CN104389295A - 碾压沥青混凝土心墙的施工方法 - Google Patents

碾压沥青混凝土心墙的施工方法 Download PDF

Info

Publication number
CN104389295A
CN104389295A CN201410725748.8A CN201410725748A CN104389295A CN 104389295 A CN104389295 A CN 104389295A CN 201410725748 A CN201410725748 A CN 201410725748A CN 104389295 A CN104389295 A CN 104389295A
Authority
CN
China
Prior art keywords
transition materials
core
construction
shaking
asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410725748.8A
Other languages
English (en)
Other versions
CN104389295B (zh
Inventor
朱志坚
谢晓龙
翁昌国
戈文武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yichang Dingcheng Engineering Technology Service Co ltd
China Gezhouba Group No 2 Engineering Co Ltd
Original Assignee
China Gezhouba Group No 2 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 2 Engineering Co Ltd filed Critical China Gezhouba Group No 2 Engineering Co Ltd
Priority to CN201410725748.8A priority Critical patent/CN104389295B/zh
Publication of CN104389295A publication Critical patent/CN104389295A/zh
Application granted granted Critical
Publication of CN104389295B publication Critical patent/CN104389295B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/02Fixed barrages
    • E02B7/04Dams across valleys
    • E02B7/06Earth-fill dams; Rock-fill dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Road Paving Machines (AREA)

Abstract

本发明土石坝碾压沥青混凝土心墙的施工方法,该方法是每日连续进行二层沥青混凝土碾压铺筑施工,施工时每层沥青混合料的摊铺厚度为35cm,沥青混合料入仓温度160~170℃,初碾温度150~155℃,碾压后的沥青混凝土表层下1cm~2cm处的温度下降到140~145℃时复碾,温度下降到130~135℃时终碾,无振碾压1遍进行表面收光。本发明方法充分利用施工时间,加快了施工进度,缩短工程建设工期,极大的提高了施工效率,大大的降低了施工成本。

Description

碾压沥青混凝土心墙的施工方法
技术领域:
本发明涉及一种土石坝碾压沥青混凝土心墙铺筑施工的方法。
背景技术:
土石坝设计中采用碾压沥青混凝土作为防渗心墙材料成为当今的发展方向,同时使土石坝工程在水利水电行业中得到更大的发展。我国土石坝大坝上应用碾压沥青混凝土作防渗心墙的时间短,施工的经验较少,特别是沥青混合料的摊铺层厚一直在23.0cm左右(压实后的层厚20.0cm左右),不但施工效率低、施工成本高,而且严重制约着碾压沥青混凝土防渗心墙施工的进度。
发明内容:
本新发明的目的是为了提供一种施工效率高,施工成本低的土石坝碾压沥青混凝土心墙的施工方法。
本发明的目的是这样来实现的:
本发明碾压沥青混凝土心墙的施工方法,该方法是每日连续进行二层沥青混凝土碾压铺筑施工,施工时每层沥青混合料的摊铺厚度为35cm,沥青混合料入仓温度160~170℃,初碾温度150~155℃,碾压后的沥青混凝土表层下1cm~2cm处的温度下降到140~145℃时复碾,温度下降到130~135℃时终碾,再无振碾压1遍进行表面收光,在摊铺沥青混合料的同时摊铺心墙两侧的过渡料。
上述的碾压方法如下:
当日铺筑的第一层碾压顺序为1)无振碾压沥青混合料1遍;2)无振碾压过渡料1遍;3)振动碾压过渡料4遍;4)振动碾压沥青混合料10~12遍;5)振动碾压过渡料4遍;6)用1.5t振振动碾压在沥青心墙无振碾压1遍收光,过渡料用2.5t振振动碾压无振碾压1遍压平过渡料与心墙接触部位;振动碾压行走速度为25~30m/min。
当日铺筑的第二层碾压顺序为;1)无振碾压沥青混合料1遍;2)无振碾压过渡料2遍;3)振动碾压过渡料4遍;4)振动碾压沥青混合料13~14遍;5)振动碾压过渡料4遍;6)用1.5t振振动碾压在沥青心墙无振碾压1遍收光沥青混凝土面,过渡料用2.5t振动碾无振碾压1遍压平过渡料与心墙接触部位;振动碾压行走速度为25~30m/min;
当日第一层铺筑时,基础沥青混凝土的表面温度加热到55~65℃;当日铺筑第二层时,基础沥青混凝土表面下深1~2cm处的温度降至90℃,才能保证沥青混凝土碾压施工的质量达到要求值,保证在软基础上的沥青混合料被碾压密实。
上述的方法中采用人工或机械摊铺凝青混合料。
上述的机械摊铺凝青混合料时,沥青拌和站拌制的沥青混合料用保温车承担水平运输,由装载机作垂直运输,并给沥青摊铺机喂料;摊铺机的框模或架立的模板高度35cm;反铲给摊铺机后部的料斗喂过渡料;摊铺机摊铺作业时沥青混合料的出机口温度控制在165~175℃,必须保证其前部的远红外线加热器正常工作,当日的第二层铺筑时,关闭前部的远红外线加热器。摊铺机的沥青混合料斗和过渡料斗装满料后进行摊铺,摊铺时行走速度保持在2~3m/min;在摊铺沥青混合料同时摊铺心墙两侧的过渡料。
上述的方法中采用人工摊铺时,用装载机直接送沥青混合料入仓,用移动红外线加热器加热基础面。
本发明方法突破了DL/T5363—2006施工规范的要求;极大的提高了施工效率,充分利用施工时间,尤其是在全年允许碾压沥青混凝土心墙施工天数较少的地区,加快了施工进度,缩短工程建设工期,大大的降低了施工成本。
附图说明:
日连续摊铺2层示意图见下图。
具体实施方式:
本实施1碾压沥青混凝土心墙的施工方法,该方法是每日连续进行二层沥青混凝土碾压铺筑施工,施工时每层沥青混合料的摊铺厚度为35cm,沥青混合料入仓温度160~170℃,初碾温度150~155℃,碾压后的沥青混凝土表层下1cm~2cm处的温度下降到140~145℃时复碾,温度下降到130~135℃时终碾,再无振碾压1遍进行表面收光,在摊铺沥青混合料的同时摊铺心墙两侧的过渡料。
上述的碾压方法如下:
当日铺筑的第一层碾压顺序为1)无振碾压沥青混合料1遍;2)无振碾压过渡料1遍;3)振动碾压过渡料4遍;4)振动碾压沥青混合料11遍;5)振动碾压过渡料4遍;6)用1.5t振振动碾压在沥青心墙无振碾压1遍收光;过渡料用2.5t振动碾无振碾压1遍压平过渡料与心墙接触部位;振动碾压行走速度为25~30m/min。
当日铺筑的第二层碾压顺序;1)为无振碾压沥青混合料1遍;2)无振碾压过渡料2遍;3)振动碾压过渡料4遍;4)振动碾压沥青混合料13遍;5)振动碾压过渡料4遍;6)用1.5t振振动碾压在沥青心墙无振碾压1遍收光沥青混凝土面,过渡料用2.5t振动碾无振碾压1遍压平过渡料与心墙接触部位;振动碾压行走速度为25~30m/min。
当日第一层铺筑时,基础沥青混凝土的表面温度加热到55~65℃;当日铺筑第二层时,基础沥青混凝土表面下深1~2cm处的温度降至90℃,才能保证沥青混凝土碾压施工的质量达到要求值,保证在软基础上的沥青混合料被碾压密实。
机械摊铺凝青混合料时,沥青拌和站拌制的沥青混合料用保温车承担水平运输,由改装的装载机作垂直运输,并给沥青摊铺机喂料;摊铺机的框模或架立的模板高度35cm;反铲给摊铺机后部的料斗喂过渡料,摊铺机摊铺作业时沥青混合料的出机口温度控制在165~175℃,必须保证其前部的远红外线加热器正常工作当日的第二层铺筑时,关闭前部的远红外线加热器不要工作。摊铺机的沥青混合料斗和过渡料斗装满料后进行摊铺,摊铺时行走速度保持在2~3m/min;在摊铺沥青混合料同时摊铺心墙两侧的过渡料。
图1中序号1、2、3、4、5分别为第一层沥青混凝土、第二层沥青混凝土、基础面线,压实后的基础面线、沥青混合料摊铺层面线。H1、H2分别为35cm、31cm。
实施例2:
本实施例2基本与实施例1同,不同处是人工摊铺时,用装载机直接送沥青混合料入仓,用移动红外线加热器加热基础面。
上述实施例是对本发明的上述内容作进一步的说明,但不应将此理解为本发明上述主题的范围仅限于上述实施例。凡基于上述内容所实现的技术均属于本发明的范围。

Claims (5)

1.碾压沥青混凝土心墙的施工方法,该方法是每日连续进行二层沥青混凝土碾压铺筑施工,施工时每层沥青混合料的摊铺厚度为35cm,沥青混合料入仓温度160~170℃,初碾温度150~155℃之间,碾压后的沥青混凝土表层下1cm~2cm处的温度下降到140~145℃时复碾,温度下降到130~135℃时终碾,再无振碾压1遍进行表面收光,在摊铺沥青混合料同时摊铺心墙两侧的过渡料。
2.如权利要求1所述的碾压沥青混凝土心墙的施工方法,其特征在于碾压方法如下:
当日铺筑的第一层碾压顺序为1)无振碾压沥青混合料1遍;2)无振碾压过渡料1遍;3)振动碾压过渡料4遍;4)振动碾压沥青混合料10~12遍;5)振动碾压过渡料4遍;6)用1.5t振动碾在沥青心墙无振碾压1遍收光,过渡料用2.5t振振动碾压无振碾压1遍压平过渡料与心墙接触部位;振动碾压行走速度为25~30m/min;
当日铺筑的第二层碾压顺序;1)为无振碾压沥青混合料1遍;2)无振碾压过渡料2遍;3)振动碾压过渡料4遍;4)振动碾压沥青混合料13~14遍;5)振动碾压过渡料4遍;6)用1.5t振振动碾压在沥青心墙无振碾压1遍收光沥青混凝土面,过渡料用2.5t振动碾无振碾压1遍压平过渡料与心墙接触部位;振动碾压行走速度为25~30m/min;
当日第一层铺筑时,基础沥青混凝土的表面温度加热到55~65℃;当日铺筑第二层时,基础沥青混凝土表面下深1~2cm处的温度降至90℃,保证沥青混凝土碾压施工的质量达到要求值,保证在软基础上的沥青混合料被碾压密实。
3.如权利要求2所述的碾压沥青混凝土心墙的施工方法,其特征在于采用人工或机械摊铺凝青混合料。
4.如权利要求3所述的碾压沥青混凝土心墙的施工方法,其特征在于机械摊铺凝青混合料时,沥青拌和站拌制的沥青混合料用保温车承担水平运输,由改装的装载机作垂直运输,并给沥青摊铺机喂料;摊铺机的框模或架立的模板高度35cm;反铲给摊铺机后部的料斗喂过渡料;摊铺机摊铺作业时沥青混合料的出机口温度控制在165~175℃,保证其前部的远红外线加热器正常工作;当日的第二层铺筑时,关闭前部的远红外线加热器;摊铺机的沥青混合料斗和过渡料斗装满料后进行摊铺,摊铺时行走速度保持在2~3m/min;在摊铺沥青混合料同时摊铺心墙两侧的过渡料。
5.如权利要求3所述的碾压沥青混凝土心墙的施工方法,其特征在于人工摊铺时,用装载机直接送沥青混合料入仓,用移动红外线加热器加热基础面。
CN201410725748.8A 2014-12-04 2014-12-04 碾压沥青混凝土心墙的施工方法 Active CN104389295B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410725748.8A CN104389295B (zh) 2014-12-04 2014-12-04 碾压沥青混凝土心墙的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410725748.8A CN104389295B (zh) 2014-12-04 2014-12-04 碾压沥青混凝土心墙的施工方法

Publications (2)

Publication Number Publication Date
CN104389295A true CN104389295A (zh) 2015-03-04
CN104389295B CN104389295B (zh) 2016-02-03

Family

ID=52607248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410725748.8A Active CN104389295B (zh) 2014-12-04 2014-12-04 碾压沥青混凝土心墙的施工方法

Country Status (1)

Country Link
CN (1) CN104389295B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386060A (zh) * 2017-07-18 2017-11-24 中国水电基础局有限公司 高海拔地区沥青混凝土的拌合方法
CN112854142A (zh) * 2021-01-15 2021-05-28 西安理工大学 复杂气候条件下碾压式沥青混凝土心墙施工方法
CN113152388A (zh) * 2021-03-30 2021-07-23 中电建十一局工程有限公司 一种沥青混凝土快速转运施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54436U (zh) * 1977-06-06 1979-01-05
JPS54439A (en) * 1977-06-03 1979-01-05 Kajima Corp Method of raising embankment of fill dam
SU1073365A1 (ru) * 1982-06-16 1984-02-15 Куйбышевский Филиал Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Способ возведени плотин из грунтовых материалов
CN1807763A (zh) * 2005-11-30 2006-07-26 中水东北勘测设计研究有限责任公司科学研究院 土石坝振捣式沥青混凝土防渗心墙的施工方法
CN102493402A (zh) * 2011-11-30 2012-06-13 中水东北勘测设计研究有限责任公司 土石坝沥青混凝土心墙插入式振碾施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54439A (en) * 1977-06-03 1979-01-05 Kajima Corp Method of raising embankment of fill dam
JPS54436U (zh) * 1977-06-06 1979-01-05
SU1073365A1 (ru) * 1982-06-16 1984-02-15 Куйбышевский Филиал Всесоюзного Ордена Ленина Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука Способ возведени плотин из грунтовых материалов
CN1807763A (zh) * 2005-11-30 2006-07-26 中水东北勘测设计研究有限责任公司科学研究院 土石坝振捣式沥青混凝土防渗心墙的施工方法
CN102493402A (zh) * 2011-11-30 2012-06-13 中水东北勘测设计研究有限责任公司 土石坝沥青混凝土心墙插入式振碾施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
司礼山: "实例探析沥青混凝土心墙坝施工要点", 《河南水利与南水北调》, no. 4, 26 May 2014 (2014-05-26), pages 6 - 7 *
李向春: "坝体沥青混凝土心墙施工", 《石河子科技》, no. 1, 29 February 2012 (2012-02-29), pages 49 - 52 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386060A (zh) * 2017-07-18 2017-11-24 中国水电基础局有限公司 高海拔地区沥青混凝土的拌合方法
CN107386060B (zh) * 2017-07-18 2019-06-25 中国水电基础局有限公司 高海拔地区沥青混凝土的拌合方法
CN112854142A (zh) * 2021-01-15 2021-05-28 西安理工大学 复杂气候条件下碾压式沥青混凝土心墙施工方法
CN113152388A (zh) * 2021-03-30 2021-07-23 中电建十一局工程有限公司 一种沥青混凝土快速转运施工方法

Also Published As

Publication number Publication date
CN104389295B (zh) 2016-02-03

Similar Documents

Publication Publication Date Title
CN110130278A (zh) 一种胶结堆石坝及其施工方法
CN102864758B (zh) 高寒高海拔地区碾压式沥青混凝土防渗心墙施工方法
CN104389295B (zh) 碾压沥青混凝土心墙的施工方法
CN106759126B (zh) 一种边坡支护排水渠的施工方法
CN207143857U (zh) 一种用于摊铺斜坡的摊铺机
CN207003194U (zh) 道路桥梁施工路面平整装置
CN110846967A (zh) 用于公路施工的路面改建方法及设备
CN105908609A (zh) 一种路面3d打印设备及其应用
CN104314053A (zh) 一种土石坝心墙沥青混凝土及其摊铺方法
CN111455770A (zh) 一种基于再生材料的沥青路面拼接结构及其施工方法
CN103835205A (zh) 路沿石滑模施工方法
CN111424491A (zh) 装配式沥青路面坑槽快速修补工艺
CN108824454A (zh) 一种既有道路管槽回填结构及其施工方法
CN205999755U (zh) 一种高效混凝土摊铺机
CN107419706A (zh) 高海拔地区沥青混凝土心墙施工的局部气候营造方法
CN112030665A (zh) 一种振动密实大孔隙透水混凝土路面施工的方法
CN210946329U (zh) 一种地铁上方高填路堤结构
KR20190001258A (ko) 폐아스팔트 콘크리트를 이용한 포장도로의 친환경 보수 방법
CN207277140U (zh) 水工专用沥青摊铺机
CN213115347U (zh) 一种防潮地面
CN204780555U (zh) 一种沥青路面坑槽修补的结构
CN203856170U (zh) 一种现场制作不变形的石英石
CN111472240B (zh) 一种景观园林路面建造施工工艺
CN111535323B (zh) 一种全断面准三级配长龄期碾压混凝土施工方法
CN109137674B (zh) 一种生态陶瓷透水砖制作海浪式铺装方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Applicant after: CHINA GEZHOUBA GROUP SECOND ENGINEERING Co.,Ltd.

Address before: 610091 Sichuan Province, Chengdu District of Qingyang City Industrial Development Zone (East) with the road No. 8 Building 10

Applicant before: GEZHOUBA GROUP NO.2 ENGINEERING Co.,Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240611

Address after: 610091 building 15, zone n, Qingyang Industrial headquarters base, No. 239, Guangfu Road, Supo street, Qingyang District, Chengdu, Sichuan Province

Patentee after: CHINA GEZHOUBA GROUP SECOND ENGINEERING Co.,Ltd.

Country or region after: China

Patentee after: Hubei Yichang Dingcheng Engineering Technology Service Co.,Ltd.

Address before: 610091 building 10, No.8, Tongcheng Road, Industrial Development Zone (East District), Qingyang District, Chengdu City, Sichuan Province

Patentee before: CHINA GEZHOUBA GROUP SECOND ENGINEERING Co.,Ltd.

Country or region before: China