CN206844617U - A kind of builder's jack - Google Patents

A kind of builder's jack Download PDF

Info

Publication number
CN206844617U
CN206844617U CN201720729380.1U CN201720729380U CN206844617U CN 206844617 U CN206844617 U CN 206844617U CN 201720729380 U CN201720729380 U CN 201720729380U CN 206844617 U CN206844617 U CN 206844617U
Authority
CN
China
Prior art keywords
scaffold body
tripod
builder
bolt
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720729380.1U
Other languages
Chinese (zh)
Inventor
苏话诚
鞠玉龙
任学军
薛传广
王京
何勇刚
郑飞
王冲
杨春明
赵志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA XINXING CONSTRUCTION ENGINEERING Co.,Ltd.
Original Assignee
Beijing Taiwei Metal Structure Engineering Co Ltd
China Xinxing Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Taiwei Metal Structure Engineering Co Ltd, China Xinxing Construction Engineering Co Ltd filed Critical Beijing Taiwei Metal Structure Engineering Co Ltd
Priority to CN201720729380.1U priority Critical patent/CN206844617U/en
Application granted granted Critical
Publication of CN206844617U publication Critical patent/CN206844617U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of builder's jack, it is included in the scaffold body built on the outside of construction wall, the scaffold body is supported in multiple tripod supports including hook, stock, Xuan Liang, tripod support is fixed on outer wall body by multiple bolts of upper and lower tandem, wherein at least one bolt is fixing bolt through walls, and the montant of positioning scaffold body is provided with the supporting plane beam of the gusseted.The utility model overcome using exterior wall existing for I-steel the shaped steel suspension scaffolding punch influence wall globality and flatness, increase hidden leakage defect the defects of, it is not necessary to pre-plugged part, build dismounting easily and fast.

Description

A kind of builder's jack
Technical field
The utility model belongs to the realm of building construction, and in particular to a kind of builder's jack.
Background technology
Traditional builder's jack is encorbelmented using I-steel shaped steel, takes inner space, I-steel shaped steel is encorbelmented need to be in floor Interior pre-buried steel anchor ring, exterior wall, which punches, influences the globality and flatness of wall, increases hidden leakage defect.
The content of the invention
The purpose of this utility model is to provide a kind of builder's jack, the scaffold using tripod as support, three Corner bracket is connected with wall to be fixedly connected using M20 through-wall bolts, is overcome and is punched shadow using I-steel shaped steel existing exterior wall of encorbelmenting Ring wall globality and flatness, increase hidden leakage defect the defects of.
The purpose of this utility model is achieved through the following technical solutions:
A kind of builder's jack, it is included in the scaffold body built on the outside of construction wall, wherein, the scaffold body It is supported in multiple tripod supports including hook, stock, Xuan Liang, tripod support is fixed by multiple bolts of upper and lower tandem On outer wall body, wherein at least one bolt is fixing bolt through walls, on the supporting plane beam of tripod support It is provided with the montant of positioning scaffold body.
Scheme is further:A plurality of reinforcement web member is provided between the supporting plane beam and profound beam of the tripod support, A plurality of reinforcement web member forms multiple triangles and strengthens supporting construction, wherein at least has a reinforcement web member among supporting plane beam Set between Duan Yuxuan beams, perpendicular to supporting plane beam.
Scheme is further:The montant is bolt column, and the welding of scaffold body lower end is provided with steel plate, set on steel plate There is through hole, scaffold body is fixed on tripod branch by scaffold body by the way that the through hole on steel plate is inserted in into bolt column with nut In support.
Scheme is further:The montant is steel bar column, and the welding of scaffold body lower end is provided with steel pipe, scaffold body Scaffold body is fixed in tripod support by way of steel pipe is inserted in into steel bar column.
Scheme is further:The multiple tripod support is set along scaffold body horizontal direction interval no more than 1.5 meters Put.
Scheme is further:At construction wall right angle corner relative two adjacent tripods supports respectively with institute It is horizontal in 45 degree of angles settings to state construction wall.
Scheme is further:The tripod that two adjacent at construction wall right angle corner supports relative spacing No more than 0.5 meter.
The beneficial effects of the utility model are:Overcome and punch using I-steel shaped steel existing exterior wall of encorbelmenting and influence wall Globality and flatness, increase hidden leakage defect the defects of, it is not necessary to pre-plugged part, build dismounting easily and fast.
Below in conjunction with the accompanying drawings and embodiment is described in further detail to the utility model.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model setting structure schematic diagram at construction wall right angle corner.
Embodiment
A kind of builder's jack, as shown in figure 1, the builder's jack is included in the pin hand that the outside of construction wall 1 is built Frame body 2, wherein, the scaffold body is supported on multiple including hooking(Vertical beam), stock(Crossbeam), Xuan Liang(Oblique pull beam)Three pin In frame support 3, the vertical beam of tripod support is fixed on outer wall body by multiple bolts 4 of upper and lower tandem, wherein at least It is fixing bolt 401 through walls to have a bolt, in the present embodiment, as shown in figure 1, tandem most on a bolt be fixation through walls Bolt, remaining is all expansion bolt;In the supporting plane beam of tripod support(Crossbeam)On be provided with positioning scaffold sheet The montant 301 of body.
In embodiment:In order to strengthen the support strength of tripod support, the supporting plane beam of tripod support with it is profound A plurality of reinforcement web member 302 is provided between beam, a plurality of reinforcement web member forms multiple triangles and strengthens supporting construction, wherein at least has One reinforcement web member 303 between supporting plane beam interlude and profound beam and be perpendicular to supporting plane beam setting.
In embodiment:The hook of tripod support, stock, Xuan Liang using angle steel, wherein, scaffold body and montant position Connection can use two kinds of preferred schemes:
One preferred scheme is that the montant is steel bar column, and the welding of scaffold body lower end is provided with steel pipe, scaffold sheet Scaffold body is fixed in tripod support by body by way of steel pipe is inserted in into steel bar column.Reinforcing bar can more slightly, can To select diameter 32mm, long 150mm.
Another preferred scheme is that the montant is bolt column, and scaffold body lower end, which is welded, is provided with steel plate, on steel plate Through hole is provided with, scaffold body is fixed on three pin by scaffold body by the way that the through hole on steel plate is inserted in into bolt column with nut In frame support.
In construction, due to being supported using tripod, therefore the pre-buried work in wall is not according to the conventional method just had to Word die steel, live tripod can be installed by punching, preformed hole or using former large form bolt eye, reduce wall and open Hole, while support as needed, generally the multiple tripod support is not more than 1.5 along scaffold body horizontal direction interval Rice is set.
In embodiment:As shown in Fig. 2 two adjacent tripod supports point relative at construction wall right angle corner Unhorizontal in 45 degree of angle a settings with the construction wall, therefore, two adjacent tripods supports are parallel.And And the tripod that two adjacent at the construction wall right angle corner support relative spacing is not more than 0.5 meter, two 45 The tripod drawknot of degree is fixed integral.
In embodiment:The vertical girder of tripod(Vertical beam)Using the equal leg angle of L90 × 8, crossbeam and Xuan Liang(Oblique pull beam)Adopt With the equal leg angle of L75 × 5, reinforcement is all welded to connect using the equal leg angle of L40 × 4 with crossbeam and Xuan Liang, vertical girder with Crossbeam and Xuan Liang are also to be welded to connect, through-wall bolt using M20 bolt.
Overhanging scaffold erection technological process:Positioning measurement → structure reserve the installation of through-wall bolt hole → shaped steel tripod → Vertical spacer bar is welded on tripod(Montant)→ installation longitudinal sweep the floor bar and its temporary support → paving scaffold board → are erected by root Vertical vertical rod 201, and laterally swept the floor bar → installation vertical equity bar → installation transverse horizontal bar → paving with bar fastening → installation of sweeping the floor The large and small cross bar 202,203 of the scaffold board → installation first step → large and small cross bar of installation second step → installation off-load steel wire rope → setting Wall-connecting piece → setting bridging → installation guard rail, the close mesh safety net of foot guard plate → extension facade(Face side and hang the big eye safety of edge sealing Net)→ suspension scaffold operation layer completely spreads multi-layer sheet.

Claims (7)

1. a kind of builder's jack, it is included in the scaffold body built on the outside of construction wall, it is characterised in that the scaffold Body is supported in multiple tripod supports including hook, stock, Xuan Liang, and tripod supports multiple bolt quilts by upper and lower tandem It is fixed on outer wall body, wherein at least one bolt is fixing bolt through walls, in the supporting plane of tripod support The montant of positioning scaffold body is provided with beam.
2. builder's jack according to claim 1, it is characterised in that the supporting plane beam of tripod support with it is profound A plurality of reinforcement web member is provided between beam, a plurality of reinforcement web member forms multiple triangles and strengthens supporting construction, wherein at least there is one Bar is strengthened web member and set between supporting plane beam interlude and profound beam, perpendicular to supporting plane beam.
3. builder's jack according to claim 1, it is characterised in that the montant is bolt column, under scaffold body End welding is provided with steel plate, through hole is provided with steel plate, scaffold body by the through hole on steel plate by being inserted in bolt column spiral shell It is female that scaffold body is fixed in tripod support.
4. builder's jack according to claim 1, it is characterised in that the montant is steel bar column, under scaffold body End welding is provided with steel pipe, and scaffold body is fixed on tripod by scaffold body by way of steel pipe is inserted in into steel bar column In support.
5. builder's jack according to claim 1, it is characterised in that the multiple tripod is supported along scaffold body The setting of no more than 1.5 meters of horizontal direction interval.
6. builder's jack according to claim 1, it is characterised in that relative two at construction wall right angle corner The adjacent tripod support is horizontal in 45 degree of angles settings with the construction wall respectively.
7. builder's jack according to claim 6, it is characterised in that two phases at construction wall right angle corner Adjacent tripod support relative spacing is not more than 0.5 meter.
CN201720729380.1U 2017-06-22 2017-06-22 A kind of builder's jack Active CN206844617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720729380.1U CN206844617U (en) 2017-06-22 2017-06-22 A kind of builder's jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720729380.1U CN206844617U (en) 2017-06-22 2017-06-22 A kind of builder's jack

Publications (1)

Publication Number Publication Date
CN206844617U true CN206844617U (en) 2018-01-05

Family

ID=60801518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720729380.1U Active CN206844617U (en) 2017-06-22 2017-06-22 A kind of builder's jack

Country Status (1)

Country Link
CN (1) CN206844617U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805257A (en) * 2019-11-18 2020-02-18 广西途辉建筑工程有限公司 Flower basket overhanging type section steel bearing beam structure and construction method
CN111809851A (en) * 2020-06-28 2020-10-23 中电建十一局工程有限公司 Steel pipe triangular truss support system and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110805257A (en) * 2019-11-18 2020-02-18 广西途辉建筑工程有限公司 Flower basket overhanging type section steel bearing beam structure and construction method
CN110805257B (en) * 2019-11-18 2022-03-15 广西途辉建筑工程有限公司 Flower basket overhanging type section steel bearing beam structure and construction method
CN111809851A (en) * 2020-06-28 2020-10-23 中电建十一局工程有限公司 Steel pipe triangular truss support system and construction method

Similar Documents

Publication Publication Date Title
CN201554121U (en) Connection joint of inner sleeve squared rectangular steel pipe column and H-shaped steel beam
CN104074358A (en) Construction method of prefabricated assembled building
CN102979312B (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN104563494A (en) Transformation supporting system for socket disc-lock steel tube support and construction method
CN212534174U (en) Raft foundation steel bar supporting tool
CN204475846U (en) A kind of conversion support system for socket joint dish button steel tube frame
CN206844617U (en) A kind of builder's jack
CN204001650U (en) Overhanging scaffold for building
CN103982014B (en) A kind of reducing steel work spiral ramp and construction techniques thereof
CN102767644B (en) Assembly type heavy pipeline hanger
CN104179362A (en) Building site guardrail fast to mount and demount
CN211257756U (en) Progressive overhanging structure aiming at complex outer vertical surface modeling
CN204139631U (en) The guard rail of building site fast demountable
CN103669817B (en) Building structure overhanging scaffold external corner assembling type frame body device
CN204282788U (en) Shaping type scaffold can be assembled
CN214498388U (en) Assembled overhanging formwork support bent
CN204644886U (en) Two cam combination bracket
CN210600469U (en) Assembled series pipeline support
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN209353480U (en) A kind of connecting node of steel bar truss floor support plate and concrete filled steel tube combined special-shaped column
CN203654694U (en) Novel building structure cantilever scaffold external corner assembly type frame body device
CN204571041U (en) Floor
CN110700543A (en) Steel truss inclined strut system structure with section steel cantilever and construction method thereof
CN205296805U (en) Portable electronic hanging flower basket of rail mounted
CN218564566U (en) double-C-shaped purline lower hanging pipeline mounting support and hanger device for steel structure roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100009 Pei Yongli No. 3, Xicheng District, Beijing

Co-patentee after: BEIJING TAIWEI METAL COMPOSITION ENGINEERING Co.,Ltd.

Patentee after: CHINA XINXING CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 100079 Beijing City, Fengtai District, Shun eight No. 9

Co-patentee before: BEIJING TAIWEI METAL COMPOSITION ENGINEERING Co.,Ltd.

Patentee before: CHINA XINXING BUILDING ENGINEERING Corp.

CP03 Change of name, title or address