CN202337344U - Scaffold structure in cargo cabin of bulk cargo ship - Google Patents
Scaffold structure in cargo cabin of bulk cargo ship Download PDFInfo
- Publication number
- CN202337344U CN202337344U CN2011204468915U CN201120446891U CN202337344U CN 202337344 U CN202337344 U CN 202337344U CN 2011204468915 U CN2011204468915 U CN 2011204468915U CN 201120446891 U CN201120446891 U CN 201120446891U CN 202337344 U CN202337344 U CN 202337344U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- guardrail
- cargo
- cabin
- ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to a scaffold structure in a cargo cabin of a bulk cargo ship and belongs to the technical field of ship repairing and building. The scaffold structure comprises a plurality of eye plates (2), wherein the eye plates (2) are fixedly arranged on a transverse cabin wall (1), cross beams (3) are fixedly arranged on the eye plates (2), the end part of each cross beam (3) is provided with a guardrail sleeve (4), a guardrail (6) is inserted into each guardrail sleeve, scaffold boards (5) are erected between the cross beams (3), and the upper part and the middle part of the guardrail (6) are respectively provided with lug rings (7). The scaffold structure in the cargo cabin of the bulk cargo ship has the advantages that the whole scaffold is supported through the eye plates fixedly arranged on the transverse cabin wall, and the original structure that the lower layer supports the upper layer is changed, so the bottom-to-top building of the scaffold is not needed, the work efficiency for building and dismounting the scaffold is improved, in addition, the space occupation is reduced, and the influence on other construction operation is small.
Description
Technical field
The utility model relates to scaffolding structure in a kind of bulge carrier cargo hold, belongs to and builds the ship technical field.
Background technology
In the bulge carrier manufacturing process, close up the seam construction for what carry out that transcerse bulkhead and deck panel and topside tank segmentation join, need in cargo hold, build the scaffold of multilayer usually, operating personal carries out operation on scaffold.Existing scaffold all be from down and on successively build, take big quantity space, and because scaffold near bulkhead; Can the construction of bulkhead bottom be impacted; And the work capacity that this scaffold is built and removed is big, and the time is long, can impact other operations.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned deficiency, and scaffolding structure in a kind of bulge carrier cargo hold is provided, and it builds and remove very convenient, and it is little to take up room, and is less to other operation influences.
The purpose of the utility model is achieved in that scaffolding structure in a kind of bulge carrier cargo hold, and be characterized in: it comprises eye plate, and said eye plate has several; Said several eye plates are fixedly set on the transcerse bulkhead; Be set with crossbeam on the said eye plate, said beam-end is provided with the guardrail cover, is fitted with guardrail in the said guardrail cover; Set up foot plank between said crossbeam and the crossbeam, said guardrail top and middle part are provided with earrings.
Compared with prior art, the beneficial effect of the utility model is:
Scaffolding structure in a kind of bulge carrier cargo hold of the utility model; It supports whole scaffold through the eye plate that is fixedly installed on the transcerse bulkhead; Changed the supporting structure of original lower floor, therefore need not to scaffold erecting from bottom to top, improved the work efficiency that scaffold is built and removed the upper strata; And reduced taking of space, very little to the influence of other construction operations.
Description of drawings
Fig. 1 is the scheme drawing of scaffolding structure in a kind of bulge carrier cargo hold of the utility model.
Fig. 2 is the installation site scheme drawing of scaffolding structure in a kind of bulge carrier cargo hold of the utility model.
Wherein:
Transcerse bulkhead 1
Eye plate 2
Crossbeam 3
Guardrail cover 4
Guardrail 6
Top side tank 9
Close up seam 10.
The specific embodiment
Referring to Fig. 1, Fig. 2, the utility model relates to scaffolding structure in a kind of bulge carrier cargo hold, and it comprises eye plate 2; Said eye plate 2 has several, and said several eye plates 2 are fixedly set on the transcerse bulkhead 1, and the distributing position of several eye plates 2 can be provided with according to actual conditions; Be provided with crossbeam 3 through bolt on the said eye plate 2, said crossbeam 3 is processed by angle steel, and said crossbeam 3 ends are provided with guardrail cover 4; Be fitted with guardrail 6 in the said guardrail cover; Set up foot plank 5 between said crossbeam 3 and the crossbeam 3, said guardrail 6 tops and middle part are provided with earrings 7, and said earrings 7 can be used for the fixing of steel pipe.
Claims (1)
1. scaffolding structure in the bulge carrier cargo hold; It is characterized in that: it comprises eye plate (2); Said eye plate (2) has several, and said several eye plates (2) are fixedly set on the transcerse bulkhead (1), are set with crossbeam (3) on the said eye plate (2); Said crossbeam (3) end is provided with guardrail cover (4); Be fitted with guardrail (6) in the said guardrail cover, set up foot plank (5) between said crossbeam (3) and the crossbeam (3), said guardrail (6) top and middle part are provided with earrings (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204468915U CN202337344U (en) | 2011-11-14 | 2011-11-14 | Scaffold structure in cargo cabin of bulk cargo ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204468915U CN202337344U (en) | 2011-11-14 | 2011-11-14 | Scaffold structure in cargo cabin of bulk cargo ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202337344U true CN202337344U (en) | 2012-07-18 |
Family
ID=46486044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204468915U Expired - Fee Related CN202337344U (en) | 2011-11-14 | 2011-11-14 | Scaffold structure in cargo cabin of bulk cargo ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202337344U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102785766A (en) * | 2012-09-03 | 2012-11-21 | 广东中远船务工程有限公司 | Novel scaffold fixture combination for ships |
CN103482043A (en) * | 2013-09-23 | 2014-01-01 | 浙江海洋学院 | Marine used fixture for erecting scaffold |
CN105539769A (en) * | 2015-12-23 | 2016-05-04 | 江苏现代造船技术有限公司 | Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold |
CN107444582A (en) * | 2017-07-31 | 2017-12-08 | 广船国际有限公司 | A kind of hyperboloid line style cabin scaffold device erection method |
CN108791702A (en) * | 2018-05-31 | 2018-11-13 | 广船国际有限公司 | A kind of corrugated bulkhead scaffold installation method |
-
2011
- 2011-11-14 CN CN2011204468915U patent/CN202337344U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102785766A (en) * | 2012-09-03 | 2012-11-21 | 广东中远船务工程有限公司 | Novel scaffold fixture combination for ships |
CN102785766B (en) * | 2012-09-03 | 2016-01-20 | 广东中远船务工程有限公司 | New Marine scaffold tooling combination |
CN103482043A (en) * | 2013-09-23 | 2014-01-01 | 浙江海洋学院 | Marine used fixture for erecting scaffold |
CN105539769A (en) * | 2015-12-23 | 2016-05-04 | 江苏现代造船技术有限公司 | Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold |
CN107444582A (en) * | 2017-07-31 | 2017-12-08 | 广船国际有限公司 | A kind of hyperboloid line style cabin scaffold device erection method |
WO2019024290A1 (en) * | 2017-07-31 | 2019-02-07 | 广船国际有限公司 | Method for building scaffold device in hyperboloidal linear cabin |
CN108791702A (en) * | 2018-05-31 | 2018-11-13 | 广船国际有限公司 | A kind of corrugated bulkhead scaffold installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202337344U (en) | Scaffold structure in cargo cabin of bulk cargo ship | |
CN103075020B (en) | A kind of steel tray supports actuating system | |
CN102587647A (en) | Early-removal formwork system for concreting of constructions comprising beams, plates and columns | |
CN103669655A (en) | Construction technology for pouring concrete of walls on two sides of deformation joint | |
CN102392536A (en) | Construction method for long-span hanging vestibule type template support system | |
CN102146731A (en) | Supporting structure for floor formwork of steel structure building and construction method | |
CN202745364U (en) | Template support structure | |
CN201963320U (en) | Scaffold for mounting tunnel support arch frame | |
CN202072183U (en) | Container | |
CN204570480U (en) | A kind of roadbed formula steel suspension bridge bridge floor | |
CN103112766A (en) | Construction elevator suspending over basement roof of building and construction method thereof | |
CN204024084U (en) | Easy unloading type triangular pipe truss just spells moulding bed | |
CN208122340U (en) | A kind of detachable recycling discharging platform | |
CN202899639U (en) | Concrete column structure | |
CN205804178U (en) | Scalable without holder device for the liftable of bridge coping construction | |
CN201687083U (en) | Suspension type template supporting structure with high-position integrated structure | |
CN204590599U (en) | A kind of corner internal corner formwork for aluminum alloy mould plate system | |
CN203160729U (en) | Steel pallet supporting power transmission system | |
CN204875544U (en) | T type roof beam pterygoid lamina reinforcing bar fetal membrane | |
CN202689494U (en) | Elevator shaft template support | |
CN202337343U (en) | Straight subsection scaffold structure for bulk cargo ship | |
CN204299144U (en) | Elevator internal mold operating platform | |
CN201391222Y (en) | Simple crawling ladder used in ship subsection shelving construction | |
CN204212071U (en) | A kind of pier stud anchor structure | |
CN204901559U (en) | Hall ceiling lamp mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120718 Termination date: 20141114 |
|
EXPY | Termination of patent right or utility model |