CN104405041A - 钢结构建筑装配式预制楼板连接件及其安装方法 - Google Patents
钢结构建筑装配式预制楼板连接件及其安装方法 Download PDFInfo
- Publication number
- CN104405041A CN104405041A CN201410668160.3A CN201410668160A CN104405041A CN 104405041 A CN104405041 A CN 104405041A CN 201410668160 A CN201410668160 A CN 201410668160A CN 104405041 A CN104405041 A CN 104405041A
- Authority
- CN
- China
- Prior art keywords
- steel
- floor slab
- bar
- precast floor
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
一种钢结构建筑装配式预制楼板连接件及其安装方法,所述预制楼板两端的外露钢筋端部均为加装有垫板的钢筋墩头,或者预制楼板一端的外露钢筋端部为加装有垫板的钢筋墩头,另一端的外露钢筋端部安装有挤压套筒;工字钢梁沿顶面通长垂直焊接有一条形钢板,条形钢板在长度方向间隔开有钢筋定位槽;每个工字钢梁上条形钢板两侧的预制楼板错开放置,条形钢板两侧预制楼板的外露钢筋相互交错放置在钢筋定位槽内,并由端部加装有垫板的钢筋墩头或挤压套筒与条形钢板固定。本发明安装十分方便,可大大减少施工工序,节约预制楼板与钢梁的锚固时间,可使楼板的锚固强度明显提高。本发明可广泛应用于装配式钢结构建筑中预制楼板与钢梁之间的连接。
Description
技术领域
本发明涉及装配式钢结构建筑领域,具体涉及一种预制楼板与钢梁的连接件及其安装方法。
背景技术
现阶段钢结构建筑体系楼板主要采用现浇混凝土结构,楼板现浇需要钢梁安装完成后,再支设模板、绑扎钢筋、浇筑混凝土,待混凝土达到一定强度后,方可进行下一道工序施工,大大降低了钢结构安装速度。
现有装配式钢筋混凝土预制楼板可在工厂预先加工成型后,运到工地现场进行安装,预制楼板可以大大缩短工期,减少工程造价。预制楼板与钢结构锚固性能是影响预制楼板在钢结构建筑上推广使用的主要因素之一。现有预制楼板与钢梁的连接方式复杂,施工速度慢,锚固强度不高的技术问题,体现不出钢结构建筑施工速度快的优势。
发明内容
本发明提供一种钢结构建筑装配式预制楼板连接件及其安装方法,要解决现有装配式预制楼板与钢梁连接方式复杂、锚固性能差的技术问题。
本发明解决其技术问题所采用的技术方案是:
这种钢结构建筑装配式预制楼板连接件,所述预制楼板放置在工字钢梁上,预制楼板内间隔分布有上下两排纵向钢筋,纵向钢筋两端穿出预制楼板两端面形成外露钢筋;
所述预制楼板两端的外露钢筋端部均为加装有垫板的钢筋墩头,或者预制楼板一端的外露钢筋端部为加装有垫板的钢筋墩头,另一端的外露钢筋端部安装有挤压套筒;
所述工字钢梁沿顶面通长垂直焊接有一条形钢板,条形钢板在长度方向间隔开有钢筋定位槽,钢筋定位槽间距为预制楼板内纵向钢筋水平间距的一半;
所述预制楼板两端分别置于相邻工字钢梁上,每个工字钢梁上条形钢板两侧的预制楼板错开放置,错开距离为预制楼板内纵向钢筋水平间距的一半,条形钢板两侧预制楼板的外露钢筋相互交错放置在钢筋定位槽内,并由端部加装有垫板的钢筋墩头或挤压套筒与条形钢板固定;
所述条形钢板与其两侧预制楼板之间的板端头空隙内填充有自密实混凝土。
所述钢筋定位槽上部开口为喇叭口形,钢筋定位槽的底部宽度为纵向钢筋直径d+2mm。
所述钢筋定位槽槽底高度等于预制楼板内下排纵向钢筋的保护层厚度。
所述预制楼板宽度为0.6~1.0m,厚度为90~130mm。
所述预制楼板与工字钢梁的搭接长度为30~40mm。
所述工字钢梁与条形钢板采用双面全焊。
这种钢结构建筑装配式预制楼板连接件的安装方法,安装步骤如下:
步骤一,采用工厂化生产预制楼板,将预制楼板两端的外露钢筋端部均加工成钢筋墩头并加装有垫板,或者将预制楼板一端的外露钢筋端部加工成钢筋墩头并加装有垫板,另一端的外露钢筋端部安装挤压套筒;
步骤二,在工字钢梁沿顶面通长垂直焊接条形钢板,条形钢板在长度方向间隔开设钢筋定位槽;
步骤三,在预制楼板上安装四个吊点,工字钢梁安装完成后,通过吊点用吊机将预制楼板吊起,放置到工字钢梁上,将每个工字钢梁上条形钢板两侧的预制楼板错开放置,条形钢板两侧预制楼板的外露钢筋相互交错放置在钢筋定位槽内,并由端部加装有垫板的钢筋墩头或挤压套筒与条形钢板固定,外露钢筋端部安装有挤压套筒时,用压力钳将挤压套筒挤压后与钢筋锚固;
步骤四,在条形钢板与其两侧预制楼板之间的板端头空隙内填充自密实混凝土,完成封锚。
本发明的有益效果如下:
本发明在工厂生产预制楼板时,在每块预制楼板两端外露一定长度的钢筋,并在端部加工好锚固用的钢筋墩头,或安装挤压套筒。在工字钢梁上焊接钢板条并开设钢筋定位槽,钢筋定位槽上部开口采用喇叭口形,便于预制楼板吊装时其外露钢筋的定位入槽。钢梁安装完成后,预制楼板相互错开放置在钢梁上,并将外露钢筋直接放置在钢板开槽内,通过钢筋墩头和套筒完成与钢板的锚固。
本发明钢筋锚固用的钢筋墩头和挤压套筒在工厂预制时即可加工完成,工字钢梁现场焊接条形钢板后,预制楼板吊装到位,可直接与条形钢板进行固定,无需安装其他锚固件或连接钢筋,安装十分方便,可大大减少施工工序,节约预制楼板与钢梁的锚固时间。此外,采用相邻两块预制楼板外露钢筋水平向交错锚固的方式,可使楼板的锚固强度明显提高。
本发明可广泛应用于装配式钢结构建筑中预制楼板与钢梁之间的连接。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明正立面结构示意图。
图2是图1A处的放大图。
图3是本发明平面结构示意图。
图4是图3中I-I剖面的结构示意图。
图5是本发明另一连接节点处正立面结构示意图。
图6是图5B处的放大图。
图7是本发明另一连接节点处的平面结构示意图。
图8是图7中I-I剖面的结构示意图。
附图标记:1-预制楼板、2-纵向钢筋、3-工字钢梁、4-条形钢板、4.1-钢筋定位槽、5-钢筋墩头、6-垫板、7-挤压套筒、8-自密实混凝土。
具体实施方式
实施例参见图1~8所示,这种钢结构建筑装配式预制楼板连接件,所述预制楼板1放置在工字钢梁4上,预制楼板1内间隔分布有上下两排纵向钢筋2,纵向钢筋2两端穿出预制楼板1两端面形成外露钢筋。所述预制楼板1宽度可为0.6~1.0m,厚度为90~130mm。
所述预制楼板1两端的外露钢筋端部均为加装有垫板6的钢筋墩头5,或者预制楼板1一端的外露钢筋端部为加装有垫板6的钢筋墩头5,另一端的外露钢筋端部安装有挤压套筒7。
所述工字钢梁3沿顶面通长垂直焊接有一条形钢板4,采用双面全焊,条形钢板4厚度可为10mm。条形钢板4在长度方向间隔开有钢筋定位槽4.1,所述钢筋定位槽4.1上部开口为喇叭口形,钢筋定位槽4.1的底部宽度为纵向钢筋2直径d+2mm。钢筋定位槽4.1间距为预制楼板内纵向钢筋2水平间距的一半,钢筋定位槽4.1槽底高度等于预制楼板内下排纵向钢筋的保护层厚度。
所述预制楼板1两端分别置于相邻工字钢梁3上,搭接的长度为30~40mm。每个工字钢梁3上条形钢板4两侧的预制楼板1错开放置,错开距离为预制楼板内纵向钢筋2水平间距的一半,条形钢板4两侧预制楼板1的外露钢筋相互交错放置在钢筋定位槽4.1内,并由端部加装有垫板6的钢筋墩头5或挤压套筒7与条形钢板4固定。
所述条形钢板4与其两侧预制楼板1之间的板端头空隙内填充有自密实混凝土8。
参见图1~4所示,相邻两预制楼板的外露钢筋均由加装有垫板6的钢筋墩头5与条形钢板4锚固。
参见图5~8所示,一侧预制楼板的外露钢筋由加装有垫板6的钢筋墩头5与条形钢板4锚固,另一侧预制楼板的外露钢筋由挤压套筒7与条形钢板锚固。
这种钢结构建筑装配式预制楼板连接件的安装方法,安装步骤如下:
步骤一,采用工厂化生产预制楼板1,将预制楼板1两端的外露钢筋端部均加工成钢筋墩头5并加装有垫板6,或者将预制楼板1一端的外露钢筋端部加工成钢筋墩头5并加装有垫板6,另一端的外露钢筋端部安装挤压套筒7;
步骤二,在工字钢梁3沿顶面通长垂直焊接条形通长钢板4,条形钢板4在长度方向间隔开设钢筋定位槽4.1;
步骤三,在预制楼板1上安装四个吊点,工字钢梁3安装完成后,通过吊点用吊机将预制楼板吊起,放置到工字钢梁上,将每个工字钢梁上条形钢板4两侧的预制楼板1错开放置,条形钢板4两侧预制楼板1的外露钢筋相互交错放置在钢筋定位槽4.1内,并由端部加装有垫板6的钢筋墩头5或挤压套筒7与条形钢板4固定,外露钢筋端部安装有挤压套筒7时,用压力钳将挤压套筒挤压后与钢筋锚固;
步骤四,在条形钢板4与其两侧预制楼板1之间的板端头空隙内填充自密实混凝土8,完成封锚。
Claims (7)
1.一种钢结构建筑装配式预制楼板连接件,所述预制楼板(1)放置在工字钢梁(4)上,预制楼板(1)内间隔分布有上下两排纵向钢筋(2),纵向钢筋(2)两端穿出预制楼板(1)两端面形成外露钢筋,其特征在于:
所述预制楼板(1)两端的外露钢筋端部均为加装有垫板(6)的钢筋墩头(5),或者预制楼板(1)一端的外露钢筋端部为加装有垫板(6)的钢筋墩头(5),另一端的外露钢筋端部安装有挤压套筒(7);
所述工字钢梁(3)沿顶面通长垂直焊有一条形钢板(4),条形钢板(4)在长度方向间隔开有钢筋定位槽(4.1),钢筋定位槽(4.1)间距为预制楼板内纵向钢筋(2)水平间距的一半;
所述预制楼板(1)两端分别置于相邻工字钢梁(3)上,每个工字钢梁(3)上条形钢板(4)两侧的预制楼板(1)错开放置,错开距离为预制楼板内纵向钢筋(2)水平间距的一半,条形钢板(4)两侧预制楼板(1)的外露钢筋相互交错放置在钢筋定位槽(4.1)内,并由端部加装有垫板(6)的钢筋墩头(5)或挤压套筒(7)与条形钢板(4)固定;
所述条形钢板(4)与其两侧预制楼板(1)之间的板端头空隙内填充有自密实混凝土(8)。
2.根据权利要求1所述的钢结构建筑装配式预制楼板连接件,其特征在于:所述钢筋定位槽(4.1)上部开口为喇叭口形,钢筋定位槽(4.1)的底部宽度为纵向钢筋(2)直径d+2mm;钢筋定位槽(4.1)的槽底宽度为纵向钢筋(2)直径d+2mm。
3.根据权利要求1所述的钢结构建筑装配式预制楼板连接件,其特征在于:所述钢筋定位槽槽底高度等于预制楼板内下排纵向钢筋的保护层厚度。
4.根据权利要求1所述的钢结构建筑装配式预制楼板连接件,其特征在于:所述预制楼板(1)宽度为0.6~1.0m,厚度为90~130mm。
5.根据权利要求1所述的钢结构建筑装配式预制楼板连接件,其特征在于:所述预制楼板(1)与工字钢梁(3)的搭接长度为30~40mm。
6.根据权利要求1所述的钢结构建筑装配式预制楼板连接件,其特征在于:所述工字钢梁(3)与条形钢板(4)采用双面全焊。
7.一种如权利要求1~6任意一项所述的钢结构建筑装配式预制楼板连接件的安装方法,其特征在于安装步骤如下:
步骤一,采用工厂化生产预制楼板(1),将预制楼板(1)两端的外露钢筋端部均加工成钢筋墩头(5)并加装有垫板(6),或者将预制楼板(1)一端的外露钢筋端部加工成钢筋墩头(5)并加装有垫板(6),另一端的外露钢筋端部安装挤压套筒(7);
步骤二,在工字钢梁(3)沿顶面通长垂直焊接条形钢板(4),条形钢板(4)在长度方向间隔开设钢筋定位槽(4.1);
步骤三,在预制楼板(1)上安装四个吊点,工字钢梁(3)安装完成后,通过吊点用吊机将预制楼板吊起,放置到工字钢梁上,将每个工字钢梁上条形钢板(4)两侧的预制楼板(1)错开放置,条形钢板(4)两侧预制楼板(1)的外露钢筋相互交错放置在钢筋定位槽(4.1)内,并由端部加装有垫板(6)的钢筋墩头(5)或挤压套筒(7)与条形钢板(4)固定,外露钢筋端部安装有挤压套筒(7)时,用压力钳将挤压套筒挤压后与钢筋锚固;
步骤四,在条形钢板(4)与其两侧预制楼板(1)之间的板端头空隙内填充自密实混凝土(8),完成封锚。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410668160.3A CN104405041B (zh) | 2014-11-21 | 2014-11-21 | 钢结构建筑装配式预制楼板连接件及其安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410668160.3A CN104405041B (zh) | 2014-11-21 | 2014-11-21 | 钢结构建筑装配式预制楼板连接件及其安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104405041A true CN104405041A (zh) | 2015-03-11 |
CN104405041B CN104405041B (zh) | 2016-03-02 |
Family
ID=52642699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410668160.3A Active CN104405041B (zh) | 2014-11-21 | 2014-11-21 | 钢结构建筑装配式预制楼板连接件及其安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104405041B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369901A (zh) * | 2015-12-10 | 2016-03-02 | 中建三局集团有限公司重庆分公司 | 楼板预埋钢筋结构 |
CN105507460A (zh) * | 2015-12-18 | 2016-04-20 | 上海中森建筑与工程设计顾问有限公司 | 一种用于预制墙板的水平快速连接结构 |
CN108018975A (zh) * | 2017-11-29 | 2018-05-11 | 深圳雅鑫建筑钢结构工程有限公司 | 锚固连接件及预制楼板装配结构体系 |
CN110107006A (zh) * | 2019-05-05 | 2019-08-09 | 湘潭大学 | 一种大跨度组合结构楼盖 |
CN110230506A (zh) * | 2019-07-01 | 2019-09-13 | 湖南五新隧道智能装备股份有限公司 | 一种用于侧墙施工的衬砌台车 |
CN110409622A (zh) * | 2018-04-26 | 2019-11-05 | 湖北宇星建设有限公司 | 一种新型钢结构装配式建筑 |
CN110629915A (zh) * | 2019-09-06 | 2019-12-31 | 浙江旷厦建设有限公司 | 一种预制楼板的安装结构及安装方法 |
CN111441520A (zh) * | 2020-04-10 | 2020-07-24 | 中国五冶集团有限公司 | 一种钢结构免支撑全预制混凝土楼板连接节点及连接方法 |
CN114753534A (zh) * | 2022-05-07 | 2022-07-15 | 吉林大学 | 一种用于水暖型供热楼板拼接的连接件 |
CN114856060A (zh) * | 2022-05-18 | 2022-08-05 | 海南大学 | 一种装配式楼板的连接装置及方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1587575A (zh) * | 2004-06-30 | 2005-03-02 | 清华大学 | 钢-混凝土叠合板组合梁 |
CN201151961Y (zh) * | 2007-12-20 | 2008-11-19 | 同济大学 | 腹板嵌入式组合楼盖 |
US20090205285A1 (en) * | 2008-02-15 | 2009-08-20 | Lightweight Structures, Llc (A Wisconsin Limited Liability Company) | Composite floor systems and apparatus for supporting a concrete floor |
KR20100111883A (ko) * | 2009-04-08 | 2010-10-18 | (주)대우건설 | 커플러를 이용한 딜레이 조인트 구간의 보철근 시공방법 |
CN103061418A (zh) * | 2013-01-14 | 2013-04-24 | 西南交通大学 | 连续变刚度剪力键式钢-混凝土结合段 |
CN103397727A (zh) * | 2013-08-16 | 2013-11-20 | 威海建设集团股份有限公司 | 建筑物钢梁与叠合楼板的连接结构 |
CN103572839A (zh) * | 2013-11-05 | 2014-02-12 | 南京工业大学 | 一种混合抗剪连接件 |
CN204225277U (zh) * | 2014-11-21 | 2015-03-25 | 大元建业集团股份有限公司 | 钢结构建筑装配式预制楼板连接件 |
-
2014
- 2014-11-21 CN CN201410668160.3A patent/CN104405041B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1587575A (zh) * | 2004-06-30 | 2005-03-02 | 清华大学 | 钢-混凝土叠合板组合梁 |
CN201151961Y (zh) * | 2007-12-20 | 2008-11-19 | 同济大学 | 腹板嵌入式组合楼盖 |
US20090205285A1 (en) * | 2008-02-15 | 2009-08-20 | Lightweight Structures, Llc (A Wisconsin Limited Liability Company) | Composite floor systems and apparatus for supporting a concrete floor |
KR20100111883A (ko) * | 2009-04-08 | 2010-10-18 | (주)대우건설 | 커플러를 이용한 딜레이 조인트 구간의 보철근 시공방법 |
CN103061418A (zh) * | 2013-01-14 | 2013-04-24 | 西南交通大学 | 连续变刚度剪力键式钢-混凝土结合段 |
CN103397727A (zh) * | 2013-08-16 | 2013-11-20 | 威海建设集团股份有限公司 | 建筑物钢梁与叠合楼板的连接结构 |
CN103572839A (zh) * | 2013-11-05 | 2014-02-12 | 南京工业大学 | 一种混合抗剪连接件 |
CN204225277U (zh) * | 2014-11-21 | 2015-03-25 | 大元建业集团股份有限公司 | 钢结构建筑装配式预制楼板连接件 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105369901A (zh) * | 2015-12-10 | 2016-03-02 | 中建三局集团有限公司重庆分公司 | 楼板预埋钢筋结构 |
CN105507460A (zh) * | 2015-12-18 | 2016-04-20 | 上海中森建筑与工程设计顾问有限公司 | 一种用于预制墙板的水平快速连接结构 |
CN108018975A (zh) * | 2017-11-29 | 2018-05-11 | 深圳雅鑫建筑钢结构工程有限公司 | 锚固连接件及预制楼板装配结构体系 |
CN110409622A (zh) * | 2018-04-26 | 2019-11-05 | 湖北宇星建设有限公司 | 一种新型钢结构装配式建筑 |
CN110107006A (zh) * | 2019-05-05 | 2019-08-09 | 湘潭大学 | 一种大跨度组合结构楼盖 |
CN110230506A (zh) * | 2019-07-01 | 2019-09-13 | 湖南五新隧道智能装备股份有限公司 | 一种用于侧墙施工的衬砌台车 |
CN110629915A (zh) * | 2019-09-06 | 2019-12-31 | 浙江旷厦建设有限公司 | 一种预制楼板的安装结构及安装方法 |
CN111441520A (zh) * | 2020-04-10 | 2020-07-24 | 中国五冶集团有限公司 | 一种钢结构免支撑全预制混凝土楼板连接节点及连接方法 |
CN114753534A (zh) * | 2022-05-07 | 2022-07-15 | 吉林大学 | 一种用于水暖型供热楼板拼接的连接件 |
CN114856060A (zh) * | 2022-05-18 | 2022-08-05 | 海南大学 | 一种装配式楼板的连接装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104405041B (zh) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104405041B (zh) | 钢结构建筑装配式预制楼板连接件及其安装方法 | |
CN204225277U (zh) | 钢结构建筑装配式预制楼板连接件 | |
CN204983662U (zh) | 一种对拉螺杆与钢管排架组合单侧支模装置 | |
CN102102396A (zh) | 圆钢管混凝土柱与钢筋混凝土剪力墙的节点连接方法 | |
CN110792164B (zh) | 一种装配式剪力墙横向拼装装置和拼装方法 | |
CN108086488B (zh) | 装配式框剪结构墙错层式连接结构及拼装方法 | |
CN205046677U (zh) | 一种装配式混凝土框架节点连接结构 | |
CN104612300A (zh) | 一种空心叠合楼板及其施工方法 | |
CN103603494B (zh) | 一种超薄钢桁架斜墙施工方法及模板结构 | |
CN103726586A (zh) | 工形钢与钢板架构界面带凹槽装配剪力墙及作法 | |
CN106978909A (zh) | 一种混凝土梁与型钢混凝土柱节点钢筋连接的方法 | |
CN104631674A (zh) | 一种叠合楼板及其施工方法 | |
CN210262715U (zh) | 一种桥梁工程用预制装配式防撞护栏 | |
CN205399773U (zh) | 一种轻型房屋结构的装配式楼板 | |
CN103194982B (zh) | 桥梁边跨现浇段短悬臂支架施工方法 | |
CN205024833U (zh) | 一种钢骨混凝土组合预制构件 | |
CN103882808B (zh) | 匝道桥与主线桥交接跨架设预制梁支撑系统的施工方法 | |
CN203271106U (zh) | 一种悬挑脚手架型钢锚固装置 | |
CN204825945U (zh) | 一种用于固定预埋螺栓的卡具 | |
CN205348214U (zh) | 一种柱状式钢筋混凝土与型钢混合式龙门吊基础 | |
CN114197511A (zh) | 一种新型装配式型钢混凝土轻质基础及其装配方法 | |
CN103628673B (zh) | 一种楼板铝模板拼接支模结构体系 | |
CN113175124A (zh) | 一种采用竖向通孔置入竹竿灌浆加固空心砌块结构及施工方法 | |
CN205399827U (zh) | 混凝土柱、梁、板交接处用预制整体装配式钢筋架 | |
CN206769198U (zh) | 分离组合式钢筋混凝土预制块锚固端支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |