CN104368915B - 隧道初衬钢筋网片模具制作方法 - Google Patents
隧道初衬钢筋网片模具制作方法 Download PDFInfo
- Publication number
- CN104368915B CN104368915B CN201410497289.2A CN201410497289A CN104368915B CN 104368915 B CN104368915 B CN 104368915B CN 201410497289 A CN201410497289 A CN 201410497289A CN 104368915 B CN104368915 B CN 104368915B
- Authority
- CN
- China
- Prior art keywords
- steel plate
- node
- reinforcing bar
- plate frame
- mesh sheet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种隧道初衬钢筋网片模具制作方法,该方法包括以下步骤:⑴将5根1.5m等长度的Ф20或Ф22钢筋作为底部钢筋;⑵制作钢板边框;⑶将所述底部钢筋竖直按20cm等间距排列,并焊接于所述钢板边框的底部;⑷以所述钢板边框右下角为控制点,预留施工搭接长度,确定网片右下角第一个节点位置,并在所述底部钢筋上标出网片节点,然后再依次确定其余节点,并使节点位置横竖在一条直线上;最后将0.3~0.4m长的Φ8钢筋作为节点控制钢筋沿所述钢板边框的深度方向垂直焊接在所述钢板边框框底钢筋已标网片节点处即可。本发明操作简单,成本低,可实现快速布设网片的目的。
Description
技术领域
本发明涉及新奥法隧道施工中挂网喷锚支护技术领域及模具加工领域,尤其涉及隧道初衬钢筋网片模具制作方法。
背景技术
隧道初衬施工是新奥法的核心,由于隧道作业环境狭小,为快速安全施工,尽快固定围岩使其自身受力,网片挂设要求方便快捷,且搭接规范,尺寸合格,要求钢筋加工厂具有快速精准的网片加工工艺。
发明内容
本发明所要解决的技术问题是提供一种快速布设网片的隧道初衬钢筋网片模具制作方法。
为解决上述问题,本发明所述的隧道初衬钢筋网片模具制作方法,包括以下步骤:
⑴将5根1.5m等长度的Ф20或Ф22钢筋作为底部钢筋;
⑵将厚度为3~5mm的钢板用氧炔焰切割为宽为30~40cm,长分别为1.5m、1.2m的长方形各两块,然后焊接成宽为1.2m、高为1.5m、深为0.3~0.4m的呈“口” 字形钢板边框;
⑶将所述底部钢筋竖直按20cm等间距排列,并焊接于所述钢板边框的底部;
⑷以所述钢板边框右下角为控制点,预留施工搭接长度,确定网片右下角第一个节点位置,并在所述底部钢筋上标出网片节点,然后再依次确定其余节点,并使节点位置横竖在一条直线上;最后将0.3~0.4m长的Φ8钢筋作为节点控制钢筋沿所述钢板边框的深度方向垂直焊接在所述钢板边框框底钢筋已标网片节点处即可。
本发明与现有技术相比具有以下优点:
1、本发明通过对钢筋网提前批量加工,有效地改善了现场空间小,且受隧道断面的影响,台车上钢筋运输及拱腰以上至拱顶钢筋绑扎极其困难的问题,大大提高了网片布设速度,为及早喷射混凝土使围岩自身受力赢得了时间,减少围岩的暴露时间,不但节省了劳力,而且节省了时间,同时,也提高了安全系数。
2、本发明操作简单,成本低,使用方便。
附图说明
下面结合附图对本发明的具体实施方式作进一步详细的说明。
图1为本发明示意图。
图中:1—底部钢筋 2—钢板边框 3—节点控制钢筋。
具体实施方式
隧道初衬钢筋网片模具制作方法,包括以下步骤:
⑴将5根1.5m等长度的Ф20或Ф22钢筋作为底部钢筋1;
⑵将厚度为3~5mm的钢板用氧炔焰切割为宽为30~40cm,长分别为1.5m、1.2m的长方形各两块,然后焊接成宽为1.2m、高为1.5m、深为0.3~0.4m的呈“口” 字形钢板边框2;
⑶将底部钢筋1竖直按20cm等间距排列,并焊接于钢板边框2的底部;
⑷以钢板边框2右下角为控制点,预留施工搭接长度,确定网片右下角第一个节点位置,并在底部钢筋1上标出网片节点,然后再依次确定其余节点,并使节点位置横竖在一条直线上;最后将0.3~0.4m长的Φ8钢筋作为节点控制钢筋3沿钢板边框2的深度方向垂直焊接在钢板边框2框底钢筋已标网片节点处即可。
使用时,按尺寸调直切断不同长度钢筋,钢筋长度控制在0.5~1.5m之间,再按竖向一层、横向一层的顺序紧靠节点控制钢筋3逐层摆放,钢筋放置完成后进行节点焊接。
Claims (1)
1.隧道初衬钢筋网片模具制作方法,包括以下步骤:
⑴将5根1.5m等长度的Ф20或Ф22钢筋作为底部钢筋(1);
⑵将厚度为3~5mm的钢板用氧炔焰切割为宽为30~40cm,长分别为1.5m、1.2m的长方形各两块,然后焊接成宽为1.2m、高为1.5m、深为0.3~0.4m的呈“口” 字形钢板边框(2);
⑶将所述底部钢筋(1)竖直按20cm等间距排列,并焊接于所述钢板边框(2)的底部;
⑷以所述钢板边框(2)右下角为控制点,预留施工搭接长度,确定网片右下角第一个节点位置,并在所述底部钢筋(1)上标出网片节点,然后再依次确定其余节点,并使节点位置横竖在一条直线上;最后将0.3~0.4m长的Φ8钢筋作为节点控制钢筋(3)沿所述钢板边框(2)的深度方向垂直焊接在所述钢板边框(2)框底钢筋已标网片节点处即可。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410497289.2A CN104368915B (zh) | 2014-09-26 | 2014-09-26 | 隧道初衬钢筋网片模具制作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410497289.2A CN104368915B (zh) | 2014-09-26 | 2014-09-26 | 隧道初衬钢筋网片模具制作方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104368915A CN104368915A (zh) | 2015-02-25 |
CN104368915B true CN104368915B (zh) | 2016-09-21 |
Family
ID=52548246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410497289.2A Active CN104368915B (zh) | 2014-09-26 | 2014-09-26 | 隧道初衬钢筋网片模具制作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104368915B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201092861Y (zh) * | 2007-08-08 | 2008-07-30 | 上海市机械施工有限公司 | 钢、混凝土复合隧道预制衬砌 |
CN201176598Y (zh) * | 2007-12-28 | 2009-01-07 | 浙江环宇建设集团有限公司 | 地铁隧道正上方基础底板钢筋笼 |
CN102205477A (zh) * | 2011-05-23 | 2011-10-05 | 大连大金马基础建设有限公司 | 一种预应力方桩网片焊接模具 |
KR20130084431A (ko) * | 2012-01-17 | 2013-07-25 | 최성준 | 방음터널용 트러스 아치형 골조 |
CN203592260U (zh) * | 2013-12-11 | 2014-05-14 | 中铁十七局集团第三工程有限公司 | 一种锚喷混凝土钢筋网片的制作台架 |
-
2014
- 2014-09-26 CN CN201410497289.2A patent/CN104368915B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201092861Y (zh) * | 2007-08-08 | 2008-07-30 | 上海市机械施工有限公司 | 钢、混凝土复合隧道预制衬砌 |
CN201176598Y (zh) * | 2007-12-28 | 2009-01-07 | 浙江环宇建设集团有限公司 | 地铁隧道正上方基础底板钢筋笼 |
CN102205477A (zh) * | 2011-05-23 | 2011-10-05 | 大连大金马基础建设有限公司 | 一种预应力方桩网片焊接模具 |
KR20130084431A (ko) * | 2012-01-17 | 2013-07-25 | 최성준 | 방음터널용 트러스 아치형 골조 |
CN203592260U (zh) * | 2013-12-11 | 2014-05-14 | 中铁十七局集团第三工程有限公司 | 一种锚喷混凝土钢筋网片的制作台架 |
Also Published As
Publication number | Publication date |
---|---|
CN104368915A (zh) | 2015-02-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (zh) | 吊模法后浇带梁板施工方法 | |
CN103669562A (zh) | 悬挑飘窗板混凝土整体浇筑结构及其施工方法 | |
CN103882813A (zh) | 用于桥墩与横系梁同步施工的牛腿托架平台及其搭建方法 | |
CN103603359A (zh) | 一种深基坑斜撑支护结构拆除方法 | |
CN104175398B (zh) | 制作预制箱梁钢筋骨架的胎具及方法 | |
CN203835403U (zh) | 一种既有隧道拱部衬砌严重开裂有净空加固体系 | |
CN206397137U (zh) | 一种框架柱模板加固装置 | |
CN104368915B (zh) | 隧道初衬钢筋网片模具制作方法 | |
CN104989107A (zh) | 一种曲形肋梁加工及拼装施工工艺 | |
CN102926554A (zh) | 钢挂座模板支撑及其施工方法 | |
CN204510813U (zh) | 一种新型框架梁梁下l型挂板结构 | |
CN204552774U (zh) | 一种可定位纵向止水带的整体式仰拱模架 | |
CN104047607A (zh) | 盾构机围护结构条件下吊出工法 | |
CN207260636U (zh) | 管模钢筋混凝土柱支撑构件 | |
CN210369038U (zh) | 一种预制钢筋笼 | |
CN204781467U (zh) | 一种现浇轻质保温隔音填充墙的浇筑结构 | |
CN104141321A (zh) | 一种地下室侧壁后浇带封堵方法及所用的封堵钢板 | |
CN103205983B (zh) | 一种地下室后支撑体系的施工方法 | |
CN203270950U (zh) | 一种控制剪力墙两侧水平分布筋位置的装置 | |
CN209040844U (zh) | 拼装式盾构渣土池 | |
CN204080820U (zh) | 一种混凝土结构基坑换撑装置 | |
CN203569693U (zh) | 在混凝土结构上设置拉结筋的预埋铁件 | |
CN202925887U (zh) | 基于预制钢筋砼空心模板的板柱—剪力墙结构建筑 | |
CN206599994U (zh) | 一种免洞穿式模板支撑体系支顶件 | |
CN204252329U (zh) | 砌体与柱拉结钢筋预埋钢板支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |