CN104278992A - 用于在露天矿中分层地开采材料的连接带设备和使连接带设备匹配于开采进度的方法 - Google Patents
用于在露天矿中分层地开采材料的连接带设备和使连接带设备匹配于开采进度的方法 Download PDFInfo
- Publication number
- CN104278992A CN104278992A CN201410427158.7A CN201410427158A CN104278992A CN 104278992 A CN104278992 A CN 104278992A CN 201410427158 A CN201410427158 A CN 201410427158A CN 104278992 A CN104278992 A CN 104278992A
- Authority
- CN
- China
- Prior art keywords
- station
- head
- mobile
- tail
- connecting band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C47/00—Machines for obtaining or the removal of materials in open-pit mines
- E21C47/02—Machines for obtaining or the removal of materials in open-pit mines for coal, brown coal, or the like
- E21C47/04—Conveyor bridges used in co-operation with the winning apparatus
Abstract
本发明涉及针对用于在露天矿中分层地开采材料的连接带设备的长度匹配的方法。连接带设备具有头站和尾站,头站划分成能移动的头滚筒站(2)和静止的交付站。尾站(3)与交付站(1)之间的传送带的由开采导致的长度改变通过能移动的头滚筒站(2)与交付站(1)之间的长度改变补偿。在此,可以有利地取出头滚筒站(2)与交付站(1)之间的带机架(4)并且将其重新安装在尾站(3)与交付站(1)之间。本发明还涉及用于在露天矿中分层地开采材料的连接带设备,其具有头站和能移动的尾站(3),头站划分成能移动的头滚筒站(2)和静止的交付站(1),从而尾站(3)的由开采导致的位置移动可以通过头滚筒站(2)的相同的位置移动补偿。
Description
技术领域
本发明涉及用于在露天矿中分层地开采材料的连接带设备和使连接带设备匹配于开采进度的方法。
背景技术
原料露天矿中的材料通常在许多层中以10-15m的开采高度剥离。
在小型露天矿中,材料通过挖掘机开采,并且通过货车拉到制备设备或废渣堆处,并且倾倒在那里。该方法特别灵活并且由于运输距离短和深度低也是很经济的。
在较大的露天矿中,运输距离和升降高度增大,从而所要求的货车的数量和燃料消耗大幅上升。这由于高的废气排放而对环境造成负担并且从一定的规模开始也是不经济的。因此,在较大的露天矿中,通过货车的运输部分或完全通过带传送所替代。
在完全代替货车的情况下,在开采底部安装有挖掘机、移动粉碎机和移动传送带。连接带负责从露天矿中传送出,该连接带相应必须匹配于开采进度。地面上的继续传送通过通向原料堆或废渣堆的回转点的静止的连接带进行。
通常,连接带在每个开采底部上向前延伸,直到挖掘机可以够到露天矿的底部。随后又拆除连接带,并且在下一开采底部上再次向前延伸。该方法的优点在于,头站(Kopfstation)是简单且完全静止的。相反缺点在于要与之关联地频繁延长和缩短传送带,这是因为必须因此 总是要一再重复地剪切并且重新硫化传送带。这是很费时的,造成传送带长度的损失并且对传送带强度具有负面影响。该方法导致传送带的磨损较高。
发明内容
本发明的任务是介绍一种连接带设备和一种简单的且以最短的中断时间使连接带设备匹配于开采进度的方法。
根据本发明,该任务将通过具有权利要求1的特征的方法和具有权利要求3的特征的设施解决。优选的实施方式是从属权利要求的主题。
该任务将以如下方式解决:将普通的静止的头站划分成静止的交付站和能移动的头滚筒站(Kopftrommelstation)。能移动的头滚筒站和/或能移动的尾站例如借助履带式行走机构,轮子或通过支承在浮筒(Ponton)上而是可迁移或可行驶的。此外,移动站可以具有自身的电动机或内燃机形式的驱动装置,驱动装置使得特别快速的匹配成为可能。通过头滚筒站和尾站的运动来补偿可迁移和可行驶的尾站与静止的交付站之间的长度改变,从而使传送带始终保持相同的长度。将开采的材料交付给后置的传送装置或者运走是在静止的交付站上进行。由此,后置的传送装置可在头滚筒站和尾站匹配的情况下保持不变。
在使连接带设备匹配于开采进度的方法中使用带有能移动的尾站和头站的连接带设备,其中,将头站划分成静止的交付站和能移动的头滚筒站。能移动的尾站与交付站之间的必需的长度改变借助交付站与能移动的头站之间的类似的长度改变补偿,例如,在降低尾站的情况下,头滚筒站同样移动或行驶相应的距离。因此有利地,不用剪切传送带就使连接带设备匹配于开采深度。
在尾站与交付站之间和在交付站与头滚筒站之间布置有带机架, 用以支撑传送带。为了匹配,优选仅清除头滚筒站与交付站之间的带机架并且将其又安装在尾站与交付站之间,反之亦然。由此可以有利地进一步最小化用于匹配过程的费用。
附图说明
下面借助两个图对本发明的实施利进行阐述。在此;
图1示出露天矿的层的剖视图,和
图2示出根据本发明的连接带设备
具体实施方式
图1示出露天矿的不同的层,其中,在开采完一层之后需要将连接带设备降低到新的开采位置。露天矿的坡度在连接带设备所定位的一侧应该为大约20%。在此使用根据图2的连接带设备。
图2以侧视图示出根据本发明的连接带设备。为了取得更好的示出效果,在图的上部区域分开地示出尾站。连接带设备具有静止的交付站1、能移动的头滚筒站2和能移动的尾站3。在这些站之间,传送带通过带机架4a和带机架4b承载。
静止的交付站1具有带有驱动装置的卸料滚筒5、带有驱动装置的第二驱动滚筒6、转向滚筒7和张紧滚筒8。能移动的头站2上的滚筒9和能移动的尾站3上的滚筒10没有驱动装置。在顶部滚筒5上卸下的材料通过布置在下面的带设备11继续传送。
在延长连接带的情况下,尾站3和头滚筒站2同时后退。在这个过程期间,在头滚筒站2的后面连续地取出带机架4b并且将其作为带机架4a嵌入在尾站3前面。
如果一个露天矿盘(Tagebauscheibe)被开采完,则执行相反的流程。头滚筒站2和尾站3同步地前行。在此取出带机架4a并且将其作为带 机架4b嵌入。在整个开采过程中不改变传送带的长度。改建时间被最小化,并且传送带保持其强度。
附图标记
1 静止的交付站
2 能移动的头滚筒站
3 能移动的尾站
4a、4b 带机架
5 卸料滚筒
6 驱动滚筒
7 转向滚筒
8 张紧滚筒
9 滚筒
10 滚筒
11 带设备。
Claims (5)
1.针对用于在露天矿中分层地开采材料的连接带设备的长度匹配的方法,其中,所述连接带设备具有头站和尾站(3),并且所述头站划分成能移动的头滚筒站(2)和静止的交付站(1),其中,尾站(3)与交付站(1)之间的所述传送带的由开采导致的长度改变通过能移动的头滚筒站(2)与交付站(1)之间的长度改变补偿。
2.根据权利要求1所述的方法,其特征在于,为了长度匹配,取出头滚筒站(2)与交付站(1)之间的带机架(4)并且将其重新安装在尾站(3)与交付站(1)之间,或取出尾站(3)与交付站(1)之间的带机架并且将其安装在头滚筒站(2)与交付站(1)之间。
3.用于在露天矿中分层地开采材料的连接带设备,所述连接带设备具有划分成能移动的头滚筒站(2)和静止的交付站(1)的头站和能移动的尾站(3),从而所述尾站(3)的由开采导致的位置移动能够通过所述头滚筒站(2)的相同的位置移动补偿。
4.根据权利要求3所述的连接带设备,其特征在于,所述能移动的头滚筒站(2)和/或所述能移动的尾站(3)具有履带式行走机构或轮子,或能移动地布置在浮筒上。
5.根据权利要求3或4所述的连接带设备,其特征在于,在头滚筒站(2)与尾站(3)之间布置有能拆卸地相互连接的带机架(4)。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102013213610.2 | 2013-07-11 | ||
DE102013213610.2A DE102013213610B4 (de) | 2013-07-11 | 2013-07-11 | Verbindungsbandanlage für die schichtweise Materialgewinnung in einem Tagebau und Verfahren zur Anpassung der Verbindungsbandanlage an den Abbaufortschritt |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104278992A true CN104278992A (zh) | 2015-01-14 |
CN104278992B CN104278992B (zh) | 2017-04-12 |
Family
ID=52107313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410427158.7A Active CN104278992B (zh) | 2013-07-11 | 2014-07-11 | 用于在露天矿中分层地开采材料的连接带设备和使连接带设备匹配于开采进度的方法 |
Country Status (6)
Country | Link |
---|---|
CN (1) | CN104278992B (zh) |
AU (1) | AU2014203807A1 (zh) |
CA (1) | CA2856874A1 (zh) |
CL (1) | CL2014001850A1 (zh) |
DE (1) | DE102013213610B4 (zh) |
RU (1) | RU2570850C1 (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756875A (zh) * | 2018-03-30 | 2018-11-06 | 中国矿业大学 | 一种内排露天煤矿中厚煤层连续开采装置及方法 |
CN109843758A (zh) * | 2016-10-18 | 2019-06-04 | 克磊镘有限公司 | 物料处理装置的传送带配置 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2211130A1 (de) * | 1972-03-08 | 1973-09-13 | Rheinische Braunkohlenw Ag | Foerderbandanlage |
US4103972A (en) * | 1973-12-03 | 1978-08-01 | Kochanowsky Boris J | Open pit mine |
US20100308641A1 (en) * | 2009-06-03 | 2010-12-09 | ThyssenKrupp Robins, Inc. | Mining methods and systems using mobile conveyors |
CN102373927A (zh) * | 2010-08-11 | 2012-03-14 | 西安煤矿机械有限公司 | 分层开采技术及其采煤机 |
CN103104260A (zh) * | 2013-02-27 | 2013-05-15 | 湖南科技大学 | 复杂地质条件下综—机对拉面采煤方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
PL155628B1 (en) * | 1988-04-13 | 1991-12-31 | Ogolnokrajowe Gwarectwo Wegla | Transportable, bipartite sloped belt conveyor |
DE102010025059B4 (de) * | 2010-06-25 | 2014-05-28 | Takraf Gmbh | Großschaufelradbagger mit Teleskopbrücke und portalartige Beladeanlage direkt über dem Strossenband |
-
2013
- 2013-07-11 DE DE102013213610.2A patent/DE102013213610B4/de active Active
-
2014
- 2014-07-10 CA CA2856874A patent/CA2856874A1/en not_active Abandoned
- 2014-07-10 RU RU2014128038/11A patent/RU2570850C1/ru active
- 2014-07-11 AU AU2014203807A patent/AU2014203807A1/en not_active Abandoned
- 2014-07-11 CL CL2014001850A patent/CL2014001850A1/es unknown
- 2014-07-11 CN CN201410427158.7A patent/CN104278992B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2211130A1 (de) * | 1972-03-08 | 1973-09-13 | Rheinische Braunkohlenw Ag | Foerderbandanlage |
US4103972A (en) * | 1973-12-03 | 1978-08-01 | Kochanowsky Boris J | Open pit mine |
US20100308641A1 (en) * | 2009-06-03 | 2010-12-09 | ThyssenKrupp Robins, Inc. | Mining methods and systems using mobile conveyors |
CN102373927A (zh) * | 2010-08-11 | 2012-03-14 | 西安煤矿机械有限公司 | 分层开采技术及其采煤机 |
CN103104260A (zh) * | 2013-02-27 | 2013-05-15 | 湖南科技大学 | 复杂地质条件下综—机对拉面采煤方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109843758A (zh) * | 2016-10-18 | 2019-06-04 | 克磊镘有限公司 | 物料处理装置的传送带配置 |
CN109843758B (zh) * | 2016-10-18 | 2021-09-24 | 克磊镘有限公司 | 物料处理装置的传送带配置 |
CN108756875A (zh) * | 2018-03-30 | 2018-11-06 | 中国矿业大学 | 一种内排露天煤矿中厚煤层连续开采装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CL2014001850A1 (es) | 2015-04-10 |
AU2014203807A1 (en) | 2015-01-29 |
CN104278992B (zh) | 2017-04-12 |
RU2570850C1 (ru) | 2015-12-10 |
DE102013213610A1 (de) | 2015-01-15 |
CA2856874A1 (en) | 2015-01-11 |
DE102013213610B4 (de) | 2015-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102939434B (zh) | 用于露天开采的前进式长壁系统 | |
RU2011117361A (ru) | Способ и устройство для переработки подачи разделенной по крупности кусков руды | |
CN101624138A (zh) | 横川拐弯转载运输机 | |
RU2671381C1 (ru) | Способ открытой разработки месторождений твердых полезных ископаемых | |
MX2012000111A (es) | Explotacion minera subterranea. | |
CN104278992A (zh) | 用于在露天矿中分层地开采材料的连接带设备和使连接带设备匹配于开采进度的方法 | |
WO2014191196A3 (en) | Discharging of material excavated in underground workings | |
CN104234714B (zh) | 一种煤矿井下绿色高效运输方法 | |
CN203667545U (zh) | 矿用桥式转载机可调节卸载挡板 | |
CN203345674U (zh) | 移动式皮带输送装置 | |
CN204162029U (zh) | 一种皮带运输机清扫装置 | |
US5427439A (en) | Surface mining conveyor system | |
CN203239353U (zh) | 矿用龙门式转载机 | |
CN205891938U (zh) | 抛矸输送机及用于填充巷道的抛矸传输系统 | |
CN203997750U (zh) | 一种用于煤矿皮带输送机转向的连接装置 | |
CN102430475A (zh) | 矿山轨道式矿选设备及其选矿方法 | |
CN102777184A (zh) | 矿山的开采系统和方法 | |
CN107060756A (zh) | 一种机载回转升降转运装置 | |
CN103693429A (zh) | 矿用桥式转载机可调节卸载挡板 | |
CN203476334U (zh) | 露天矿开采工作面用自移式转载机 | |
CN211058804U (zh) | 皮带传送系统及具有其的掘进设备 | |
CN102673949A (zh) | 机尾驱动式顺槽用刮板转载机 | |
RU2318964C2 (ru) | Экскаватор | |
CN206448812U (zh) | 一种机载回转升降转运装置 | |
CN201884030U (zh) | 拐弯转载运输机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |