CN201144515Y - Steel structure high altitude construction platform - Google Patents
Steel structure high altitude construction platform Download PDFInfo
- Publication number
- CN201144515Y CN201144515Y CNU2008200424884U CN200820042488U CN201144515Y CN 201144515 Y CN201144515 Y CN 201144515Y CN U2008200424884 U CNU2008200424884 U CN U2008200424884U CN 200820042488 U CN200820042488 U CN 200820042488U CN 201144515 Y CN201144515 Y CN 201144515Y
- Authority
- CN
- China
- Prior art keywords
- platform body
- steel structural
- platform
- operation platform
- overhead operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200424884U CN201144515Y (en) | 2008-01-04 | 2008-01-04 | Steel structure high altitude construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200424884U CN201144515Y (en) | 2008-01-04 | 2008-01-04 | Steel structure high altitude construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201144515Y true CN201144515Y (en) | 2008-11-05 |
Family
ID=40081389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200424884U Expired - Lifetime CN201144515Y (en) | 2008-01-04 | 2008-01-04 | Steel structure high altitude construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201144515Y (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505836A (en) * | 2011-10-24 | 2012-06-20 | 沈阳建筑大学 | Guy cable type high-altitude working platform |
CN102605941A (en) * | 2012-03-23 | 2012-07-25 | 河北杭萧钢构有限公司 | Enclosing shield hoisting platform |
CN104314312A (en) * | 2014-11-12 | 2015-01-28 | 江苏南通六建建设集团有限公司 | High altitude reinforced concrete corridor structure triangle steel tube cantilever formwork construction technology |
CN106049847A (en) * | 2016-07-28 | 2016-10-26 | 嘉兴御创电力科技有限公司 | Bearing type positioning device |
CN107386662A (en) * | 2017-08-29 | 2017-11-24 | 四川省第十五建筑有限公司 | Construction lift tool formula is encorbelmented escape way |
CN110552703A (en) * | 2019-09-27 | 2019-12-10 | 中铁工程装备集团有限公司 | Duct piece mounting system applied to shaft construction |
CN113718724A (en) * | 2021-08-30 | 2021-11-30 | 长江国际水利水电工程建设有限公司 | Operating platform for replacing arc-shaped gate side water stop rubber and construction method thereof |
-
2008
- 2008-01-04 CN CNU2008200424884U patent/CN201144515Y/en not_active Expired - Lifetime
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505836A (en) * | 2011-10-24 | 2012-06-20 | 沈阳建筑大学 | Guy cable type high-altitude working platform |
CN102505836B (en) * | 2011-10-24 | 2014-02-19 | 沈阳建筑大学 | Guy cable type high-altitude working platform |
CN102605941A (en) * | 2012-03-23 | 2012-07-25 | 河北杭萧钢构有限公司 | Enclosing shield hoisting platform |
CN104314312A (en) * | 2014-11-12 | 2015-01-28 | 江苏南通六建建设集团有限公司 | High altitude reinforced concrete corridor structure triangle steel tube cantilever formwork construction technology |
CN104314312B (en) * | 2014-11-12 | 2017-02-15 | 江苏南通六建建设集团有限公司 | High altitude reinforced concrete corridor structure triangle steel tube cantilever formwork construction technology |
CN106049847A (en) * | 2016-07-28 | 2016-10-26 | 嘉兴御创电力科技有限公司 | Bearing type positioning device |
CN107386662A (en) * | 2017-08-29 | 2017-11-24 | 四川省第十五建筑有限公司 | Construction lift tool formula is encorbelmented escape way |
CN110552703A (en) * | 2019-09-27 | 2019-12-10 | 中铁工程装备集团有限公司 | Duct piece mounting system applied to shaft construction |
CN110552703B (en) * | 2019-09-27 | 2021-03-12 | 中铁工程装备集团有限公司 | Duct piece mounting system applied to shaft construction |
CN113718724A (en) * | 2021-08-30 | 2021-11-30 | 长江国际水利水电工程建设有限公司 | Operating platform for replacing arc-shaped gate side water stop rubber and construction method thereof |
CN113718724B (en) * | 2021-08-30 | 2023-08-15 | 长江国际水利水电工程建设有限公司 | Operation platform for replacing arc-shaped gate side water stop rubber and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101672102B (en) | Steel structural overhead ceiling construction platform | |
CN201144515Y (en) | Steel structure high altitude construction platform | |
CN101691191B (en) | Self-climbing tower crane | |
CN201512345U (en) | Multifunctional integrated lifting frame | |
CN105544984A (en) | Large-span steel structure jig frame integrity slip construction process | |
CN107217815B (en) | Resistance to compression, safe type assembled steel construction elevartor shaft | |
CN102080384B (en) | Construction method for mounting lifter on top plate of underground parking garage | |
CN201501750U (en) | Climbing mechanism of self-climbing type tower machine | |
CN103452126A (en) | Light combined hanging box with recyclable baseplate steels and construction technology thereof | |
CN202370234U (en) | Tool type elevator hoistway construction platform | |
CN209456892U (en) | Cable-stayed bridge steel overhangs structure of sidewalk | |
CN205557951U (en) | Novel local cast -in -place assembled coincide building roof boarding | |
CN208280592U (en) | Automatic climbing formula hoistway cylinder mould panel assembly | |
CN103061514A (en) | Long-span steel structure corridor construction method | |
CN203034799U (en) | Tower hoist standard knot bearing overhead support formwork steel platform structure | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN206267519U (en) | A kind of light engine position hydraulic climbing die block system | |
CN105625732A (en) | Supporting-free construction method of ultrahigh overhung steel-structure truss | |
CN201687083U (en) | Suspension type template supporting structure with high-position integrated structure | |
CN102465601B (en) | Method for installing main body frame steel structure of benzene hydrogenation project | |
CN201411926Y (en) | Arc beam hoisting structure | |
CN205602927U (en) | Integral type hauler and leading wheel fixing device | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN207749859U (en) | A kind of trestle support system for structure floor operation in Large-scale Hoisting equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: CHINA BUILDING 8TH ENGINEERING BUREAU CO., LTD. Free format text: FORMER OWNER: GUANGZHOU BRANCH OF CHINA CONSTRUCTION 8TH ENGINEERING BUREAU Effective date: 20090605 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20090605 Address after: No. 388 deep road, Shanghai, Pudong New Area: 200135 Patentee after: China Construction Eighth Engineering Division Co., Ltd. Address before: C1, building 7, building 16#, information road, Tianhe District, Guangdong, Guangzhou Province, China Patentee before: China Construction Eighth Engineering Bureau Guangzhou Branch |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20081105 |