CN202467147U - Hanging basket mounting bracket for building outer vertical face with two side gables - Google Patents
Hanging basket mounting bracket for building outer vertical face with two side gables Download PDFInfo
- Publication number
- CN202467147U CN202467147U CN 201220080549 CN201220080549U CN202467147U CN 202467147 U CN202467147 U CN 202467147U CN 201220080549 CN201220080549 CN 201220080549 CN 201220080549 U CN201220080549 U CN 201220080549U CN 202467147 U CN202467147 U CN 202467147U
- Authority
- CN
- China
- Prior art keywords
- gable
- mounting bracket
- hanging basket
- suspension rod
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model provides a hanging basket mounting bracket for a building outer vertical face with two side gables. The mounting bracket comprises a transverse suspender, a vertical supporting rod, a steel bar sleeve and a steel wire rope; the transverse suspender presses a low gable, one end of the transverse suspender extends out of the low gable, the other end of the transverse suspender penetrates through the steel bar sleeve and is inserted into a concave hole formed in a high gable, and the steel bar sleeve is fixed on a concrete crossbeam through the steel wire rope; and the bottom of the vertical supporting rod is fixed on the transverse suspender and arranged right above the low gable. According to the mounting bracket, one end of the transverse suspender extends out of the low gable and the other end of the transverse suspender penetrates through the steel bar sleeve and is inserted into the concave hole formed in the high gable; even if an outer scaffold is detached, outer wall heat preservation and decoration construction of a building outer vertical face with the two side gables and a slope roof can be performed by hanging a hanging basket on the transverse suspender through the steel wire rope; and the structure can be used as a uniform structure for mounting a building outer vertical face hanging basket, and the mounting bracket has the advantages of simple and firm structure and low cost.
Description
Technical field
The utility model relates to hanging basket mounting bracket used in a kind of decorating outer wall of building decoration construction, relates in particular to a kind of outer side elevation hanging basket mounting bracket of building with both sides gable.
Background technology
The building operations hanging basket is widely applied in the decorations construction of facade, and the hanging basket mounting bracket is the basis that hanging basket is installed.The hanging basket mounting bracket comprises horizontal suspension rod and vertical support bar, and laterally the front and back supporting leg of suspension rod all is mounted on the roof panel of plane.
Yet in the building of reality, not all building roof all is the plane roofing, has the roofing of part building to be the gradient, and the external outer eaves of the leading edge of pitched roof, and each piece pitched roof is separated by gable again.In outer side elevation exterior-wall heat insulation of this building with both sides gable and inclined slope roof and Decorating Project, all utilized external scaffolding in the prior art.
After the structural engineering completion, in a single day external scaffolding is removed, and it is very difficult that the exterior-wall heat insulation of outer side elevation and Decorating Project just seem, is not applicable to the mounting bracket of the unified structure of the outer side elevation hanging basket of building with both sides gable at present.
The utility model content
To the above-mentioned deficiency that exists in the above-mentioned prior art, the utility model provides side elevation hanging basket mounting bracket outside a kind of building with both sides gable that under the situation that external scaffolding is removed, also can realize building outer side elevation hanging basket installation.
In order to solve the problems of the technologies described above, the utility model has adopted following technical scheme:
Have the outer side elevation hanging basket mounting bracket of building of both sides gable, comprise horizontal suspension rod, vertical support bar, reinforcing bar cover and wire rope; Said horizontal suspension rod is pressed on the lower gable, and laterally an end of suspension rod stretches out the lower gable, and laterally the other end of suspension rod passes the reinforcing bar cover and inserts in the shrinkage pool that is provided with on the eminence gable, and said reinforcing bar cover is fixed on the concrete crossbeam through wire rope; The bottom of said vertical support bar be fixed on the horizontal suspension rod and be positioned at the lower gable directly over.
As a kind of preferred version of the utility model, said reinforcing bar cover is welded by steel bar end.
As the another kind of preferred version of the utility model, this hanging basket mounting bracket also comprises pressing plate and bolt, and said pressing plate is pressed on the horizontal suspension rod, and pressing plate is through being bolted on the lower gable.
The beneficial effect of the utility model is: the utility model is pressed in horizontal suspension rod on the lower gable; Laterally an end of suspension rod stretches out the lower gable; Laterally the other end of suspension rod passes the reinforcing bar cover and inserts in the shrinkage pool that is provided with on the eminence gable also fixing; Even under the situation that external scaffolding is removed, hanging basket is hung on the horizontal suspension rod through wire rope, just can have the exterior-wall heat insulation and the decorations construction of the outer side elevation of building of both sides gable and inclined slope roof; This structure can be used as the unified structure that the outer side elevation hanging basket of the building with both sides gable and inclined slope roof is installed, have simple in structure, firm, the advantage that cost is low.
Description of drawings
Fig. 1 is the structural representation with outer side elevation hanging basket mounting bracket of building of both sides gable;
Fig. 2 is the structure for amplifying sketch map at A place among Fig. 1;
Fig. 3 is the structure for amplifying sketch map at B place among Fig. 1.
Among the figure: 1-laterally suspension rod; 2-vertical support bar; 3-reinforcing bar cover; 4-wire rope; 5-lower gable; 6-eminence gable; 7-shrinkage pool; 8-concrete crossbeam; 9-pressing plate; 10-bolt; 11-hanging basket; 12-wire rope.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done explanation in further detail.
Like Fig. 1, Fig. 2 and shown in Figure 3, have the outer side elevation hanging basket mounting bracket of building of both sides gable, comprise horizontal suspension rod 1, vertical support bar 2, reinforcing bar cover 3, wire rope 4, pressing plate 9 and bolt 10.Laterally suspension rod 1 is pressed on the lower gable 5 (in the present embodiment; Pressing plate 9 is pressed on the horizontal suspension rod 1, and pressing plate 9 is fixed on the lower gable 5 through bolt 10, and is as shown in Figure 3; Laterally suspension rod 1 is fixed on the lower gable 5 through pressing plate 9 and bolt 10); Laterally an end of suspension rod 1 stretches out lower gable 5, and laterally the other end of suspension rod 1 passes reinforcing bar cover 3 and inserts in the shrinkage pool 7 that is provided with on the eminence gable 6, and reinforcing bar cover 3 is fixed on the concrete crossbeam 8 through wire rope 4.The bottom of vertical support bar 2 be fixed on the horizontal suspension rod 1 and be positioned at lower gable 5 directly over.
In the present embodiment, reinforcing bar cover 3 is welded by steel bar end, and as shown in Figure 2, the steel bar end seam of the material selection job site of reinforcing bar cover 3 is made, and draws materials conveniently, and cost of manufacture is low.
When using the outer side elevation hanging basket mounting bracket of this building with both sides gable; Only need the wire rope on the hanging basket 11 12 is walked around the top of front end with the vertical support bar 2 of horizontal suspension rod 1; Be fixed on the rear end of horizontal suspension rod 1 at last; After hanging basket 11 is hung on the horizontal suspension rod 1 through wire rope 12, just can have the exterior-wall heat insulation and the decorations construction of the outer side elevation of building of both sides gable and inclined slope roof.
Explanation is at last; Above embodiment is only unrestricted in order to the technical scheme of explanation the utility model; Although with reference to preferred embodiment the utility model is specified, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement the technical scheme of the utility model; And not breaking away from the aim and the scope of the utility model technical scheme, it all should be encompassed in the middle of the claim scope of the utility model.
Claims (3)
1. the outer side elevation hanging basket mounting bracket of building that has the both sides gable; Comprise horizontal suspension rod (1) and vertical support bar (2); It is characterized in that: also comprise reinforcing bar cover (3) and wire rope (4); Said horizontal suspension rod (1) is pressed on the lower gable (5); Laterally an end of suspension rod (1) stretches out lower gable (5), and laterally the other end of suspension rod (1) passes reinforcing bar cover (3) and inserts eminence gable (6) and go up in the shrinkage pool (7) that is provided with, and said reinforcing bar cover (3) is fixed on the concrete crossbeam (8) through wire rope (4); The bottom of said vertical support bar (2) be fixed on horizontal suspension rod (1) go up and be positioned at lower gable (5) directly over.
2. the outer side elevation hanging basket mounting bracket of building with both sides gable according to claim 1, it is characterized in that: said reinforcing bar cover (3) is welded by steel bar end.
3. the outer side elevation hanging basket mounting bracket of building with both sides gable according to claim 1 and 2; It is characterized in that: this hanging basket mounting bracket also comprises pressing plate (9) and bolt (10); Said pressing plate (9) is pressed on the horizontal suspension rod (1), and pressing plate (9) is fixed on the lower gable (5) through bolt (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220080549 CN202467147U (en) | 2012-03-06 | 2012-03-06 | Hanging basket mounting bracket for building outer vertical face with two side gables |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220080549 CN202467147U (en) | 2012-03-06 | 2012-03-06 | Hanging basket mounting bracket for building outer vertical face with two side gables |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202467147U true CN202467147U (en) | 2012-10-03 |
Family
ID=46915314
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220080549 Expired - Fee Related CN202467147U (en) | 2012-03-06 | 2012-03-06 | Hanging basket mounting bracket for building outer vertical face with two side gables |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202467147U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669822A (en) * | 2013-11-27 | 2014-03-26 | 安徽三宝钢结构有限公司 | Permanently suspended structure for structural steel building |
CN110397259A (en) * | 2019-07-15 | 2019-11-01 | 五冶集团上海有限公司 | A kind of hanging basket crossbeam end fixing method |
CN112459446A (en) * | 2020-12-01 | 2021-03-09 | 中冶建工集团有限公司 | Hanging basket for hanging on H-shaped steel |
-
2012
- 2012-03-06 CN CN 201220080549 patent/CN202467147U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669822A (en) * | 2013-11-27 | 2014-03-26 | 安徽三宝钢结构有限公司 | Permanently suspended structure for structural steel building |
CN110397259A (en) * | 2019-07-15 | 2019-11-01 | 五冶集团上海有限公司 | A kind of hanging basket crossbeam end fixing method |
CN112459446A (en) * | 2020-12-01 | 2021-03-09 | 中冶建工集团有限公司 | Hanging basket for hanging on H-shaped steel |
CN112459446B (en) * | 2020-12-01 | 2022-03-25 | 中冶建工集团有限公司 | Hanging basket for hanging on H-shaped steel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201826468U (en) | Thermal decorating plate | |
CN105133755B (en) | A kind of construction method and shear wall structure of reinforcement welding rack composite shear wall | |
CN202467147U (en) | Hanging basket mounting bracket for building outer vertical face with two side gables | |
CN202465215U (en) | Hanging basket mounting support for outer facade of building with slope roof | |
CN106869492A (en) | A kind of across high-altitude truss mould plate | |
CN205024884U (en) | Compound shear force wall of welded steel fabric frame | |
CN202450764U (en) | Support for mounting hanging basket on single-sided gable | |
CN201241453Y (en) | Stone or ceramic tile wire cable or bar steel prestress pulling and hanging glue implant paste installation apparatus | |
CN205669279U (en) | There is the NEW TYPE OF COMPOSITE GRC curtain wall system of prefabricated partition board | |
CN204456809U (en) | A kind of steel supporting structure | |
CN210177758U (en) | Ceramic tile curtain wall connecting system | |
CN204298969U (en) | A kind of lacing bar type heat-insulation wall plate | |
CN204112529U (en) | The residence outer wall plate of gas concrete | |
CN204326313U (en) | The residence outer wall plate of gas concrete batten assembling | |
CN201447862U (en) | Instrumental operating platform used for elevator shaft shear wall shuttering erection | |
CN205116421U (en) | Steel structure node convenient to external eaves gutter of installation | |
CN203361434U (en) | Large-scale suspended ceiling structure with thin-wall metal plate | |
CN203905181U (en) | Shear wallboard with supporting frames and connection structure of shear wallboard and composite floor slabs | |
CN202509758U (en) | Mounting bracket for exterior facade hanging basket of building with two high-elevation difference gables | |
CN201232328Y (en) | Prefabricating combined inside and outside wall safety ceramic tile | |
CN205297164U (en) | Aerated concrete window wrap panel fixed establishment | |
CN204081370U (en) | Building heat preservation decorative panel connects securing member | |
CN205297165U (en) | Aerated concrete window wrap panel fixed establishment's lower structure | |
CN200978491Y (en) | Compound thermal insulating board | |
CN203961278U (en) | Building operations roof beam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121003 Termination date: 20150306 |
|
EXPY | Termination of patent right or utility model |