CN204901559U - Hall ceiling lamp mounting structure - Google Patents

Hall ceiling lamp mounting structure Download PDF

Info

Publication number
CN204901559U
CN204901559U CN201520665437.7U CN201520665437U CN204901559U CN 204901559 U CN204901559 U CN 204901559U CN 201520665437 U CN201520665437 U CN 201520665437U CN 204901559 U CN204901559 U CN 204901559U
Authority
CN
China
Prior art keywords
galvanized steel
zinc
type galvanized
type
pendent lamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520665437.7U
Other languages
Chinese (zh)
Inventor
蔡善武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Decai Decoration Co Ltd
Original Assignee
Decai Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Decai Decoration Co Ltd filed Critical Decai Decoration Co Ltd
Priority to CN201520665437.7U priority Critical patent/CN204901559U/en
Application granted granted Critical
Publication of CN204901559U publication Critical patent/CN204901559U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model provides a hall ceiling lamp mounting structure, push up the structure roof beam including daylighting, C type galvanized steel, 2 group link supporting component and ceiling lamp, the both ends of C type galvanized steel are fixed with the daylighting top structure roof beam that corresponds the side through the joint support subassembly respectively, the joint support subassembly includes the galvanized steel sheet, zinc -plating angle steel bracing and zinc -plated angle sign indicating number, the galvanized steel sheet passes through 2 chemical bolts and corresponds side daylighting top structure roof beam inboardly fixed, zinc -plating angle steel bracing one end and galvanized steel sheet welding, it is fixed with the C type galvanized steel that corresponds the end that the other end passes through galvanized bolt, the both ends of C type galvanized steel are supported and are leaned on on corresponding side daylighting top structure roof beam, zinc -plating angle sign indicating number is to leaning on lower extreme and daylighting top structure roof beam corresponding side C type galvanized steel inboard just fixed with C type galvanized steel and daylighting top structure roof beam respectively, to hang the muscle many of its below fixed with the ceiling lamp through setting up for C type galvanized steel. Through the utility model discloses mounting structure does not have welding jobs basically, simple process, and the time limit for a project is short, has improved work efficiency.

Description

A kind of hall pendent lamp mounting structure
Technical field
The utility model relates to construction engineering technical field, particularly relates to a kind of hall suspended ceiling mounting structure with lightweight conversion layer.
Background technology
In recent years, along with the development of repairs profession, hall pendent lamp is also more and more widely used, but except family hall pendent lamp, also need the saloon many areas are larger to carry out pendent lamp installation, when the hall area needing to lift pendent lamp is larger, the pendent lamp specification of the finishing selected is also larger, the weight of pendent lamp is also heavier, compares and installs the very large difficulty of existence with the lifting of the family pendent lamp of routine.And the top of hall furred ceiling is provided with design of glass lighting roof usually, the keel of lighting roof cannot be stressed, and each crystal electrolier lamp specification is comparatively large again, mostly adopts large-scale H steel and concrete to do structure sheaf for meeting in installation requirements prior art.Consider the span of lighting roof, for the indeformable requirement of satisfied installation, needs are selected at least, 200mm high H profile steel is as the major and minor keel of structure, and H profile steel is from great, needs at substantial steel like this and deadweight is too large, causes whole engineering production cost to improve.When being connected and fixed, H profile steel is mainly welded with the structural beams connected mode of lighting roof, and welding procedure is complicated, and every root H steel spreading all needs welding and quality requirement is higher, long in time limit, inefficiency; Carrying comparatively bothers.Because lobby floor height is very high, need set up full hall scaffold, H steel, from great, is carried pretty troublesome.
Summary of the invention
Technical problem to be solved in the utility model is: the utility model proposes a kind of hall pendent lamp mounting structure, during the installation existed in the pendent lamp mounting structure of hall in solution prior art, conversion layer needs by having welded, complex process, inefficiency, the problem that cost is high, without the need to realizing mainly through welding when installing fixing, simplifying mounting process, improve operating efficiency and also reduce production cost simultaneously.
The utility model realizes by the following technical solutions:
A kind of hall pendent lamp mounting structure, it is characterized in that, comprise C type galvanized steel, be arranged on the lighting roof structural beams of C type galvanized steel both sides, 2 groups connect supporting component and pendent lamp, the both sides of described C type galvanized steel are fixedly connected with the lighting roof structural beams of respective side respectively by described connection supporting component, described connection supporting component comprises galvanized steel plain sheet, Zinc-coated angle steel diagonal brace and zinc-plated corner brace, described galvanized steel plain sheet is fixedly connected with by the inner side of 2 chemical bolts with respective side lighting roof structural beams, described Zinc-coated angle steel diagonal brace one end is welded with described galvanized steel plain sheet, the other end is fixedly connected with the C type galvanized steel of corresponding end by galvanized bolt, the two ends of described C type galvanized steel are all resisted against in the lighting roof structural beams of respective side, lower end that described zinc-plated corner brace is resisted against the C type galvanized steel of respective side is fixedly connected with described lighting roof structural beams with described C type galvanized steel with connecting bolt two respectively by connecting bolt one with inside lighting roof structural beams, described C type galvanized steel hangs muscle by many of arranging thereunder and is fixedly connected with described pendent lamp.
Further, be disposed with many C type galvanized steels with corresponding position, pendent lamp installation site, described many C type galvanized steel two ends are all fixedly connected with described lighting roof structural beams by described connection supporting component.
Further, described C type galvanized steel specification is: 100x40x20x2.5mm, and described Zinc-coated angle steel diagonal brace specification is: L50x50x5mm, and described zinc-plated corner brace specification is: 70x70x150mm, galvanized steel plain sheet specification is: 120x200x8mm.
Further, described chemical bolt specification is: φ 12x145, and described galvanized bolt specification is: M10x30, and described connecting bolt one specification is: M10x30, and described connecting bolt two specification is: φ 10x130 chemical bolt.
Further, between described Zinc-coated angle steel diagonal brace and described lighting roof structural beams, there is the first angle, the angle of described first angle is 45-60 degree, has the second angle between described Zinc-coated angle steel diagonal brace and described C type galvanized steel plain sheet, and the angle of described second angle is 30-45 degree.
The utility model advantage and good effect:
The utility model proposes a kind of hall pendent lamp mounting structure, comprise lighting roof structural beams, C type galvanized steel, 2 groups connect supporting component and pendent lamp, C type galvanized steel connects supporting component respectively by 2 groups and is fixedly connected with the lighting roof structural beams being positioned at both sides, connect supporting component and mainly comprise galvanized steel plain sheet, Zinc-coated angle steel diagonal brace and zinc-plated corner brace, galvanized steel plain sheet is first fixedly connected with by the inner side of 2 chemical bolts with described respective side lighting roof structural beams when connecting by C type galvanized steel, then Zinc-coated angle steel diagonal brace one end is welded with galvanized steel plain sheet, the other end is fixedly connected with the C type galvanized steel of corresponding end by galvanized bolt, lower end that zinc-plated corner brace is resisted against the C type galvanized steel plain sheet of respective side is fixedly connected with described lighting roof structural beams with described C type galvanized steel with connecting bolt two respectively by connecting bolt one with inside lighting roof structural beams, the utility model mainly adopts connection supporting component to be connected with lighting roof structural beams by C type galvanized steel when carrying out pendent lamp decoration and installing, and connection supporting component is mainly connected by bolt with the connected mode of lighting roof structural beams with C type galvanized steel, mainly adopt compared with the mode of welding with adopting H profile steel structure in prior art, basic welding operation, technique is simple, duration is short, improve operating efficiency, and in the present embodiment, adopting C type galvanized steel, as pendent lamp, fixing main spandrel girder is installed, structure is simple and lightweight, without the need to the steel of at substantial, has saved production cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of hall of the utility model pendent lamp mounting structure;
Fig. 2 is the layout of a kind of hall of the utility model pendent lamp mounting structure;
Fig. 3 is the partial enlargement node diagram at the A place of Fig. 1.
Detailed description of the invention
See Fig. 1-Fig. 3, the utility model proposes a kind of hall pendent lamp mounting structure, comprise C type galvanized steel 1, be arranged on the lighting roof structural beams 2 of C type galvanized steel 1 both sides, pendent lamp 3, the both sides of described C type galvanized steel 1 are fixedly connected with the lighting roof structural beams 2 of respective side respectively by described connection supporting component, described connection supporting component comprises galvanized steel plain sheet 4, Zinc-coated angle steel diagonal brace 5 and zinc-plated corner brace 6, described galvanized steel plain sheet 4 is fixedly connected with by the inner side of 2 chemical bolts with described respective side lighting roof structural beams 2, described Zinc-coated angle steel diagonal brace 5 one end is welded with described galvanized steel plain sheet 4, the other end is fixedly connected with the C type galvanized steel 1 of corresponding end by galvanized bolt, the two ends of described C type galvanized steel 1 are all resisted against in the lighting roof structural beams 2 of respective side, lower end that described zinc-plated corner brace 6 is resisted against the C type galvanized steel 1 of respective side is fixedly connected with described lighting roof structural beams 2 with described C type galvanized steel 1 with connecting bolt two respectively by connecting bolt one with inside lighting roof structural beams 2, described C type galvanized steel 1 hangs muscle 7 by many of arranging thereunder and is fixedly connected with described pendent lamp 3.
Concrete, a kind of hall pendent lamp mounting structure is proposed in the present embodiment, adopt C type galvanized steel 1 as the spandrel girder of pendent lamp 3, connect mainly through connecting supporting component between lighting roof structural beams 2 and C type galvanized steel 1, C type galvanized steel 1 is connected and fixed respectively by the lighting roof structural beams 2 that 2 groups connect supporting component and respective side in the position, both sides near end when arranging, then on the bottom surface of C type galvanized steel 1, arrange many and hang muscle 7, hang being connected and fixed with pendent lamp 3 of muscle 7 correspondence, for meeting the supporting power of pendent lamp 3 in the present embodiment, C type galvanized steel 1 is set, be connected and fixed by C type galvanized steel 1 and lighting roof structural beams 2, C type galvanized steel 1 selects connection supporting component to connect when installing, connect supporting component and include galvanized steel plain sheet 4, Zinc-coated angle steel diagonal brace 5 and zinc-plated corner brace 6, when connecting, first galvanized steel plain sheet 4 is fixed on the inner side of lighting roof structural beams 2 of respective side by chemical bolt, then by one end full weld of Zinc-coated angle steel diagonal brace 5 on galvanized steel plain sheet 4, the other end is then tilted after certain angle and is connected and fixed by 2 galvanized bolts with the C type galvanized steel 1 of corresponding section, for strengthening C type galvanized steel 1, the intensity after fixing is installed simultaneously, angle position place inside the bottom of C type galvanized steel 1 and the lighting roof structural beams 2 of respective side arranges zinc-plated corner brace 6, zinc-plated corner brace 6 is resisted against on the madial wall of C type galvanized steel 1 end and lighting roof structural beams 2 simultaneously, and by connecting bolt one and connecting bolt two, the dual-side of zinc-plated corner brace 6 is fixed with C type galvanized steel 1 and lighting roof structural beams 2 respectively simultaneously.Visible, to the C type galvanized steel 1 that the lifting load-bearing of pendent lamp 3 is mainly selected in the present embodiment, C type galvanized steel 1 with select compared with H profile steel structure in prior art, lightweight, carry more convenient when installing, and adopt C type galvanized steel 1 without the need to the steel of at substantial, C type galvanized steel 1 is more preferential than H profile steel plate cost, save cost, and C type galvanized steel 1 structure connects mainly through connecting supporting component when being connected with lighting roof structural beams 2, and the connected mode adopted is mostly bolted form, fetch carry out installation without the need to carrying out site welding, simplify the technical process of installation greatly, save the time, improve operating efficiency.Meanwhile, the connection supporting component in the present embodiment not only can realize the connection of C type galvanized steel 1 and lighting roof structural beams 2, also plays the supporting role to C type galvanized steel 1 simultaneously.
Preferably, be disposed with many C type galvanized steels 1 in the present embodiment with corresponding position, pendent lamp 3 installation site, described many C type galvanized steel 1 both sides are all fixedly connected with described lighting roof structural beams 2 by described connection supporting component.Due to the heavier-weight of pendent lamp 3, for guaranteeing to play good load-bearing effect to pendent lamp 3, the correspondence at pendent lamp 3 Hoisting Position place many C type galvanized steels 1 are set, in case pendent lamp 3 drops.
Preferably, in the present embodiment, C type galvanized steel 1 specification is: 100x40x20x2.5mm, and described Zinc-coated angle steel diagonal brace 5 specification is: L50x50x5mm, and described zinc-plated corner brace 6 specification is: 70x70x150, and galvanized steel plain sheet 4 specification is: 120x200x8mm; Described chemical bolt specification is: φ 12x145mm, and described galvanized bolt specification is: M10x30, and described connecting bolt one specification is: M10x30, and described connecting bolt two specification is: φ 10x130 chemical bolt.
Further, between described Zinc-coated angle steel diagonal brace 5 and described lighting roof structural beams 2, there is the first angle, the angle of described first angle is 45-60 degree, has the second angle between described Zinc-coated angle steel diagonal brace 5 and described C type galvanized steel plain sheet 1, and the angle of described second angle is 30-45 degree.Zinc-coated angle steel diagonal brace 5 not only plays the effect of connection, also plays a supporting role for being supported between lighting roof structural beams 2 and C type galvanized steel 1.
Last it is noted that following examples are only in order to illustrate the technical solution of the utility model, be not intended to limit; Although be described in detail the utility model with reference to previous embodiment, those of ordinary skill in the art is to be understood that: it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of each embodiment technical scheme of the present utility model.

Claims (5)

1. a hall pendent lamp mounting structure, it is characterized in that, comprise lighting roof structural beams, C type galvanized steel, 2 groups connect supporting component and pendent lamp, the two ends of described C type galvanized steel are fixedly connected with the lighting roof structural beams of respective side respectively by described connection supporting component, described connection supporting component comprises galvanized steel plain sheet, Zinc-coated angle steel diagonal brace and zinc-plated corner brace, described galvanized steel plain sheet is fixedly connected with by the inner side of 2 chemical bolts with described respective side lighting roof structural beams, described Zinc-coated angle steel diagonal brace one end is welded with described galvanized steel plain sheet, the other end is fixedly connected with the C type galvanized steel of corresponding end by galvanized bolt, the two ends of described C type galvanized steel are all resisted against in the lighting roof structural beams of respective side, lower end that described zinc-plated corner brace is resisted against the C type galvanized steel of respective side is fixedly connected with described lighting roof structural beams with described C type galvanized steel with connecting bolt two respectively by connecting bolt one with inside lighting roof structural beams, described C type galvanized steel hangs muscle by many of arranging thereunder and is fixedly connected with described pendent lamp.
2. hall according to claim 1 pendent lamp mounting structure, it is characterized in that, be disposed with many C type galvanized steels with corresponding position, pendent lamp installation site, described many C type galvanized steel two ends are all fixedly connected with described lighting roof structural beams by described connection supporting component.
3. hall according to claim 1 pendent lamp mounting structure, it is characterized in that, described C type galvanized steel specification is: 100x40x20x2.5mm, described Zinc-coated angle steel diagonal brace specification is: L50x50x5mm, described zinc-plated corner brace specification is: 70x70x150mm, galvanized steel plain sheet specification is: 120x200x8mm.
4. hall according to claim 3 pendent lamp mounting structure, it is characterized in that, described chemical bolt specification is: φ 12x145, and described galvanized bolt specification is: M10x30, described connecting bolt one specification is: M10x30, and described connecting bolt two specification is: φ 10x130 chemical bolt.
5. hall according to claim 4 pendent lamp mounting structure, it is characterized in that, between described Zinc-coated angle steel diagonal brace and described lighting roof structural beams, there is the first angle, the angle of described first angle is 45-60 degree, have the second angle between described Zinc-coated angle steel diagonal brace and described C type galvanized steel, the angle of described second angle is 30-45 degree.
CN201520665437.7U 2015-08-31 2015-08-31 Hall ceiling lamp mounting structure Expired - Fee Related CN204901559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520665437.7U CN204901559U (en) 2015-08-31 2015-08-31 Hall ceiling lamp mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520665437.7U CN204901559U (en) 2015-08-31 2015-08-31 Hall ceiling lamp mounting structure

Publications (1)

Publication Number Publication Date
CN204901559U true CN204901559U (en) 2015-12-23

Family

ID=54923732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520665437.7U Expired - Fee Related CN204901559U (en) 2015-08-31 2015-08-31 Hall ceiling lamp mounting structure

Country Status (1)

Country Link
CN (1) CN204901559U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067976A (en) * 2019-05-06 2019-07-30 中建八局装饰工程有限公司 A kind of installation system and installation method of matrix form system art pendent lamp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067976A (en) * 2019-05-06 2019-07-30 中建八局装饰工程有限公司 A kind of installation system and installation method of matrix form system art pendent lamp

Similar Documents

Publication Publication Date Title
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN105780925A (en) Method for installation construction of truss-hanging combination system
CN110748139B (en) Hanging basket support system
CN104878867A (en) Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof
CN105625645A (en) Construction method of suspension type steel-structured lighting skylight
CN109132843B (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN204901559U (en) Hall ceiling lamp mounting structure
CN202337344U (en) Scaffold structure in cargo cabin of bulk cargo ship
CN103835369B (en) Extensible high-altitude conjoined steel structure
CN211200882U (en) Steel construction conversion layer furred ceiling
CN202899639U (en) Concrete column structure
CN204940662U (en) A kind of hall suspended ceiling mounting structure
CN202706495U (en) Ladder type air basket
CN110107095A (en) The installation method of high-altitude long-span steel truss
CN102259794B (en) Method for installing overall combined type crane beam
CN104261269A (en) Special hoisting mechanism for annular dual-rail sliding track
CN201411926Y (en) Arc beam hoisting structure
CN204096948U (en) Annular double track sliding rail Special hoisting mechanism
CN211622717U (en) Integrated girder steel of cross-line installation convenient to implement
CN202689494U (en) Elevator shaft template support
CN111502104A (en) Strip-shaped aluminum plate ceiling facing mounting structure and mounting method thereof
CN110805189A (en) Method for mounting steel structure of daylighting roof
CN220336399U (en) Profile steel construction platform for high-altitude overhanging
CN203878966U (en) Ascending and descending protecting screen of spine structure
CN203855278U (en) People and goods elevator installation structure of complicated exterior building structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20190831

CF01 Termination of patent right due to non-payment of annual fee