CN208934380U - A kind of Excitations for Long Span Suspension operating platform - Google Patents
A kind of Excitations for Long Span Suspension operating platform Download PDFInfo
- Publication number
- CN208934380U CN208934380U CN201821309471.0U CN201821309471U CN208934380U CN 208934380 U CN208934380 U CN 208934380U CN 201821309471 U CN201821309471 U CN 201821309471U CN 208934380 U CN208934380 U CN 208934380U
- Authority
- CN
- China
- Prior art keywords
- suspension cable
- davit
- suspension
- ear plate
- fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of Excitations for Long Span Suspension operating platforms, suspension cable davit cord clip is set on suspension cable, suspension cable davit cord clip is equipped with suspension cable davit anchoring piece, the bottom of suspension cable davit anchoring piece is equipped with suspension cable davit, rail horizontal rod is equipped between suspension cable davit, the bottom end of suspension cable davit is fixedly connected with platform beams, and platform beams are equipped with scaffold board, platform skirting board is fixedly connected between suspension cable davit.The utility model is by having formed stable fixture as supporting point on building top, drawing sets main load-bearing part of the suspension cable as operation platform, according to the stress condition of suspension cable operating platform, in the design position of suspension cable, a certain number of suspension cable davits are set, and rail horizontal rod is set between suspension cable davit, platform beams are set in suspension cable davit bottom again, scaffold board is laid on platform beams, for worker's travel in high sky and operation, the excellent characteristics of high strength steel can be given full play to, steel using amount is reduced, economizes on resources.
Description
Technical field
The utility model belongs to novel high-strength steel applied technical field, and in particular to a kind of Excitations for Long Span Suspension operation is flat
Platform.
Background technique
With building increasingly increasing using function and space requirement, large span, the building of super-high storied building have been obtained greatly
Power development, construction of the construction operation platform compared with routine building for such building propose challenge.Such as using conventional foot hand
Frame erection construction platform, there are operation platforms to set up the shortcomings such as need measure material more, at high cost, long in time limit.
Utility model content
The utility model aim is solution the above deficiencies in the existing technologies, provides a kind of Excitations for Long Span Suspension operation
Platform, by having formed stable fixture as supporting point on building top, drawing sets master of the suspension cable as operation platform
Load-bearing part, according to the stress condition of suspension cable operating platform, a certain number of suspension cable davits are arranged in the design position on suspension cable,
And rail horizontal rod is set between suspension cable davit, then platform beams are arranged in suspension cable davit bottom, foot is laid on platform beams
Palm, for worker's travel in high sky and operation, this suspension cable operating platform can give full play to the excellent characteristics of high strength steel, reduce
Steel using amount economizes on resources, light-weight, convenient for setting up and remove;During setting up, first put on ground or flooring outstanding
It is horizontal successively to assemble suspension cable davit cord clip, suspension cable davit anchoring piece, suspension cable davit and platform according to design position on suspension cable for rope
Beam, due to be carried out on ground or flooring assembly operation, there is no high altitude operation, reduce security risk, also facilitate materials
And installation, while the precision and construction efficiency of installation are improved, then left end and the suspension cable of suspension cable are successively promoted by pulling equipment
Then right end is laid with scaffold board, reduce the operation difficulty that high altitude operation is brought.
In order to solve the above-mentioned technical problem, the utility model adopts the following technical solution:
A kind of Excitations for Long Span Suspension operating platform, including left end fixture and right end fixture, left end fixture and right end are solid
Suspension cable is fixedly connected between earnest, it is characterised in that: suspension cable is fixedly connected with suspension cable davit cord clip, and suspension cable davit cord clip is equipped with
Suspension cable davit anchoring piece, suspension cable davit anchoring piece axis rotate on suspension cable davit cord clip, and the bottom of suspension cable davit anchoring piece is set
There is suspension cable davit, is equipped with rail horizontal rod between suspension cable davit, the bottom end of suspension cable davit is fixedly connected with platform beams, platform beams
On be equipped with scaffold board, platform skirting board is fixedly connected between suspension cable davit.
Further, left end fixture is equipped with the fixed rope in left end, is fixedly connected between the fixed rope in left end and the left end of suspension cable
There is fixed card buckle, right end fixture is equipped with the fixed rope of right end, is fixedly connected with rope between the fixed rope of right end and the right end of suspension cable
Cord clip realizes that left end fixture is fixedly connected with the left end of suspension cable, and right end fixture is fixedly connected with the right end of suspension cable, fixation side
Formula is simple, easy to operate, can be operated in high-altitude.
Further, suspension cable davit cord clip fixing bolt is equipped between suspension cable davit cord clip, convenient for dismounting suspension cable on suspension cable
Davit cord clip.
Further, suspension cable davit anchoring piece fixing bolt is equipped between suspension cable davit anchoring piece, convenient in suspension cable davit rope
Suspension cable davit anchoring piece is dismounted on folder.
Further, suspension cable davit cord clip is equipped with the first arc sections, and suspension cable davit anchoring piece is equipped with the second arc sections, the second circle
Arc portion is set to the outside of the first arc sections, and the internal diameter of the second arc sections is not less than the outer diameter of the first arc sections.It is hung in installation suspension cable
When column anchoring piece, the inside of the second arc sections is arranged in the first arc sections, hangs so that suspension cable davit anchoring piece has around suspension cable
Column cord clip carries out axis rotation function, convenient for the adjustment of suspension cable davit upright position.
Further, suspension cable davit includes sunpender, suspension cable davit upper ear plate connector, suspension cable davit upper ear plate, suspension cable davit
Lower ear plate connector and suspension cable davit lower ear plate, suspension cable davit upper ear plate connector and suspension cable davit lower ear plate connector weld respectively
Be connected to the both ends of sunpender, suspension cable davit upper ear plate is welded and fixed with suspension cable davit upper ear plate connector, suspension cable davit lower ear plate with
Suspension cable davit lower ear plate connector is welded and fixed, and suspension cable davit upper ear plate offers suspension cable davit upper ear plate pin shaft hole, and suspension cable is hung
Column anchoring piece is equipped with suspension cable davit anchoring piece pin shaft hole, suspension cable davit anchoring piece pin shaft hole and suspension cable davit upper ear plate pin shaft hole it
Between be equipped with suspension cable davit on hang fixed pin shaft, suspension cable davit lower ear plate offers suspension cable davit lower ear plate pin shaft hole, platform beams
It is horizontal that platform is equipped with equipped with the fixed otic placode pin shaft hole of crossbeam, between the fixed otic placode pin shaft hole of crossbeam and suspension cable davit lower ear plate pin shaft hole
Beam fixed pin shaft.Suspension cable davit is installed in the convenient bottom in suspension cable davit anchoring piece, horizontal in the bottom end mounting platform of suspension cable davit
Beam.
Further, the bottom of left end fixture and the bottom of right end fixture are welded with fixture lifting lug, and fixture is hung
The lower end of ear is fixedly connected with fixture davit, and fixture davit is fixedly connected with platform beams.
Further, rail horizontal rod is fixedly connected with suspension cable davit, fixture davit by rail horizontal rod fixing piece, is conveniently torn open
Fill rail horizontal rod.
A kind of erection method of Excitations for Long Span Suspension operating platform, it is characterised in that include the following steps:
1) fixture lifting lug is fixed: at the bottom for the left end fixture for needing to set up operating platform and the bottom of right end fixture
Object lifting lug is welded and fixed at portion;
2) suspension cable is put: being put on the ground of lower section between left end fixture and right end fixture or flooring outstanding
Rope is parallel to each other between suspension cable;
3) fixation of suspension cable davit cord clip is carried out on suspension cable according to design position, two suspension cable davit cord clips pass through suspension cable
Davit cord clip fixing bolt is fixed with suspension cable;
4) install suspension cable davit anchoring piece: suspension cable davit anchoring piece is hung by suspension cable davit anchoring piece fixing bolt with suspension cable
Column cord clip is attached fixation;
5) install suspension cable davit: the upper end of suspension cable davit is by hanging fixed pin shaft and suspension cable davit anchoring piece on suspension cable davit
It is attached;
6) mounting platform crossbeam: the lower end of platform beams and suspension cable davit is connected by platform beams fixed pin shaft
It connects;
7) the fixed rope in left end is installed on the fixture of left end, the fixed rope of right end is installed on right end fixture;
8) left end of suspension cable is promoted by pulling equipments such as chain block or hoist engines, then the left end of suspension cable is consolidated with left end
Standing wire is attached fixation by fixed card buckle;
9) right end that simultaneously tensioning suspension cable is promoted by pulling equipments such as chain block or hoist engines passes through promotion in suspension cable
When process being drawn to reach designated space position, the right end of suspension cable and the fixed rope of right end are attached by fixation by rope folder;
10) install fixture davit: in left end, the bottom of fixture and the bottom of right end fixture are welded and fixed object and hang
Ear, then it is fixedly connected with fixture davit in the lower end of fixture lifting lug, then fixture davit is attached with platform beams
It is fixed;
11) it is laid with scaffold board, while the fixed platform skirting board between suspension cable davit from both ends toward centre, then guardrail is installed
Cross bar, rail horizontal rod are fixed with suspension cable davit, fixture davit by rail horizontal rod fixing piece.
Further, step 3) is carried out according to design position on suspension cable in the fixed operation of suspension cable davit cord clip, on ground
Or two are put on flooring with reference to rope, corresponding one of the outside of every suspension cable refers to rope, then will be straightened with reference to rope, then
It is arranged in parallel between two reference ropes using the end of briquetting fixed reference rope, it is referred to then along wherein one
Tape measure is arranged in the length direction of rope, is marked using red paint to reference rope from left end fixture to right end fixture direction
Note, mark point position are corresponded to each other with the side of suspension cable davit cord clip, are first determined first mark point and are marked, further according to adjacent
The distance between two suspension cable davit cord clip stationary nodes, are successively marked, and then set in the red paint mark of reference rope
Horizontal line is set, and horizontal the other end is tied up on another reference rope, horizontal line is attached on suspension cable straight, horizontal line
It is arranged in a mutually vertical manner with suspension cable, then according to the intersection point of horizontal line and suspension cable, suspension cable davit cord clip is carried out on two suspension cables
Fixation, the intersection point of horizontal line and suspension cable is close in the side of suspension cable davit cord clip.Suspension cable davit cord clip can be fixed on by the operation
The design position of suspension cable, and two suspension cable davits on same root platform beams are arranged in parallel, convenient for the bottom of suspension cable davit
End is fixedly connected with platform beams.
The utility model is by adopting the above-described technical solution, have the advantages that
1, the utility model is by having formed stable left end fixture and right end fixture conduct on building top
Supporting point draws main load-bearing part of the suspension cable set as operation platform, according to the stress condition of suspension cable operating platform, in setting for suspension cable
It counts position and a certain number of suspension cable davits is set, suspension cable davit is dismounted for convenience, the utility model is solid on suspension cable
Surely suspension cable davit cord clip is connected, the distance between suspension cable davit is adjusted by the distance between suspension cable davit cord clip, so that outstanding
The design position of suspension cable is arranged in rope davit;And suspension cable davit anchoring piece is installed on suspension cable davit cord clip, the anchoring of suspension cable davit
Part axis rotates on suspension cable davit cord clip, convenient for carrying out the adjustment of upright position to suspension cable davit.Then suspension cable davit it
Between rail horizontal rod is set, then platform beams are set in suspension cable davit bottom, are laid with scaffold board, on platform beams for worker's height
Null is walked and is operated, and is set up conveniently, the resource needed is few, and use is safe.And it can be taken to avoid conventional scaffold construction platform
If needing a large amount of scaffolding steel pipe, setting up human resources, set up the problem long with the dismounting time, and then reduces operation platform and take
If expense, while also avoiding the basis instrument of conventional scaffold construction platform.
2, the suspension cable in the utility model using high strength steel tow as main stressed member, by suspension cable davit cord clip,
The installation of suspension cable davit anchoring piece and suspension cable davit, so that the scaffold board that suspension cable and platform beams are laid with carries out lower leaf, and
Guardrail is collectively formed with rail horizontal rod, improves worker operation safety, the excellent characteristics of high strength steel can be given full play to, subtracted
Few steel using amount economizes on resources;Scaffold board can be using material general at present, other are all made of general steel, all platform groups
Part material purchases are convenient, convenient processing and manufacture.
3, the utility model first puts suspension cable on ground or flooring during setting up, according to design position outstanding
Suspension cable davit cord clip, suspension cable davit anchoring piece, suspension cable davit and platform beams are successively assembled on rope, due to being in ground or flooring
Upper carry out assembly operation is not present high altitude operation, reduces security risk, also facilitate materials and installation, is convenient for suspension cable davit
Cord clip is fixed on the distance between the design position of suspension cable, control suspension cable davit cord clip, and two on same root platform beams
Suspension cable davit is arranged in parallel, and the bottom end convenient for suspension cable davit is fixedly connected with platform beams, improves the precision of integral installation
And construction efficiency.The left end of suspension cable and the right end of suspension cable are successively promoted by pulling equipment again, are then laid with scaffold board, is reduced high
Idle job bring operation difficulty.
4, the utility model is by the setting flag at reference rope, to determine the design position of suspension cable davit cord clip on suspension cable
It sets, avoids being marked on suspension cable, play a protective role to suspension cable.And rope setting flag is referred to wherein one, lead to
It crosses the red paint mark at this with reference to rope and horizontal line is set, and horizontal the other end is tied up on another reference rope,
So that horizontal line is attached on suspension cable straight, horizontal line is arranged in a mutually vertical manner with suspension cable, then according to the friendship of horizontal line and suspension cable
Point, just can determine that the design position of suspension cable davit cord clip on two suspension cables, and make setting for suspension cable davit cord clip on two suspension cables
It counts position or so to correspond to each other, suspension cable davit cord clip can be fixed on to the design position of suspension cable, and on same root platform beams
Two suspension cable davits are arranged in parallel, and the bottom end convenient for suspension cable davit is fixedly connected with platform beams.
5, in the utility model, by removing fixture davit and its respective members, to the fixed rope in left end, the fixed rope of right end
Respectively along left end fixture, the synchronizing moving of right end fixture axial direction, suspending platform can be moved on to next operating position, and
Fixture davit and its respective members are installed, reaches and quickly forms safe operation platform.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawing:
Fig. 1 is a kind of structural schematic diagram of Excitations for Long Span Suspension operating platform in the utility model;
Fig. 2 be in Fig. 1 A-A to structural schematic diagram;
Fig. 3 is B-B direction structural schematic diagram in Fig. 2;
Fig. 4 is the utility model centre suspension cord davit cord clip and suspension cable davit anchoring piece and suspension cable attachment structure schematic diagram;
Fig. 5 be in Fig. 4 C-C to structural schematic diagram;
Fig. 6 is the utility model centre suspension cord davit and platform beams attachment structure schematic diagram;
Fig. 7 be in Fig. 6 D-D to structural schematic diagram;
Fig. 8 is the structural schematic diagram of the utility model centre suspension cord davit cord clip;
Fig. 9 is the structural schematic diagram of the utility model centre suspension cord davit anchoring piece;
Figure 10 is the structural schematic diagram of the utility model centre suspension cord davit;
Figure 11 is the structural schematic diagram of platform beams in the utility model.
In figure, 1: suspension cable;2: left end fixture;3: right end fixture;4: the fixed rope in left end;5: the fixed rope of right end;6: Gu
Fixed buckle;7: rope folder;8: suspension cable davit cord clip;8-1: the first arc sections;9: suspension cable davit anchoring piece;9-1: suspension cable davit anchor
Firmware pin shaft hole;9-2: the second arc sections;10: suspension cable davit;10-1: sunpender;10-2: suspension cable davit upper ear plate connector;10-
3: suspension cable davit upper ear plate;10-4: suspension cable davit upper ear plate pin shaft hole;10-5: suspension cable davit lower ear plate connector;10-6: outstanding
Rope davit lower ear plate;10-7: suspension cable davit lower ear plate pin shaft hole;11: platform skirting board;12: scaffold board;13: rail horizontal rod;
14: rail horizontal rod fixing piece;15: platform beams fixed pin shaft;16: hanging fixed pin shaft on suspension cable davit;17: suspension cable davit cord clip
Fixing bolt;18: platform beams;19: suspension cable davit anchoring piece fixing bolt;20: fixture lifting lug;21: fixture davit.
Specific embodiment
It as shown in Figure 1 to 11, is a kind of Excitations for Long Span Suspension operating platform in the utility model, including left end fixture 2
With right end fixture 3, suspension cable 1 is fixedly connected between left end fixture 2 and right end fixture 3.Left end fixture 2 is equipped with a left side
Fixed rope 4 is held, is fixedly connected with fixed card buckle 6 between the fixed rope 4 in left end and the left end of suspension cable 1.Right end fixture 3 is equipped with the right side
Fixed rope 5 is held, rope folder 7 is fixedly connected between the fixed rope 5 of right end and the right end of suspension cable 1, realizes left end fixture 2 and suspension cable
1 left end is fixedly connected, and right end fixture 3 is fixedly connected with the right end of suspension cable 1, and fixed form is simple, easy to operate, and corresponding behaviour
Work can be completed in high-altitude.
Suspension cable 1 is fixedly connected with suspension cable davit cord clip 8, and the fixed spiral shell of suspension cable davit cord clip is equipped between suspension cable davit cord clip 8
Bolt 17, convenient for dismounting suspension cable davit cord clip 8 on suspension cable 1.Suspension cable davit cord clip 8 is equipped with suspension cable davit anchoring piece 9, suspension cable davit
9 axis of anchoring piece rotates on suspension cable davit cord clip 8.The fixed spiral shell of suspension cable davit anchoring piece is equipped between suspension cable davit anchoring piece 9
Bolt 19, convenient for dismounting suspension cable davit anchoring piece 9 on suspension cable davit cord clip 8.Suspension cable davit cord clip 8 is equipped with the first arc sections 8-1,
Suspension cable davit anchoring piece 9 is equipped with the second arc sections 9-2, the second arc sections 9-2 and is set to the outside of the first arc sections 8-1, the second circle
The internal diameter of arc portion 9-2 is not less than the outer diameter of the first arc sections 8-1.When installing suspension cable davit anchoring piece 9, the first arc sections 8-1
The inside of second arc sections 9-2 is set, so that suspension cable davit anchoring piece 9, which has, carries out axis rotation around suspension cable davit cord clip 8
Rotating function, convenient for the adjustment of 1 davit upright position of suspension cable.
The bottom of suspension cable davit anchoring piece 9 is equipped with suspension cable davit 10, is equipped with rail horizontal rod 13, suspension cable between suspension cable davit 10
The bottom end of davit 10 is fixedly connected with platform beams 18.Suspension cable davit 10 includes sunpender 10-1, suspension cable davit upper ear plate connector
10-2, suspension cable davit upper ear plate 10-3, suspension cable davit lower ear plate connector 10-5 and suspension cable davit lower ear plate 10-6, suspension cable davit
Upper ear plate connector 10-2 and suspension cable davit lower ear plate connector 10-5 are respectively welded on the both ends of sunpender 10-1, suspension cable davit
Otic placode 10-3 is welded and fixed with suspension cable davit upper ear plate connector 10-2, suspension cable davit lower ear plate 10-6 and suspension cable davit lower ear plate
Connector 10-5 is welded and fixed.Suspension cable davit upper ear plate 10-3 offers suspension cable davit upper ear plate pin shaft hole 10-4, suspension cable davit
Anchoring piece 9 is equipped with suspension cable davit anchoring piece pin shaft hole 9-1, suspension cable davit anchoring piece pin shaft hole 9-1 and suspension cable davit upper ear plate pin
It is equipped on suspension cable davit between axis hole 10-4 and hangs fixed pin shaft 16.Suspension cable davit lower ear plate 10-6 offers suspension cable davit lower ear plate
Pin shaft hole 10-7, platform beams 18 are equipped with the fixed otic placode pin shaft hole of crossbeam, ear under the fixed otic placode pin shaft hole of crossbeam and suspension cable davit
Platform beams fixed pin shaft 15 is equipped between plate pin shaft hole 10-7.It is convenient to be hung in the bottom of suspension cable davit anchoring piece 9 installation suspension cable
Column 10, in the bottom end mounting platform crossbeam 18 of suspension cable davit 10.
Platform beams 18 are equipped with scaffold board 12, and platform skirting board 11 is fixedly connected between suspension cable davit 10.Left end is solid
The bottom of earnest 2 and the bottom of right end fixture 3 are welded with fixture lifting lug 20, and the lower end of fixture lifting lug 20 is fixedly connected
There is fixture davit 21, fixture davit 21 is fixedly connected with platform beams 18, so that left end fixture 2 and right end fixture 3
The power being subject on platform beams 18 can be born.Rail horizontal rod 13 and suspension cable davit 10, fixture davit 21 pass through rail horizontal rod
Fixing piece 14 is fixedly connected, easy disassembly rail horizontal rod 13.
A kind of erection method of Excitations for Long Span Suspension operating platform, includes the following steps:
1) fixture lifting lug 20 is fixed: bottom and right end fixture 3 in the left end fixture 2 for needing to set up operating platform
Bottom at object lifting lug 20 is welded and fixed.
2) suspension cable 1 is put: being put on the ground of lower section or flooring between left end fixture 2 and right end fixture 3
Suspension cable 1 is parallel to each other between suspension cable 1.
3) fixation of suspension cable davit cord clip 8 is carried out on suspension cable 1 according to design position, two suspension cable davit cord clips 8 pass through
Suspension cable davit cord clip fixing bolt 17 is fixed with suspension cable 1.
In the fixed operation for carrying out suspension cable davit cord clip 8 on suspension cable 1 according to design position, put on ground or flooring
Two refer to rope, and corresponding one of the outside of every suspension cable 1 refers to rope, then will be straightened with reference to rope, then solid using briquetting
Surely the end of rope is referred to, two with reference to arranged in parallel between rope.Then along wherein one length with reference to rope
Tape measure is arranged in direction, reference rope is marked from left end fixture 2 to 3 direction of right end fixture using red paint, mark point
Position is corresponded to each other with the side of suspension cable davit cord clip 8.It first determines first mark point and marks, further according to two neighboring suspension cable
The distance between 8 stationary nodes of davit cord clip, are successively marked.Then it is arranged in the red paint mark of reference rope horizontal
Line, and by horizontal the other end tie up to it is another with reference on rope, horizontal line is attached to straight on suspension cable 1, horizontal line and outstanding
Rope 1 is arranged in a mutually vertical manner, and then according to the intersection point of horizontal line and suspension cable 1, suspension cable davit cord clip 8 is carried out on two suspension cables 1
Fixation, the intersection point of horizontal line and suspension cable 1 is close in the side of suspension cable davit cord clip 8.The operation can be fixed by suspension cable davit cord clip 8
Two suspension cable davits 10 in the design position of suspension cable 1, and on same root platform beams 18 are arranged in parallel, hang convenient for suspension cable
The bottom end of column 10 is fixedly connected with platform beams 18.
4) install suspension cable davit anchoring piece 9: suspension cable davit anchoring piece 9 is by suspension cable davit anchoring piece fixing bolt 19 and hangs
Rope davit cord clip 8 is attached fixation.
5) install suspension cable davit 10: the upper end of suspension cable davit 10 is by hanging fixed pin shaft 16 and suspension cable davit on suspension cable davit
Anchoring piece 9 is attached.
6) mounting platform crossbeam 18: by platform beams fixed pin shaft 15 by the lower end of platform beams 18 and suspension cable davit 10
It is attached.
7) the fixed rope 4 in left end is installed on left end fixture 2, the fixed rope 5 of right end is installed on right end fixture 3.
8) left end of suspension cable 1 is promoted by the pulling equipments such as chain block or hoist engine, then by the left end and left end of suspension cable 1
Fixed rope 4 is attached fixation by fixed card buckle 6.
9) right end that simultaneously tensioning suspension cable 1 is promoted by pulling equipments such as chain block or hoist engines, passes through promotion in suspension cable 1
When tension process reaches designated space position, the right end of suspension cable 1 and the fixed rope 5 of right end are attached by fixation by rope folder 7.
10) install fixture davit 21: in left end, the bottom of fixture 2 and the bottom of right end fixture 3 are welded and fixed
Object lifting lug 20, then it is fixedly connected with fixture davit 21 in the lower end of fixture lifting lug 20, then by fixture davit 21 and platform
Crossbeam 18 is attached fixation.
11) it is laid with scaffold board 12, while the fixed platform skirting board 11 between suspension cable davit 10 from both ends toward centre, then pacified
Rail horizontal rod 13 is filled, rail horizontal rod 13 is fixed with suspension cable davit 10, fixture davit 21 by rail horizontal rod fixing piece 14.
After the completion of the setting up of suspension cable operating platform, can normally come into operation, after the completion of the use of suspension cable operating platform according to
The reverse order for setting up technique is removed.
For the utility model by having formed stable fixture as supporting point on building top, drawing sets suspension cable conduct
The main load-bearing part of operation platform, according to the stress condition of suspension cable operating platform, a fixed number is arranged in the design position on suspension cable
The suspension cable davit of amount, and rail horizontal rod is set between suspension cable davit, then platform beams are arranged in suspension cable davit bottom, in platform
Scaffold board is laid on crossbeam, for worker's travel in high sky and operation, this suspension cable operating platform can give full play to high strength steel
Excellent characteristics reduces steel using amount, economizes on resources, light-weight, convenient for setting up and remove;During setting up, first on ground or
Suspension cable is put on flooring, is successively assembled suspension cable davit cord clip, suspension cable davit anchoring piece, suspension cable on suspension cable according to design position and is hung
Column and platform beams, due to be on ground or flooring carry out assembly operation, there is no high altitude operation, reduce security risk,
Also facilitate materials and installation, while improving the precision and construction efficiency of installation, then successively promote a left side for suspension cable by pulling equipment
Then the right end at end and suspension cable is laid with scaffold board, reduce the operation difficulty that high altitude operation is brought.
The above are only specific embodiments of the present invention, but the technical characteristics of the utility model is not limited thereto.Appoint
How based on the utility model, to solve essentially identical technical problem, essentially identical technical effect is realized, it is made
Simple change, equivalent replacement or modification etc., are all covered by among the protection scope of the utility model.
Claims (8)
1. a kind of Excitations for Long Span Suspension operating platform, it is characterised in that: including left end fixture and right end fixture, the left end is solid
Suspension cable is fixedly connected between earnest and the right end fixture, the suspension cable is fixedly connected with suspension cable davit cord clip, described outstanding
Rope davit cord clip is equipped with suspension cable davit anchoring piece, and the suspension cable davit anchoring piece axis rotates on the suspension cable davit cord clip,
The bottom of the suspension cable davit anchoring piece is equipped with suspension cable davit, is equipped with rail horizontal rod between the suspension cable davit, the suspension cable is hung
The bottom end of column is fixedly connected with platform beams, and scaffold board, fixed company between the suspension cable davit are equipped on the platform beams
It is connected to platform skirting board.
2. a kind of Excitations for Long Span Suspension operating platform according to claim 1, it is characterised in that: the left end fixture installation
There is the fixed rope in left end, is fixedly connected with fixed card buckle between the fixed rope in the left end and the left end of the suspension cable, the right end is solid
Earnest is equipped with the fixed rope of right end, is fixedly connected with rope folder between the fixed rope of the right end and the right end of the suspension cable.
3. a kind of Excitations for Long Span Suspension operating platform according to claim 1, it is characterised in that: the suspension cable davit cord clip it
Between be equipped with suspension cable davit cord clip fixing bolt.
4. a kind of Excitations for Long Span Suspension operating platform according to claim 1, it is characterised in that: the suspension cable davit anchoring piece
Between be equipped with suspension cable davit anchoring piece fixing bolt.
5. a kind of Excitations for Long Span Suspension operating platform according to claim 1 or 4, it is characterised in that: the suspension cable davit rope
The first arc sections are folded with, the suspension cable davit anchoring piece is equipped with the second arc sections, and second arc sections are set to described first
The outside of arc sections, the internal diameter of second arc sections are not less than the outer diameter of first arc sections.
6. a kind of Excitations for Long Span Suspension operating platform according to claim 1, it is characterised in that: the suspension cable davit includes hanging
Bar, suspension cable davit upper ear plate connector, suspension cable davit upper ear plate, suspension cable davit lower ear plate connector and suspension cable davit lower ear plate,
The suspension cable davit upper ear plate connector and the suspension cable davit lower ear plate connector are respectively welded in the both ends of the sunpender, institute
It states suspension cable davit upper ear plate to be welded and fixed with the suspension cable davit upper ear plate connector, the suspension cable davit lower ear plate is hanged with described
Rope davit lower ear plate connector is welded and fixed, and the suspension cable davit upper ear plate offers suspension cable davit upper ear plate pin shaft hole, described
Suspension cable davit anchoring piece is equipped with suspension cable davit anchoring piece pin shaft hole, the suspension cable davit anchoring piece pin shaft hole and the suspension cable davit
It is equipped between upper ear plate pin shaft hole on suspension cable davit and hangs fixed pin shaft, the suspension cable davit lower ear plate offers ear under suspension cable davit
Plate pin shaft hole, the platform beams are equipped with the fixed otic placode pin shaft hole of crossbeam, the fixed otic placode pin shaft hole of the crossbeam and the suspension cable
Platform beams fixed pin shaft is equipped between davit lower ear plate pin shaft hole.
7. a kind of Excitations for Long Span Suspension operating platform according to claim 1, it is characterised in that: the bottom of the left end fixture
Portion and the bottom of the right end fixture are welded with fixture lifting lug, and the lower end of the fixture lifting lug is fixedly connected with fixation
Object davit, the fixture davit are fixedly connected with the platform beams.
8. a kind of Excitations for Long Span Suspension operating platform according to claim 7, it is characterised in that: the rail horizontal rod with it is described
Suspension cable davit, the fixture davit are fixedly connected by rail horizontal rod fixing piece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821309471.0U CN208934380U (en) | 2018-08-14 | 2018-08-14 | A kind of Excitations for Long Span Suspension operating platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821309471.0U CN208934380U (en) | 2018-08-14 | 2018-08-14 | A kind of Excitations for Long Span Suspension operating platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208934380U true CN208934380U (en) | 2019-06-04 |
Family
ID=66717732
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821309471.0U Active CN208934380U (en) | 2018-08-14 | 2018-08-14 | A kind of Excitations for Long Span Suspension operating platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208934380U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083395A (en) * | 2018-08-14 | 2018-12-25 | 浙江中南建设集团钢结构有限公司 | A kind of Excitations for Long Span Suspension operating platform and its erection method |
-
2018
- 2018-08-14 CN CN201821309471.0U patent/CN208934380U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109083395A (en) * | 2018-08-14 | 2018-12-25 | 浙江中南建设集团钢结构有限公司 | A kind of Excitations for Long Span Suspension operating platform and its erection method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100590277C (en) | High-altitude bridge type cantilever scaffold | |
CN101514586B (en) | Hanger rail type electric hanging boat and construction method thereof | |
CN201221193Y (en) | High altitude packway ceiling construction operating platform | |
CN104213508B (en) | A kind of method utilizing stull and external tendon to control king-post displacement | |
CN106848938B (en) | Cable testing bridge hangs installation method under a kind of High Altitude Platform | |
CN110468724B (en) | Auxiliary device for main cable construction of space cable suspension bridge and main cable construction method | |
CN102425261B (en) | Large-span multiunit tensile membrane structure and installation construction method thereof | |
CN109372243A (en) | A kind of hanging basket system for the installation of steel construction metal Roof bottom plate | |
CN102897677A (en) | Crane fly jib self-assembly and disassembly device and method, as well as crane | |
CN105586832A (en) | Suspension type catwalk surface net mounting system | |
CN109083395A (en) | A kind of Excitations for Long Span Suspension operating platform and its erection method | |
CN208934380U (en) | A kind of Excitations for Long Span Suspension operating platform | |
CN205421022U (en) | Suspension bridge stiffening beam handing equipment that slides | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN105888227A (en) | Ultrahigh horn-shaped steel structure exterior facing construction platform, equalizing beam for construction and construction method of ultrahigh horn-shaped steel structure exterior facing construction platform | |
CN201284551Y (en) | Suspension type simple platform for work high above ground | |
CN106245984B (en) | Jack up Multifunctional creeping gin pole | |
CN205908004U (en) | Special hoist and mount fixing device of hanging flower basket | |
CN105152052A (en) | Glass curtain wall component lifting device and glass curtain wall component installing method | |
CN110939069A (en) | Construction method of suspension bridge catwalk | |
CN205591115U (en) | Suspension type catwalk veil installing the system | |
CN101459320B (en) | Large span cable bridge rack installation mold and installation method thereof | |
CN201758253U (en) | Overhaul frame | |
CN212027054U (en) | Overhanging scaffold | |
CN107524285A (en) | A kind of external wall construction suspension bracket and its installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 311400 No.18, Changkou East Street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province Patentee after: Zhejiang Zhongnan Lvjian Technology Group Co.,Ltd. Address before: No.245, BINKANG Road, Binjiang District, Hangzhou City, Zhejiang Province 310052 Patentee before: ZHEJIANG ZHONGNAN CONSTRUCTION GROUP STEEL STRUCTURE Co.,Ltd. |