspended ceiling mounting structure according to claim 3, is characterized in that, described connecting bolt one specification is: M20x80, and described connecting bolt two specification is: M10x30, and described connecting bolt three specification is: M10x30.
CN201520665419.9U 2015-08-31 2015-08-31 A kind of hall suspended ceiling mounting structure Expired - Fee Related CN204940662U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520665419.9U CN204940662U (en) 2015-08-31 2015-08-31 A kind of hall suspended ceiling mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520665419.9U CN204940662U (en) 2015-08-31 2015-08-31 A kind of hall suspended ceiling mounting structure

Publications (1)

Publication Number Publication Date
CN204940662U true CN204940662U (en) 2016-01-06

Family

ID=55008103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520665419.9U Expired - Fee Related CN204940662U (en) 2015-08-31 2015-08-31 A kind of hall suspended ceiling mounting structure

Country Status (1)

Country Link
CN (1) CN204940662U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577543A (en) * 2018-12-28 2019-04-05 山西五建集团有限公司 Large-size net rack lower edge abnormity aluminum veneer ceiling construction method
CN110512790A (en) * 2019-08-30 2019-11-29 北京建工集团有限责任公司 Large space multi-curvature ceiling structure and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577543A (en) * 2018-12-28 2019-04-05 山西五建集团有限公司 Large-size net rack lower edge abnormity aluminum veneer ceiling construction method
CN110512790A (en) * 2019-08-30 2019-11-29 北京建工集团有限责任公司 Large space multi-curvature ceiling structure and its construction method

Similar Documents

Publication Publication Date Title
CN103938791B (en) A kind of prefabricated panel and the external wall assembled by it
CN202400723U (en) Lifting tool type hanger frame for prefabricated parts
CN101597918B (en) Prestressed giant brace-frame structure
CN205688642U (en) A kind of large space ceiling decoration supporting construction
CN204940662U (en) A kind of hall suspended ceiling mounting structure
CN202787047U (en) Deck type triangular steel truss composite beam
CN208899928U (en) Stage building structure
CN105040880A (en) Roof steel structure and construction method thereof
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
CN211200882U (en) Steel construction conversion layer furred ceiling
CN203006792U (en) Single-attachment-point tower crane wall attaching device
CN201802051U (en) Shared bracket for large-aperture pipelines
CN104989166A (en) Support structure for chimney internal steel cylinders
CN204782207U (en) Supporting structure of be used for chimney steel inner tube
CN102174969B (en) Steel wire hanging frame and construction method thereof
CN210423968U (en) Assembled support and hanger and building using same
CN211899202U (en) Suspended ceiling conversion layer system
CN202790959U (en) Steel pipe truss structure based on aloft lateral support
CN204590258U (en) A kind ofly be suitable for the lower end that box-shaped support is connected with i-shaped roof beam and build node
CN203571233U (en) Large-span X-shaped spatial arch pipeline support
CN204901559U (en) Hall ceiling lamp mounting structure
CN204681017U (en) A kind of joist steel upright base
CN203451109U (en) I-shaped steel truss device for tower crane attachment
CN105625576A (en) Series-tied-arch-type prestressed steel structure cantilever system
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20200831