CN202337344U - Scaffold structure in cargo cabin of bulk cargo ship - Google Patents

Scaffold structure in cargo cabin of bulk cargo ship Download PDF

Info

Publication number
CN202337344U
CN202337344U CN2011204468915U CN201120446891U CN202337344U CN 202337344 U CN202337344 U CN 202337344U CN 2011204468915 U CN2011204468915 U CN 2011204468915U CN 201120446891 U CN201120446891 U CN 201120446891U CN 202337344 U CN202337344 U CN 202337344U
Authority
CN
China
Prior art keywords
scaffold
guardrail
cargo
cabin
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011204468915U
Other languages
Chinese (zh)
Inventor
徐国彬
孙小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu New Yangzi Shipbuilding Co Ltd
Original Assignee
Jiangsu New Yangzi Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu New Yangzi Shipbuilding Co Ltd filed Critical Jiangsu New Yangzi Shipbuilding Co Ltd
Priority to CN2011204468915U priority Critical patent/CN202337344U/en
Application granted granted Critical
Publication of CN202337344U publication Critical patent/CN202337344U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a scaffold structure in a cargo cabin of a bulk cargo ship and belongs to the technical field of ship repairing and building. The scaffold structure comprises a plurality of eye plates (2), wherein the eye plates (2) are fixedly arranged on a transverse cabin wall (1), cross beams (3) are fixedly arranged on the eye plates (2), the end part of each cross beam (3) is provided with a guardrail sleeve (4), a guardrail (6) is inserted into each guardrail sleeve, scaffold boards (5) are erected between the cross beams (3), and the upper part and the middle part of the guardrail (6) are respectively provided with lug rings (7). The scaffold structure in the cargo cabin of the bulk cargo ship has the advantages that the whole scaffold is supported through the eye plates fixedly arranged on the transverse cabin wall, and the original structure that the lower layer supports the upper layer is changed, so the bottom-to-top building of the scaffold is not needed, the work efficiency for building and dismounting the scaffold is improved, in addition, the space occupation is reduced, and the influence on other construction operation is small.

Description

Scaffolding structure in a kind of bulge carrier cargo hold
Technical field
The utility model relates to scaffolding structure in a kind of bulge carrier cargo hold, belongs to and builds the ship technical field.
Background technology
In the bulge carrier manufacturing process, close up the seam construction for what carry out that transcerse bulkhead and deck panel and topside tank segmentation join, need in cargo hold, build the scaffold of multilayer usually, operating personal carries out operation on scaffold.Existing scaffold all be from down and on successively build, take big quantity space, and because scaffold near bulkhead; Can the construction of bulkhead bottom be impacted; And the work capacity that this scaffold is built and removed is big, and the time is long, can impact other operations.
Summary of the invention
The purpose of the utility model is to overcome above-mentioned deficiency, and scaffolding structure in a kind of bulge carrier cargo hold is provided, and it builds and remove very convenient, and it is little to take up room, and is less to other operation influences.
The purpose of the utility model is achieved in that scaffolding structure in a kind of bulge carrier cargo hold, and be characterized in: it comprises eye plate, and said eye plate has several; Said several eye plates are fixedly set on the transcerse bulkhead; Be set with crossbeam on the said eye plate, said beam-end is provided with the guardrail cover, is fitted with guardrail in the said guardrail cover; Set up foot plank between said crossbeam and the crossbeam, said guardrail top and middle part are provided with earrings.
Compared with prior art, the beneficial effect of the utility model is:
Scaffolding structure in a kind of bulge carrier cargo hold of the utility model; It supports whole scaffold through the eye plate that is fixedly installed on the transcerse bulkhead; Changed the supporting structure of original lower floor, therefore need not to scaffold erecting from bottom to top, improved the work efficiency that scaffold is built and removed the upper strata; And reduced taking of space, very little to the influence of other construction operations.
Description of drawings
Fig. 1 is the scheme drawing of scaffolding structure in a kind of bulge carrier cargo hold of the utility model.
Fig. 2 is the installation site scheme drawing of scaffolding structure in a kind of bulge carrier cargo hold of the utility model.
Wherein:
Transcerse bulkhead 1
Eye plate 2
Crossbeam 3
Guardrail cover 4
Foot plank 5
Guardrail 6
Earrings 7
Deck 8
Top side tank 9
Close up seam 10.
The specific embodiment
Referring to Fig. 1, Fig. 2, the utility model relates to scaffolding structure in a kind of bulge carrier cargo hold, and it comprises eye plate 2; Said eye plate 2 has several, and said several eye plates 2 are fixedly set on the transcerse bulkhead 1, and the distributing position of several eye plates 2 can be provided with according to actual conditions; Be provided with crossbeam 3 through bolt on the said eye plate 2, said crossbeam 3 is processed by angle steel, and said crossbeam 3 ends are provided with guardrail cover 4; Be fitted with guardrail 6 in the said guardrail cover; Set up foot plank 5 between said crossbeam 3 and the crossbeam 3, said guardrail 6 tops and middle part are provided with earrings 7, and said earrings 7 can be used for the fixing of steel pipe.

Claims (1)

1. scaffolding structure in the bulge carrier cargo hold; It is characterized in that: it comprises eye plate (2); Said eye plate (2) has several, and said several eye plates (2) are fixedly set on the transcerse bulkhead (1), are set with crossbeam (3) on the said eye plate (2); Said crossbeam (3) end is provided with guardrail cover (4); Be fitted with guardrail (6) in the said guardrail cover, set up foot plank (5) between said crossbeam (3) and the crossbeam (3), said guardrail (6) top and middle part are provided with earrings (7).
CN2011204468915U 2011-11-14 2011-11-14 Scaffold structure in cargo cabin of bulk cargo ship Expired - Fee Related CN202337344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204468915U CN202337344U (en) 2011-11-14 2011-11-14 Scaffold structure in cargo cabin of bulk cargo ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204468915U CN202337344U (en) 2011-11-14 2011-11-14 Scaffold structure in cargo cabin of bulk cargo ship

Publications (1)

Publication Number Publication Date
CN202337344U true CN202337344U (en) 2012-07-18

Family

ID=46486044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204468915U Expired - Fee Related CN202337344U (en) 2011-11-14 2011-11-14 Scaffold structure in cargo cabin of bulk cargo ship

Country Status (1)

Country Link
CN (1) CN202337344U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785766A (en) * 2012-09-03 2012-11-21 广东中远船务工程有限公司 Novel scaffold fixture combination for ships
CN103482043A (en) * 2013-09-23 2014-01-01 浙江海洋学院 Marine used fixture for erecting scaffold
CN105539769A (en) * 2015-12-23 2016-05-04 江苏现代造船技术有限公司 Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold
CN107444582A (en) * 2017-07-31 2017-12-08 广船国际有限公司 A kind of hyperboloid line style cabin scaffold device erection method
CN108791702A (en) * 2018-05-31 2018-11-13 广船国际有限公司 A kind of corrugated bulkhead scaffold installation method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102785766A (en) * 2012-09-03 2012-11-21 广东中远船务工程有限公司 Novel scaffold fixture combination for ships
CN102785766B (en) * 2012-09-03 2016-01-20 广东中远船务工程有限公司 New Marine scaffold tooling combination
CN103482043A (en) * 2013-09-23 2014-01-01 浙江海洋学院 Marine used fixture for erecting scaffold
CN105539769A (en) * 2015-12-23 2016-05-04 江苏现代造船技术有限公司 Method for building scaffolds in closing stage of bottom side tank of bulk cargo ship cargo hold
CN107444582A (en) * 2017-07-31 2017-12-08 广船国际有限公司 A kind of hyperboloid line style cabin scaffold device erection method
WO2019024290A1 (en) * 2017-07-31 2019-02-07 广船国际有限公司 Method for building scaffold device in hyperboloidal linear cabin
CN108791702A (en) * 2018-05-31 2018-11-13 广船国际有限公司 A kind of corrugated bulkhead scaffold installation method

Similar Documents

Publication Publication Date Title
CN202337344U (en) Scaffold structure in cargo cabin of bulk cargo ship
CN103075020B (en) A kind of steel tray supports actuating system
CN102587647A (en) Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN103669655A (en) Construction technology for pouring concrete of walls on two sides of deformation joint
CN102392536A (en) Construction method for long-span hanging vestibule type template support system
CN102146731A (en) Supporting structure for floor formwork of steel structure building and construction method
CN202745364U (en) Template support structure
CN201963320U (en) Scaffold for mounting tunnel support arch frame
CN202072183U (en) Container
CN204570480U (en) A kind of roadbed formula steel suspension bridge bridge floor
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN204024084U (en) Easy unloading type triangular pipe truss just spells moulding bed
CN208122340U (en) A kind of detachable recycling discharging platform
CN202899639U (en) Concrete column structure
CN205804178U (en) Scalable without holder device for the liftable of bridge coping construction
CN201687083U (en) Suspension type template supporting structure with high-position integrated structure
CN204590599U (en) A kind of corner internal corner formwork for aluminum alloy mould plate system
CN203160729U (en) Steel pallet supporting power transmission system
CN204875544U (en) T type roof beam pterygoid lamina reinforcing bar fetal membrane
CN202689494U (en) Elevator shaft template support
CN202337343U (en) Straight subsection scaffold structure for bulk cargo ship
CN204299144U (en) Elevator internal mold operating platform
CN201391222Y (en) Simple crawling ladder used in ship subsection shelving construction
CN204212071U (en) A kind of pier stud anchor structure
CN204901559U (en) Hall ceiling lamp mounting structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120718

Termination date: 20141114

EXPY Termination of patent right or utility model