CN102031863A - Three-suspension-point combined L-shaped high work platform - Google Patents
Three-suspension-point combined L-shaped high work platform Download PDFInfo
- Publication number
- CN102031863A CN102031863A CN 201010568514 CN201010568514A CN102031863A CN 102031863 A CN102031863 A CN 102031863A CN 201010568514 CN201010568514 CN 201010568514 CN 201010568514 A CN201010568514 A CN 201010568514A CN 102031863 A CN102031863 A CN 102031863A
- Authority
- CN
- China
- Prior art keywords
- platform
- standard
- standard knot
- bent angle
- knot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention relates to a high work platform, in particular to a three-suspension-point combined L-shaped high work platform which is suitable for large-scale industrial building construction. The three-suspension-point combined L-shaped high work platform comprises common elevator installing frames and standard-knot platforms, wherein each standard-knot platform comprises two side guardrails and a bottom plate, the bottom plate is connected to the bottoms of the two side guardrails, two L-shaped edges respectively comprise a standard-knot platform A and a standard-knot platform B, the corners of the two edges are in butt joint with a corner platform, ports of the standard-knot platform A and the standard-knot platform B are respectively provided with a common elevator installing frame A and a common elevator installing frame B, and a heightening type elevator installing frame is arranged in the middle of the corner platform or into the standard-knot platform A or the standard-knot platform B. The high work platform is convenient to construction personnel to pass and operate, is convenient to assemble , disassemble, store and transport at the same time, forms a three-suspension-point elevating mode, has low cost and greatly satisfies the requirements of profile conversion surfaces of large-scale industrial buildings.
Description
Technical field
The present invention relates to a kind of high-rise working platform, especially relate to a kind of three suspension centre combined type L type high-rise working platforms that are applicable to the large scale industry building operations.
Background technology
[0002] in recent years, the engineer operation of accompanying with it along with the fast development of large scale industry building day by day increases, the for example application of bridge bridge pier, chimney stalk, blade of wind-driven generator and upkeep operation etc., this all needs the job platform that matches with it, but domestic existing high-rise working platform major part also only is confined to common rectangle job platform, can not adapt to the requirement on existing building construction surface.Even used the special-shaped platform of whole plain type in some specific occasion, but consider that aspects such as the dismounting of monolithic platform, transportation, storage are very inconvenient, and the recycling that can not well circulate, be difficult to be promoted widely.The fitness and the functional performance that how to improve job platform and large scale industry building operations operation surface are the places of the key of aerial work basket development, therefore design a kind of novel high-rise working platform and are very important and accord with the demands of the market.
Summary of the invention
The invention provides a kind of large scale industry building operations environment that is applicable to, the convenient construction personnel pass through and operation, also easy disassembly simultaneously, storage and transportation, and formed the hoisting way of three suspension centres, be a kind of preferably three suspension centre combined type L type high-rise working platforms of a kind of safety and stability.
The technical scheme of technical solution problem of the present invention to achieve these goals is:
A kind of three suspension centre combined type L type high-rise working platforms, comprise: general expression hoist installation frame and standard knot platform, the standard knot platform is made up of guardrails of both sides and the base plate that is connected in the guardrails of both sides bottom, and it is: two limits of L type are made of standard knot platform A and standard knot platform B respectively; Article two, the corner on limit is connected as a single entity by docking with the bent angle platform, and the port of standard knot platform A and standard knot platform B is respectively equipped with general expression hoist installation frame A and general expression hoist installation frame B; Increasing the formula hoist installation is set up in bent angle platform middle part or is located in the standard knot platform A or is located in the standard knot platform B.
Described bent angle platform is combined by outer guardrail, interior guardrail and bent angle base plate.
The inside and outside guardrail of described bent angle platform is the framework that shaped steel connects to form.
The inside and outside guardrail of described bent angle platform be circular arc type or U type or linear pattern or or two more than or equal to any one shape in the seamed edges combination at 90 ° of angles, and the shape of the shape of described bent angle base plate and inside and outside guardrail is adaptive.
The described formula hoist installation frame of increasing is the framework that shaped steel connects to form.
The present invention compared with prior art has following advantage and effect:
The present invention obtains different platform forms owing to the angle that adopts the bent angle platform is different, and adopt two general expression installing racks and a hoisting way of increasing three suspension centres of formula installing rack, adopt the standard knot platform and the adjusting of different length to increase the demand that formula installing rack placement location adapts to different constructions surface, in dismounting, storage and transportation aspect are all convenient, help to improve efficiency of construction, guarantee constructor's safety, cost of the present invention is low, satisfy large scale industry to the utmost and build the requirement of special-shaped working face, particularly by after it being carried out standardization and seriation design, carry out reasonable combination again, be convenient to satisfy the construction requirement of the different different objects of shape and size.
Description of drawings
With reference to accompanying drawing, concrete structure of the present invention is described in detail as follows:
Fig. 1 is the three-dimensional structure schematic diagram of main body of the present invention;
Fig. 2 is a kind of embodiment schematic diagram of bent angle platform structure of the present invention;
Fig. 3 is a kind of embodiment schematic diagram of bent angle platform floor structure of the present invention.
Major part among the figure: increase formula hoist installation frame 1, bent angle platform 2, standard knot platform A 3, general expression hoist installation frame A 4, interior guardrail 5, standard knot platform B 6, general expression hoist installation frame B 7, bent angle base plate 8, outer guardrail 9, long bent angle steel 10, bottom strut 11, short bending angle steel 12.
The specific embodiment
Below in conjunction with specific embodiment the present invention is further elaborated, but protection scope of the present invention is not limited by specific embodiment, is as the criterion with claims.In addition, with under the prerequisite of technical solution of the present invention, any change or change that those of ordinary skills that the present invention did are realized easily all will fall within the claim scope of the present invention.
Embodiment 1:
A kind of three suspension centre combined type L type high-rise working platforms shown in Fig. 1,2 and 3, comprise: general expression hoist installation frame and standard knot platform, the standard knot platform is made up of guardrails of both sides and the base plate that is connected in the guardrails of both sides bottom, and two limits of its L type are made of standard knot platform A 3 and standard knot platform B 6 respectively; Article two, the corner on limit is linked as L type high-rise working platform by docking with bent angle platform 2 that outer guardrail 9, interior guardrail 5 and bent angle base plate 8 combine, the inside and outside guardrail 5,9 that is bent angle platform 2 is that the angle of two seamed edges combination is the shape at 135 ° of angles and standard knot platform A 3 and standard knot platform B6 and is combined into L type high-rise working platform, and the shape of the shape of bent angle base plate 8 and inside and outside guardrail 5,9 is adaptive.Bent angle platform 2 both sides are furnished with the assembling standard connecting hole that links to each other with standard knot platform B6 with standard knot platform A3, and the port of standard knot platform A3 and standard knot platform B6 is respectively equipped with general expression hoist installation frame A4 and general expression hoist installation frame B7; Increase formula hoist installation frame 1 and be located at bent angle platform 2 middle parts, increase formula hoist installation frame 1 and inside and outside guardrail 5,9 is the framework that shaped steel is welded to form.The bent angle base plate is welded by the bent angle base plate 8 of bottom strut 11, long bent angle steel 10, short bending angle steel 12 and diamond plate, is provided with the bolt hole that cooperates with inside and outside guardrail 5,9 at long and short bent angle steel 10,12.
Embodiment 2:
The inside and outside guardrail 5,9 of bent angle platform 2 is combined into L type high-rise working platform for circular arc type and standard knot platform A3 and standard knot platform B6, increases formula hoist installation frame 1 to be located in the standard knot platform A3, and other repeats no more with embodiment 1.
Embodiment 3:
The inside and outside guardrail 5,9 of bent angle platform 2 is combined into L type high-rise working platform for U type and standard knot platform A3 and standard knot platform B6, increases formula hoist installation frame 1 to be located in the standard knot platform B6, and other repeats no more with embodiment 1.
When the present invention specifically uses, carrying out three kinds of settings according to the distribution situation of load to increasing formula hoist installation frame 1, is stressed even situation as above-mentioned embodiment 1.Embodiment 2 is the situation of the main bearing load of standard knot platform A3.Embodiment 3 is standard knot platform B6, the situation of main bearing load.The present invention chooses suitable standard knot land lengths according to the needs of construction operation; Obtain different platform forms by angle, the shape of regulating the bent angle platform.
In addition, can also a plurality of L type high-rise working platforms of the present invention be used in combination according to the needs of construction operation in use, be combined into square high-rise working platform as two L type high-rise working platforms.
Claims (5)
1. suspension centre combined type L type high-rise working platform, comprise: general expression hoist installation frame, standard knot platform, the standard knot platform is made up of guardrails of both sides and the base plate that is connected in the guardrails of both sides bottom, and it is characterized in that: two limits of L type are respectively by standard knot platform A(3) and standard knot platform B(6) constitute; Article two, the corner on limit is connected as a single entity by docking with bent angle platform (2), standard knot platform A(3) and standard knot platform B(6) the port be respectively equipped with general expression hoist installation frame A(4) and general expression hoist installation frame B(7); Increasing formula hoist installation frame (1) is located at bent angle platform (2) middle part or is located at standard knot platform A(3) in or be located at standard knot platform B(6) in.
2. a kind of three suspension centre combined type L type high-rise working platforms according to claim 1 is characterized in that described bent angle platform (2) is combined by outer guardrail (9), interior guardrail (5) and bent angle base plate (8).
3. a kind of three suspension centre combined type L type high-rise working platforms according to claim 2 is characterized in that the framework that the inside and outside guardrail (5,9) of described bent angle platform (2) connects to form for shaped steel.
4. a kind of three suspension centre combined type L type high-rise working platforms according to claim 2, the inside and outside guardrail (5,9) that it is characterized in that described bent angle platform (2) for circular arc type or U type or two more than or equal to any one shape in the seamed edges combination at 90 ° of angles, and the shape of the shape of described bent angle base plate (8) and inside and outside guardrail (5,9) is adaptive.
5. a kind of three suspension centre combined type L type high-rise working platforms according to claim 1 is characterized in that the described framework that formula hoist installation frame (1) connects to form for shaped steel of increasing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010568514 CN102031863A (en) | 2010-12-01 | 2010-12-01 | Three-suspension-point combined L-shaped high work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010568514 CN102031863A (en) | 2010-12-01 | 2010-12-01 | Three-suspension-point combined L-shaped high work platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102031863A true CN102031863A (en) | 2011-04-27 |
Family
ID=43885258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010568514 Pending CN102031863A (en) | 2010-12-01 | 2010-12-01 | Three-suspension-point combined L-shaped high work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102031863A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505836A (en) * | 2011-10-24 | 2012-06-20 | 沈阳建筑大学 | Guy cable type high-altitude working platform |
CN102583199A (en) * | 2012-02-16 | 2012-07-18 | 毛坤龙 | Movable elevator mounting frame |
CN105715029A (en) * | 2016-02-01 | 2016-06-29 | 重庆瑜煌电力设备制造有限公司 | Anti-fall steel angle tower |
CN108431346A (en) * | 2016-01-15 | 2018-08-21 | 日综产业株式会社 | Nacelle device |
CN109898824A (en) * | 2019-03-30 | 2019-06-18 | 中国二十二冶集团有限公司 | Round Interconnected silos decoration of exterior wall crosshead erection method |
CN110439255A (en) * | 2019-07-03 | 2019-11-12 | 安徽长青建筑制品有限公司 | A kind of scaffold is warned device with corner |
CN112324124A (en) * | 2020-12-03 | 2021-02-05 | 新乡市英昊建工机械有限公司 | Multi-purpose polygonal construction hanging basket |
CN115075539A (en) * | 2022-07-07 | 2022-09-20 | 中建二局第三建筑工程有限公司 | Hanging basket system suitable for building local convex structure |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1205591A (en) * | 1967-04-17 | 1970-09-16 | Stephens And Carter Ltd | Sectional working platforms or stagings |
CN201593299U (en) * | 2009-12-08 | 2010-09-29 | 无锡华科机械设备有限公司 | Hanging basket for construction engineering |
-
2010
- 2010-12-01 CN CN 201010568514 patent/CN102031863A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1205591A (en) * | 1967-04-17 | 1970-09-16 | Stephens And Carter Ltd | Sectional working platforms or stagings |
CN201593299U (en) * | 2009-12-08 | 2010-09-29 | 无锡华科机械设备有限公司 | Hanging basket for construction engineering |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102505836A (en) * | 2011-10-24 | 2012-06-20 | 沈阳建筑大学 | Guy cable type high-altitude working platform |
CN102505836B (en) * | 2011-10-24 | 2014-02-19 | 沈阳建筑大学 | Guy cable type high-altitude working platform |
CN102583199A (en) * | 2012-02-16 | 2012-07-18 | 毛坤龙 | Movable elevator mounting frame |
CN108431346A (en) * | 2016-01-15 | 2018-08-21 | 日综产业株式会社 | Nacelle device |
CN108431346B (en) * | 2016-01-15 | 2020-07-07 | 日综产业株式会社 | Hanging basket device |
CN105715029A (en) * | 2016-02-01 | 2016-06-29 | 重庆瑜煌电力设备制造有限公司 | Anti-fall steel angle tower |
CN109898824A (en) * | 2019-03-30 | 2019-06-18 | 中国二十二冶集团有限公司 | Round Interconnected silos decoration of exterior wall crosshead erection method |
CN109898824B (en) * | 2019-03-30 | 2024-02-27 | 中国二十二冶集团有限公司 | Method for erecting operation frame for decoration of outer wall of circular conjoined silo |
CN110439255A (en) * | 2019-07-03 | 2019-11-12 | 安徽长青建筑制品有限公司 | A kind of scaffold is warned device with corner |
CN112324124A (en) * | 2020-12-03 | 2021-02-05 | 新乡市英昊建工机械有限公司 | Multi-purpose polygonal construction hanging basket |
CN115075539A (en) * | 2022-07-07 | 2022-09-20 | 中建二局第三建筑工程有限公司 | Hanging basket system suitable for building local convex structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102031863A (en) | Three-suspension-point combined L-shaped high work platform | |
CN202400745U (en) | Trusswork portal crane | |
CN201753244U (en) | Multipurpose micro-elevator for decoration | |
CN102102437A (en) | Combined U-shaped elevation hanging work platform | |
CN205222514U (en) | Novel gantry crane portal | |
CN201512863U (en) | Building vertical column | |
CN204456807U (en) | Composite extendible elevator hoistway construction platform | |
CN206831058U (en) | Modularization channel steel base | |
CN202577926U (en) | Fixed operating platform for elevator shaft | |
CN206336557U (en) | A kind of electric pole transportation pallet suitable for fork truck | |
CN201850751U (en) | Combined U-shaped high-altitude suspension operation platform | |
CN210393455U (en) | Independent upper trolley for hoisting machinery | |
CN202693110U (en) | Novel combined reinforced concrete weighing platform | |
CN201679271U (en) | Power triangular tower | |
CN214832651U (en) | Loading and unloading platform of sliding pile driver | |
CN201473239U (en) | Simple carloader | |
CN213539653U (en) | Truss type scaffold | |
CN204873441U (en) | Novel big plate -girder of boiler hoist and mount lug | |
CN205222483U (en) | Gate type portal gantry | |
CN207986485U (en) | A kind of superimposed sheet hanger | |
CN204435817U (en) | Stair shaft hanging operation bracing frame | |
CN218090361U (en) | Keel main material, keel structure comprising keel main material and packaging material assembly | |
CN202519809U (en) | Truss concrete shear wall body for housing | |
CN202380406U (en) | Operating platform for changing bridge pad | |
CN202787988U (en) | Assembled-type steel bar machining shed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110427 |