CN109898824B - Method for erecting operation frame for decoration of outer wall of circular conjoined silo - Google Patents

Method for erecting operation frame for decoration of outer wall of circular conjoined silo Download PDF

Info

Publication number
CN109898824B
CN109898824B CN201910253609.2A CN201910253609A CN109898824B CN 109898824 B CN109898824 B CN 109898824B CN 201910253609 A CN201910253609 A CN 201910253609A CN 109898824 B CN109898824 B CN 109898824B
Authority
CN
China
Prior art keywords
hanging basket
isosceles trapezoid
construction
wall
silo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910253609.2A
Other languages
Chinese (zh)
Other versions
CN109898824A (en
Inventor
单杭清
孙博涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910253609.2A priority Critical patent/CN109898824B/en
Publication of CN109898824A publication Critical patent/CN109898824A/en
Application granted granted Critical
Publication of CN109898824B publication Critical patent/CN109898824B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/51Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture specially adapted for storing agricultural or horticultural products

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a method for erecting an operation frame for decorating an outer wall of a circular conjoined silo, which comprises a traditional hanging basket, wherein an isosceles trapezoid auxiliary hanging basket is additionally arranged on the traditional hanging basket; the front end of the isosceles trapezoid auxiliary hanging basket is inserted into a V-shaped area between two adjacent silos; the rear end of the isosceles trapezoid auxiliary hanging basket is connected with the traditional hanging basket through a fixing device, the front end of the isosceles trapezoid auxiliary hanging basket is provided with a lifting lug, the lifting lug is connected with the lower part of a chain block, and the upper part of the chain block is fixed on a cabin top floor slab through a lifting hole. The method for erecting the operation frame for decorating the outer wall of the circular conjoined silo effectively solves the construction difficulty of the decoration engineering of the outer wall of the grouped cylindrical silo body structure, ensures the construction quality, simultaneously facilitates the alternate construction and the flow construction, saves the construction cost and improves the construction efficiency.

Description

Method for erecting operation frame for decoration of outer wall of circular conjoined silo
Technical Field
The invention relates to a building construction method, in particular to a method for erecting an operation frame for decorating an outer wall of a circular conjoined silo.
Background
With the steady promotion of social development and environmental protection careers in China, at present, the requirements of various industrial enterprises on the appearance quality of various buildings (structures) in respective factories are higher and higher, the aesthetic property is an indispensable aspect, and particularly for high-rise structures such as silos, the appearance is attractive, the enterprise image can be effectively improved, the environment can be beautified, and visual enjoyment can be provided for people. Therefore, no matter new construction or modification (expansion) construction engineering is adopted, the design of the outer wall decoration is added to the structures in the same way, and a better effect is obtained.
When the outer wall of the structures is decorated, the scaffold in the construction stage of the structure is removed in general, and the conventional hanging basket is often selected as a construction operation platform for construction. However, for the grouped cylindrical silo structure, if the traditional hanging basket method is used, the construction operation cannot be performed because the V-shaped bent position between two silos is far away from the hanging basket, so that the construction requirement cannot be met. If the traditional scaffold is used for construction, the construction method not only occupies the working face of other professional working procedures, but also takes a great deal of labor and time for building and dismantling the scaffold, and the economic benefit and the construction period benefit are not ideal.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides the method for erecting the operation frame for decorating the outer wall of the circular conjoined silo, which has the advantages of improving the construction efficiency, saving the manpower, along with safety and reliability.
The technical scheme adopted by the invention is as follows:
the method for erecting the operation frame for decorating the outer wall of the circular conjoined silo comprises the steps of arranging a traditional hanging basket, and arranging an isosceles trapezoid auxiliary hanging basket on the traditional hanging basket; the front end of the isosceles trapezoid auxiliary hanging basket is inserted into a V-shaped area between two adjacent silos; the rear end of the isosceles trapezoid auxiliary hanging basket is connected with the traditional hanging basket through a fixing device, the front end of the isosceles trapezoid auxiliary hanging basket is provided with a lifting lug, the lifting lug is connected with the lower part of a chain block, and the upper part of the chain block is fixed on a cabin top floor slab through a lifting hole.
The front end width of the isosceles trapezoid auxiliary hanging basket is smaller than the rear end width.
The lifting lug is arranged in the middle of the front end of the isosceles trapezoid auxiliary hanging basket.
The fixing device is a U-shaped fixing hook, the opening end of the U-shaped fixing hook is downward, and the front end of the U-shaped fixing hook is fixedly connected with the rear end of the isosceles trapezoid auxiliary hanging basket; the rear end of the U-shaped fixed hook is movably connected with the traditional hanging basket.
The rear end of the U-shaped fixed hook is hung on a traditional hanging basket.
Compared with the prior art, the invention has the beneficial effects that:
the method for erecting the operation frame for decorating the outer wall of the circular conjoined silo effectively solves the construction difficulty of the decoration engineering of the outer wall of the grouped cylindrical silo body structure, ensures the construction quality, simultaneously facilitates the alternate construction and the flow construction, saves the construction cost and improves the construction efficiency.
The method for erecting the operation frame for decorating the outer wall of the circular conjoined silo omits the steps of erecting and dismantling the traditional scaffold, improves the construction efficiency, saves manpower and materials, does not occupy the construction surface of other professional procedures, and has remarkable social benefit.
Drawings
FIG. 1 is a schematic top view structure of a conventional hanging basket of the method for erecting an operation frame for decorating an outer wall of a circular conjoined silo, wherein an isosceles trapezoid auxiliary hanging basket is additionally arranged on the conventional hanging basket;
FIG. 2 is a schematic cross-sectional view of A-A of FIG. 1;
fig. 3 is a schematic top view structure of an isosceles trapezoid auxiliary hanging basket of the method for erecting the operation frame for decorating the outer wall of the circular conjoined silo;
fig. 4 is a schematic diagram of an installation structure of an isosceles trapezoid auxiliary hanging basket of the operation frame setting method for decoration of the outer wall of the circular conjoined silo;
FIG. 5 is a schematic structural view of a fixing device of the operation frame setting method for decoration of the outer wall of the circular conjoined silo;
FIG. 6 is a schematic view of the cross-sectional structure 1-1 of FIG. 5.
The main component symbols in the drawings illustrate:
in the figure:
1. traditional hanging basket 2 and isosceles trapezoid auxiliary hanging basket
3. Silo 4, lifting lug
5. Chain block 6, warehouse roof floor board
7. A fixing device.
Detailed Description
The invention is described in detail below with reference to the attached drawings and examples:
1-6, a method for erecting an operation frame for decorating an outer wall of a circular conjoined silo comprises the steps of arranging a traditional hanging basket 1, and arranging an isosceles trapezoid auxiliary hanging basket 2 on the traditional hanging basket 1; the front end of the isosceles trapezoid auxiliary hanging basket 2 is inserted into a V-shaped area between two adjacent silos 3; the rear end of the isosceles trapezoid auxiliary hanging basket is connected with the traditional hanging basket 1 through a fixing device 7, the front end of the isosceles trapezoid auxiliary hanging basket is provided with a lifting lug 4, the lifting lug 4 is connected with the lower part of a chain block 5, and the upper part of the chain block 5 is fixed on a cabin roof building board 6 through a lifting hole.
The front end width of the isosceles trapezoid auxiliary hanging basket is smaller than the rear end width.
The lifting lug is arranged in the middle of the front end of the isosceles trapezoid auxiliary hanging basket.
The fixing device is a U-shaped fixing hook, the opening end of the U-shaped fixing hook is downward, and the front end of the U-shaped fixing hook is fixedly connected with the rear end of the isosceles trapezoid auxiliary hanging basket; the rear end of the U-shaped fixed hook is movably connected with the traditional hanging basket.
The rear end of the U-shaped fixed hook is hung on a traditional hanging basket.
The method for erecting the operation frame for decorating the outer wall of the circular conjoined silo effectively solves the construction difficulty of the decoration engineering of the outer wall of the grouped cylindrical silo body structure, ensures the construction quality, simultaneously facilitates the alternate construction and the flow construction, saves the construction cost and improves the construction efficiency.
The method for erecting the operation frame for decorating the outer wall of the circular conjoined silo omits the steps of erecting and dismantling the traditional scaffold, improves the construction efficiency, saves manpower and materials, does not occupy the construction surface of other professional procedures, and has remarkable social benefit.
The above description is only of the preferred embodiment of the present invention, and is not intended to limit the structure of the present invention in any way. Any simple modification, equivalent variation and modification of the above embodiments according to the technical substance of the present invention fall within the technical scope of the present invention.

Claims (1)

1. The method for erecting the operation frame for decorating the outer wall of the circular conjoined silo comprises a traditional hanging basket, and is characterized in that an isosceles trapezoid auxiliary hanging basket is additionally arranged on the traditional hanging basket; the front end of the isosceles trapezoid auxiliary hanging basket is inserted into a V-shaped area between two adjacent silos; the rear end of the isosceles trapezoid auxiliary hanging basket is connected with the traditional hanging basket through a fixing device, the front end of the isosceles trapezoid auxiliary hanging basket is provided with a lifting lug, the lifting lug is connected with the lower part of a chain block, and the upper part of the chain block is fixed on a cabin top floor slab through a lifting hole; the front end width of the isosceles trapezoid auxiliary hanging basket is smaller than the rear end width;
the lifting lug is arranged in the middle of the front end of the isosceles trapezoid auxiliary hanging basket;
the fixing device is a U-shaped fixing hook, the opening end of the U-shaped fixing hook is downward, and the front end of the U-shaped fixing hook is fixedly connected with the rear end of the isosceles trapezoid auxiliary hanging basket; the rear end of the U-shaped fixed hook is movably connected with the traditional hanging basket; the rear end of the U-shaped fixed hook is hung on a traditional hanging basket.
CN201910253609.2A 2019-03-30 2019-03-30 Method for erecting operation frame for decoration of outer wall of circular conjoined silo Active CN109898824B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910253609.2A CN109898824B (en) 2019-03-30 2019-03-30 Method for erecting operation frame for decoration of outer wall of circular conjoined silo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910253609.2A CN109898824B (en) 2019-03-30 2019-03-30 Method for erecting operation frame for decoration of outer wall of circular conjoined silo

Publications (2)

Publication Number Publication Date
CN109898824A CN109898824A (en) 2019-06-18
CN109898824B true CN109898824B (en) 2024-02-27

Family

ID=66955107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910253609.2A Active CN109898824B (en) 2019-03-30 2019-03-30 Method for erecting operation frame for decoration of outer wall of circular conjoined silo

Country Status (1)

Country Link
CN (1) CN109898824B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201593299U (en) * 2009-12-08 2010-09-29 无锡华科机械设备有限公司 Hanging basket for construction engineering
CN201647228U (en) * 2010-02-11 2010-11-24 周青青 Folding type hanging basket
CN102031863A (en) * 2010-12-01 2011-04-27 沈阳建筑大学 Three-suspension-point combined L-shaped high work platform
CN104878933A (en) * 2015-06-16 2015-09-02 中国二十二冶集团有限公司 Construction method for setting up over roof curtain wall hanging basket support scaffolding
CN107532428A (en) * 2014-11-21 2018-01-02 快梁公司 Scaffold device
CN208137403U (en) * 2018-03-30 2018-11-23 青建国际集团有限公司 A kind of construction hanging basket
CN210239094U (en) * 2019-03-30 2020-04-03 中国二十二冶集团有限公司 Hanging basket device for decorating outer wall of grouped cylindrical silo

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201593299U (en) * 2009-12-08 2010-09-29 无锡华科机械设备有限公司 Hanging basket for construction engineering
CN201647228U (en) * 2010-02-11 2010-11-24 周青青 Folding type hanging basket
CN102031863A (en) * 2010-12-01 2011-04-27 沈阳建筑大学 Three-suspension-point combined L-shaped high work platform
CN107532428A (en) * 2014-11-21 2018-01-02 快梁公司 Scaffold device
CN104878933A (en) * 2015-06-16 2015-09-02 中国二十二冶集团有限公司 Construction method for setting up over roof curtain wall hanging basket support scaffolding
CN208137403U (en) * 2018-03-30 2018-11-23 青建国际集团有限公司 A kind of construction hanging basket
CN210239094U (en) * 2019-03-30 2020-04-03 中国二十二冶集团有限公司 Hanging basket device for decorating outer wall of grouped cylindrical silo

Also Published As

Publication number Publication date
CN109898824A (en) 2019-06-18

Similar Documents

Publication Publication Date Title
CN202899395U (en) Suspension type detachable aluminum honeycomb composite stone plate ceiling installation structure
CN105525745A (en) Bamboo joint type exterior facade super-high building structure attached climbing frame and lifting method
CN104499615A (en) Double-layer open-type perforated aluminium panel curtain wall system
CN109898824B (en) Method for erecting operation frame for decoration of outer wall of circular conjoined silo
CN204850402U (en) Outer facade super high -rise building structure of bamboo joint shape is adhered to formula and is climbed frame
CN204326330U (en) Double-layer Opening Pierced Aluminum Plank curtain wall system
CN210239094U (en) Hanging basket device for decorating outer wall of grouped cylindrical silo
CN204899108U (en) Node structure is hung futilely to marble
CN204059718U (en) Openable metal sheet furred ceiling
CN202450764U (en) Support for mounting hanging basket on single-sided gable
CN202465215U (en) Hanging basket mounting support for outer facade of building with slope roof
CN202467147U (en) Hanging basket mounting bracket for building outer vertical face with two side gables
CN203361434U (en) Large-scale suspended ceiling structure with thin-wall metal plate
CN207776395U (en) A kind of driving working at height maintenance dedicated platform
CN212129994U (en) Rope protector for high-altitude operation
CN210887736U (en) Ceiling assembled metal keel structure
CN203201123U (en) Device capable of enabling worker to carry out ceiling suspending engineering nail hole coating work on ground
CN209723565U (en) Attached tower crane attachment construction operation platform outside a kind of steel-core wall structure
CN201232328Y (en) Prefabricating combined inside and outside wall safety ceramic tile
CN203347055U (en) Building material curtain wall mounting fastener
CN108081448B (en) Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column
CN105084207B (en) One kind can assembled mobile haulage equipment
CN204185121U (en) One can assembled mobile haulage equipment
CN215406797U (en) Suspension type facade pottery tile curtain wall construction
CN202012173U (en) Decorating framework for ceramic tiles

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant