CN102505836A - Guy cable type high-altitude working platform - Google Patents

Guy cable type high-altitude working platform Download PDF

Info

Publication number
CN102505836A
CN102505836A CN2011103242121A CN201110324212A CN102505836A CN 102505836 A CN102505836 A CN 102505836A CN 2011103242121 A CN2011103242121 A CN 2011103242121A CN 201110324212 A CN201110324212 A CN 201110324212A CN 102505836 A CN102505836 A CN 102505836A
Authority
CN
China
Prior art keywords
platform
drag
line
working platform
installation frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103242121A
Other languages
Chinese (zh)
Other versions
CN102505836B (en
Inventor
孙佳
樊玉言
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201110324212.1A priority Critical patent/CN102505836B/en
Publication of CN102505836A publication Critical patent/CN102505836A/en
Application granted granted Critical
Publication of CN102505836B publication Critical patent/CN102505836B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a guy cable type high-altitude working platform, which comprises a plurality of groups of single-lift-point platforms consisting of lifting machines, lifting machine mounting frames, platform standard joints, end part guard rails with supporting legs, reinforcing guy cables, fixing pins of reinforcing guy cables and cable tensioners, wherein the platform standard joints are symmetrically tensioned by penetrating a plurality of reinforcing guy cables through the lifting machine mounting frames in the single-lift-point platforms; pre-tightening force of the guy cables can be adjusted through the cable tensioners; and the groups of single-lift-point platforms are connected through bolts to form the guy cable type high-altitude working platform. According to the invention, by rationally arranging the positions of the lifting machine mounting frames and by using a stay cable structure, the dead weight of the structure is reduced, the rigidity of the platform is effectively improved, and the deformation of the platform in work is reduced in the design of the construction platform with limited number of suspension lift points; meanwhile, the platform has the characteristics of convenience in disassembly, assembly and transportation; and the requirements of construction equipment with limited large-span lifting points.

Description

A kind of drag-line high-rise working platform
Technical field
The present invention relates to drag-line high-rise working platform in the technical field of buildings, it is limited especially to relate to a kind of hoist point, a kind of drag-line high-rise working platform that is used for the eminence construction operation of horizontal direction construction operation face length.
Background technology
Along with the continuous development of mechanization of building operation equipment, diversified constructure scheme is provided to construction, maintenance and the maintenance of large-scale, complicated landmark structure.The eminence construction operation method of traditional high energy consumption, high pollution and high-risk degree is little by little substituted by the high-rise working platform of, safety efficient based on the wire rope suspension type, environmental protection.The wire rope that platform adopts climbing type elevator climbing hitch the to hang down work that fulfils assignment; Its hitch mainly contains lever, the clamp-type of band counterweight and is located at form such as the hanger of structure own; The hitch of special engineering can be in the enterprising line slip of design track, to satisfy requirement of engineering.Such form of construction work is simple in structure because of it, easy construction, duration short, require characteristics such as low to obtain using very widely to operating environment.But there is certain limitation equally in being arranged on of hitch in the practical application, mainly shows on the structure that suspension centre settings such as bridge, TV transmission tower are restricted.Particularly in the care and maintenance construction of bridge; Because the characteristics of the large span of construction operation, few suspension centre; The high-rise working platform rigidity that causes designing can't meet the demands; Thereby limited the development of high-rise working platform in the large span construction application, designed a kind of novel high-rise working platform based on stayed structure for this reason to solve the practical engineering application problem.
Summary of the invention
The present invention provides a kind of and is applicable to that the hoist point installation site is limited, the eminence construction operation platform that horizontal direction construction operation span is big---a kind of drag-line high-rise working platform.
For realizing above-mentioned purpose, the present invention realizes through following technical scheme:
Comprise how group is formed single hoist point platform by steady pin, the turnbuckle of elevator, hoist installation frame, platform standard joint, band leg ends guardrail, reinforcement drag-line, reinforcement drag-line; It is characterized in that: single hoist point platform is strengthened drag-line with many and is passed the hoist installation frame with the tension of platform standard joint symmetry; And the pretightning force that can regulate drag-line through turnbuckle, will organize single hoist point platform more and be connected to form drag-line high-rise working platform through bolt.Hoist installation frame both sides have with platform standard saves the end through bolted montant structure, and external welding is used to install the mounting rod of strengthening drag-line.There is the member structure that elevator is installed described hoist installation frame inside, and bracing piece, and the bottom has supporting leg simultaneously.Said platform standard joint is connected through bolt by guardrail, base plate, and the base plate both sides install additional and are used for fixing the steady pin of strengthening drag-line.
Said band leg ends guardrail is to be used to seal the platform standard joint end that does not connect the hoist installation frame, is connected through the guardrail of bolt with the platform standard joint, has supporting leg simultaneously.
Said reinforcement drag-line can adopt elasticity drag-line forms such as wire rope; The one of which end is fixed on the steady pin of platform standard joint base plate both sides, and the other end is fixed on another adjacent platforms standard knot base plate both sides steady pin after passing the mounting rod that hoist installation frame both sides install additional.
Invention is compared with prior art and had the following advantages and effect: the present invention is through the position and the use suspension cable structure of reasonable Arrangement hoist installation frame; In the operation platform design that the quantity that hangs hoist point is restricted, alleviate dead load, effectively improve the rigidity of platform; Reduce the distortion of platform in the operation; Simultaneously, have the characteristics of dismounting, convenient transportation, greatly satisfy the limited construction equipment needs of large span suspension centre.
Description of drawings
The two hoist point high-rise working platform 3D solid structural representations of Fig. 1 the present invention
The single hoist point high-rise working of Fig. 2 the present invention platform 3D solid structural representation
The concrete connected mode sketch map of drag-line among Fig. 3 the present invention.
The specific embodiment
To form single hoist point platform by steady pin 9, the turnbuckle 10 of elevator 2, hoist installation frame 3, platform standard joint 7, band leg ends guardrail 1, reinforcement drag-line 5, reinforcement drag-line 5 like Fig. 2; Through bolt two single hoist point platforms are connected to form two hoist point drag-line high-rise working platforms, as shown in Figure 1.Many hoist points platform is tiltedly strengthened drag-line 5 with many and is passed hoist installation frame 3 with two adjacent standard knot symmetry tensions, and can regulate the pretightning force of strengthening drag-line 5 through turnbuckle, to meet design requirement.
Hoist installation frame 3 both sides have with platform standard and save 7 ends through bolted montant 8 structures in Fig. 2 structure; Montant installs additional outward and is used to install the mounting rod 4 of strengthening drag-line 5; There is the member structure that elevator is installed inside, and necessary bracing piece, and the bottom has supporting leg simultaneously.
Platform standard joint 7 is connected through bolt by guardrail 11, base plate 6 among Fig. 2, and base plate 6 both sides install additional and are used for fixing the steady pin 9 of strengthening drag-line 5.For making up single suspension centre high-rise working operation platform, connect among Fig. 2 to be followed successively by and be with leg ends guardrail 1, platform standard joint 7, hoist installation frame 3, platform standard joint 7, band leg ends guardrail 1.A hoist installation frame 3 should be used for making up the suspension cable structure form by corresponding two platform standards joint 7.
Fig. 1 is designed to two high-rise working operation platforms that promote, and its connection is followed successively by band leg ends guardrail 1, platform standard joint 7, hoist installation frame 3, platform standard joint 7, platform standard joint 7, hoist installation frame 2, platform standard joint 7, band leg ends guardrail 1.This that is to say that band leg ends guardrail 1 is to be used to seal the platform standard that does not connect hoist installation frame 2 to save 7 ends, saves 7 guardrails 11 through bolt and platform standard and is connected.The reinforcement drag-line 5 used like Fig. 3 platform can adopt elasticity drag-lines such as wire rope; The one of which end is fixed on platform standard and saves on 7 base plates, the 6 both sides steady pins 9, and the other end is fixed on another adjacent platforms standard knot 7 base plates 6 both sides steady pins 9 after passing the mounting rod 4 that hoist installation frame both sides install additional.Strengthen drag-line 5 simultaneously and be provided with turnbuckle 10, install and strengthen behind the drag-line 5 it being carried out the pretension setting.Thereby play the effect that base plate 6 rigidity are strengthened, solve in the actual engineering high-rise working platform promote count few, the problem that platform course of work bending deformation quantity is big.

Claims (6)

1. drag-line high-rise working platform; Comprise how group is formed single hoist point platform by steady pin (9), the turnbuckle (10) of elevator (2), hoist installation frame (3), platform standard joint (7), band leg ends guardrail (1), reinforcement drag-line (5), reinforcement drag-line; It is characterized in that: single hoist point platform is strengthened drag-line (5) with many and is passed hoist installation frame (3) with the tension of platform standard joint (7) symmetry; And can pass through the pretightning force that turnbuckle (10) is regulated drag-line, will organize single hoist point platform more and be connected to form drag-line high-rise working platform through bolt.
2. a kind of drag-line high-rise working platform according to claim 1; It is characterized in that: hoist installation frame (3) both sides have with platform standard saves (7) end through bolted montant structure, and external welding is used for installing the mounting rod (4) of strengthening drag-line (5).
3. a kind of drag-line high-rise working platform according to claim 1 is characterized in that: there is the member structure that elevator is installed described hoist installation frame (2) inside, and bracing piece, and the bottom has supporting leg simultaneously.
4. a kind of drag-line high-rise working platform according to claim 1; It is characterized in that: said platform standard joint (7) is connected through bolt by guardrail (11), base plate (6), and base plate (6) both sides install additional and are used for fixing the steady pin (9) of strengthening drag-line (5).
5. a kind of drag-line high-rise working platform according to claim 1; It is characterized in that: said band leg ends guardrail (1) is to be used for platform standard joint (7) end that sealing does not connect hoist installation frame (2); Be connected through the guardrail (11) of bolt, have supporting leg simultaneously with platform standard joint (7).
6. a kind of drag-line high-rise working platform according to claim 1; It is characterized in that: said reinforcement drag-line (5) can adopt elasticity drag-line forms such as wire rope; The one of which end is fixed on platform standard joint (7) base plate (6) both sides steady pins (9), and the other end is fixed on another adjacent platforms standard knot (7) base plate (6) both sides steady pins (9) after passing the mounting rod (4) that hoist installation frame (2) both sides install additional.
CN201110324212.1A 2011-10-24 2011-10-24 Guy cable type high-altitude working platform Expired - Fee Related CN102505836B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110324212.1A CN102505836B (en) 2011-10-24 2011-10-24 Guy cable type high-altitude working platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110324212.1A CN102505836B (en) 2011-10-24 2011-10-24 Guy cable type high-altitude working platform

Publications (2)

Publication Number Publication Date
CN102505836A true CN102505836A (en) 2012-06-20
CN102505836B CN102505836B (en) 2014-02-19

Family

ID=46217964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110324212.1A Expired - Fee Related CN102505836B (en) 2011-10-24 2011-10-24 Guy cable type high-altitude working platform

Country Status (1)

Country Link
CN (1) CN102505836B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741941A (en) * 2014-01-16 2014-04-23 江苏博宇建筑工程设备科技有限公司 Large-span corridor basket

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0161388A1 (en) * 1984-02-21 1985-11-21 Peter Gasparini Work platform
SU1260483A1 (en) * 1985-01-07 1986-09-30 Трест "Оргтехстрой" Главмурманскстроя Suspension cradle
CN200955259Y (en) * 2006-09-21 2007-10-03 罗祥彬 Funnel-derrick moving type construction apparatus
CN201144515Y (en) * 2008-01-04 2008-11-05 中国建筑第八工程局广州分公司 Steel structure high altitude construction platform
CN201224993Y (en) * 2007-11-27 2009-04-22 吴杰 Elevating rack body for chimney and well path inner wall constructions
CN201567779U (en) * 2009-12-18 2010-09-01 上海市机械施工有限公司 Flexible cable composite gang board
CN201786010U (en) * 2010-09-21 2011-04-06 中国十五冶金建设有限公司 Elevating platform for construction use
CN102031863A (en) * 2010-12-01 2011-04-27 沈阳建筑大学 Three-suspension-point combined L-shaped high work platform
CN102155089A (en) * 2011-01-30 2011-08-17 中建三局建设工程股份有限公司 Self-jacking construction platform integrating vertical transportation equipment and mold base

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0161388A1 (en) * 1984-02-21 1985-11-21 Peter Gasparini Work platform
SU1260483A1 (en) * 1985-01-07 1986-09-30 Трест "Оргтехстрой" Главмурманскстроя Suspension cradle
CN200955259Y (en) * 2006-09-21 2007-10-03 罗祥彬 Funnel-derrick moving type construction apparatus
CN201224993Y (en) * 2007-11-27 2009-04-22 吴杰 Elevating rack body for chimney and well path inner wall constructions
CN201144515Y (en) * 2008-01-04 2008-11-05 中国建筑第八工程局广州分公司 Steel structure high altitude construction platform
CN201567779U (en) * 2009-12-18 2010-09-01 上海市机械施工有限公司 Flexible cable composite gang board
CN201786010U (en) * 2010-09-21 2011-04-06 中国十五冶金建设有限公司 Elevating platform for construction use
CN102031863A (en) * 2010-12-01 2011-04-27 沈阳建筑大学 Three-suspension-point combined L-shaped high work platform
CN102155089A (en) * 2011-01-30 2011-08-17 中建三局建设工程股份有限公司 Self-jacking construction platform integrating vertical transportation equipment and mold base

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741941A (en) * 2014-01-16 2014-04-23 江苏博宇建筑工程设备科技有限公司 Large-span corridor basket
CN103741941B (en) * 2014-01-16 2016-02-10 江苏博宇建筑工程设备科技有限公司 Large-span corridor basket

Also Published As

Publication number Publication date
CN102505836B (en) 2014-02-19

Similar Documents

Publication Publication Date Title
CN101672102B (en) Steel structural overhead ceiling construction platform
CN201458596U (en) Crane with self-dismounting device
CN201221193Y (en) High altitude packway ceiling construction operating platform
CN202706503U (en) Electric lifting discharging platform for main building construction
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN106698208B (en) A kind of hanging device and hanging method for being transported outside high-rise building
CN105401714A (en) Attachment type lifting scaffold and lifting method
CN105442458A (en) Method for hanging and installing stay cable of cable-stayed bridge special-shaped tower pillar
CN101775896A (en) Method for installing pipeline scaffold of steel roof equipment and rigid suspended scaffold
CN205100531U (en) Lift scaffold support body assembly
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN108004931A (en) Using the method for mixing drag-line construction steel reinforced concrete combination beam
CN100476146C (en) High altitude placing steel pole inner concrete operating platform frame
CN209081290U (en) Bailey truss pylon and distributing earth anchor CABLEWAY ERECTION SYSTEM that can be traversing
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN102505836B (en) Guy cable type high-altitude working platform
CN101695984B (en) Assembly method and assembly lifting appliance of vertical beam and horizontal beam under arc of midheight deck steel pipe concrete arch bridge
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN204112721U (en) The huge post climbing apparatus of a kind of track attaching superelevation support body steel reinforced concrete
CN203461720U (en) Simple cantilever hoisting machine
CN201598570U (en) Cable-stayed bridge cableway erecting equipment
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN208934380U (en) A kind of Excitations for Long Span Suspension operating platform
CN208122299U (en) A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219

Termination date: 20171024